    S.No Furniture Type MarketPrice

    10%Con.Profit

    3.50%Overhead

    SubTotal VAT2.25%

    G.Total

    1 Executive Table 17250 1,725 604 19,579 440.52 20,019

    2 Swivel Chair 10580 1,058 370 12,008 270.19 12,278

    3 Visitors Chair 3460 346 121 3,927 88.36 4,015

    4 What Nut 6860 686 240 7,786 175.19 7,961

    5 File Cabinet (3 Drayer) 10820 1,082 379 12,281 276.32 12,557

    6 Executive Table 14820 1,482 519 16,821 378.47 17,199

    7 Swivel Chair 4270 427 149 4,846 109.05 4,955

    8 Visitors Chair 3460 346 121 3,927 88.36 4,015

    9 What Nut 6860 686 240 7,786 175.19 7,961

    10 Steel File Cabinet (3 Drayer) 10820 1,082 379 12,281 276.32 12,557

    11 Small Table 3540 354 124 4,018 90.40 4,108

    12 Small Chair 3460 346 121 3,927 88.36 4,015

    13 Table 4640 464 162 5,266 118.49 5,38514 Chair 3460 346 121 3,927 88.36 4,015

    15 Visitor Chair 3460 346 121 3,927 88.36 4,015

    16 What Nut 6860 686 240 7,786 175.19 7,961

    17 Steel File Cabinet 10820 1,082 379 12,281 276.32 12,557

    18 Table 4640 464 162 5,266 118.49 5,385

    19 Chair 3460 346 121 3,927 88.36 4,015

    20 Visitor Chair 3460 346 121 3,927 88.36 4,015

    21 Computer Table 3010 301 105 3,416 76.87 3,493

    22 Computer Chair 3460 346 121 3,927 88.36 4,015

    23 Libraroy Table Big Size 47900 4,790 1,677 54,367 1,223.25 55,590

    24 Libraroy Table Medium 21970 2,197 769 24,936 561.06 25,497

    25 Chair 3460 346 121 3,927 88.36 4,015

    26 ZvlK 1000 100 35 1,135 25.54 1,16127 gmvix 500 50 18 568 12.77 580

    28 evwjk I Kvfvi 500 50 18 568 12.77 580

    29 eWwmU 500 50 18 568 12.77 580

    PWD Resource Sub-Division

    Certified that I personally checked all the non schedule items

    incorporated in this Estimate which are essentially required for

    this work. Market rate of Analysis items have been checked and

    Verified personally.

    Sub-Divisional Engineer

    PWD Resource Sub-Division

    Sub-Assistant Enginner

    Name of the Work: Construct ion o f PWD Tra in ing Academy& Test ing Laboratory (Revised)

    Sub Head:

    Lot : 2-Supplying, Installation,Commissioning of Furniture for PWD Training Academy

    Analysis of Furniture per unit

    PWD Resource Division

    Allenbari, Tejgaon, Dhaka.

    PWD Resource Division

    Allenbari, Tejgaon, Dhaka.

    Allenbari, Tejgaon, Dhaka.

    Sub-Assistant Enginner

    Allenbari, Tejgaon, Dhaka.

    Executive Engineer

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    2/55

    Item-1

    CE's-04.1

    0.5 4 25.00 ft x 0.83 ft x 3.50 ft = 145.25 cft

    2 x 9.67 ft x 1.67 ft x 0.50 ft = 16.15 cft

    2 x 9.67 ft x 1.25 ft x 0.50 ft = 12.09 cft

    2 x 9.67 ft x 0.83 ft x 4.50 ft = 72.23 cft

    2 x 0.83 ft x 0.83 ft x 3.50 ft = 4.82 cft

    2 x 5.92 ft x 0.83 ft x 3.50 ft = 34.40 cft

    2 x 10.75 ft x 0.83 ft x 1.58 ft = 28.20 cft

    2 x 6.17 ft x 0.83 ft x 3.58 ft = 36.67 cft

    2 x 5.67 ft x 0.83 ft x 3.58 ft = 33.70 cft

    = 383.50 cft

    2 x 5.50 ft x 0.83 ft x 3.50 ft = 31.96 cft

    2 x 5.50 ft x 0.83 ft x 4.00 ft = 36.52 cft

    1 x 34.67 ft x 0.83 ft x 3.17 ft = 91.22 cft

    = 543.19 cft

    = 15.38 cum

    @ per cum = Tk 72107.70

    Item-2

    CE's-04.2

    N/S

    4 x 0.83 ft x 19.50 ft x 10.00 ft = 647.40 cft

    1 x 0.83 ft x 8.00 ft x 10.00 ft = 66.40 cft

    E/W

    1 x 0.83 ft x 10.00 ft x 10.00 ft = 83.00 cft

    3 x 0.83 ft x 20.33 ft x 10.00 ft = 506.22 cft

    = 1303.02 cft (A)

    = 36.90 cum

    @ per cum = Tk 182381.79

    A) G.F: At level (+) 7'-0".

    Tk 4943.00

    Sub-head:- Super Structure for superior quality building category (Renovation & Modification of

    ground floor, first floor, second floor, third floor and other floor for accommodation of 3 nos honorable

    members, 3 nos Deputy Secretary, Scrutinizer & Moderation room, Vault room etc. including other

    ancillary works i,e false ceiling, wall penelling, marble, granite works etc.).

    Name of work: Construction of Bangladesh Public Service Commission Complex at

    Sher-e-Banglanagar, Dhaka (2nd phase).

    01. Civil works.

    B) F.F: At level (+) 25'-0", grid 13 to 18 (D to L) (Parapet)

    A) Ground floor

    For 02 nos ramp (East west side)

    For 02 nos ramp (East west side)

    Tk 4688.00

    Brick works of width one brick or one and a half brick length with first class bricks in cement

    sand (F.M. 1.2) mortar (1:6) in superstructure including raking out joints, filling the

    interstices with mortar, cleaning and soaking the bricks at least for 24 hours before use and

    washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete

    (measurement to given as 250 mm width for one brick length and 375 mm for one brick and

    a half brick length) and accepted by the Engineer. (Cement: CEM-II/A-M)

    In ground floor

    Middle stair grid-16

    (East west side)

    Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:6) in

    foundation and plinth, filling the joints/interstices fully with mortar, racking out the joints,

    cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7

    days etc. all complete including cost of water, electricity and other charges and accepted by

    the Engineer.

    (Cement: CEM-II/A-M)

    2 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    3/55

    58 x 0.83 ft x 0.83 ft x 3.50 ft = 139.85 cft

    = 3.96 cum

    @ per cum = Tk 20413.70

    78 x 0.83 ft x 0.83 ft x 3.00 ft = 161.20 cft= 4.56 cum

    @ per cum = Tk 26333.79

    Item-3

    CE's-04.16

    8 x 20.00ft x 12.00ft = 1920.00 sft

    Deduct:

    Door -5 x 6.00ft x 7.00ft = -210.00 sftC.gate -1 x 6.00ft x 7.00ft = -42.00 sft

    Door gap

    4 x 3.00ft x 7.00ft = 84.00 sft

    New wall (Grid-8 to 11, E)

    N/S 1 x 68.00ft x 10.00ft = 680.00 sft

    3 x 13.00ft x 10.00ft = 390.00 sft

    New wall (Grid-11 to 13, K)

    N/S 1 x 30.00ft x 10.00ft = 300.00 sft

    4 x 5.00ft x 10.00ft = 200.00 sft

    E/W 1 x 33.00ft x 10.00ft = 330.00 sft

    2 x 19.00ft x 10.00ft = 380.00 sft

    Deduct:

    Door -4 x 6.00ft x 7.00ft = -168.00 sft

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    Duct wall

    Inside 3 x 6.33ft x 10.50ft = 199.40 sft

    South west of building

    Outside 1 x 7.25ft x 14.00ft = 101.50 sft

    Under & below disible ramp (Grid-16)

    4 x 23.58ft x 2.58ft = 243.35 sft

    4 x 2.67ft x 1.00ft = 10.68 sft

    Total = 4508.92 sft

    = 418.89 sqm

    @ Tk 730.00 per sqm = Tk 305788.93

    Duct wall

    Inside 3 x 6.33ft x 10.50ft = 199.40 sft

    South west of building

    Outside 1 x 7.25ft x 14.00ft = 101.50 sft

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    E/W 2 x 14.24 ft x 10.88 ft = 309.72 sft

    3 x 2.50 ft x 10.88 ft = 81.56 sft

    ii) At level (-) 9'-0"

    Brick Pillar

    (i) F.F:3 nos members accomodation, Scrutinize & Moderate room

    Tk 5155.00

    Brick Pillar

    Tk 5769.00

    125 mm brick works with first class bricks in cement sand (F.M. 1.2) mortar (1:4) and

    making bond with connected walls including necessary scaffolding, raking out joints,

    cleaning and soaking the bricks for at least 24 hours before use and washing of sand

    curing at least for 7 days in all floors including cost of water, electricity and other charges

    etc. all complete and accepted by the Engineer. (Cement:CEM-II/A-M)

    (a):Scrutinize & Moderate room:

    A) G.F

    i) At level (-) 6'-0"

    C) 7th floor: At level (+) 80'-0".(Parapet)

    B) F.F

    3 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    4/55

    2 x 7.50 ft x 10.88 ft = 163.13 sft

    N/S 3 x 2.50 ft x 10.88 ft = 81.56 sft

    1 x 3.00 ft x 10.88 ft = 32.63 sft

    Grid-7 2 x 20.33 ft x 10.88 ft = 442.18 sft

    Grid-8 3 x 20.33 ft x 10.88 ft = 663.27 sft

    Grid-9 2 x 20.33 ft x 10.88 ft = 442.18 sft1 x 12.25 ft x 10.88 ft = 133.22 sft

    1 x 14.00 ft x 10.88 ft = 152.25 sft

    1 x 12.17 ft x 10.88 ft = 132.35 sft

    2 x 12.25 ft x 10.88 ft = 266.44 sft

    1 x 14.08 ft x 10.88 ft = 153.12 sft

    2 x 23.33 ft x 10.88 ft = 507.43 sft

    1 x 13.25 ft x 10.88 ft = 144.09 sft

    1 x 14.08 ft x 10.88 ft = 153.12 sft

    2 x 20.33 ft x 10.88 ft = 442.18 sft

    1 x 10.25 ft x 10.88 ft = 111.47 sft

    1 x 14.08 ft x 10.88 ft = 153.12 sft

    2 x 23.33 ft x 10.88 ft = 507.43 sft

    1 x 13.25 ft x 10.88 ft = 144.09 sft

    1 x 13.17 ft x 10.88 ft = 143.22 sft

    1 x 10.00 ft x 10.88 ft = 108.75 sft

    2 x 19.50 ft x 10.88 ft = 424.13 sft

    1 x 12.25 ft x 10.88 ft = 133.22 sft

    1 x 10.00 ft x 10.88 ft = 108.75 sft

    3 x 19.50 ft x 10.88 ft = 636.19 sft

    1 x 13.17 ft x 10.88 ft = 143.22 sft

    1 x 10.00 ft x 10.88 ft = 108.75 sft

    3 x 14.08 ft x 10.88 ft = 459.36 sft

    1 x 15.58 ft x 10.88 ft = 169.43 sft

    1 x 5.00 ft x 10.88 ft = 54.38 sft

    2 x 14.75 ft x 10.88 ft = 320.81 sft

    1 x 8.00 ft x 10.88 ft = 87.00 sft

    1 x 13.25 ft x 10.88 ft = 144.09 sft

    2 x 10.00 ft x 10.88 ft = 217.50 sft

    1 x 13.25 ft x 10.88 ft = 144.09 sft

    1 x 11.00 ft x 10.88 ft = 119.63 sft

    1 x 14.67 ft x 10.88 ft = 159.54 sft

    2 x 10.00 ft x 10.88 ft = 217.50 sft

    1 x 19.50 ft x 10.88 ft = 212.06 sft

    1 x 14.67 ft x 10.88 ft = 159.54 sft

    2 x 10.00 ft x 10.88 ft = 217.50 sft

    1 x 10.00 ft x 10.88 ft = 108.75 sft

    2 x 10.00 ft x 10.88 ft = 217.50 sft

    = 10422.32 sft (A)

    Grid 13 to 16 D to L and Grid 13 to 16 D & L

    N/S 2 x 70.00 ft x 2.75 ft = 385.00 sft

    E/W 2 x 25.00 ft x 2.75 ft = 137.50 sft

    2 x 46.00 ft x 2.75 ft = 253.00 sft

    = 775.50 sft (B)

    = 11197.82 sft

    = 1040.30 sqm

    @ per sqm = Tk 779186.93

    Grid 16 (D to F & J to L)

    ii) At level (+) 7'-0" to (+) 25'-0" (False slab gap)

    Grid-JK

    Grid-R

    Total = A+B

    Grid-8-9

    (b):3 nos members accomodation

    Grid-9-10

    Grid-11

    Grid-10-11

    Grid-IJ

    North to south

    Grid-E

    Grid-F

    Tk 749.00

    Grid-EF

    Grid-FG

    Grid 13

    4 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    5/55

    E/W 2 x 19.67 ft x 10.50 ft = 413.07 sft

    2 x 19.67 ft x 10.50 ft = 413.07 sft

    2 x 13.67 ft x 10.50 ft = 287.07 sft

    N/S 2 x 19.67 ft x 10.50 ft = 413.07 sft2 x 19.67 ft x 10.50 ft = 413.07 sft

    2 x 13.67 ft x 10.50 ft = 287.07 sft

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    Door -2 x 3.33 ft x 7.00 ft = -46.62 sft

    -2 x 2.50 ft x 7.00 ft = -35.00 sft

    P.A -2 x 7.00 ft x 7.00 ft = -98.00 sft

    Window -4 x 6.00 ft x 4.50 ft = -108.00 sft

    = 2028.80 sft

    = 188.48 sqm (A)

    E/W 1 x 146.00 ft x 3.50 ft = 511.00 sft

    E/W 2 x 23.50 ft x 3.50 ft = 164.50 sft

    N/S 2 x 69.50 ft x 3.50 ft = 486.50 sft

    E/W 2 x 45.00 ft x 3.50 ft = 315.00 sft

    N/S 2 x 43.50 ft x 3.50 ft = 304.50 sft

    E/W 4 x 20.00 ft x 3.50 ft = 280.00 sft

    = 2061.50 sft

    = 191.52 sqm (B)

    = 380.00 sqm (C)

    @ per sqm = Tk 291838.57

    E/W 1 x 21.58 ft x 10.50 ft = 226.59 sft

    1 x 8.83 ft x 10.50 ft = 92.72 sft

    N/S 1 x 14.75 ft x 10.50 ft = 154.88 sft

    1 x 12.17 ft x 10.50 ft = 127.79 sft

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    E/W 1 x 20.33 ft x 10.50 ft = 213.47 sft

    1 x 16.58 ft x 10.50 ft = 174.09 sftN/S 2 x 13.00 ft x 10.50 ft = 273.00 sft

    1 x 8.00 ft x 10.50 ft = 84.00 sft

    Toilet inside 1 x 7.00 ft x 8.00 ft = 56.00 sft

    = 1492.52 sft

    = 138.66 sqm (A)

    @ persqm = Tk 109124.23

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    = 8.36 sqm

    E) 4th floor: At level (+) 47'-0"

    Grid 18

    C) 2nd floor: At level (+) 25'-0"

    Grid 13 E to D & KL

    Grid 13 to 16 D & L

    Grid 16 (D to F & J to L)

    Grid 13 to 14, D to H

    D) 3rd floor: At level (+) 36'-0"

    (ii) Grid 13 to 18 (D to L) (Parapet)

    (i) 2 nos Deputy Secretary room (new accomodation)

    Total =A+B

    Grid 16 to 18 (F & J)

    Tk 787.00

    Tk 768.00

    Grid 8 to 10 & 10 to 11

    Deduction

    DS room attached to exam. Controller (Non-Cadre)

    DS room attached to exam. Controller (cadre)

    (i) 2 nos Deputy Secretary room (new accomodation)

    5 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    6/55

    @ persqm = Tk 6739.13

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    = 8.36 sqm

    @ persqm = Tk 6897.99

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    = 8.36 sqm

    @ persqm = Tk 7115.38

    E/W 2 x 21.00 ft x 3.00 ft = 126.00 sft

    2 x 20.50 ft x 3.00 ft = 123.00 sft

    E/W 2 x 21.33 ft x 3.00 ft = 127.98 sft

    E/W 2 x 21.00 ft x 3.00 ft = 126.00 sft

    N/S 4 x 6.50 ft x 3.00 ft = 78.00 sft

    4 x 10.00 ft x 3.00 ft = 120.00 sft

    Lift door gap

    2 x 5.00ft x 9.00ft = 90.00 sft

    N/S 2 x 5.50 ft x 3.00 ft = 33.00 sft

    N/S 1 x 8.00 ft x 3.00 ft = 24.00 sft

    E/W 2 x 5.00 ft x 3.00 ft = 30.00 sft

    N/S 2 x 6.50 ft x 3.00 ft = 39.00 sft

    East & West side s/wall to s/wall

    N/S 2 x 15.00 ft x 3.00 ft = 90.00 sft

    E/W 4 x 13.00 ft x 3.00 ft = 156.00 sft

    E/W 4 x 15.83 ft x 3.00 ft = 189.96 sft

    N/S 8 x 1.50 ft x 3.00 ft = 36.00 sft

    E/W 4 x 28.50 ft x 3.00 ft = 342.00 sft

    E/W 2 x 42.50 ft x 3.00 ft = 255.00 sft

    E/W 2 x 12.00 ft x 3.00 ft = 72.00 sft

    = 2057.94 sft ( A )

    N/S 2 x 14.50 ft x 9.25 ft = 268.25 sft

    2 x 19.50 ft x 9.00 ft = 351.00 sft

    E/W 2 x 12.00 ft x 9.00 ft = 216.00 sft

    -1 x 3.00 ft x 7.00 ft = -21.00 sft

    E/W 2 x 14.00 ft x 9.00 ft = 252.00 sft

    2 x 12.00 ft x 9.00 ft = 216.00 sft

    N/S 2 x 46.00 ft x 9.00 ft = 828.00 sft

    Tk 806.00

    F) 5th floor: At level (+) 58'-0"

    Tk 825.00

    G) 6th floor: At level (+) 69'-0"

    East & West side

    Main Stair Chillakota

    Deduction

    H) At level (+) 80'-0".

    Main stair east side

    Lift wall gap

    Tk 851.00

    Grid 9 E to F & grid 11 J to K:

    Deduction for door

    Grid 07 & 13 G to I:

    Stair Chillakota S-E & N-W

    Grid 09 E to s/wall & 11 K to s/wall:

    Two Lift connection

    Grid 9 J to K & grid 11 E to F:

    Electric room side

    Grid 9 F to G & grid 11 I to J:

    Grid 9 I to J & grid 11 F to G: (Parapet)

    Stair & lift wall (Wall)

    Grid 07 & 13 E to F & grid J to K:

    6 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    7/55

    RCC wall -2 x 3.00 ft x 9.00 ft = -54.00 sft

    -2 x 6.00 ft x 9.00 ft = -108.00 sft

    -1 x 21.00 ft x 9.00 ft = -189.00 sft

    Door -1 x 3.00 ft x 7.00 ft = -21.00 sft

    -2 x 6.00 ft x 9.00 ft = -108.00 sft

    -2 x 3.00 ft x 9.00 ft = -54.00 sft

    N/S 1 x 8.00 ft x 12.00 ft = 96.00 sft

    East side 2 x 5.00 ft x 13.00 ft = 130.00 sft

    2 x 5.00 ft x 13.00 ft = 130.00 sft

    = 1932.25 sft (B)

    = 3990.19 sft (C)

    = 370.70 sqm

    @ per sqm = Tk 325101.88

    Item-4

    CE's-6.4

    1 x 42.50 ft x 70.00 ft = 2975.00 sft

    = 276.38 sqm

    @ Tk 7269.00 per sqm = Tk 2009037.07

    Item-5

    Analysis rate

    2 x 20.00 ft x 10.50 ft = 420.00 sft

    2 x 2 x 9.00 ft x 0.50 ft = 18.00 sft

    2 x 1 x 5.00 ft x 0.50 ft = 5.00 sft

    2 x 5.00 ft x 0.50 ft = 5.00 sft

    -4 x 5.00 ft x 9.00 ft = -180.00 sft

    = 268.00 sft

    = 7 x 268.00 ft = 1876.00 sft

    = 174.28 sqm

    @ Tk 10849.00 per sqm = Tk 1890814.20

    Item-6CE's-06.6.3

    Glazed wall tiles@ 2nd floor

    DS toilet 2 x 7.50ft x 8.00ft = 120.00 sft

    2 x 5.50ft x 8.00ft = 88.00 sft

    Deduct:

    (+) 7'-0" Level

    Supplying and setting foreign made white / black/ any colour Granite on walls of approved

    quality, textured and size (large size) on walls over 12 mm thick cement sand (F.M. 1.2)

    mortar (1:2) including cutting and grinding the Granite slab/tile setting in position keeping

    horizontal and vertical alignment correct, fi ll ing the joints with white cement, cutting and

    grinding the top surface, finishing etc including water, electricity and other charges

    complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M)

    Marble stone flooring with 18mm thick Italian coloured/ grey marble stone of approved

    quality, texture and size over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including.

    placing cement slurry below the stone, cutting the marble stone to desired size, grinding

    and finishing the edges, setting in position in proper level filling the gaps with white cement

    and colouring pigments including supplying all necessary equipments/materials and

    finishing the top by pumic stone and necessary auxiliary materials and water, electricity andother charges complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M). In

    ground floor

    Lift wall

    (i) 2 nos Deputy Secretary room (new accomodation)

    Total =A+B

    (Rate same for all floor)

    Supplying, fitting and fixing glazed wall tiles (local made) with on 20 mm thick cement sand

    (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting,

    laying and hire charge of machine and finishing with care etc. including water, electricity

    and other charges complete all respect accepted by the Engineer.Coloured glazed wall tiles

    of different sizes (Cement: CEM-II/A-M).

    Wall tiles more than 250 x 400 mm size

    For 8 nos floor

    Lift Portion

    12 mm thick white / black/ any colour Granite walling.

    Tk 877.00

    7 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    8/55

    2 x 6.33ft x 8.00ft = 101.28 sft

    2 x 2.33ft x 8.00ft = 37.28 sft

    2 x 3.83ft x 8.00ft = 61.28 sft

    2 x 4.67ft x 8.00ft = 74.72 sft

    Door sill 2 x 2.50ft x 0.75ft = 3.75 sft

    = 486.31 sft

    Deduct:Door -2 x 2.50ft x 7.00ft = -35.00 sft

    Window -2 x 6.33ft x 5.50ft = -69.63 sft

    Total = 381.68 sft

    = 35.46 sqm

    @ Tk 1166.00 per sqm = Tk 41345.12

    Glazed wall tiles @ 3rd floor

    2 x 2 x 7.00ft x 8.00ft = 112.00 sft

    2 x 2 x 3.50ft x 8.00ft = 56.00 sft

    2 x 1 x 4.58ft x 8.00ft = 36.64 sft

    2 x 1 x 8.00ft x 8.00ft = 64.00 sft

    = 268.64 sft

    = 24.96 sqm

    @ Tk 1172.00 per sqm = Tk 29249.91

    Item-7

    CE's-06.9.3

    1 x 34.00 ft x 42.50 ft = 1445.00 sft

    = 134.24 sqm

    @ Tk 1809.00 per sqm = Tk 242846.99

    Room 3 1 x 22.00ft x 22.08ft = 1457.28 sft

    3 1 x 5.50ft x 4.75ft = 78.38 sft

    3 2 x 22.00ft x 0.50ft = 66.00 sft

    3 2 x 22.08ft x 0.50ft = 66.24 sft

    3 2 x 5.50ft x 0.50ft = 16.50 sft

    3 2 x 4.75ft x 0.50ft = 14.25 sft

    = 1698.65 sft

    = 157.81 Sqm

    @ Tk 1815.00 per sqm = Tk 286421.47

    E/W 1 x 134.00 ft x 6.00 ft = 804.00 sft

    2 1 x 146.00ft x 0.50ft = 146.00 sft

    2 1 x 22.00ft x 0.50ft = 22.00 sft

    2 2 x 14.17ft x 0.50ft = 28.34 sft

    2 2 x 11.50ft x 0.50ft = 23.00 sft

    2 2 x 7.00ft x 0.50ft = 14.00 sft

    2 2 x 9.50ft x 0.50ft = 19.00 sft

    2 1 x 10.50ft x 0.50ft = 10.50 sft

    = 1066.84 sft

    = 99.11 Sqm

    @ Tk 1821.00 per sqm = Tk 180482.69

    GP (mirror polished) 300 x 600 mm / 600 x 600 mm floor tiles @ Ground floor

    Supplying, fitt ing and fixing mirror polished homogeneous floor ti les (local made) with

    cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement

    including cutting and laying the tiles in proper way and finishing with care etc. all complete

    and accepted by the Engineer.(Cement: CEM-II/A-M)GP (mirror polished) 300 x 600 mm /

    600 x 600 mm floor tiles.

    (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation):

    Skirting

    (i) 2 nos Deputy Secretary room (new accomodation)

    (i) G.F: (+) 7'-0" Level

    (ii) F.F: 3 nos members room (new accomodation)

    Skirting

    Grid 13 to 14, D to H

    Skirting

    8 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    9/55

    Item-8

    CE's-7.1

    (A)

    CE's-7.1.42 x 2.00 ft x 3.00 ft = 12.00 sft

    3 x 2.00 ft x 3.00 ft = 18.00 sft

    5 x 2.00 ft x 3.00 ft = 30.00 sft

    2 x 1.67 ft x 3.00 ft = 10.02 sft

    7 x 1.67 ft x 3.00 ft = 35.07 sft

    2 x 2.00 ft x 3.00 ft = 12.00 sft

    2 x 2.00 ft x 3.00 ft = 12.00 sft

    10 x = 33.96 sft

    = 163.05 sft

    = 163.05 x 3.50 ft = 570.68 cft

    = 16.16 cum

    @ per cum = Tk 109563.35

    CE's-7.1.4 ii) Form Work (Wooden Shuttet)

    14 x 2 x 3.00 ft x 4.50 ft = 378.00 sft

    14 x 2 x 2.00 ft x 4.50 ft = 252.00 sft

    9 x 2 x 1.67 ft x 4.50 ft = 135.27 sft

    9 x 2 x 3.00 ft x 4.50 ft = 243.00 sft

    10 x x 4.50 ft = 152.83 sft

    = 1161.10 sft

    = 107.87 sqm

    @ per sqm = Tk 43686.88

    CE's-7.1.4Col-C10 2 x 2.00 ft x 3.00 ft = 12.00 sft

    8 x 2.00 ft x 3.00 ft = 48.00 sft

    5 x 2.00 ft x 3.00 ft = 30.00 sft

    19 x 1.67 ft x 3.00 ft = 95.19 sft

    2 x 1.67 ft x 3.00 ft = 10.02 sft

    = 195.21 sft

    = 195.21 x 4.50 ft = 878.45 cft

    Shear wall

    4 x 6.50 ft x 1.17 ft x 4.50 ft = 136.89 cft

    4 x 8.00 ft x 1.17 ft x 4.50 ft = 168.48 cft

    (3.14x2.08x2.08/4)

    (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and

    placing)

    Reinforced cement concrete works using wooden shutter, with minimum cement content

    relates to mix ratio 1:2:4 having minimum f 'cr = 24 Mpa, and satisfying, specified

    compressive strength f'c=19 Mpa at 28 days on standard cylinders as per standardpractice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM 1 ( 52.5

    N) / ASTM-C 150 Type I, best quality sand [50% quantity of best local sand (F.M. 1.2) and50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well

    graded picked jhama brick chips conforming ASTM C-33 including breaking chips and

    screening, making, placing shutter in position and maintaining true to plumb, making

    shutter water-tight properly, placing reinforcement in position; mixing in standard mixer

    machine with hoper fed by standard measuring boxes, casting in forms, compacting by

    vibrator machine and curing for 28 days,and removing centering-shuttering after specified

    time proved; including cost of water, electricity, testing charges of materials and cylinders,

    other charges etc. all complete approved and accepted by the Engineer.

    Padestals, column capitals, lift walls and walls :Ground Floor

    Col-C9

    Col-C6

    Col-C1

    Col-C2

    Col-C8

    Col-C13

    Tk 6780.00

    Tk 405.00

    For Col-C4

    Col-C5

    (3.14 x 2.08 x 2.08/4)

    Col-C7

    i) Concrete

    a) At level (+) 25'-0" (In 2nd Floor)

    Col-C4

    Col-C11

    For Col-C1,C2, C5, C8, C9

    b) In Column: At level (+) 80'-0" (In 7th Floor)

    For Col-C6,C7

    Col-C14

    Col-C15

    i) Concrete

    9 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    10/55

    2 x 11.00 ft x 1.00 ft x 4.50 ft = 99.00 cft

    2 x 5.00 ft x 1.00 ft x 4.50 ft = 45.00 cft

    2 x 1.00 ft x 3.00 ft x 4.50 ft = 27.00 cft

    2 x 49.00 ft x 1.00 ft x 4.50 ft = 441.00 cft

    = 1795.82 cft= 50.85 cum

    @ per cum = Tk 364044.73

    CE's-7.1.4 ii) Form Work (Wooden Shuttet)

    15 x 2 x 3.00 ft x 4.50 ft = 405.00 sft

    15 x 2 x 2.17 ft x 4.50 ft = 292.95 sft

    21 x 2 x 1.67 ft x 4.50 ft = 315.63 sft

    21 x 2 x 3.17 ft x 4.50 ft = 599.13 sft

    Shear wall

    4 x 2 x 6.50 ft x 4.50 ft = 234.00 sft

    4 x 2 x 1.42 ft x 4.50 ft = 51.12 sft

    4 x 2 x 8.00 ft x 4.50 ft = 288.00 sft

    4 x 2 x 1.42 ft x 4.50 ft = 51.12 sft

    2 x 24.63 ft x 4.50 ft = 221.63 sft

    2 x 12.63 ft x 4.50 ft = 113.63 sft

    2 x 8.50 ft x 4.50 ft = 76.50 sft

    2 x 98.00 ft x 4.50 ft = 882.00 sft

    = 3530.70 sft

    = 328.01 sqm

    @ per sqm = Tk 182373.58

    (B)

    CE's-7.1.5

    8 x 20.00 ft x 0.42 ft x 0.50 ft = 33.60 cft (A)

    New wall (Grid-8 to 11, E)

    1 x 68.00ft x 0.42 ft x 0.50 ft = 14.28 cft

    3 x 13.00ft x 0.42 ft x 0.50 ft = 8.19 cft

    New wall (Grid-11 to 13, K)

    1 x 30.00ft x 0.42 ft x 0.50 ft = 6.30 cft

    4 x 5.00ft x 0.42 ft x 0.50 ft = 4.20 cft

    1 x 33.00ft x 0.42 ft x 0.50 ft = 6.93 cft

    2 x 19.00ft x 0.42 ft x 0.50 ft = 7.98 cft

    N/S

    4 x 0.83 ft x 19.50 ft x 0.50 ft = 32.37 cft

    1 x 0.83 ft x 8.00 ft x 0.50 ft = 3.32 cft

    E/W

    1 x 0.83 ft x 10.00 ft x 0.50 ft = 4.15 cft

    3 x 0.83 ft x 20.33 ft x 0.50 ft = 25.31 cft

    3 x 7.00 ft x 0.42 ft x 0.50 ft = 4.41 cft

    1 x 42.33 ft x 1.42 ft x 1.50 ft = 90.16 cft

    1 x 42.50 ft x 0.42 ft x 0.50 ft = 8.93 cft

    3 x 6.33 ft x 0.42 ft x 0.50 ft = 3.99 cft

    (+) 3'-0" level

    (-) 6'-0" level

    At level (-) 9'-0"

    For Col-C10,C11, C13

    At level (+) 7'-0".

    (a) G.F:

    For Col-C14,C15

    Tk 556.00

    i) Concrete

    Electric wall

    Lift wall

    New wall

    Tk 7159.00

    Lift wall

    Electric wall

    Tie beam and lintels:Ground Floor

    RCC bend for out side pipeline

    10 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    11/55

    1 x 7.25 ft x 0.42 ft x 0.50 ft = 1.52 cft

    = 222.04 cft (B)

    = 255.64 cft

    = 7.24 cum

    @ per cum = Tk 50584.92

    CE's-7.1.5 ii) Form Work (Wooden Shuttet)8 x 1 x 20.00 ft x 1.42 ft = 227.20 sft

    6 x 1 x 6.00 ft x 1.42 ft = 51.12 sft

    = 278.32 sft (A)

    1 x 1 x 68.00ft x 1.42 ft = 96.56 sft

    3 x 1 x 13.00ft x 1.42 ft = 55.38 sft

    1 x 1 x 30.00ft x 1.42 ft = 42.60 sft

    4 x 1 x 5.00ft x 1.42 ft = 28.40 sft

    1 x 1 x 33.00ft x 1.42 ft = 46.86 sft

    2 x 1 x 19.00ft x 1.42 ft = 53.96 sft

    4 x 1 x 19.50 ft x 1.83 ft = 142.74 sft

    1 x 1 x 8.00 ft x 1.83 ft = 14.64 sft

    1 x 1 x 10.00 ft x 1.83 ft = 18.30 sft

    3 x 1 x 20.33 ft x 1.83 ft = 111.61 sft

    3 x 1 x 7.00 ft x 1.42 ft = 29.82 sft1 x 1 x 42.33 ft x 1.42 ft = 60.11 sft

    1 x 1 x 42.50 ft x 1.42 ft = 60.35 sft

    1 x 1 x 6.33 ft x 1.42 ft = 8.99 sft

    2 x 1 x 7.25 ft x 1.42 ft = 20.59 sft

    = 790.91 sft (B)

    = 1069.23 sft

    = 99.33 sqm

    @ per sqm = Tk 34766.83

    CE's-7.1.5

    2 x 14.24 ft x 0.42 ft x 0.50 ft = 5.98 cft

    3 x 2.50 ft x 0.42 ft x 0.50 ft = 1.58 cft2 x 7.50 ft x 0.42 ft x 0.50 ft = 3.15 cft

    3 x 2.50 ft x 0.42 ft x 0.50 ft = 1.58 cft

    1 x 3.00 ft x 0.42 ft x 0.50 ft = 0.63 cft

    Grid-7 2 x 20.33 ft x 0.42 ft x 0.50 ft = 8.54 cft

    Grid-8 3 x 20.33 ft x 0.42 ft x 0.50 ft = 12.81 cft

    Grid-9 2 x 20.33 ft x 0.42 ft x 0.50 ft = 8.54 cft

    1 x 12.25 ft x 0.42 ft x 0.50 ft = 2.57 cft

    1 x 14.00 ft x 0.42 ft x 0.50 ft = 2.94 cft

    Grid-8-9 1 x 12.17 ft x 0.42 ft x 0.50 ft = 2.56 cft

    2 x 12.25 ft x 0.42 ft x 0.50 ft = 5.15 cft

    1 x 14.08 ft x 0.42 ft x 0.50 ft = 2.96 cft

    Grid-9-10 2 x 23.33 ft x 0.42 ft x 0.50 ft = 9.80 cft1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft

    1 x 14.08 ft x 0.42 ft x 0.50 ft = 2.96 cft

    Grid-11 2 x 20.33 ft x 0.42 ft x 0.50 ft = 8.54 cft

    1 x 10.25 ft x 0.42 ft x 0.50 ft = 2.15 cft

    1 x 14.08 ft x 0.42 ft x 0.50 ft = 2.96 cft

    Grid-10-11 2 x 23.33 ft x 0.42 ft x 0.50 ft = 9.80 cft

    1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft

    Grid-E 1 x 13.17 ft x 0.42 ft x 0.50 ft = 2.77 cft

    1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft

    (ii) F.F: 3 nos members accomodation

    North to south

    Total =A+B

    Total =A+B

    (b) F.F:

    (i) F.F: Scrutinize & Moderate room:

    i) Concrete

    Tk 350.00

    Tk 6988.00

    11 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    12/55

    Grid-F 2 x 19.50 ft x 0.42 ft x 0.50 ft = 8.19 cft

    1 x 12.25 ft x 0.42 ft x 0.50 ft = 2.57 cft

    1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft

    3 x 19.50 ft x 0.42 ft x 0.50 ft = 12.29 cft

    Grid-EF 1 x 13.17 ft x 0.42 ft x 0.50 ft = 2.77 cft

    1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft

    Grid-FG 3 x 14.08 ft x 0.42 ft x 0.50 ft = 8.87 cft1 x 15.58 ft x 0.42 ft x 0.50 ft = 3.27 cft

    1 x 5.00 ft x 0.42 ft x 0.50 ft = 1.05 cft

    2 x 14.75 ft x 0.42 ft x 0.50 ft = 6.20 cft

    Grid-IJ 1 x 8.00 ft x 0.42 ft x 0.50 ft = 1.68 cft

    1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft

    2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft

    1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft

    1 x 11.00 ft x 0.42 ft x 0.50 ft = 2.31 cft

    1 x 14.67 ft x 0.42 ft x 0.50 ft = 3.08 cft

    2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft

    1 x 19.50 ft x 0.42 ft x 0.50 ft = 4.10 cft

    Grid-JK 1 x 14.67 ft x 0.42 ft x 0.50 ft = 3.08 cft

    2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft

    1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft

    Grid-R 2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft

    = 193.71 cft (A)

    = 222.04 cft (B)

    = 415.75 cft

    = 11.77 cum

    @ per cum = Tk 83055.71

    CE's-7.1.5

    922.43 ft x 1.42 ft = 1309.85 sft

    = 790.91 sft

    = 2100.76 sft

    = 195.17 sqm

    @ per sqm = Tk 73186.99

    CE's-7.1.5

    2 x 17.75 ft x 0.42 ft x 0.50 ft = 7.46 cft

    2 x 10.50 ft x 0.42 ft x 0.50 ft = 4.41 cft

    4 x 22.00 ft x 0.42 ft x 0.50 ft = 18.48 cft

    = 30.35 cft

    = 0.86 cum

    @ per cum = Tk 6119.70

    CE's-7.1.5 ii) Form Work (Wooden Shuttet)

    2 x 1 x 17.75 ft x 1.42 ft = 50.41 sft

    2 x 1 x 10.50 ft x 1.42 ft = 29.82 sft

    4 x 1 x 22.00 ft x 1.42 ft = 124.96 sft= 205.19 sft

    = 19.06 sqm

    @ per sqm = Tk 7625.05

    CE's-7.1.5

    1 x 21.58 ft x 0.42 ft x 0.50 ft = 4.53 cft

    1 x 8.83 ft x 0.42 ft x 0.50 ft = 1.85 cft

    1 x 14.75 ft x 0.42 ft x 0.50 ft = 3.10 cft

    1 x 12.17 ft x 0.42 ft x 0.50 ft = 2.56 cft

    Total

    Tk 400.00

    i) Concrete

    (ii) F.F: RCC bend for out side pipeline

    i) Concrete

    Rft same as (A) =

    Total =A+B

    Qty same as GF (B)

    Tk 7122.00

    D) 3rd floor: At level (+) 36'-0"

    (d) 3rd floor:

    Qty same as GF (B)

    ii) Form Work (Wooden Shuttet)

    Tk 375.00

    Tk 7055.00

    (c) 2nd floor:

    12 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    13/55

    1 x 20.33 ft x 0.42 ft x 0.50 ft = 4.27 cft

    1 x 16.58 ft x 0.42 ft x 0.50 ft = 3.48 cft

    2 x 13.00 ft x 0.42 ft x 0.50 ft = 5.46 cft

    1 x 8.00 ft x 0.42 ft x 0.50 ft = 1.68 cft

    1 x 7.00 ft x 0.42 ft x 0.50 ft = 1.47 cft

    = 28.40 cft

    = 0.80 cum@ per cum = Tk 5781.41

    CE's-7.1.5 ii) Form Work (Wooden Shuttet)

    1 x 1 x 21.58 ft x 1.42 ft = 30.64 sft

    1 x 1 x 8.83 ft x 1.42 ft = 12.54 sft

    1 x 1 x 14.75 ft x 1.42 ft = 20.95 sft

    1 x 1 x 12.17 ft x 1.42 ft = 17.28 sft

    1 x 1 x 20.33 ft x 1.42 ft = 28.87 sft

    1 x 1 x 16.58 ft x 1.42 ft = 23.54 sft

    2 x 1 x 13.00 ft x 1.42 ft = 36.92 sft

    1 x 1 x 8.00 ft x 1.42 ft = 11.36 sft

    1 x 1 x 7.00 ft x 1.42 ft = 9.94 sft

    = 192.04 sft

    = 17.84 sqm

    @ per sqm = Tk 7047.21

    CE's-7.1.5

    6 x 4.50 ft x 0.42 ft x 0.50 ft = 5.67 cft

    = 0.16 cum

    @ per cum = Tk 1215.08

    CE's-7.1.5 ii) Form Work (Wooden Shuttet)

    6 x 1 x 4.50 ft x 1.42 ft = 38.34 sft

    = 3.56 sqm

    @ per sqm = Tk 2454.13

    (C)

    CE's-7.1.6

    E/W

    4 x 12.00 ft x 1.00 ft x 1.58 ft = 75.84 cft

    N/S

    2 x 19.54 ft x 1.00 ft x 1.58 ft = 61.75 cft

    2 x 14.50 ft x 1.00 ft x 1.58 ft = 45.82 cft

    2 x 19.00 ft x 1.00 ft x 1.58 ft = 60.04 cft

    E/W

    5 x 10.00 ft x 1.00 ft x 1.58 ft = 79.00 cft

    6 x 5.00 ft x 1.00 ft x 1.58 ft = 47.40 cft

    E/W4 x 7.50 ft x 1.00 ft x 1.58 ft = 47.40 cft

    = 417.25 cft

    = 11.81 cum

    @ per cum = Tk 83236.61

    CE's-7.1.6 ii) Form Work (Wooden Shuttet)

    2 x 2 x 12.00 ft x 4.17 ft = 200.16 sft

    2 x 1 x 19.54 ft x 4.17 ft = 162.96 sft

    2 x 1 x 14.50 ft x 4.17 ft = 120.93 sft

    In Tee beam, ELL beam & Rectangular beam

    (e) 7th floor:

    i) Concrete

    Tk 395.00

    Tk 7045.00

    E/W

    Lift room: South lift, N/S

    N/S

    Main stair attached: N/S

    Tk 689.00

    Stair-2: 02 nos stair

    i) Concrete : At level (+) 80'-0" (In 7th Floor)

    Tk 7568.00

    Tk 7189.00

    13 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    14/55

    2 x 1 x 19.00 ft x 4.17 ft = 158.46 sft

    5 x 1 x 10.00 ft x 4.17 ft = 208.50 sft

    3 x 2 x 5.00 ft x 4.17 ft = 125.10 sft

    2 x 2 x 7.50 ft x 4.17 ft = 125.10 sft

    = 1101.21 sft= 102.31 sqm

    @ per sqm = Tk 62406.20

    (D)

    CE's-7.1.7

    2 x 28.67 ft x 19.00 ft x 0.42 ft = 457.57 cft

    1 x 49.00 ft x 17.00 ft x 0.42 ft = 349.86 cft

    1 x 49.00 ft x 14.50 ft x 0.42 ft = 298.41 cft

    = 1105.84 cft

    = 31.31 cum

    @ per cum = Tk 220604.99

    CE's-7.1.7 ii) Form Work (Wooden Shuttet)

    2 x 28.67 ft x 19.00 ft = 1089.46 sft

    1 x 49.00 ft x 17.00 ft = 833.00 sft

    1 x 49.00 ft x 14.00 ft = 686.00 sft

    2 x 2 x 28.67 ft x 0.42 ft = 48.17 sft

    2 x 2 x 19.00 ft x 0.42 ft = 31.92 sft

    1 x 2 x 49.00 ft x 0.42 ft = 41.16 sft

    1 x 2 x 17.00 ft x 0.42 ft = 14.28 sft

    2 x 2 x 49.00 ft x 0.42 ft = 82.32 sft

    2 x 2 x 49.00 ft x 0.42 ft = 82.32 sft

    = 2908.63 sft

    = 270.22 sqm

    @ per sqm = Tk 172399.03

    (E)

    CE's-7.1.8

    Drop wall

    N/S 2 x 70.00 ft x 2.00 ft = 280.00 sft

    2 x 26.00 ft x 2.00 ft = 104.00 sft

    Planter 2 x 26.00 ft x 2.00 ft = 104.00 sft

    E/W 2 x 45.00 ft x 2.00 ft = 180.00 sft

    668.00 sft

    = 668.00 x 0.29 ft = 194.83 cft

    = 5.52 cum@ per cum = Tk 37714.09

    CE's-7.1.8 ii) Form Work (Wooden Shuttet)

    2 x 2 x 2.00 ft x 0.33 ft = 2.64 sft

    1 x 2 x 70.00 ft x 4.33 ft = 606.20 sft

    1 x 2 x 26.00 ft x 4.33 ft = 225.16 sft

    1 x 2 x 26.00 ft x 4.33 ft = 225.16 sft

    1 x 2 x 45.00 ft x 4.33 ft = 389.70 sft

    = 1448.86 sft

    = 134.60 sqm

    @ per sqm = Tk 40111.51

    Bottom

    Side

    Lift room: South lift - 02 nos

    Stair-2: 02 nos stair

    In Floor & Roof slab;

    Cornice, railing, drop walls, louver, fins etc. Ground Floor

    Tk 638.00

    a) At level (+) 80'-0" (In 7th Floor)

    Tk 7045.00

    E/W

    Tk 6836.00

    Main stair-4:

    i) Concrete

    Tk 610.00

    Lift Room: N/S

    a) In Ground floor (+7'-0" level)

    i) Concrete

    Tk 298.00

    14 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    15/55

    CE's-7.1.8

    Drop wall

    Gird 13 north side

    E/W 1 x 134.00 ft x 3.00 ft = 402.00 sft

    N/S 2 x 5.33 ft x 3.00 ft = 31.98 sft

    433.98 sft= 433.98 x 0.29 ft = 126.58 cft

    = 3.58 cum

    @ per cum = Tk 24982.02

    CE's-7.1.8 ii) Form Work (Wooden Shuttet)

    1 x 2 x 134.00 ft x 3.00 ft = 804.00 sft

    1 x 1 x 134.00 ft x 0.63 ft = 83.75 sft

    2 x 2 x 5.33 ft x 3.00 ft = 63.96 sft

    2 x 1 x 5.33 ft x 0.63 ft = 6.72 sft

    1 x 1 x 144.67 ft x 0.46 ft = 66.55 sft

    = 1024.97 sft

    = 95.22 sqm

    @ per sqm = Tk 33137.40

    CE's-7.1.8 = 3.56 cum

    = 3.56 cum

    7.12 cum

    @ per cum = Tk 50103.44

    CE's-7.1.8

    = 95.02 sqm

    = 95.02 sqm

    190.04 sqm

    @ per sqm = Tk 70884.92

    CE's-7.1.8 i)Concrete: oty same as 2nd Floor Drop = 3.56 cum

    @ per cum = Tk 25418.40

    CE's-7.1.8 ii) Form work (Wooden shutter)

    Qty same as 2nd Floor = 95.02 sqm

    @ per sqm = Tk 37817.96

    (F)

    CE's-7.1.9

    Gird 13 north side

    2 7.50 ft x 7.50 ft x 0.25 ft = 28.13 cft

    = 0.80 cum

    @ per cum = Tk 6000.90

    CE's-7.1.8 ii) Form Work (Wooden Shuttet)2 x 1 x 7.50 ft x 7.50 ft = 112.50 sft

    2 x 2 x 7.50 ft x 0.33 ft = 9.90 sft

    2 x 2 x 7.50 ft x 0.33 ft = 9.90 sft

    = 132.30 sft

    = 12.29 sqm

    @ per sqm = Tk 4965.55

    CE's-7.1.9

    1 7.50 ft x 8.83 ft x 0.25 ft = 16.56 cft

    Railing

    Tk 7535.00

    Qty same as FF

    Tk 348.00

    Sunshade, false ceiling:Ground Floor

    i)Concrete: qnty same as item-D (a)i

    Tk 373.00

    ii) Form work

    Drop Wall

    Qty same as Drop wall

    Tk 7037.00

    c) In 3rd Floor (+36'-0"+47'-0")

    Railing same Drop

    Tk 7140.00

    False slab

    False slab

    a) In 2nd floor

    i) Concrete

    i) Concrete

    Tk 404.00

    Tk 398.00

    i) Concrete

    Tk 6970.00

    In Railing

    b) In 2nd floor (+25'-0"+0+36'-0" level)

    d) In 4th Floor (+47'-0"to+58'-0"level)

    b) In 3rd floor

    15 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    16/55

    1 8.83 ft x 5.50 ft x 0.25 ft = 12.14 cft

    = 28.70 cft

    = 0.81 cum

    @ per cum = Tk 5471.34

    CE's-7.1.8 ii) Form Work (Wooden Shuttet)

    1 x 1 x 7.50 ft x 8.83 ft = 66.23 sft

    1 x 2 x 7.50 ft x 0.33 ft = 4.95 sft1 x 2 x 8.83 ft x 0.33 ft = 5.83 sft

    1 x 1 x 8.83 ft x 5.50 ft = 48.57 sft

    1 x 2 x 8.83 ft x 0.33 ft = 5.83 sft

    1 x 2 x 5.50 ft x 0.33 ft = 3.63 sft

    = 135.03 sft

    = 12.54 sqm

    @ per sqm = Tk 5381.46

    Item-9

    CE's-8.1.1

    = 450.47 cft = 5.63 cft

    = 1251.54 kg

    @ per kg = Tk 101374.45

    = 415.75 cft

    = 5.20 cft

    = 1155.07 kg

    @ per kg = Tk 93930.22

    = 570.68 cft

    = 5.71 cft

    = 30.35 cft

    = 0.38 cft

    = 126.58 cft

    = 1.27 cft

    = 28.13 cft

    = 0.35 cft

    = 7.70 cft

    = 1712.19 kg

    @ per kg = Tk 139783.44

    = 28.40 cft

    = 0.36 cft

    = 251.44 cft

    = 2.51 cft

    = 28.70 cft

    = 0.43 cft

    = 3.30 cft

    = 733.44 kg

    @ per kg = Tk 60113.00

    = 125.72 cft

    = 1.26 cft

    = 279.43 kg

    @ per kg = Tk 22991.63

    1.0% of this item

    3rd floor

    cft same as item- 08.E(b)

    1.0% of this item

    cft same as item- 08.E(c)

    cft same as item- 08.B(c)

    1st floor

    2nd floor

    1.25% of this item

    1.25% of this item

    cft same as item- 08.A(a)

    cft same as item- 08.B(a)+08.E(a)

    Ground floor

    Tk 6733.00

    Tk 429.00

    1.25% of this item

    cft same as item- 08.B(d)

    1.0% of this item

    Tk 81.32

    3420/400-grade(B420/400DWR) / 400G ribbed or deformed bar with minimum fy (ReH)=

    420/400 MPa & tensile strength(fu or Rm) at least 525 Mpa, minimum elongation after

    fracture and total elongation at maximum force is 16% and 8% respectively.

    1.0% of this item

    Tk 81.96

    cft same as item- 08.F(b)

    1.50% of this item

    cft same as item- 08.F(a)

    Tk 81.64

    Tk 82.28

    1.25% of this item

    cft same as item- 08.E(a)

    4th floor

    cft same as item- 08.B(b)

    1.25% of this item

    Tk 81.00

    16 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    17/55

    Item-10

    CE's-11.1

    CE's-11.1.5 Chittagong Teak

    5 2 x 7.00ft 0.46ft 0.21ft = 6.76 cft

    5 1 x 6.00ft 0.46ft 0.21ft = 2.90 cft

    G.F 3 2 x 7.00ft 0.46ft 0.21ft = 4.06 cft

    3 1 x 6.00ft 0.46ft 0.21ft = 1.74 cft

    35 2 x 7.00ft 0.46ft 0.21ft = 47.33 cft

    28 1 x 3.33ft 0.46ft 0.21ft = 9.01 cft

    7 1 x 2.50ft 0.46ft 0.21ft = 1.69 cft

    2 2 x 7.00ft 0.46ft 0.21ft = 2.70 cft

    1 1 x 2.50ft 0.46ft 0.21ft = 0.24 cft

    1 1 x 3.33ft 0.46ft 0.21ft = 0.32 cft

    6 2 x 7.00ft 0.46ft 0.21ft = 8.11 cft

    3 1 x 2.50ft 0.46ft 0.21ft = 0.72 cft

    3 1 x 3.33ft 0.46ft 0.21ft = 0.97 cft

    = 86.56 cft

    = 2.45 cum

    @ per cum = Tk 525861.51

    Item-11

    CE's-11.3

    8 2 x 4 = 64.00 nos

    35 2 x 4 = 280.00 nos

    2 2 x 4 = 16.00 nos

    6 2 x 4 = 48.00 nos

    = 408.00 nos

    @Tk 78.00 each = Tk 31824.00

    Item-12

    CE's-12.1

    CE's-12.1.4 Chittagong Teak

    7 1 x 2.17ft x 6.83ft = 103.75 sft

    2 1 x 2.17ft x 6.83ft = 29.64 sft

    (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation)

    (iii) 3rd F: 3 nos Deputy Secretary room (new accomodation)

    (i) F.F: 3 nos Members room (new accomodation) & others

    Supplying and making door and window frames (Chowkat) for all floors with

    matured natural seasoned wood of required size including painting two coats of coal

    tar to the surface in contact with wall, fitting and fixing in position etc. complete and

    accepted by the Engineer. (All sizes of wood are finished).

    (iv) 3rd floor:

    (ii) 1st floor:

    Tk 214544.00

    (iii) 2nd floor:

    (i)GF: (-) 6'-0" level

    Supplying, fitting and fixing 38 mm thick well matured, seasoned (min 10" wide

    plank) solid wood single leaf door shutter having top rail style of sections 100 mm x

    38 mm, lock rail 125 x 38 mm and bottom rail 225 x 38 mm. Closed joints with 25

    mm x 12 mm size wooden peg and provided with best quality 4 Nos. 100 mm iron

    hinges 2 (two) Nos. best quality 12 mm dia 300 mm and 200 mm long iron tower

    and socket bolts, 2 (two) Nos. heavy type nickel plated handle, hinged cleats, buffer

    blocks and finished by sand papering etc. all complete in all floors and accepted by

    the Engineer. (All sizes of wood are finished)

    Supplying, fitting and fixing M.S. flat bar clamp 150 x 38 x 6 mm size having

    bifurcated ends to door and window frames with rowel plug, necessary screws etc.

    including cutting groove in Chowkat if necessary etc. complete in all respect

    accepted by the Engineer.

    (ii) 2nd F: 2 nos Deputy Secretary room (new accomodation)

    (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation)

    (ii) F.F: 3 nos Members room (new accomodation) & others

    (i) G.F

    17 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    18/55

    3 1 x 3.00ft x 6.83ft = 61.47 sft

    3 1 x 2.17ft x 6.83ft = 44.46 sft

    = 239.32 sft

    = 22.23 sqm

    @Tk 9836.00 per sqm = Tk 218690.36

    Item-13

    CE's-12.4

    CE's-12.4.4 Chittagong Teak

    (i) Store

    4 1 x 6.00ft x 6.83ft = 163.92 sft

    (ii) G.F Vault3 1 x 5.67ft x 6.83ft = 116.18 sft

    5 1 x 6.00ft x 6.83ft = 204.90 sft

    = 485.00 sft

    = 45.06 sqm

    @Tk 12048.00 per sqm = Tk 542852.05

    Item-14

    CE's-12.7

    CE's-12.7.1

    (i)3 nos members accomodation

    28 1 x 3.00ft x 6.83ft = 573.72 sft

    2 1 x 3.00ft x 6.83ft = 40.98 sft

    = 614.70 sft

    = 57.11 sqm

    @Tk 4156.00 per sqm = Tk 237336.79

    Item-15

    CE's-12.19

    CE's-12.7.1

    2nd floor 2 1 x 2.50ft x 2.25ft = 11.25 sft

    3rd floor 3 1 x 2.50ft x 2.25ft = 16.88 sft

    At level (-) 6'-0" to (-) 9'-0"

    Burma Teak veneered

    Supplying, fitting and fixing 36 mm thick and having density 400 kg/cum solid

    particle board single leaf flush door for all floors for internal use made of well

    matured mechanical seasoned Rubber (Malaysian timber) or other approved

    wooden frame having finished size 35 x 50 mm around upon which 1.2 mm thick

    veneer (total two Nos. of veneers one of 0.7 mm horizontally made of gorjon and

    another of 0.5 mm vertically made of Burma Teak or Champa or Chapalish orGarjan wood) with necessary screws are pested on each side by mechanized

    process and provided with best quality 4 Nos. 100 mm iron hinges, 2 Nos. best

    quality 12 mm iron dia 300 mm and 225 mm long iron tower and socket bolts, 2

    (two) Nos. heavy type nickel plated handles, hinged cleats, buffer blocks etc.

    complete and accepted by the Engineer.

    Supplying, fitt ing and fixing 38 mm thick well matured, natural seasoned (min 10"

    wide plank) wooden double leaf panel door shutters. Top rail and styles of sections100 mm x 38 mm, lock rail 125 mm x 38 mm and bottom rail 225mm x 38 mm,

    paneling 38 mm thick both sides raised, provided with best quality 6 Nos. 100 mm

    iron hinges, 2 (two) Nos. best quality 12 mm dia 300 mm and 225 mm long iron

    tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle, 1 No. hatch-

    bolt hinged cleats, buffer blocks and finished by sand papering, necessary screws

    etc. all complete in all floors and accepted by the Engineer.

    (Double leaf. All sizes of wood are finished)

    Supplying, fitting and fixing of well matured louver shutter having 75.50mm x 38mm

    size all around frame and inner horizontal wooden louver blade 65mm x 20mm

    spaced @ 38mm c/c, fixed with frame in grooves including cost of nails, handle,

    tower bolt, screws (brass fitting) etc. all complete in all respect as per drawing and

    direction of the Engineer in charge.

    False slab top

    (iii) Presspart

    (ii) 2 nos Deputy Secretary room (new accomodation)

    18 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    19/55

    = 28.13 sft

    = 2.61 sqm

    @Tk 12417.00 per sqm = Tk 32444.08

    Item-16

    CE's-12.15.2

    4 x 3.50 ft x 7.00 ft = 98.00 sft

    = 9.10 sqm

    @ Tk 4797.00 per sqm = Tk 43673.91

    Item-17

    CE's-12.21.2

    = 124.40 sqm

    @Tk 223.00 per sqm = Tk 27740.78

    Item-18

    CE's-12.22

    18 1 = 18.00 nos

    2 1 = 2.00 nos

    3 1 = 3.00 nos

    = 23.00 nos

    @Tk 2014.00 each = Tk 46322.00

    Item-19

    CE's-12.23.2

    8 1 = 8.00 nos

    35 1 = 35.00 nos

    2 1 = 2.00 nos

    6 1 = 6.00 nos

    = 51.00 nos

    @Tk 767.00 each = Tk 39117.00

    Item-20

    CE's-13.4.1

    1 1 x 19.50ft x 3.00ft = 58.50 sft

    N/S 4 1 x 19.50ft x 7.00ft = 546.00 sft

    1 1 x 8.00ft x 7.00ft = 56.00 sft

    E/W 3 1 x 20.33ft x 7.00ft = 426.93 sft

    1 1 x 10.00ft x 7.00ft = 70.00 sft

    (i) G.F: (+) 3'-0"

    (ii) F.F: 3 nos Members room (new accomodation) & others

    Supplying, fitting, fixing window grills of any design made with 25 x 6 mm F.I. bar

    including fabrication, welding, cost of electricity workshop charges, carriage, cutting

    grooves, mending good the damages, tools and plants etc. complete for all floors

    accepted by the Engineer. (Total weight per sqm should be min 42.88 kg. and addor deduct @ Tk. 35.00 for each kg. excess or less respectively)

    SS fittings of door

    Qty same as item no-12, 13, 14

    (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation)

    Supplying, fitting and fixing M.S. door shutter made with 1.5 x 1.5 x angle outer frame,inner member1 x F.I. bar, cladding with 16 BWG M.S. sheet, hinged with 2 x 2 x M.S. angle Chowkat.

    (i) G.F

    (ii) F.F: 3 nos Members room (new accomodation) & others

    Supplying, fitting and fixing Rim/ round door lock approved and accepted by the

    Engineer.

    Extra cost for using brass/ SS fittings in place of iron fitt ings in doors & windows for

    all floors (super quality local).

    (iv) 3rd F: 3 nos Deputy Secretary room (new accomodation)

    Supplying, fitting and fixing of made in hydraulic door closer (big size) including all

    necessary tools and accessories etc. all complete approved and accepted by the

    Engineer.

    (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation)

    (iii) 2nd F: 2 nos Deputy Secretary room (new accomodation)

    (+) 7'-0"

    (ii) F.F: 3 nos members accomodation & others:

    19 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    20/55

    1 1 x 19.50ft x 3.00ft = 58.50 sft

    2 1 x 21.00ft x 3.00ft = 126.00 sft

    36 1 x 5.00ft x 4.50ft = 810.00 sft

    1 1 x 12.00ft x 9.00ft = 108.00 sft

    2 2 x 6.00ft x 4.50ft = 108.00 sft

    1 2 x 6.00ft x 4.50ft = 54.00 sft

    1 1 x 13.00ft x 4.50ft = 58.50 sft

    1 1 x 12.17ft x 4.50ft = 54.77 sft

    = 2535.20 sft

    = 235.53 sqm

    @Tk 2570.00 per sqm = Tk 605300.18

    Item-21

    CE's-14.2

    14.2.2

    Bronze colour

    G.F 1 1 x 40.00ft x 10.50ft = 420.00 sft

    2 2 x 6.00ft x 7.00ft = 168.00 sft

    2 1 x 4.50ft x 7.00ft = 63.00 sft

    F.F 1 1 x 22.00ft x 10.50ft = 231.00 sft

    1 1 x 4.50ft x 7.00ft = 31.50 sft

    = 913.50 sft

    = 84.87 sqm

    @Tk 5296.00 per sqm = Tk 449451.51

    Item-22

    (iii) 2nd F:2 nos Deputy Secretary room (new accomodation)

    (iv) 3rd F: 2 nos Deputy Secretary room (new accomodation)

    Supplying fitt ing and fixing of Aluminium swing door as per the U.S.Architectural

    Aluminium Manufacturers Association (AAMA) standard specification having 1.8mm thick wall frame size 101.60 mm. 44.45 mm. 83.21 mm). 2.33 mm thick shutter

    size (54 mm, 46 mm), 0.99 mm thick door glass bit (size 16.54 mm. 14.49 mm

    0.115 kg/m), 2.5 mm thick clousure section (size 101.60 mm, 42.93 mm 1.2 mm),

    106.60 mm clousure cover (0.45 kg/m), 4 mm thick floor bottom (size 101.60 mm.

    12.70 mm 1 kg/m), 1.8 mm thick shutter bottom (size 82.6 mm, 43.99 mm, 0.60kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) and 2.3 mm to

    4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m)

    section of all aluminum members will be anodized to aluminium bronze/silver colour

    with a coat not less than 15 micrones in thickness and density of 4 mg per square

    cm etc. including all accessories like swing door clousure, swing door lock, swing

    door mohiar, labour charge, fabrication, fitting fixing in position, carriage and

    electricity charge keeping provision for fitting 5 mm thick glass including neoprene

    sealant etc. complete in all respect as per drawing and accepted by the Engineer.

    (Total weight min 23 kg/m2)

    Swing door with fixed partition

    Size up to: 2100 mm x 2100 mm.

    20 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    21/55

    CE's-14.4

    14.4.2

    Bronze colour

    2 1 x 3.50ft x 7.00ft = 49.00 sft

    1 1 x 7.50ft x 7.00ft = 52.50 sft

    = 101.50 sft

    = 9.43 sqm

    @Tk 2075.00 per sqm = Tk 19566.38

    Item-23

    CE's-14.6

    14.6.1.2 Size up to: 1500 mm x 1400 mm. (total weight minimum 9.081 kg)

    Bronze colour

    (i) 3 nos members accomodation

    1 2 x 6.00ft x 4.50ft = 54.00 sft

    1 1 x 13.00ft x 4.50ft = 58.50 sft

    1 1 x 12.17ft x 4.50ft = 54.77 sft36 1 x 5.00ft x 4.50ft = 810.00 sft

    = 977.27 sft (A)

    2 2 x 6.00ft x 4.50ft = 108.00 sft (B)

    2 1 x 6.33ft x 5.50ft = 69.63 sft (C)

    3 1 x 9.75ft x 4.50ft = 131.63 sft

    5 1 x 4.50ft x 4.50ft = 101.25 sft

    = 232.88 sft (D)

    Total = 1387.77 sft

    (ii) 2 nos Deputy Secretary room (new accomodation)

    Supplying, fitting and fixing of Aluminium sliding window as per the U.S.

    Architectural Aluminium Manufacturers Association (AAMA) standard specificationhaving 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top

    (size 75.50 mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm),

    1.2 mm thick shutter bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size

    75.50 mm,19.90 mm), 1.2 mm thick sliding side (size 31 mm, 26 mm),1.2 mm thick

    shutter lock (size 49.20 mm 26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm,

    32.10 mm) sections all aluminium members (total weight kg/sqm) will be anodized

    to aluminium bronze/silver colour with a coat not less than 15 micron in thickness

    and density of 4 mg per square cm etc. including all accessories like sliding door

    key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and

    nuts including sealants, keeping provision for fitting 5 mm thick glass including

    labour charge for fitting of accessories, making grooves and mending good

    damages, carriage, and electricity complete in all respect as per drawing and

    accepted by the Engineer.

    Supplying, fitting and fixing of Aluminium sliding doors as per the U.S. Architectural

    Aluminium Manufacturers Association (AAMA) standard specification having 1.2mm thick outer bottom (size 75.50 mm, 17.79 mm, 0.528 kg/m), 1.2 mm thick outer

    top (size 75.50 mm, 26.80 mm, 0.78 kg/m) 1.2 mm thick shutter top (size 33 mm,

    26.80 mm, 0.536 kg/m), 1.2 mm shutter bottom (size 60 mm, 24 mm, 0.736 kg/m),

    1.2 mm thick outer side(size 75.50 mm, 19.90 mm, 0.616 kg/m) 1.5 mm thick

    shutter lock (size 49.20 mm, 26.20 mm, 0.661 kg/m), 1.2 mm thick inter lock (size

    34.40 mm, 32.10 mm, 0.665 kg/m), 1.2 mm thick shutter divider (size 31.75 mm,

    0.535 kg/m) sections all aluminium members (Total weight 14.789 kg) will be

    anodized to aluminium bronze/silver colour with a coat not less than 15 microns in

    thickness and density of 4 mg per square cm etc. including all accessories like

    handle, sliding door key lock , sliding door wheel, sliding door mohiar, sliding door

    neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick

    glass including labour charge for fitting of accessories, making grooves and

    mending good damages, carriage, and electricity complete in all respect as per

    drawing and accepted by the Engineer.

    Size up to: 2100 mm x 2100 mm.

    (iii) G.F

    21 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    22/55

    = 128.93 sqm

    @Tk 2370.00 per sqm = Tk 305556.94

    14.6.2.2 Size up to: 900 mm x 1400 mm (total weight minimum 7.409 kg)

    Bronze colour

    2 1 x 6.33ft x 2.50ft = 31.65 sft

    2 1 x 6.33ft x 2.00ft = 25.32 sft= 56.97 sft (E)

    = 5.29 sqm

    @Tk 3120.00 per sqm = Tk 16513.04

    Item-24

    CE's-14.11

    14.11.2 Bronze colour

    1 1 x 19.50ft x 3.00ft = 58.50 sft

    N/S 4 1 x 19.50ft x 7.00ft = 546.00 sft

    1 1 x 8.00ft x 7.00ft = 56.00 sft

    E/W 3 1 x 20.33ft x 7.00ft = 426.93 sft

    1 1 x 10.00ft x 7.00ft = 70.00 sft

    1 1 x 19.50ft x 3.00ft = 58.50 sft

    2 1 x 21.00ft x 3.00ft = 126.00 sft

    = 1341.93 sft= 124.67 sqm (A)

    Scrutinizer & moderation room

    1 1 x 12.00ft x 9.00ft = 108.00 sft

    1 2 x 7.50ft x 10.50ft = 157.50 sft

    1 2 x 12.00ft x 10.50ft = 252.00 sft

    3 6 x 6.00ft x 7.00ft = 756.00 sft

    2 1 x 14.00ft x 7.00ft = 196.00 sft

    = 1469.50 sft

    = 136.52 sqm (B)

    Total= A+B = 261.19 sqm

    @Tk 3154.00 per sqm = Tk 823787.65

    Item-25

    CE's-14.14

    CE's-14.14.2 (A) 5mm thick tinted glass

    = 101.50 sft

    = 1375.11 sft

    = 1476.61 sft

    = 913.50 sft

    = 124.67 sft

    Supplying, fitt ing and fixing in Aluminium door frames, windows, partitions andcurtain wall distortion free glass of approved quality and shade including cost of

    fitt ing fixing all necessary accessories etc. complete in all respect as per drawing

    and accepted by the Engineer.

    Qty same as item no-21

    Qty same as item no-24(A)

    (i) 2 nos Deputy Secretary room (new accomodation)

    Qty same as item no-22

    Qty same as item no-23(A+B+D+E)

    (+) 7'-0"

    (ii) F.F: 3 nos members accomodation & others:

    (+) 3'-0"

    Supplying fitting and fixing of Aluminium fixed fan light as per the U.S. Architectural

    Aluminium Manufacturers Association (AAMA) standard specification mm, 0.313kg/m) 1.2 mm thick bottom cover (size 76.2 mm, 38.10 mm, 0.76 kg/m) and 2.5 mm

    thick grouve cover section (size 57.15mm, 15.80 mm, 0.425 kg/m) and 1.2 thick top

    and side section (76.20 mm, 16 mm, 38.10 mm, 0.961 kg/m) fixed with above

    mentioned frames and all aluminium members (Total weight 5.365kg) will be

    anodized to aluminium bronze/silver colour with a coat not less than 15 micron in

    thickness and density of 4 mg per square cm etc. including all accessories,

    neoprene, sealant, nut and bolt etc. complete in all respect as per drawing and

    accepted by the Engineer.

    (i) G.F

    22 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    23/55

    6 x 4.50 ft x 4.50 ft = 121.50 sft

    2 x 6.33 ft x 2.50 ft = 31.65 sft

    2 x 6.33 ft x 2.00 ft = 25.32 sft

    3 x 9.75 ft x 4.50 ft = 131.63 sft

    6 x 6.83 ft x 3.50 ft = 143.43 sft

    2 x 7.50 ft x 5.50 ft = 82.50 sft2 x 2.25 ft x 5.50 ft = 24.75 sft

    2 x 4.17 ft x 7.00 ft = 58.38 sft

    1 x 5.75 ft x 7.00 ft = 40.25 sft

    1 x 5.75 ft x 2.00 ft = 11.50 sft

    1 x 4.00 ft x 7.00 ft = 28.00 sft

    2 x 3.75 ft x 7.00 ft = 52.50 sft

    = 751.41 sft

    Total = 3266.18 sft

    = 303.44 sqm

    @Tk 1073.00 per sqm = Tk 325586.65

    CE's-14.14.3 (B) 5mm thick frosted glass

    = 1469.50 sft

    = 108.00 sft

    = 1577.50 sft

    = 146.55 sqm

    @Tk 1152.00 per sqm = Tk 168829.43

    Item-26

    Analysis rate

    18 x 22.00 ft x 14.50 ft = 5742.00 sft

    18 x 3.00 ft x 14.50 ft = 783.00 sft= 6525.00 sft= 606.19 s m

    @ Tk 3951.00 per sqm = Tk 2395045.99Item-27

    CE's-15.1

    = 1551.00 sft

    = 144.09 sqm (A)

    @ per sqm = Tk 26512.82

    = 4123.00 sft

    42 x 2 x 0.42 ft x 3.50 ft = 123.48 sft

    = 443.00 ft x 0.50 ft = 221.50 sft

    42 x 0.42 ft x 0.83 ft = 14.64 sft

    = 4482.62 sft

    = 416.45 sqm (B)

    @ per sqm = Tk 80374.01

    (i) Scrutinizer & moderation room

    Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) having with fresh cement to wall

    both inner-and outer surface, finishing the corner and edges including washing of sand

    cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and

    other charges etc. all complete in all respect as per drawing and accepted by the Engineer.

    (Cement: CEM-II/A-M)

    Sft same as item -3B(B) x 2

    Tk 184.00

    6 mm thick tempered reflected glass

    Top of wall

    At level (+)80'-0"

    Offset

    Sft same as item -3C(B) x 2

    Tk 193.00

    At level (+) 25'-0"

    Offset

    At level (+) 7'-0" to (+) 25'-0"

    (+) 7'-0" level

    Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall

    tempered reflected glass of approved quality and shade including cost of fitt ing fixing all

    necessary accessories etc. complete in all respect as per drawing and accepted by the

    Engineer.

    Qty same as item no-23(B)

    Qty same as item no-24(B)

    (ii) 2 nos Deputy Secretary room (new accomodation)

    Outside

    23 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    24/55

    = 7980.38 sft

    78 x 2 x 0.42 ft x 3.50 ft = 229.32 sft

    = 1330.06 ft x 0.50 ft = 665.03 sft

    78 x 0.42 ft x 0.83 ft = 27.19 sft

    Stair & lift wall

    Outside 2 x 28.92 ft x 10.50 ft = 607.32 sft

    E/W 2 x 14.83 ft x 10.50 ft = 311.43 sft

    Main Stair

    N/S 2 x 46.00 ft x 10.50 ft = 966.00 sft

    E/W 2 x 14.00 ft x 10.50 ft = 294.00 sft

    Lift Portion

    2 x 46.00 ft x 13.00 ft = 1196.00 sft

    E/W 2 x 11.50 ft x 13.00 ft = 299.00 sft

    = 12575.67 sft

    = 1168.31 sqm ( C )

    Inside plaster

    N/S 4 x 25.50 ft x 10.50 ft = 1071.00 sft

    E/W 2 x 12.50 ft x 10.50 ft = 262.50 sft

    Main Stair

    N/S 2 x 12.50 ft x 10.50 ft = 262.50 sft

    E/W 2 x 20.50 ft x 10.50 ft = 430.50 sft

    Electric room

    N/S 2 x 6.50 ft x 10.50 ft = 136.50 sft

    E/W 2 x 13.00 ft x 10.50 ft = 273.00 sft

    = 2436.00 sft

    = 226.31 sqm ( D )

    = 1394.62 sqm ( E )

    @ per sqm = Tk 365390.02

    Item-28

    CE's-15.2

    Open terrece wall side

    2 x 1 x 4.00 ft = 8.00 rft

    N/s 2 x 9.58 ft = 19.16 rft

    E/W 2 x 2 x 2.25 ft = 9.00 rft

    N/s 2 x 2 x 41.50 ft = 166.00 rft

    2 x 2 x 23.00 ft = 92.00 rft

    2 x 2 x 13.00 ft = 52.00 rft

    = 346.16 rft

    = 173.08 sft

    = 16.08 sqm

    @ Tk 238.00 per sqm = Tk 3826.93

    2 x 2 x 48.33 ft = 193.32 rft

    2 x 2 x 39.82 ft = 159.28 rft

    Oftset

    2 x 2 x 6 x 1.67 ft = 40.08 rft

    (+47'-0"to+58'-0"level) 392.68 rft

    = 196.34 sft

    47'-0"Level

    Open terrace Skirting

    Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth

    wall (1:4) with cement up to 150 mm below ground level with neat cement finishingincluding washing of sand, finishing the edges and corners and curing at least for 7 days,

    cost of water, electricity and other charges etc. all complete in all respect as per drawing

    and accepted by the Engineer. (Cement: CEM-II/A-M) Ground floor.

    Stair Chillakota S-E & N-W

    Top of wall

    Offset

    Total = (C+D)

    Stair Chillakota S-E & N-W

    Offset

    Tk 262.00

    Sft same as item -H(C) x 2

    36'-0"Level

    24 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    25/55

    = 18.24 sqm

    @ Tk 247.00 sqm = Tk 4505.39

    Item-29

    CE's-15.4

    4 x 2.00 ft x 19.50 ft x 10.00 ft = 1560.00 sft

    1 x 0.83 ft x 8.00 ft x 10.00 ft = 66.40 sft

    E/W sft

    1 x 2.00 ft x 10.00 ft x 10.00 ft = 200.00 sft

    3 x 2.00 ft x 20.33 ft x 10.00 ft = 1219.80 sft

    0.5 4 25.00 ft x 0.83 ft x 3.50 ft = 145.25 sft

    sft

    2 x 2 x 9.67 ft x 0.50 ft = 19.34 sft

    2 x 2 x 9.67 ft x 0.50 ft = 19.34 sft2 x 2 x 9.67 ft x 4.50 ft = 174.06 sft

    2 x 2 x 0.83 ft x 3.50 ft = 11.62 sft

    2 x 2 x 5.92 ft x 3.50 ft = 82.88 sft

    2 x 2 x 10.75 ft x 1.58 ft = 67.94 sft

    2 x 2 x 6.17 ft x 3.58 ft = 88.35 sft

    2 x 2 x 5.67 ft x 3.58 ft = 81.19 sft

    sft

    2 x 2 x 5.50 ft x 3.50 ft = 77.00 sft

    2 x 2 x 5.50 ft x 4.00 ft = 88.00 sft

    sft

    1 x 2 x 34.67 ft x 3.17 ft = 219.81 sft

    = 4120.99 sft

    3 1 x 6.33 ft x 10.00 ft = 189.90 sft1 1 x 7.25 ft x 14.00 ft = 101.50 sft

    = 291.40 sft

    = 9017.84 sft

    = 13430.23 sft

    = 1247.70 sqm

    @ per sqm = Tk 200879.48

    3 1 x 6.33 ft x 10.00 ft = 189.90 sft

    1 1 x 7.25 ft x 14.00 ft = 101.50 sft

    = 291.40 sft

    = 20844.64 sft

    = 21136.04 sft= 1963.59 sqm

    @ per sqm = Tk 333809.66

    Lift door gap

    2 2 x 5.00ft x 9.00ft = 180.00 sft

    E/W 2 2 x 22.00 ft x 10.00 ft = 880.00 sft

    2 2 x 20.00 ft x 10.00 ft = 800.00 sft

    N/S 2 2 x 11.50 ft x 10.00 ft = 460.00 sft

    2 1 x 9.50 ft x 10.00 ft = 190.00 sft

    At level (+) 7'-0"

    ii) At level (-) 6'-0"

    Sft same as item -3B(A) x 2

    (i) 2 nos Deputy Secretary room (new accomodation)

    Middle stair grid-16

    (East west side)

    i) Duct wall

    C) At level (+) 25'-0"

    Tk 170.00

    For 02 nos ramp (East west side)

    For 02 nos ramp (East west side)

    A) G.F

    Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:6) having with fresh cement to wall

    both inner-and outer surface, finishing the corner and edges including washing of sand

    cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and

    other charges etc. all complete in all respect as per drawing and accepted by the Engineer.

    (Cement: CEM-II/A-M)

    B) FF: At level (+) 14'-0" (3 nos members accomodation)

    Tk 161.00

    Sft same as item -3(A) x 2

    i) Duct wall

    25 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    26/55

    2 1 x 10.50 ft x 10.00 ft = 210.00 sft

    2 2 x 3.50 ft x 10.00 ft = 140.00 sft

    = 2860.00 sft

    Door -2 x 3.33 ft x 7.00 ft = -46.62 sft

    -2 x 2.50 ft x 7.00 ft = -35.00 sft

    -2 x 3.50 ft x 7.00 ft = -49.00 sft

    Window -4 x 6.00 ft x 4.50 ft = -108.00 sft= 2621.38 sft

    = 243.53 sqm

    @ per sqm = Tk 43592.25

    Lift door gap

    2 2 x 5.00ft x 9.00ft = 180.00 sft

    E/W 1 x 21.58 ft x 10.50 ft = 226.59 sft

    1 x 8.83 ft x 10.50 ft = 92.72 sft

    N/S 1 x 14.75 ft x 10.50 ft = 154.88 sft

    1 x 12.17 ft x 10.50 ft = 127.79 sft

    E/W 1 x 20.33 ft x 10.50 ft = 213.47 sft1 x 16.58 ft x 10.50 ft = 174.09 sft

    N/S 2 x 13.00 ft x 10.50 ft = 273.00 sft

    1 x 8.00 ft x 10.50 ft = 84.00 sft

    Toilet inside 1 x 7.00 ft x 8.00 ft = 56.00 sft

    = 1582.52 sft

    = 147.02 sqm (A)

    @ persqm = Tk 27639.70

    Lift door gap

    2 2 x 5.00ft x 9.00ft = 180.00 sft

    = 16.72 sqm

    @ persqm = Tk 3294.31

    Lift door gap2 2 x 5.00ft x 9.00ft = 180.00 sft

    = 16.72 sqm

    @ persqm = Tk 3444.82

    Lift door gap

    2 2 x 5.00ft x 9.00ft = 180.00 sft

    = 16.72 sqm

    @ persqm = Tk 3846.15

    Item-30

    CE's-15.5

    = 2518.09 sft

    = 233.94 sqm (A)

    @ per sqm = Tk 35558.30

    = 2100.76 sft

    = 195.17 sqm (A)

    E) 4th floor: At level (+) 47'-0"

    Tk 197.00

    F) 5th floor: At level (+) 58'-0"

    Tk 206.00

    G) 6th floor: At level (+) 69'-0"

    (i) 2 nos Deputy Secretary room (new accomodation)

    Tk 230.00

    Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling

    R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall,

    louvers, fins and finishing the corners and edges including washing of sand cleaning the

    surface, scaffolding and curing at least for 7 days, cost of water, electricity and other

    charges etc. all complete in all respect as per drawing and accepted by the Engineer.

    (Cement: CEM-II/A-M)

    DS room attached to exam. Controller (Non-Cadre)

    Tk 188.00

    DS room attached to exam. Controller (cadre)

    D) 3rd floor: At level (+) 36'-0"

    Tk 179.00

    A) G.F:

    Sft same as item- 8.B(a-ii)+8.E(a-ii)

    Sft same as item- 8.B(b-ii)

    Tk 152.00

    Deduct

    B) F.F:

    26 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    27/55

    @ per sqm = Tk 31421.62

    = 1161.10 sft

    14 x 3.00 ft x 2.00 ft = 84.00 sft

    9 x 1.67 ft x 3.00 ft = 45.09 sft

    10 x = 33.96 sft

    = 1324.15 sft

    = 123.02 sqm (A)

    = 1362.46 sft

    = 126.58 sqm (B)

    Total = 249.59 sqm (C)

    @ per sqm = Tk 42430.77

    = 2372.66 sft

    = 220.43 sqm (A)

    @ per sqm = Tk 39456.11

    = 1022.80 sft

    = 95.02 sqm (A)

    @ per sqm = Tk 17008.58

    = 3530.70 sft

    15 x 3.00 ft x 2.00 ft = 90.00 sft

    21 x 1.67 ft x 3.00 ft = 105.21 sft

    = 3725.91 sft

    = 346.15 sqm (A)

    Cornice 2 1 x 48.00 ft x 1.00 ft = 96.00 sftN/S 2 1 x 49.00 ft x 1.50 ft = 147.00 sft

    E/W 2 1 x 11.50 ft x 1.00 ft = 23.00 sft

    2 1 x 11.50 ft x 1.50 ft = 34.50 sft

    side 2 1 x 48.00 ft x 0.67 ft = 64.32 sft

    2 1 x 49.00 ft x 0.42 ft = 41.16 sft

    E/W 2 1 x 13.50 ft x 0.67 ft = 18.09 sft

    2 1 x 14.50 ft x 0.42 ft = 12.18 sft

    N/S 2 2 x 27.25 ft x 1.50 ft = 163.50 sft

    E/W 2 2 x 14.50 ft x 1.50 ft = 87.00 sft

    side 2 2 x 27.25 ft x 0.42 ft = 45.78 sft

    2 2 x 14.50 ft x 0.42 ft = 24.36 sft

    N/S 2 1 x 48.00 ft x 1.50 ft = 144.00 sft

    E/W 2 1 x 14.00 ft x 1.50 ft = 42.00 sft

    side 2 1 x 48.00 ft x 0.42 ft = 40.32 sft

    2 1 x 17.25 ft x 0.42 ft = 14.49 sft

    1 1 x 9.50 ft x 17.00 ft = 161.50 sft

    Sft same as item- 8.A(b-ii)

    F) 7th. F:

    Sft same as item- 8.B(d-ii)+8.C(c-ii)+8.F(b-ii)

    Tk 179.00

    E) 4th. F:

    Sft same as item- 8.C(d-ii)

    Sft same as item- 8.B(b-ii)+8.C(b-ii)+8.F(a-ii)

    Top of column

    (3.14 x 2.08 x 2.08/4)

    Tk 161.00

    C) 2nd. F:

    D) 3rd. F:

    Tk 179.00

    Sft same as item- 8.A(a-ii)

    Tk 170.00

    Lift 1st roof & 2nd roof bottom: slab, cornice, side

    Stair Chillakota S-E & N-W: Slab, cornice, side

    RCC wall

    Main Stair Chillakota: Slab, cornice, side

    Inside Lift room (North part)

    At level (+)80'-0"

    27 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    28/55

    N/S 2 1 x 17.00 ft x 7.75 ft = 263.50 sft

    E/W 2 1 x 9.50 ft x 7.75 ft = 147.25 sft

    2 1 x 7.50 ft x 1.50 ft = 22.50 sft

    Electric room ceiling

    2 1 x 13.50 ft x 6.50 ft = 175.50 sft

    1 1 x 21.00 ft x 13.50 ft = 283.50 sft

    2 1 x 26.50 ft x 13.50 ft = 715.50 sft

    = 2766.95 sft

    = 257.06 sqm (B)

    Total = 603.20 sqm (C)

    @ per sqm = Tk 130291.51

    Item-31

    Analysis rate

    (A)

    = 1 x 69.50 ft x 180.00 ft = 12510.00 sft

    = 1 x 43.50 ft x 90.00 ft = 3915.00 sft

    = 16425.00 sft (A)

    (B)

    = 16320.00 sft

    = 355.61 ft x 0.42 ft = 149.36 sft

    1 x 19.00 ft x 12.00 ft = 228.00 sft

    2 x 17.50 ft x 12.00 ft = 420.00 sft

    4 x 9.50 ft x 8.50 ft = 323.00 sft15 x 2.00 ft x 3.00 ft = 90.00 sft

    21 x 1.67 ft x 3.00 ft = 105.21 sft

    2 x 19.00 ft x 1.00 ft = 38.00 sft

    4 x 9.50 ft x 1.00 ft = 38.00 sft

    4 x 3.00 ft x 1.00 ft = 12.00 sft

    2 x 2.00 ft x 1.00 ft = 4.00 sft

    2 x 3.00 ft x 1.00 ft = 6.00 sft

    Main stair wall

    1 x 21.00 ft x 1.00 ft = 21.00 sft

    Electric room wall

    2 x 11.00 ft x 1.00 ft = 22.00 sft

    2 x 5.00 ft x 1.00 ft = 10.00 sft2 x 3.00 ft x 1.00 ft = 6.00 sft

    4 x 8.00 ft x 1.17 ft = 37.44 sft

    4 x 6.50 ft x 1.17 ft = 30.42 sft

    4 x 12.00 ft x 0.42 ft = 20.16 sft

    2 x 15.00 ft x 0.42 ft = 12.60 sft

    2 x 16.00 ft x 0.42 ft = 13.44 sft

    Main stair attached:

    2 x 10.00 ft x 0.42 ft = 8.40 sft

    2 x 5.00 ft x 0.42 ft = 4.20 sft

    1 x 16.00 ft x 0.42 ft = 6.72 sft

    Lift:Column:

    R.C.C wall:

    Lift wall:

    Shear w

    Brick/W

    At level (+) 80'-0"

    Sft as per Architectural plan

    Deduct:

    5" brick wall

    Stair:

    Grid 13 to 16 (D to L)

    Grid 16 to 18

    At level (+) 25'-0"

    75 mm thick cement concrete (C.C) works with 25 mm x 25 mm mesh expanded metal

    using 1st class brick chips of proportion 1:2:4 with net cement finishing on roof including

    breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7

    days including the supply of water, electricity and other charges and costs of tools and

    plants etc. as per direction of Engineer-in-charge

    Tk 216.00

    Beam side

    Stair room: Main & S-E & N-W stair

    28 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    29/55

    (-) = 1605.95 sft

    = 14714.05 sft (B)

    = 31139.05 sft

    = 2892.89 sqm

    @ per sqm = Tk 3020175.79

    Item-32

    CE's-03.5.2

    A

    2 x 69.50 ft = 139.00 rft2 x 180.00 ft = 360.00 rft2 x 43.50 ft = 87.00 rft2 x 90.00 ft = 180.00 rft

    14 x 2 x 3.00 ft = 84.00 rft14 x 2 x 2.00 ft = 56.00 rft

    9 x 2 x 3.00 ft = 54.00 rft9 x 2 x 1.67 ft = 30.06 rft

    10 x 1 x 6.53 ft = 65.30 rft= 1055.36 rft

    0.50 x 1055.36 x 0.42 ft x 0.50 ft = 110.81 cft AB

    E/W 4 x 159.17 ft = 636.68 rftN/S 4 x 47.17 ft = 188.68 rft

    8 x 1.50 ft = 12.00 rft4 x 14.00 ft = 56.00 rft2 x 11.08 ft = 22.16 rft2 x 46.00 ft = 92.00 rft

    = 1007.52 rftDeduct: Lift core 2 x 19.50 ft = 39.00 rft

    = 968.52 rft0.50 x 968.52 x 0.42 ft x 0.50 ft = 101.69 cft (B)

    15 x 2 x 3.83 ft = 114.90 rft15 x 2 x 2.00 ft = 60.00 rft21 x 2 x 3.83 ft = 160.86 rft21 x 2 x 1.67 ft = 70.14 rft

    = 405.90 rft0.50 x 405.90 x 0.42 ft x 0.50 ft = 42.62 cft (C)

    = 255.13 cft= 7.22 cum

    er cum = Tk 45932.23Item-33

    Tk 1044.00

    Total = (A+B)

    Stair attached:Lift attached:

    Column Side :

    Total = (A + B + C)

    Tk 6358.00

    Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2

    Column Side :

    At level (+) 80'-0"Ghoondy

    Mass concrete (1:2:4) in foundation or floor with cement, sand (F.M. 1.2) and picked jhama

    chips including breaking chips, screening, mixing, laying, compacting to levels and curing

    for at least 7 days including the supply of water, electricity and other charges and costs of

    tools and plants etc. all complete and accepted by the Engineer. (Cement: CEM-II/A-M)

    At level (+) 25'-0"Ghoondy

    29 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    30/55

    CE's-19.1.3

    2 x 8.00 ft x 7.00 ft = 112.00 sft

    = 10.41 sqm

    @ Tk 4236.00 per sqm = Tk 44075.81

    Item-34

    CE's-16.6

    12 x 7.00 ft = 84.00 rft

    = 25.60 rm

    @ Tk 816.00 per rm = Tk 20891.19

    Item-35

    CE's-16.6

    = 168.00 sft

    12 x 0.50 ft x 7.00 ft = 42.00 sft

    6 x 3.00 ft x 7.00 ft = 126.00 sft

    = 2535.20 sft

    = 2871.20 sft

    = 266.74 sqm

    @ Tk 150.00 per sqm = Tk 40011.08

    Item-36

    CE's-16.8.2

    1 x 176.00 ft x 69.00 ft = 12144.00 sft

    Wall 2 4 x 20.00 ft x 12.00 ft = 1920.00 sft

    A) At level (-) 6'-0"

    At level (+) 7'-0"

    Manufacturing, supplying, fitting and fixing M.S. tube (angle box) post (bottom end

    bifurcated) made by thorough welding of two Nos. 38 x 38 x 6 mm M.S. angle and verticallyplacing the post into C.C. or R.C.C. foundation including cutting angle to required shape

    and size including covering the top of the post with 6 mm thick M.S. plate etc. all complete

    as per drawing. (Rate is excluding the cost of C.C./R.C.C. foundation and paint)

    Chillakota

    Member & DS

    Plastic emulsion paint of approved best quality and colour delivered from authorized localagent of the manufacturer in a sealed container, applying to wall and ceiling in two coats

    over lime putty of specified brand applied on primer or sealer elapsing specified time for

    drying/recoating including cleaning drying, making free from dirt, grease, wax, removing all

    chalked and scaled materials, fungus, mending good the surface defects, sand papering

    the surface and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in

    all floors accepted by the Engineer. Lime putty to be applied as per manufacturer

    instructions approved and accepted by the Engineer.

    Ceiling

    sft same as item- 20

    Painting to door and window frames and shutters in two coats with approved best quality

    and colour of synthetic enamel paint delivered from authorized local agent of the

    manufacturer in a sealed container, having highly water resistant, high bondibilty, flexible,

    using specific brand thinner applied by brass/roller/spray over a coat of priming elapsing

    time for drying including surface cleaning from dust, oil or dirt, smoothening, finishing and

    polishing with sand paper and necessary tools, scaffolding, testing charges etc. all

    complete in all floors approved and accepted by the Engineer.

    Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made

    of 3/4" x 3/4" x 1/8" channel placed @ 112 mm c/c vertically and connecting the same with

    each other by 20 x 3 mm M.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows

    including cutting the different M.S. members to required sizes, fabricating, welding, riveting

    with required size rivets, providing required size wheels, pulling handles on both sides,

    suitable locking arrangement, electrodes, grease and finally placing the same in position in

    between 2 (two) Nos. 50 x 50 x 6 mm M.S. Tee rail made by welding 2 Nos. 50 x 6 mm M.S.

    flat bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall

    with required Nos. 150 mm to 225 mm long 38 x 6 mm M.S. flat bar clamps one end welded

    with the gate member and the other end bifurcated and embedded in C.C. at the respective

    point including cutting holes and mending good the damages by pouring concrete (1:2:4)

    into the holes and finishing, etc complete, painting 2 (two) coats with approved best quality

    synthetic enamel paint over a coat of anticorrosive painting, both end carriage, including

    greasing, electrodes, curing etc. complete as per drawing and design and accepted by the

    Engineer.(Rate is excluding the cost of paint).

    sft same as item- 14x1.5

    30 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    31/55

    2 2 x 20.00 ft x 8.00 ft = 640.00 sft

    = 14704.00 sft

    = 1366.03 sqm

    1 x 180.00 ft x 70.00 ft = 12600.00 sft

    BeamN/S 2 21 x 19.50 ft x 1.50 ft = 1228.50 sft

    Rib 2 7 x 19.50 ft x 1.50 ft = 409.50 sft

    E/W 2 32 x 20.00 ft x 1.50 ft = 1920.00 sft

    Wall 2 1 x 45.00 ft x 17.50 ft = 1575.00 sft

    Vault room

    Wall N/S 1 1 x 13.00 ft x 17.50 ft = 227.50 sft

    1 1 x 12.75 ft x 17.50 ft = 223.13 sft

    1 1 x 11.58 ft x 17.50 ft = 202.65 sft

    1 1 x 11.83 ft x 17.50 ft = 207.03 sft

    E/W 1 1 x 12.17 ft x 17.50 ft = 212.98 sft

    1 1 x 10.25 ft x 17.50 ft = 179.38 sft

    1 1 x 11.33 ft x 17.50 ft = 198.28 sft1 1 x 11.75 ft x 17.50 ft = 205.63 sft

    Self 1 2 x 10.25 ft x 6.00 ft = 123.00 sft

    Colm 25 1 x 10.50 ft x 17.50 ft = 4593.75 sft

    Porch

    1 x 90.00 ft x 44.00 ft = 3960.00 sft

    Beam

    N/S 15 2 x 42.00 ft x 2.63 ft = 3313.80 sft

    2 1 x 42.00 ft x 3.00 ft = 252.00 sft

    2 1 x 42.00 ft x 2.92 ft = 245.28 sft

    E/W 2 1 x 86.00 ft x 2.92 ft = 502.24 sft

    7 2 x 86.00 ft x 2.63 ft = 3166.52 sft

    Colm 5 1 x 10.50 ft x 17.67 ft = 927.68 sft

    = 36473.82 sft

    = 3388.50 sqm

    = 370.40 sqm

    = 3652.00 sqm

    = 1128.18 sqm

    = 9905.12 sqm

    @ Tk 186.00 per sqm = Tk 1842352.12

    Item-37

    CE's-16.4

    = 1584.75 sqm

    = 469.16 sqm

    2 x 9.17 ft x 22.00 ft = 403.48 sft

    2 x 13.42 ft x 22.00 ft = 590.48 sft

    3 x 32.00 ft x 22.00 ft = 2112.00 sft

    4 x 6.17 ft x 22.00 ft = 542.96 sft

    3 x 9.33 ft x 22.00 ft = 615.78 sft

    4 x 3.33 ft x 22.00 ft = 293.04 sft

    1 x 30.50 ft x 22.00 ft = 671.00 sft

    2 x 17.50 ft x 22.00 ft = 770.00 sft

    On exterior surface applying as per manufacturer instructions 3 coat of weather coat of

    approved quality and colour delivered from authorized local agent of the manufacturer in a

    sealed container complete in all respect in all loors and accepted by the Engineer.

    Sqm same as item-27 (B+C)

    Sqm same as item- 30 (A + B + C(B)+D+E+F(B))

    East- West side

    Outside +3'-0" to +25'-0" level

    Sqm same as item- 27 (A+D)

    Sqm same as item- 29

    B) At level (+) 7'-0" & Porch

    Ceiling

    Grid-13 to 16

    Ceiling

    Sqm same as item-30(C(B)+F(B))

    31 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    32/55

    2 x 12.17 ft x 22.00 ft = 535.48 sft

    Southside 2 x 7.75 ft x 22.00 ft = 341.00 sft

    2 x 2.42 ft x 22.00 ft = 106.48 sft

    2 x 9.75 ft x 22.00 ft = 429.00 sft

    2 x 12.25 ft x 22.00 ft = 539.00 sft

    2 x 8.33 ft x 22.00 ft = 366.52 sft

    2 x 4.92 ft x 22.00 ft = 216.48 sft1 x 9.33 ft x 22.00 ft = 205.26 sft

    Beam E/W 12 x 9.67 ft x 2.17 ft = 251.81 sft

    9 x 9.67 ft x 1.00 ft = 87.03 sft

    4 x 9.75 ft x 1.00 ft = 39.00 sft

    Drop Bott. 1 x 65.50 ft x 3.33 ft = 218.12 sft

    Southside Ceil 1 x 65.50 ft x 6.00 ft = 393.00 sft

    2 x 6.00 ft x 1.50 ft = 18.00 sft

    4 x 4.00 ft x 1.50 ft = 24.00 sft

    1 x 65.50 ft x 3.00 ft = 196.50 sft

    West & East side

    Curve line 2 x 49.00 ft x 4.50 ft = 441.00 sft

    16 x 2.33 ft x 0.50 ft = 18.64 sft

    2 x 49.00 ft x 4.00 ft = 392.00 sft

    2 x 44.50 ft x 0.50 ft = 44.50 sft

    4 x 2.00 ft x 0.50 ft = 4.00 sft

    2 x 1.00 ft x 0.50 ft = 1.00 sft

    Deduct: Door/ Window

    E & W side -8 x 4.50ft x 4.50ft = -162.00 sft

    -4 x 6.33ft x 2.50ft = -63.30 sft

    -4 x 6.33ft x 2.00ft = -50.64 sft

    -3 x 7.50ft x 5.50ft = -123.75 sft

    -2 x 6.25ft x 5.50ft = -68.75 sft

    -5 x 14.33ft x 6.83ft = -489.37 sft

    -3 x 9.67ft x 6.83ft = -198.14 sft

    -1 x 3.00ft x 7.00ft = -21.00 sft

    -2 x 8.00ft x 2.25ft = -36.00 sft

    -4 x 9.75ft x 4.50ft = -175.50 sft

    -2 x 3.00ft x 3.83ft = -22.98 sft

    -1 x 3.00ft x 3.83ft = -11.49 sft

    -1 x 3.00ft x 14.00ft = -42.00 sft

    = 9401.63 sft

    = 873.43 sqm

    Total = 2927.35 sqm

    @ per sqm = Tk 485940.02

    Item-38

    CE's-16.7

    2 2 x 21.00 ft x 10.00 ft = 840.00 sft2 2 x 11.25 ft x 10.00 ft = 450.00 sft

    Ceil. 2 1 x 21.00 ft x 11.25 ft = 472.50 sft

    Door -2 x 3.00 ft x 7.00 ft = -42.00 sft-1 x 9.75 ft x 4.50 ft = -43.88 sft-1 x 4.00 ft x 4.50 ft = -18.00 sft

    Tk 166.00

    Grid-7H col

    Store room south east

    Deduction

    Beam

    Curve wall

    Approved best quality and colour synthetic polyvinyl distemper delivered from authorized

    local agent of the manufacturer in a sealed container, applying to wall and ceiling in 2 coats

    over a coat of brand specified primer or sealer elapsing specified time for drying/ recoating

    matt finish including cleaning and sand papering making the surface free from loose and

    flaky materials, dirt, grease, wax, polish, scraping all chalked and scaled materials, applyingthe paint by brush/roller and necessary scaffolding etc. all complete in all floors accepted

    by the Engineer.

    A) At level (+) 3'-0"

    32 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    33/55

    Ceil. 1 1 x 43.00 ft x 44.50 ft = 1913.50 sftBeam 2 4 x 20.33 ft x 1.50 ft = 243.96 sft

    2 2 x 19.54 ft x 1.50 ft = 117.24 sftColm 1 1 x 10.50 ft x 21.50 ft = 225.75 sft

    1 1 x 7.83 ft x 21.50 ft = 168.35 sftwall 2 1 x 44.50 ft x 21.00 ft = 1869.00 sft

    cobla 4 1 x 0.42 ft x 21.00 ft = 35.28 sft1 1 x 43.00 ft x 21.50 ft = 924.50 sft

    Door -1 x 19.50 ft x 2.17 ft = -42.32 sftwall 2 2 x 4.50 ft x 9.17 ft = 165.06 sft

    2 2 x 7.17 ft x 9.17 ft = 263.00 sft1 2 x 24.50 ft x 9.17 ft = 449.33 sft

    Door -4 x 8.00 ft x 7.00 ft = -224.00 sft-4 x 8.00 ft x 2.00 ft = -64.00 sft-4 x 5.50 ft x 2.00 ft = -44.00 sft-1 x 19.25 ft x 2.00 ft = -38.50 sft

    = 7620.77 sft= 707.99 sqm

    @ Tk 122.00 per sqm = Tk 86374.40Item-39

    CE's-16.14

    (i) Store

    4 2.5 x 6.00ft x 6.83ft = 409.80 sft

    (ii) G.F Vault

    3 2.5 x 6.00ft x 7.00ft = 315.00 sft

    5 2.5 x 6.00ft x 6.83ft = 512.25 sft

    = 1237.05 sft

    (i) North side hallroom attached officers toilet

    Door 5 1.25 x 2.50ft x 7.00ft = 109.38 sft

    2 1.25 x 3.00ft x 7.00ft = 52.50 sft

    4 2.5 x 3.00ft x 7.00ft = 210.00 sft

    2 2.5 x 6.00ft x 7.00ft = 210.00 sft

    Door 2 1.25 x 3.00ft x 7.00ft = 52.50 sft

    2 1.25 x 2.50ft x 7.00ft = 43.75 sft

    = 678.13 sft

    (i) Sft qnty. Same as ground floor = 678.13 sft(ii)3 nos members accomodation

    28 2.5 x 3.00ft x 6.83ft = 1434.30 sft

    5 2.5 x 2.17ft x 6.83ft = 185.26 sft

    = 2297.69 sft

    Door 2 2.5 x 7.00ft x 3.33ft = 116.55 sft

    2 1.25 x 7.00ft x 2.50ft = 43.75 sft

    Sub-station

    (iii) Presspart

    (i) 2 nos Deputy Secretary room (new accomodation)

    At 2nd floor

    At level (-) 6'-0" to (-) 9'-0"

    French polishing to door and window frames and shutters three coats over a coat of priming

    including putty, cleaning finishing and polishing with sand paper etc. all complete in all

    floors accepted by the Engineer.

    At ground floor

    (ii) Porchside

    At first floor

    Deduction

    Deduction

    33 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    34/55

    Louv. 2 2.5 x 2.50ft x 2.25ft = 28.13 sft

    = 188.43 sft

    Total = 4401.29 sft

    = 408.89 sqm

    @ per sqm = Tk 94044.63

    Item-40

    CE's-18.2.3

    3 22.00 ft x 22.08 ft = 1457.28 sft

    Scrutinize & Moderate room

    1 45.00 ft x 40.00 ft = 1800.00 sft

    1 42.50 ft x 23.08 ft = 980.90 sft

    1 19.00 ft x 21.50 ft = 408.50 sft

    1 19.00 ft x 20.67 ft = 392.73 sft

    1 39.08 ft x 42.83 ft = 1673.80 sft2 4.75 ft x 5.83 ft = 55.39 sft

    1 6.00 ft x 7.58 ft = 45.48 sft

    1 15.50 ft x 21.67 ft = 335.89 sft

    1 8.00 ft x 9.00 ft = 72.00 sft

    1 20.67 ft x 12.00 ft = 248.04 sft

    1 5.08 ft x 8.50 ft = 43.18 sft

    1 13.67 ft x 21.17 ft = 289.39 sft

    1 13.83 ft x 21.17 ft = 292.78 sft

    2 13.58 ft x 12.75 ft = 346.29 sft

    2 13.58 ft x 12.75 ft = 346.29 sft

    2 13.58 ft x 12.75 ft = 346.29 sft

    1 25.75 ft x 32.75 ft = 843.31 sft

    1 12.50 ft x 12.75 ft = 159.38 sft

    1 9.25 ft x 12.33 ft = 114.05 sft

    1 6.83 ft x 8.00 ft = 54.64 sft

    1 23.08 ft x 31.83 ft = 734.64 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    Supplying, fitting and fixing of 9 mm thick perforated gypsum board false ceiling with

    aluminium T bar frame in natural anodized frame at 600 mm x 600 mm grid suspended

    from ceiling by 12 SWG double ply G.I. Wire

    Rest room

    Member (N-W)

    Rest room

    Member (N-E)

    Rest room

    (+) 69'-0" Level

    Member (N-E)

    Rest room

    (+) 58'-0" Level

    Member (S-W)

    Rest room

    Member (S-E)

    Rest room

    Conference

    Member (S-W)

    Rest room

    Member (N-W)

    Rest room

    Exam. Contr. Non-Cadre

    D.S room(S-W)

    D.S room(S-E)

    Director room(S-E)(+) 47'-0" Level

    Chairman room

    (+) 36'-0" Level

    Secretary room

    Rest room

    J.S room

    Rest room

    Exam. Contr. Cadre

    (+) 25'-0" Level

    Commission room

    Meeting room

    Lobby

    Library

    Member

    (+) 14'-0" Level: 3 nos members room (new accomodation)

    Tk 230.00

    34 OF 55

  • 7/28/2019 Remaining works of superstructure-18-09-12.xls

    35/55

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft

    1 7.58 ft x 8.08 ft = 61.25 sft

    1 24.67 ft x 24.83 ft = 612.56 sft1 7.58 ft x 8.08 ft = 61.25 sft

    4 19.50 ft x 46.00 ft = 3588.00 sft

    4 8.00 ft x 11.50 ft = 368.00 sft

    8 4.50 ft x 13