Remediation Efforts in Japan
October 16, 2011
Masaru MORIYAFukushima Decontamination Promotion TeamLNER Headquarters
1
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
2/18
2
Radioactive materials spread widely including to the area in NWdirection where high dose areas are distributed.
Monitoring results
Air dose rate)
* Based on airborne monitoring survey by MEXT (published on Sept. 12,2011)
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
3/18
Minami-soma
Iitate
Minami-soma
Namie
Kawamata
Katsurao
Tamura
Kawauchi
Hirono
Naraha
Restricted zone, Planned evacuation zone, Former energency evacuationpreparation zone and specified evacuation recommendation zone
Evacuation zones Population(thousand)
Restricted zone 78
Plannedevacuation zone
10
Emergencyevacuationpreparation zoneLifted onSeptember 30.
58
Total 150
3
Restricted zoneEnergency evacuationpreparation zone
Plannedevacuation zone
Energency evacuationpreparation zone
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
4/18
Principles set by ICRP
Emergency exposuresituationPlanned evacuation zone, Restrictedzone]
Existing exposuresituations
Long-term goal
Reducing additional exposuredose 1 mSv/y a year
100 mSv/y
20 mSv/y
Basic Concept for Pushing Ahead withDecontamination Work
(August 26, 2011, Decision by the NuclearEmergency Response HQs)
Higher dose
Require area
decontaminationassociated withlarge scale works.
Lower doseDecontamination
focused onrainwater gutter
and side gutters1 mSv/y
Aiming to reduce exposuredose to 20 mSv/y or less.
Municipalities developand conductdecontamination plans
The nationalgovernment sendsexperts and providesfiscal support for moreeffectivedecontamination work.
The national government willtake the initiative indecontamination work untillocal resident return home
Vertical axisi Annual dosemSvy
Those when require emergencyactivities such as nuclearaccident.
Long-term exposure afteremergency situation
Basic Concept for Pushing Ahead with Decontamination Work
4
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
5/18
Long-term and Provisional Goals for the Decontamination
Aim at stepwise and rapid reduction in areas where 20 mSv/y or larger additionalradiological exposures is assumed, based on ICRP recommendation (2007)..
Long-term goal
Provisional goal
GeneralPublic
Children
Aim at reducing 1 mSv/ or less of additional (beyond natural backgroundexposure) in the area where additional radiological exposure is lower than 20mSv/y.
Specifically, reduce estimated annual exposure by thegeneral public by 50 % in two years
By radioactive decay and decay by natural factors: by 40 % in two yearsBy decontamination: by 10 %
Reduce estimated annual exposure by children by 60 %compared to the current level in two years by throughdecontamination of their life environment.
By radioactive decay and decay by natural factors: 40 % in two yearsBy decontamination of childrens living enironment: 20 %
The goals will be reviewed periodically based on the results of detailedmonitoring, investigation of actual radiation exposure to children and results offuture decontamination.
Basic Policy for Emergency Response on Decontamination Work(August 26, 2011, Decision by the Nuclear Emergency Response HQs)
5
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
6/18
Decontamination of area with evacuation instruction
Decontamination of area where evacuation instruction has been issued becauseof the potential of exceeding 20 mSv of annual cumulative dose (plannedevacuation zone) will require high level technologies as well as consideration of thesafety of workers involved.
In the restricted area of 20 km radius from the Fukushima Daiichi NPP,administrative functions of the municipalities have been moved, and access to thearea is restricted.
The government has the initiative for decontamination, in cooperation withthe municipalities.
Initiate a model program at every municipality inrestricted area,
Reduce ambient dose rate by large scale areadecontamination,
Verify effectiveness of decontamination and its resultsappropriate for land utilization types (settlement, urban area,etc.) and topographic features (plane, valley, hill, etc.)
Framework of the policy on urgent decontamination
6
Model decontamination programLife environment
Life environment
Tamura, Minamisoma, Futaba, Okuma, Tomioka, Naraha, Namie, Hirono, Kawamata,Katsurao, Kawauchi, Iitate
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
7/18
Decontamination of Areas with 1 20 mSv of Additional Annual Dose
Administration function remains and residents live in the area. Systematic community bycommunity decontamination will be most effective where individual circumstances and needs
of the residents have been understood. Decontamination programs developed and implemented by the municipalities Supported by the state in terms of sending experts, financial support, providing information
to the resident on monitoring results and points to be noted during the decontamination, andproviding radiation detectors,Briefings were held twice for municipalities in Fukushima)
Development of decontamination program: Programdevelopment procedures such as defining goals,prioritization, before program monitoring, etc.
Decontamination methods: Decontamination strategyand methods depending on type of objects such as
house/garden, road, school, street trees, forest, farm land,rivers and lakes.
Points to be noted during the work: Points to be noted forensuring workers safety.
Installation and management of temporary storage ofremoved soil: Temporary storage method (pile up,underground), proper shielding, monitoring, etc.
Actions after the decontamination: Continuousmonitoring, etc.
Decontaminationpolicy goals,priorities, etc)
Decontaminationareas
Implementer Decontamination
methods
Schedule Installation of a
tentative storage
Framework of the policy on urgent decontamination
7
Guideline for decontamination workDecontamination
program
The state will provide instructions for efficient and effectivedecontamination by municipalities, including.
Developed bymunicipalities based onthe Guideline, including
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
8/18
Financial Support for Decontamination
Protect health of residents including children from the nuclear emergency byreducing the radiation level at schools and parks that children and residents oftenuse as well as verifying levels in Fukushima .
State
Fund* To be created in
Fukushima C
ommunities
M
unici
palities
* Contribution to the fund bythe state
* Advice based on expertise
Implementprograms
Objective/program
* Implement decontaminationaccording to thedecontamination program ;financed from the fund.
A program to develop a decontamination guideline (0.2 BY Develop a guideline and review the product based on the results of the decontamination activities inFukushima as well as analysis on efficient and effective decontamination methods.
Special urgent decontamination program (18.0 BY
Special urgent decontamination program Radiation reduction in public facilities such as schools and parks, and along
school routes.
Support installation of air conditioning systems at school, etc. A program to develop a decontamination guideline
Linkage
Reporting of the results of the decontamination(e.g. change of the radiation level)
8
Secondary supplementalbudget in 2011
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
9/18
Budget for Decontamination 220 Billion Yen (BY)
Cabinet decision: 217.9BY for decontamination for the foreseeable future basedon the urgent implementation basic policy from the remediation/restoration reserve
Budget required in the foreseeable future for implementing urgent decontamination isestimated to be 220 BY
It is appropriated from East Japan Great Earthquake reconstruction reserve budget
Rapid implementation of the Basic Policy for Emergency Response onDecontamination Work (August 26, Cabinet decision)
Decontamination demonstration program in 12 municipalities including evacuation zones. Decontamination of living environment beginning in locations with the highest radiation
levels in areas with additional annual dose estimate of 1-20 mSv Construction of facilities required for temporary storage of soils generated from the
decontamination Decontamination of places where radiation level is locally high, such as gutters and
rainwater gutters (including in areas other than Fukushima)
Sending decontamination experts including in areas other than Fukushima), etc.
* Following programs shall be conducted directly by each responsible Ministry;decontamination demonstration program at evacuation zone, decontamination of state ownedroads, forest and other facilities, treatment of highly contaminated rice straw and domesticand farm animals that died in the restricted area.
Programs requiring urgent and rapid implementation in the foreseeable future
On Sept. 9, appropriation of the reserve 217.9BY was decided in the Cabinet meeting.9
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
10/18
Image of entire program conducted using the supplemental budget
Prefecture
Municipalities
StateCabinet Office,
Ministries
Fukushimaprefecture health
care fundDecontamination account
Decon. Ofschoolyards
Support
communities
* Secondarysupplemental budget18.0 BY)
Municipalities thatestablisheddecontamination programs
The fund will cover thecost required for thedecontaminationaccording to theprogram established bythe municipalities.
Resident
Public andCommercial
facilities
Road
Forest (life
environment)
Set temporary storages
Farm land
Response to hotspots (support to
communities/municipalities)
Sendingdecontaminatio
n experts
Treatment of rice straw, and livestocks died in the area
Decontamination demonstrationproject
Decontamination of national facilities
(State road, state forest)
Etc.
Prefectures(Including those other
than Fukushima)
* Some may beconducted by the State.
Reconstructioncontingency fund217.9BY in total
Decontamination of life environment
Home return support
Agricultural waste treatment
Establishment of a screeningsystem
184BY
18BY
16BY
10
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
11/18
Ministry of theEnvironment
6 officials
(Including the leader and thesub-leader of the team)
Cabinet Office
10 officials
Team Leader (Ministry of the Environment)
A team consisting of government officials and JAEAs experts has been
established in the city of Fukushima since August 24 so as to promote
decontamination in Fukushima Prefecture.
Communicating and coordinating with the local municipalities; assisting them
in their preparation of decontamination plans, for example, by dispatching
experts, in collaboration with the Local Nuclear Emergency Response
Headquarters.
Promotion of model decontamination projects in 12 municipalities of highdose
Fukushima Decontamination Promotion Team
Japan Atomic EnergyAgency (JAEA)
22 experts
Team Sub-leader (Ministry of the Environment)
11
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
12/18
Technical support
FukushimaDecontaminationPromotion Team
Expert Dispatch System
Expert Teamincluding experts of
JAEA(32 experts)
Dispatch team officials and 32 experts tothe municipalities since September 2011
- to provide necessary information- to promote communication and
coordination- to assist in their development of
decontamination plans
Governmental plans
Areas over 20 mSv/yrdoses)
Municipal plans
Areas 1~20 mSv/yrdoses
Areas with less than1 mSv/yr doses
Decontamination Plans
12
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
13/18
Overview of the Decontamination Demonstration Test1.Description
Decontamination of rather wide area including lands with different utilization forms such asresidence, road, and farming.
2. Decontamination technologies for each object
Houses (Roof, wall, rainwater gutter,): High pressure spray, brushing, etc. Gardens (concrete, plant, soil): High pressure spray, mowing, removal of surface soil, etc. Rice fields, dry fields: Removal of surface soil, absorption on poly-ion, use of heavy
equipment, etc. Forest: Collection of fallen leaves and leaf mold, planning, removal of surface soil, etc. GutterBrushing, grinding, etc.
3. Locations
Select sites in Date-city and Minami-soma city.
Forest
Dry field
House
Road
Garden
Specificallyassignedevacuationrecommendation house
50 m
Forest
Building
50 m
Decontamination areain Date-city
Decontamination area inMinami-soma-city
13
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
14/18
Actions by municipalities (Example)
Guide for reducing radiation doses at livingenvironment (Fukushima Prefecture)
Radioactive materialsdecontamination manual (Minami-
soma Emergency Headquarters)
14
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
15/18
Results of decontamination demonstration test in living area(June 30, July 1, 2011)
Farmer in Nihonmatsu-cityAir dose rate: 0.8 Sv/h, Work hours: 33 minutes (soil backfilling is
not included)
Contamination of worker after the work: NoRadioactivity concentration in air: < Below Detection limit (3E-7
Bq/cm3 for Cs-137)
Removal of grasses(Dokudami)
Radioactivity concentration of the removedgrass(Cs-134:12,000Bq/kg, Cs-137:13,300Bq/kg)
Radioactivity concentration of the removedsoil(Cs-134:16,800Bq/kg, Cs-137:18,300Bq/kg)
Removal of soil under the eaves
Removal of soilunder the eaves
Backfill of soil
1m 3.8 4.5 3.3
(2,150) (2,100) (1,900)
1.05
1cm
1m
1.4 1.17 1.0
( 1, 00 0) ( 61 0) ( 45 0)
0.80
1cm
1m
1.08 0.99 0.95
( 80 0) ( 58 0) ( 45 0)
0.83
1cm
Before excavation
1m 1.0Sv/hRemoved soilfrom the placeunder the eaves1cm3.3Sv/hGM2100cpm
1m 1.1Sv/h1cm1.0Sv/hGM530cpm
Radioactivity concentration in the soilremoved from the place under the eaves(Cs-134:14,700Bq/kg, Cs-137:16,200Bq/kg)
1m 1.081.60
(1,000)1cm
1m 1.101.60
-1cm
1m 1.101.00
(650)1cm
1.0Sv/h
0Sv 500cpm
1.05Sv/
0Sv
360cpm
()Sv/h cpm GM
25cm
15
Resident
B
C
Cedar forest
ShrubberyD
A ti Ai i t R t i R id t t th i H L d
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
16/18
Actions Aiming at Returning Residents to their Home Land(MAFF)
16
KawamataIitate
Removal ofsurface soil
Removal of grass
Removal of soil usingsurface fixation agent
Decontaminationusing adsorbent
Decontaminationby soil pudding
Trapping of soil atsettling ponds
Decontamination/recovery utilizingplants
Contamination: High
Contamination : Medium Contamination : Low
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
17/18
17
The Image of Remediation Activities
Rain water gutterbefore Wash wall with high-pressure waterSchoolyard
Pare off surface soil of farmland
Temporary storage of removed soil
Side of the road
Side ditch
7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key
18/18
Framework of the Decontamination Work
The Act on Special Measures concerningthe Handling of Radioactive Pollution
Basic principles approved by the Cabinet
Designation of a specificarea for decontamination
Designation of an intensivecontamination survey area
Decontamination plansformulated by the national
government
Basic Principles on EmergencyDecontamination Work
Municipality Decontamination Guidelines
Around 220 billion yen was secured on September 9 asreserve funds for restoration and reconstruction
in the aftermath of the Great East Japan Earthquake
(Area directly controlledby the national government)
Implementation of modelprojects and other
procedures
To be reflected in theguidelines and other
instructions
Municipality planformulation
Decontamination startedby municipalities
Enactment of ordinances and ministerial orders to provide forthe requirements for area designation, treatment standards,
etc.
Decontamination plansformulated
by municipalities, etc.
Full-scale decontamination
implemented by the nationalgovernment
Full-scale decontamination
implemented by municipalities,etc.
Phased shift
Commitment under the Act on Special Measures ConcerningNuclear Emergency Preparedness
Enacted on August 26; lawmaker-initiated legislation
promulgated and partially enforced on August 30
Full enforcement from January 1, 2012
Determined by the Nuclear Emergency Response
Headquarters on August 26
18