2
IPI's retrievable Remedial Cementing Packer (RCP) is a field proven innovative inflatable packer system designed for retrievability after remedial cementing. The retrievable RCP features drillable residual components, which makes it the optimal solution for shutting-off lost-circulation zones encountered during drilling operations. The RCP is conveyed on workstring and allows circulation during deployment. The RCP setting sequence starts by dropping and pressuring up against a phenolic ball. Once the RCP is fully inflated, an over-pressure is applied, shearing out the setting ball and a drillable ball seat sleeve, which can be captured in a tailpipe ball catcher. Once the RCP system is fully set, remedial cementing operations can commence. After the remedial cement is set, the RCP can be deflated by applying over-pull, which shears its release pins to enable RCP packer deflation. Once deflated, further over-pull is required to break any remaining cement bond to the packer assembly. A drillable plastic shroud located at the bottom of the packer element is the contact point between the RCP body and the remedial cement. The RCP packer element plastic shroud is designed to shear off if the RCP is cemented in place, minimizing risk of becoming stuck at setting depth. Remedial Cementing Packer (RCP) Packers Perform better Made differently Remedial Cementing Packer (RCP)_PS270217_Rev01_Eng © 2010-2021 Inflatable Packers International www.ipipackers.com [email protected] Stand-alone retrievable treatment while drilling to eliminate the need for a drillable or permanent system Conveyed on workstring Allows circulation during deployment Optional short fiberglass pipe stinger below the packer as an easily drillable tailpipe Optional tailpipe ball catcher Optional shearable plastic shroud located at the bottom of the RCP packer element, minimizing the risk of tool becoming stuck at setting depth FEATURES: Shut-off lost-circulation zones without running and cementing casing Test, squeeze and treat operations Vertical, inclined and horizontal wells Workover/Well intervention with a Retrievable Inflatable Bridge Plug (RIBP) as a pair APPLICATIONS:

Remedial Cementing Packer (RCP) PS270217 Rev01 Eng

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Remedial Cementing Packer (RCP) PS270217 Rev01 Eng

IPI's retrievable Remedial Cementing Packer (RCP) is a field proven innovative inflatable packer system

designed for retrievability after remedial cementing. The retrievable RCP features drillable residual

components, which makes it the optimal solution for shutting-off lost-circulation zones encountered

during drilling operations.

The RCP is conveyed on workstring and allows circulation during deployment. The RCP setting

sequence starts by dropping and pressuring up against a phenolic ball. Once the RCP is fully inflated,

an over-pressure is applied, shearing out the setting ball and a drillable ball seat sleeve, which can be

captured in a tailpipe ball catcher. Once the RCP system is fully set, remedial cementing operations

can commence. After the remedial cement is set, the RCP can be deflated by applying over-pull,

which shears its release pins to enable RCP packer deflation. Once deflated, further over-pull is required

to break any remaining cement bond to the packer assembly. A drillable plastic shroud located

at the bottom of the packer element is the contact point between the RCP body and the remedial cement.

The RCP packer element plastic shroud is designed to shear off if the RCP is cemented in place,

minimizing risk of becoming stuck at setting depth.

Remedial Cementing Packer (RCP)

Packers

Perform betterMade differently

Remedial Cementing Packer (RCP)_PS270217_Rev01_Eng© 2010-2021 Inflatable Packers International

[email protected]

Stand-alone retrievable treatment while drilling to eliminate the need for a drillable or permanent system

Conveyed on workstring

Allows circulation during deployment

Optional short fiberglass pipe stinger below the packer as an easily drillable tailpipe

Optional tailpipe ball catcher

Optional shearable plastic shroud located at the bottom of the RCP packer element, minimizing

the risk of tool becoming stuck at setting depth

FEATURES:

Shut-off lost-circulation zones without running and cementing casing

Test, squeeze and treat operations

Vertical, inclined and horizontal wells

Workover/Well intervention with a Retrievable Inflatable Bridge Plug (RIBP) as a pair

APPLICATIONS:

Page 2: Remedial Cementing Packer (RCP) PS270217 Rev01 Eng

Stage 1Run in hole and

circulate if needed

Stage 3Cement (polymer)

squeeze or test

Stage 4Deflate,

trip out of hole

DIFFERENTIAL PRESSURE RATING VS. HOLE SIZE

6.93.0 3.9 4.9 5.9 10.87.9 8.9 9.8 14.811.8 12.8 13.8 18.715.7 16.7 17.7 22.619.7 20.7 21.7 24.6

3.5" Packer Element 4.5" Packer Element 5" Packer Element 5.5" Packer Element 6.3" Packer Element 7.75" Packer Element 9" Packer Element 11" Packer Element 15.5" Packer Element

5,000

4,500

1,500

4,000

3,500

3,000

2,500

2,000

0

1,000

500

345

310

276

241

207

172

138

103

69

34

0

17575 100 125 150 275200 225 250 375300 325 350 475400 425 450 575500 525 550 600 675625 650 700 775725 750 800 825 850

23.6 25.6 26.6 28.527.6 29.5 30.5 31.5 32.5 33.5

Inflated Diameter, mm

Inflated Diameter, in

Allo

wab

le D

iffere

nti

al P

ressu

re, p

si

Allo

wab

le D

iffere

nti

al P

ressu

re, b

ar

Inflation Valve OD

Packer OD*Max Inflation

Diameter

in mm in mm in mm

3.5 89

3.5 89 8.67 220

4.5 114 11.0 280

5.0 127 12.2 310

5.5 140 13.8 350

5.5 142

5.5 140 13.8 350

6.3 160 15.0 400

7.75 197 19.3 490

7.75 196

9.0 230 22.6 575

11.0 280 27.6 700

15.5 395 33.1 840

* different packer sizes are available upon custom request

Stage 2Packerinflate

Remedial Cementing Packer (RCP)

Packers

Perform betterMade differently

Remedial Cementing Packer (RCP)_PS270217_Rev01_Eng© 2010-2021 Inflatable Packers International

[email protected]

Shut-off lost-circulation zones without running and cementing casing

Test, squeeze and treat operations

Vertical, inclined and horizontal wells

Workover/Well intervention with a Retrievable Inflatable Bridge Plug (RIBP) as a pair

SEQUENCE OF OPERATION:

AVAILABLE SIZES: