    Remediation Efforts in Japan

    October 16, 2011

    Masaru MORIYAFukushima Decontamination Promotion TeamLNER Headquarters

    1

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    2/18

    2

    Radioactive materials spread widely including to the area in NWdirection where high dose areas are distributed.

    Monitoring results

    Air dose rate)

    * Based on airborne monitoring survey by MEXT (published on Sept. 12,2011)

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    3/18

    Minami-soma

    Iitate

    Minami-soma

    Namie

    Kawamata

    Katsurao

    Tamura

    Kawauchi

    Hirono

    Naraha

    Restricted zone, Planned evacuation zone, Former energency evacuationpreparation zone and specified evacuation recommendation zone

    Evacuation zones Population(thousand)

    Restricted zone 78

    Plannedevacuation zone

    10

    Emergencyevacuationpreparation zoneLifted onSeptember 30.

    58

    Total 150

    3

    Restricted zoneEnergency evacuationpreparation zone

    Plannedevacuation zone

    Energency evacuationpreparation zone

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    4/18

    Principles set by ICRP

    Emergency exposuresituationPlanned evacuation zone, Restrictedzone]

    Existing exposuresituations

    Long-term goal

    Reducing additional exposuredose 1 mSv/y a year

    100 mSv/y

    20 mSv/y

    Basic Concept for Pushing Ahead withDecontamination Work

    (August 26, 2011, Decision by the NuclearEmergency Response HQs)

    Higher dose

    Require area

    decontaminationassociated withlarge scale works.

    Lower doseDecontamination

    focused onrainwater gutter

    and side gutters1 mSv/y

    Aiming to reduce exposuredose to 20 mSv/y or less.

    Municipalities developand conductdecontamination plans

    The nationalgovernment sendsexperts and providesfiscal support for moreeffectivedecontamination work.

    The national government willtake the initiative indecontamination work untillocal resident return home

    Vertical axisi Annual dosemSvy

    Those when require emergencyactivities such as nuclearaccident.

    Long-term exposure afteremergency situation

    Basic Concept for Pushing Ahead with Decontamination Work

    4

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    5/18

    Long-term and Provisional Goals for the Decontamination

    Aim at stepwise and rapid reduction in areas where 20 mSv/y or larger additionalradiological exposures is assumed, based on ICRP recommendation (2007)..

    Long-term goal

    Provisional goal

    GeneralPublic

    Children

    Aim at reducing 1 mSv/ or less of additional (beyond natural backgroundexposure) in the area where additional radiological exposure is lower than 20mSv/y.

    Specifically, reduce estimated annual exposure by thegeneral public by 50 % in two years

    By radioactive decay and decay by natural factors: by 40 % in two yearsBy decontamination: by 10 %

    Reduce estimated annual exposure by children by 60 %compared to the current level in two years by throughdecontamination of their life environment.

    By radioactive decay and decay by natural factors: 40 % in two yearsBy decontamination of childrens living enironment: 20 %

    The goals will be reviewed periodically based on the results of detailedmonitoring, investigation of actual radiation exposure to children and results offuture decontamination.

    Basic Policy for Emergency Response on Decontamination Work(August 26, 2011, Decision by the Nuclear Emergency Response HQs)

    5

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    6/18

    Decontamination of area with evacuation instruction

    Decontamination of area where evacuation instruction has been issued becauseof the potential of exceeding 20 mSv of annual cumulative dose (plannedevacuation zone) will require high level technologies as well as consideration of thesafety of workers involved.

    In the restricted area of 20 km radius from the Fukushima Daiichi NPP,administrative functions of the municipalities have been moved, and access to thearea is restricted.

    The government has the initiative for decontamination, in cooperation withthe municipalities.

    Initiate a model program at every municipality inrestricted area,

    Reduce ambient dose rate by large scale areadecontamination,

    Verify effectiveness of decontamination and its resultsappropriate for land utilization types (settlement, urban area,etc.) and topographic features (plane, valley, hill, etc.)

    Framework of the policy on urgent decontamination

    6

    Model decontamination programLife environment

    Life environment

    Tamura, Minamisoma, Futaba, Okuma, Tomioka, Naraha, Namie, Hirono, Kawamata,Katsurao, Kawauchi, Iitate

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    7/18

    Decontamination of Areas with 1 20 mSv of Additional Annual Dose

    Administration function remains and residents live in the area. Systematic community bycommunity decontamination will be most effective where individual circumstances and needs

    of the residents have been understood. Decontamination programs developed and implemented by the municipalities Supported by the state in terms of sending experts, financial support, providing information

    to the resident on monitoring results and points to be noted during the decontamination, andproviding radiation detectors,Briefings were held twice for municipalities in Fukushima)

    Development of decontamination program: Programdevelopment procedures such as defining goals,prioritization, before program monitoring, etc.

    Decontamination methods: Decontamination strategyand methods depending on type of objects such as

    house/garden, road, school, street trees, forest, farm land,rivers and lakes.

    Points to be noted during the work: Points to be noted forensuring workers safety.

    Installation and management of temporary storage ofremoved soil: Temporary storage method (pile up,underground), proper shielding, monitoring, etc.

    Actions after the decontamination: Continuousmonitoring, etc.

    Decontaminationpolicy goals,priorities, etc)

    Decontaminationareas

    Implementer Decontamination

    methods

    Schedule Installation of a

    tentative storage

    Framework of the policy on urgent decontamination

    7

    Guideline for decontamination workDecontamination

    program

    The state will provide instructions for efficient and effectivedecontamination by municipalities, including.

    Developed bymunicipalities based onthe Guideline, including

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    8/18

    Financial Support for Decontamination

    Protect health of residents including children from the nuclear emergency byreducing the radiation level at schools and parks that children and residents oftenuse as well as verifying levels in Fukushima .

    State

    Fund* To be created in

    Fukushima C

    ommunities

    M

    unici

    palities

    * Contribution to the fund bythe state

    * Advice based on expertise

    Implementprograms

    Objective/program

    * Implement decontaminationaccording to thedecontamination program ;financed from the fund.

    A program to develop a decontamination guideline (0.2 BY Develop a guideline and review the product based on the results of the decontamination activities inFukushima as well as analysis on efficient and effective decontamination methods.

    Special urgent decontamination program (18.0 BY

    Special urgent decontamination program Radiation reduction in public facilities such as schools and parks, and along

    school routes.

    Support installation of air conditioning systems at school, etc. A program to develop a decontamination guideline

    Linkage

    Reporting of the results of the decontamination(e.g. change of the radiation level)

    8

    Secondary supplementalbudget in 2011

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    9/18

    Budget for Decontamination 220 Billion Yen (BY)

    Cabinet decision: 217.9BY for decontamination for the foreseeable future basedon the urgent implementation basic policy from the remediation/restoration reserve

    Budget required in the foreseeable future for implementing urgent decontamination isestimated to be 220 BY

    It is appropriated from East Japan Great Earthquake reconstruction reserve budget

    Rapid implementation of the Basic Policy for Emergency Response onDecontamination Work (August 26, Cabinet decision)

    Decontamination demonstration program in 12 municipalities including evacuation zones. Decontamination of living environment beginning in locations with the highest radiation

    levels in areas with additional annual dose estimate of 1-20 mSv Construction of facilities required for temporary storage of soils generated from the

    decontamination Decontamination of places where radiation level is locally high, such as gutters and

    rainwater gutters (including in areas other than Fukushima)

    Sending decontamination experts including in areas other than Fukushima), etc.

    * Following programs shall be conducted directly by each responsible Ministry;decontamination demonstration program at evacuation zone, decontamination of state ownedroads, forest and other facilities, treatment of highly contaminated rice straw and domesticand farm animals that died in the restricted area.

    Programs requiring urgent and rapid implementation in the foreseeable future

    On Sept. 9, appropriation of the reserve 217.9BY was decided in the Cabinet meeting.9

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    10/18

    Image of entire program conducted using the supplemental budget

    Prefecture

    Municipalities

    StateCabinet Office,

    Ministries

    Fukushimaprefecture health

    care fundDecontamination account

    Decon. Ofschoolyards

    Support

    communities

    * Secondarysupplemental budget18.0 BY)

    Municipalities thatestablisheddecontamination programs

    The fund will cover thecost required for thedecontaminationaccording to theprogram established bythe municipalities.

    Resident

    Public andCommercial

    facilities

    Road

    Forest (life

    environment)

    Set temporary storages

    Farm land

    Response to hotspots (support to

    communities/municipalities)

    Sendingdecontaminatio

    n experts

    Treatment of rice straw, and livestocks died in the area

    Decontamination demonstrationproject

    Decontamination of national facilities

    (State road, state forest)

    Etc.

    Prefectures(Including those other

    than Fukushima)

    * Some may beconducted by the State.

    Reconstructioncontingency fund217.9BY in total

    Decontamination of life environment

    Home return support

    Agricultural waste treatment

    Establishment of a screeningsystem

    184BY

    18BY

    16BY

    10

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    11/18

    Ministry of theEnvironment

    6 officials

    (Including the leader and thesub-leader of the team)

    Cabinet Office

    10 officials

    Team Leader (Ministry of the Environment)

    A team consisting of government officials and JAEAs experts has been

    established in the city of Fukushima since August 24 so as to promote

    decontamination in Fukushima Prefecture.

    Communicating and coordinating with the local municipalities; assisting them

    in their preparation of decontamination plans, for example, by dispatching

    experts, in collaboration with the Local Nuclear Emergency Response

    Headquarters.

    Promotion of model decontamination projects in 12 municipalities of highdose

    Fukushima Decontamination Promotion Team

    Japan Atomic EnergyAgency (JAEA)

    22 experts

    Team Sub-leader (Ministry of the Environment)

    11

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    12/18

    Technical support

    FukushimaDecontaminationPromotion Team

    Expert Dispatch System

    Expert Teamincluding experts of

    JAEA(32 experts)

    Dispatch team officials and 32 experts tothe municipalities since September 2011

    - to provide necessary information- to promote communication and

    coordination- to assist in their development of

    decontamination plans

    Governmental plans

    Areas over 20 mSv/yrdoses)

    Municipal plans

    Areas 1~20 mSv/yrdoses

    Areas with less than1 mSv/yr doses

    Decontamination Plans

    12

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    13/18

    Overview of the Decontamination Demonstration Test1.Description

    Decontamination of rather wide area including lands with different utilization forms such asresidence, road, and farming.

    2. Decontamination technologies for each object

    Houses (Roof, wall, rainwater gutter,): High pressure spray, brushing, etc. Gardens (concrete, plant, soil): High pressure spray, mowing, removal of surface soil, etc. Rice fields, dry fields: Removal of surface soil, absorption on poly-ion, use of heavy

    equipment, etc. Forest: Collection of fallen leaves and leaf mold, planning, removal of surface soil, etc. GutterBrushing, grinding, etc.

    3. Locations

    Select sites in Date-city and Minami-soma city.

    Forest

    Dry field

    House

    Road

    Garden

    Specificallyassignedevacuationrecommendation house

    50 m

    Forest

    Building

    50 m

    Decontamination areain Date-city

    Decontamination area inMinami-soma-city

    13

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    14/18

    Actions by municipalities (Example)

    Guide for reducing radiation doses at livingenvironment (Fukushima Prefecture)

    Radioactive materialsdecontamination manual (Minami-

    soma Emergency Headquarters)

    14

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    15/18

    Results of decontamination demonstration test in living area(June 30, July 1, 2011)

    Farmer in Nihonmatsu-cityAir dose rate: 0.8 Sv/h, Work hours: 33 minutes (soil backfilling is

    not included)

    Contamination of worker after the work: NoRadioactivity concentration in air: < Below Detection limit (3E-7

    Bq/cm3 for Cs-137)

    Removal of grasses(Dokudami)

    Radioactivity concentration of the removedgrass(Cs-134:12,000Bq/kg, Cs-137:13,300Bq/kg)

    Radioactivity concentration of the removedsoil(Cs-134:16,800Bq/kg, Cs-137:18,300Bq/kg)

    Removal of soil under the eaves

    Removal of soilunder the eaves

    Backfill of soil

    1m 3.8 4.5 3.3

    (2,150) (2,100) (1,900)

    1.05

    1cm

    1m

    1.4 1.17 1.0

    ( 1, 00 0) ( 61 0) ( 45 0)

    0.80

    1cm

    1m

    1.08 0.99 0.95

    ( 80 0) ( 58 0) ( 45 0)

    0.83

    1cm

    Before excavation

    1m 1.0Sv/hRemoved soilfrom the placeunder the eaves1cm3.3Sv/hGM2100cpm

    1m 1.1Sv/h1cm1.0Sv/hGM530cpm

    Radioactivity concentration in the soilremoved from the place under the eaves(Cs-134:14,700Bq/kg, Cs-137:16,200Bq/kg)

    1m 1.081.60

    (1,000)1cm

    1m 1.101.60

    -1cm

    1m 1.101.00

    (650)1cm

    1.0Sv/h

    0Sv 500cpm

    1.05Sv/

    0Sv

    360cpm

    ()Sv/h cpm GM

    25cm

    15

    Resident

    B

    C

    Cedar forest

    ShrubberyD

    A ti Ai i t R t i R id t t th i H L d

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    16/18

    Actions Aiming at Returning Residents to their Home Land(MAFF)

    16

    KawamataIitate

    Removal ofsurface soil

    Removal of grass

    Removal of soil usingsurface fixation agent

    Decontaminationusing adsorbent

    Decontaminationby soil pudding

    Trapping of soil atsettling ponds

    Decontamination/recovery utilizingplants

    Contamination: High

    Contamination : Medium Contamination : Low

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    17/18

    17

    The Image of Remediation Activities

    Rain water gutterbefore Wash wall with high-pressure waterSchoolyard

    Pare off surface soil of farmland

    Temporary storage of removed soil

    Side of the road

    Side ditch

  • 7/31/2019 Remediation Efforts in Japan - October 16 2011 Decon_e_key

    18/18

    Framework of the Decontamination Work

    The Act on Special Measures concerningthe Handling of Radioactive Pollution

    Basic principles approved by the Cabinet

    Designation of a specificarea for decontamination

    Designation of an intensivecontamination survey area

    Decontamination plansformulated by the national

    government

    Basic Principles on EmergencyDecontamination Work

    Municipality Decontamination Guidelines

    Around 220 billion yen was secured on September 9 asreserve funds for restoration and reconstruction

    in the aftermath of the Great East Japan Earthquake

    (Area directly controlledby the national government)

    Implementation of modelprojects and other

    procedures

    To be reflected in theguidelines and other

    instructions

    Municipality planformulation

    Decontamination startedby municipalities

    Enactment of ordinances and ministerial orders to provide forthe requirements for area designation, treatment standards,

    etc.

    Decontamination plansformulated

    by municipalities, etc.

    Full-scale decontamination

    implemented by the nationalgovernment

    Full-scale decontamination

    implemented by municipalities,etc.

    Phased shift

    Commitment under the Act on Special Measures ConcerningNuclear Emergency Preparedness

    Enacted on August 26; lawmaker-initiated legislation

    promulgated and partially enforced on August 30

    Full enforcement from January 1, 2012

    Determined by the Nuclear Emergency Response

    Headquarters on August 26

    18