S.No Furniture Type MarketPrice
10%Con.Profit
3.50%Overhead
SubTotal VAT2.25%
G.Total
1 Executive Table 17250 1,725 604 19,579 440.52 20,019
2 Swivel Chair 10580 1,058 370 12,008 270.19 12,278
3 Visitors Chair 3460 346 121 3,927 88.36 4,015
4 What Nut 6860 686 240 7,786 175.19 7,961
5 File Cabinet (3 Drayer) 10820 1,082 379 12,281 276.32 12,557
6 Executive Table 14820 1,482 519 16,821 378.47 17,199
7 Swivel Chair 4270 427 149 4,846 109.05 4,955
8 Visitors Chair 3460 346 121 3,927 88.36 4,015
9 What Nut 6860 686 240 7,786 175.19 7,961
10 Steel File Cabinet (3 Drayer) 10820 1,082 379 12,281 276.32 12,557
11 Small Table 3540 354 124 4,018 90.40 4,108
12 Small Chair 3460 346 121 3,927 88.36 4,015
13 Table 4640 464 162 5,266 118.49 5,38514 Chair 3460 346 121 3,927 88.36 4,015
15 Visitor Chair 3460 346 121 3,927 88.36 4,015
16 What Nut 6860 686 240 7,786 175.19 7,961
17 Steel File Cabinet 10820 1,082 379 12,281 276.32 12,557
18 Table 4640 464 162 5,266 118.49 5,385
19 Chair 3460 346 121 3,927 88.36 4,015
20 Visitor Chair 3460 346 121 3,927 88.36 4,015
21 Computer Table 3010 301 105 3,416 76.87 3,493
22 Computer Chair 3460 346 121 3,927 88.36 4,015
23 Libraroy Table Big Size 47900 4,790 1,677 54,367 1,223.25 55,590
24 Libraroy Table Medium 21970 2,197 769 24,936 561.06 25,497
25 Chair 3460 346 121 3,927 88.36 4,015
26 ZvlK 1000 100 35 1,135 25.54 1,16127 gmvix 500 50 18 568 12.77 580
28 evwjk I Kvfvi 500 50 18 568 12.77 580
29 eWwmU 500 50 18 568 12.77 580
PWD Resource Sub-Division
Certified that I personally checked all the non schedule items
incorporated in this Estimate which are essentially required for
this work. Market rate of Analysis items have been checked and
Verified personally.
Sub-Divisional Engineer
PWD Resource Sub-Division
Sub-Assistant Enginner
Name of the Work: Construct ion o f PWD Tra in ing Academy& Test ing Laboratory (Revised)
Sub Head:
Lot : 2-Supplying, Installation,Commissioning of Furniture for PWD Training Academy
Analysis of Furniture per unit
PWD Resource Division
Allenbari, Tejgaon, Dhaka.
PWD Resource Division
Allenbari, Tejgaon, Dhaka.
Allenbari, Tejgaon, Dhaka.
Sub-Assistant Enginner
Allenbari, Tejgaon, Dhaka.
Executive Engineer
7/28/2019 Remaining works of superstructure-18-09-12.xls
2/55
Item-1
CE's-04.1
0.5 4 25.00 ft x 0.83 ft x 3.50 ft = 145.25 cft
2 x 9.67 ft x 1.67 ft x 0.50 ft = 16.15 cft
2 x 9.67 ft x 1.25 ft x 0.50 ft = 12.09 cft
2 x 9.67 ft x 0.83 ft x 4.50 ft = 72.23 cft
2 x 0.83 ft x 0.83 ft x 3.50 ft = 4.82 cft
2 x 5.92 ft x 0.83 ft x 3.50 ft = 34.40 cft
2 x 10.75 ft x 0.83 ft x 1.58 ft = 28.20 cft
2 x 6.17 ft x 0.83 ft x 3.58 ft = 36.67 cft
2 x 5.67 ft x 0.83 ft x 3.58 ft = 33.70 cft
= 383.50 cft
2 x 5.50 ft x 0.83 ft x 3.50 ft = 31.96 cft
2 x 5.50 ft x 0.83 ft x 4.00 ft = 36.52 cft
1 x 34.67 ft x 0.83 ft x 3.17 ft = 91.22 cft
= 543.19 cft
= 15.38 cum
@ per cum = Tk 72107.70
Item-2
CE's-04.2
N/S
4 x 0.83 ft x 19.50 ft x 10.00 ft = 647.40 cft
1 x 0.83 ft x 8.00 ft x 10.00 ft = 66.40 cft
E/W
1 x 0.83 ft x 10.00 ft x 10.00 ft = 83.00 cft
3 x 0.83 ft x 20.33 ft x 10.00 ft = 506.22 cft
= 1303.02 cft (A)
= 36.90 cum
@ per cum = Tk 182381.79
A) G.F: At level (+) 7'-0".
Tk 4943.00
Sub-head:- Super Structure for superior quality building category (Renovation & Modification of
ground floor, first floor, second floor, third floor and other floor for accommodation of 3 nos honorable
members, 3 nos Deputy Secretary, Scrutinizer & Moderation room, Vault room etc. including other
ancillary works i,e false ceiling, wall penelling, marble, granite works etc.).
Name of work: Construction of Bangladesh Public Service Commission Complex at
Sher-e-Banglanagar, Dhaka (2nd phase).
01. Civil works.
B) F.F: At level (+) 25'-0", grid 13 to 18 (D to L) (Parapet)
A) Ground floor
For 02 nos ramp (East west side)
For 02 nos ramp (East west side)
Tk 4688.00
Brick works of width one brick or one and a half brick length with first class bricks in cement
sand (F.M. 1.2) mortar (1:6) in superstructure including raking out joints, filling the
interstices with mortar, cleaning and soaking the bricks at least for 24 hours before use and
washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete
(measurement to given as 250 mm width for one brick length and 375 mm for one brick and
a half brick length) and accepted by the Engineer. (Cement: CEM-II/A-M)
In ground floor
Middle stair grid-16
(East west side)
Brick works with first class bricks in cement sand (F.M. of sand 1.2) mortar (1:6) in
foundation and plinth, filling the joints/interstices fully with mortar, racking out the joints,
cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7
days etc. all complete including cost of water, electricity and other charges and accepted by
the Engineer.
(Cement: CEM-II/A-M)
2 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
3/55
58 x 0.83 ft x 0.83 ft x 3.50 ft = 139.85 cft
= 3.96 cum
@ per cum = Tk 20413.70
78 x 0.83 ft x 0.83 ft x 3.00 ft = 161.20 cft= 4.56 cum
@ per cum = Tk 26333.79
Item-3
CE's-04.16
8 x 20.00ft x 12.00ft = 1920.00 sft
Deduct:
Door -5 x 6.00ft x 7.00ft = -210.00 sftC.gate -1 x 6.00ft x 7.00ft = -42.00 sft
Door gap
4 x 3.00ft x 7.00ft = 84.00 sft
New wall (Grid-8 to 11, E)
N/S 1 x 68.00ft x 10.00ft = 680.00 sft
3 x 13.00ft x 10.00ft = 390.00 sft
New wall (Grid-11 to 13, K)
N/S 1 x 30.00ft x 10.00ft = 300.00 sft
4 x 5.00ft x 10.00ft = 200.00 sft
E/W 1 x 33.00ft x 10.00ft = 330.00 sft
2 x 19.00ft x 10.00ft = 380.00 sft
Deduct:
Door -4 x 6.00ft x 7.00ft = -168.00 sft
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
Duct wall
Inside 3 x 6.33ft x 10.50ft = 199.40 sft
South west of building
Outside 1 x 7.25ft x 14.00ft = 101.50 sft
Under & below disible ramp (Grid-16)
4 x 23.58ft x 2.58ft = 243.35 sft
4 x 2.67ft x 1.00ft = 10.68 sft
Total = 4508.92 sft
= 418.89 sqm
@ Tk 730.00 per sqm = Tk 305788.93
Duct wall
Inside 3 x 6.33ft x 10.50ft = 199.40 sft
South west of building
Outside 1 x 7.25ft x 14.00ft = 101.50 sft
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
E/W 2 x 14.24 ft x 10.88 ft = 309.72 sft
3 x 2.50 ft x 10.88 ft = 81.56 sft
ii) At level (-) 9'-0"
Brick Pillar
(i) F.F:3 nos members accomodation, Scrutinize & Moderate room
Tk 5155.00
Brick Pillar
Tk 5769.00
125 mm brick works with first class bricks in cement sand (F.M. 1.2) mortar (1:4) and
making bond with connected walls including necessary scaffolding, raking out joints,
cleaning and soaking the bricks for at least 24 hours before use and washing of sand
curing at least for 7 days in all floors including cost of water, electricity and other charges
etc. all complete and accepted by the Engineer. (Cement:CEM-II/A-M)
(a):Scrutinize & Moderate room:
A) G.F
i) At level (-) 6'-0"
C) 7th floor: At level (+) 80'-0".(Parapet)
B) F.F
3 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
4/55
2 x 7.50 ft x 10.88 ft = 163.13 sft
N/S 3 x 2.50 ft x 10.88 ft = 81.56 sft
1 x 3.00 ft x 10.88 ft = 32.63 sft
Grid-7 2 x 20.33 ft x 10.88 ft = 442.18 sft
Grid-8 3 x 20.33 ft x 10.88 ft = 663.27 sft
Grid-9 2 x 20.33 ft x 10.88 ft = 442.18 sft1 x 12.25 ft x 10.88 ft = 133.22 sft
1 x 14.00 ft x 10.88 ft = 152.25 sft
1 x 12.17 ft x 10.88 ft = 132.35 sft
2 x 12.25 ft x 10.88 ft = 266.44 sft
1 x 14.08 ft x 10.88 ft = 153.12 sft
2 x 23.33 ft x 10.88 ft = 507.43 sft
1 x 13.25 ft x 10.88 ft = 144.09 sft
1 x 14.08 ft x 10.88 ft = 153.12 sft
2 x 20.33 ft x 10.88 ft = 442.18 sft
1 x 10.25 ft x 10.88 ft = 111.47 sft
1 x 14.08 ft x 10.88 ft = 153.12 sft
2 x 23.33 ft x 10.88 ft = 507.43 sft
1 x 13.25 ft x 10.88 ft = 144.09 sft
1 x 13.17 ft x 10.88 ft = 143.22 sft
1 x 10.00 ft x 10.88 ft = 108.75 sft
2 x 19.50 ft x 10.88 ft = 424.13 sft
1 x 12.25 ft x 10.88 ft = 133.22 sft
1 x 10.00 ft x 10.88 ft = 108.75 sft
3 x 19.50 ft x 10.88 ft = 636.19 sft
1 x 13.17 ft x 10.88 ft = 143.22 sft
1 x 10.00 ft x 10.88 ft = 108.75 sft
3 x 14.08 ft x 10.88 ft = 459.36 sft
1 x 15.58 ft x 10.88 ft = 169.43 sft
1 x 5.00 ft x 10.88 ft = 54.38 sft
2 x 14.75 ft x 10.88 ft = 320.81 sft
1 x 8.00 ft x 10.88 ft = 87.00 sft
1 x 13.25 ft x 10.88 ft = 144.09 sft
2 x 10.00 ft x 10.88 ft = 217.50 sft
1 x 13.25 ft x 10.88 ft = 144.09 sft
1 x 11.00 ft x 10.88 ft = 119.63 sft
1 x 14.67 ft x 10.88 ft = 159.54 sft
2 x 10.00 ft x 10.88 ft = 217.50 sft
1 x 19.50 ft x 10.88 ft = 212.06 sft
1 x 14.67 ft x 10.88 ft = 159.54 sft
2 x 10.00 ft x 10.88 ft = 217.50 sft
1 x 10.00 ft x 10.88 ft = 108.75 sft
2 x 10.00 ft x 10.88 ft = 217.50 sft
= 10422.32 sft (A)
Grid 13 to 16 D to L and Grid 13 to 16 D & L
N/S 2 x 70.00 ft x 2.75 ft = 385.00 sft
E/W 2 x 25.00 ft x 2.75 ft = 137.50 sft
2 x 46.00 ft x 2.75 ft = 253.00 sft
= 775.50 sft (B)
= 11197.82 sft
= 1040.30 sqm
@ per sqm = Tk 779186.93
Grid 16 (D to F & J to L)
ii) At level (+) 7'-0" to (+) 25'-0" (False slab gap)
Grid-JK
Grid-R
Total = A+B
Grid-8-9
(b):3 nos members accomodation
Grid-9-10
Grid-11
Grid-10-11
Grid-IJ
North to south
Grid-E
Grid-F
Tk 749.00
Grid-EF
Grid-FG
Grid 13
4 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
5/55
E/W 2 x 19.67 ft x 10.50 ft = 413.07 sft
2 x 19.67 ft x 10.50 ft = 413.07 sft
2 x 13.67 ft x 10.50 ft = 287.07 sft
N/S 2 x 19.67 ft x 10.50 ft = 413.07 sft2 x 19.67 ft x 10.50 ft = 413.07 sft
2 x 13.67 ft x 10.50 ft = 287.07 sft
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
Door -2 x 3.33 ft x 7.00 ft = -46.62 sft
-2 x 2.50 ft x 7.00 ft = -35.00 sft
P.A -2 x 7.00 ft x 7.00 ft = -98.00 sft
Window -4 x 6.00 ft x 4.50 ft = -108.00 sft
= 2028.80 sft
= 188.48 sqm (A)
E/W 1 x 146.00 ft x 3.50 ft = 511.00 sft
E/W 2 x 23.50 ft x 3.50 ft = 164.50 sft
N/S 2 x 69.50 ft x 3.50 ft = 486.50 sft
E/W 2 x 45.00 ft x 3.50 ft = 315.00 sft
N/S 2 x 43.50 ft x 3.50 ft = 304.50 sft
E/W 4 x 20.00 ft x 3.50 ft = 280.00 sft
= 2061.50 sft
= 191.52 sqm (B)
= 380.00 sqm (C)
@ per sqm = Tk 291838.57
E/W 1 x 21.58 ft x 10.50 ft = 226.59 sft
1 x 8.83 ft x 10.50 ft = 92.72 sft
N/S 1 x 14.75 ft x 10.50 ft = 154.88 sft
1 x 12.17 ft x 10.50 ft = 127.79 sft
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
E/W 1 x 20.33 ft x 10.50 ft = 213.47 sft
1 x 16.58 ft x 10.50 ft = 174.09 sftN/S 2 x 13.00 ft x 10.50 ft = 273.00 sft
1 x 8.00 ft x 10.50 ft = 84.00 sft
Toilet inside 1 x 7.00 ft x 8.00 ft = 56.00 sft
= 1492.52 sft
= 138.66 sqm (A)
@ persqm = Tk 109124.23
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
= 8.36 sqm
E) 4th floor: At level (+) 47'-0"
Grid 18
C) 2nd floor: At level (+) 25'-0"
Grid 13 E to D & KL
Grid 13 to 16 D & L
Grid 16 (D to F & J to L)
Grid 13 to 14, D to H
D) 3rd floor: At level (+) 36'-0"
(ii) Grid 13 to 18 (D to L) (Parapet)
(i) 2 nos Deputy Secretary room (new accomodation)
Total =A+B
Grid 16 to 18 (F & J)
Tk 787.00
Tk 768.00
Grid 8 to 10 & 10 to 11
Deduction
DS room attached to exam. Controller (Non-Cadre)
DS room attached to exam. Controller (cadre)
(i) 2 nos Deputy Secretary room (new accomodation)
5 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
6/55
@ persqm = Tk 6739.13
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
= 8.36 sqm
@ persqm = Tk 6897.99
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
= 8.36 sqm
@ persqm = Tk 7115.38
E/W 2 x 21.00 ft x 3.00 ft = 126.00 sft
2 x 20.50 ft x 3.00 ft = 123.00 sft
E/W 2 x 21.33 ft x 3.00 ft = 127.98 sft
E/W 2 x 21.00 ft x 3.00 ft = 126.00 sft
N/S 4 x 6.50 ft x 3.00 ft = 78.00 sft
4 x 10.00 ft x 3.00 ft = 120.00 sft
Lift door gap
2 x 5.00ft x 9.00ft = 90.00 sft
N/S 2 x 5.50 ft x 3.00 ft = 33.00 sft
N/S 1 x 8.00 ft x 3.00 ft = 24.00 sft
E/W 2 x 5.00 ft x 3.00 ft = 30.00 sft
N/S 2 x 6.50 ft x 3.00 ft = 39.00 sft
East & West side s/wall to s/wall
N/S 2 x 15.00 ft x 3.00 ft = 90.00 sft
E/W 4 x 13.00 ft x 3.00 ft = 156.00 sft
E/W 4 x 15.83 ft x 3.00 ft = 189.96 sft
N/S 8 x 1.50 ft x 3.00 ft = 36.00 sft
E/W 4 x 28.50 ft x 3.00 ft = 342.00 sft
E/W 2 x 42.50 ft x 3.00 ft = 255.00 sft
E/W 2 x 12.00 ft x 3.00 ft = 72.00 sft
= 2057.94 sft ( A )
N/S 2 x 14.50 ft x 9.25 ft = 268.25 sft
2 x 19.50 ft x 9.00 ft = 351.00 sft
E/W 2 x 12.00 ft x 9.00 ft = 216.00 sft
-1 x 3.00 ft x 7.00 ft = -21.00 sft
E/W 2 x 14.00 ft x 9.00 ft = 252.00 sft
2 x 12.00 ft x 9.00 ft = 216.00 sft
N/S 2 x 46.00 ft x 9.00 ft = 828.00 sft
Tk 806.00
F) 5th floor: At level (+) 58'-0"
Tk 825.00
G) 6th floor: At level (+) 69'-0"
East & West side
Main Stair Chillakota
Deduction
H) At level (+) 80'-0".
Main stair east side
Lift wall gap
Tk 851.00
Grid 9 E to F & grid 11 J to K:
Deduction for door
Grid 07 & 13 G to I:
Stair Chillakota S-E & N-W
Grid 09 E to s/wall & 11 K to s/wall:
Two Lift connection
Grid 9 J to K & grid 11 E to F:
Electric room side
Grid 9 F to G & grid 11 I to J:
Grid 9 I to J & grid 11 F to G: (Parapet)
Stair & lift wall (Wall)
Grid 07 & 13 E to F & grid J to K:
6 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
7/55
RCC wall -2 x 3.00 ft x 9.00 ft = -54.00 sft
-2 x 6.00 ft x 9.00 ft = -108.00 sft
-1 x 21.00 ft x 9.00 ft = -189.00 sft
Door -1 x 3.00 ft x 7.00 ft = -21.00 sft
-2 x 6.00 ft x 9.00 ft = -108.00 sft
-2 x 3.00 ft x 9.00 ft = -54.00 sft
N/S 1 x 8.00 ft x 12.00 ft = 96.00 sft
East side 2 x 5.00 ft x 13.00 ft = 130.00 sft
2 x 5.00 ft x 13.00 ft = 130.00 sft
= 1932.25 sft (B)
= 3990.19 sft (C)
= 370.70 sqm
@ per sqm = Tk 325101.88
Item-4
CE's-6.4
1 x 42.50 ft x 70.00 ft = 2975.00 sft
= 276.38 sqm
@ Tk 7269.00 per sqm = Tk 2009037.07
Item-5
Analysis rate
2 x 20.00 ft x 10.50 ft = 420.00 sft
2 x 2 x 9.00 ft x 0.50 ft = 18.00 sft
2 x 1 x 5.00 ft x 0.50 ft = 5.00 sft
2 x 5.00 ft x 0.50 ft = 5.00 sft
-4 x 5.00 ft x 9.00 ft = -180.00 sft
= 268.00 sft
= 7 x 268.00 ft = 1876.00 sft
= 174.28 sqm
@ Tk 10849.00 per sqm = Tk 1890814.20
Item-6CE's-06.6.3
Glazed wall tiles@ 2nd floor
DS toilet 2 x 7.50ft x 8.00ft = 120.00 sft
2 x 5.50ft x 8.00ft = 88.00 sft
Deduct:
(+) 7'-0" Level
Supplying and setting foreign made white / black/ any colour Granite on walls of approved
quality, textured and size (large size) on walls over 12 mm thick cement sand (F.M. 1.2)
mortar (1:2) including cutting and grinding the Granite slab/tile setting in position keeping
horizontal and vertical alignment correct, fi ll ing the joints with white cement, cutting and
grinding the top surface, finishing etc including water, electricity and other charges
complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M)
Marble stone flooring with 18mm thick Italian coloured/ grey marble stone of approved
quality, texture and size over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including.
placing cement slurry below the stone, cutting the marble stone to desired size, grinding
and finishing the edges, setting in position in proper level filling the gaps with white cement
and colouring pigments including supplying all necessary equipments/materials and
finishing the top by pumic stone and necessary auxiliary materials and water, electricity andother charges complete in all respect accepted by the Engineer. (Cement: CEM-II/A-M). In
ground floor
Lift wall
(i) 2 nos Deputy Secretary room (new accomodation)
Total =A+B
(Rate same for all floor)
Supplying, fitting and fixing glazed wall tiles (local made) with on 20 mm thick cement sand
(F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting,
laying and hire charge of machine and finishing with care etc. including water, electricity
and other charges complete all respect accepted by the Engineer.Coloured glazed wall tiles
of different sizes (Cement: CEM-II/A-M).
Wall tiles more than 250 x 400 mm size
For 8 nos floor
Lift Portion
12 mm thick white / black/ any colour Granite walling.
Tk 877.00
7 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
8/55
2 x 6.33ft x 8.00ft = 101.28 sft
2 x 2.33ft x 8.00ft = 37.28 sft
2 x 3.83ft x 8.00ft = 61.28 sft
2 x 4.67ft x 8.00ft = 74.72 sft
Door sill 2 x 2.50ft x 0.75ft = 3.75 sft
= 486.31 sft
Deduct:Door -2 x 2.50ft x 7.00ft = -35.00 sft
Window -2 x 6.33ft x 5.50ft = -69.63 sft
Total = 381.68 sft
= 35.46 sqm
@ Tk 1166.00 per sqm = Tk 41345.12
Glazed wall tiles @ 3rd floor
2 x 2 x 7.00ft x 8.00ft = 112.00 sft
2 x 2 x 3.50ft x 8.00ft = 56.00 sft
2 x 1 x 4.58ft x 8.00ft = 36.64 sft
2 x 1 x 8.00ft x 8.00ft = 64.00 sft
= 268.64 sft
= 24.96 sqm
@ Tk 1172.00 per sqm = Tk 29249.91
Item-7
CE's-06.9.3
1 x 34.00 ft x 42.50 ft = 1445.00 sft
= 134.24 sqm
@ Tk 1809.00 per sqm = Tk 242846.99
Room 3 1 x 22.00ft x 22.08ft = 1457.28 sft
3 1 x 5.50ft x 4.75ft = 78.38 sft
3 2 x 22.00ft x 0.50ft = 66.00 sft
3 2 x 22.08ft x 0.50ft = 66.24 sft
3 2 x 5.50ft x 0.50ft = 16.50 sft
3 2 x 4.75ft x 0.50ft = 14.25 sft
= 1698.65 sft
= 157.81 Sqm
@ Tk 1815.00 per sqm = Tk 286421.47
E/W 1 x 134.00 ft x 6.00 ft = 804.00 sft
2 1 x 146.00ft x 0.50ft = 146.00 sft
2 1 x 22.00ft x 0.50ft = 22.00 sft
2 2 x 14.17ft x 0.50ft = 28.34 sft
2 2 x 11.50ft x 0.50ft = 23.00 sft
2 2 x 7.00ft x 0.50ft = 14.00 sft
2 2 x 9.50ft x 0.50ft = 19.00 sft
2 1 x 10.50ft x 0.50ft = 10.50 sft
= 1066.84 sft
= 99.11 Sqm
@ Tk 1821.00 per sqm = Tk 180482.69
GP (mirror polished) 300 x 600 mm / 600 x 600 mm floor tiles @ Ground floor
Supplying, fitt ing and fixing mirror polished homogeneous floor ti les (local made) with
cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing with care etc. all complete
and accepted by the Engineer.(Cement: CEM-II/A-M)GP (mirror polished) 300 x 600 mm /
600 x 600 mm floor tiles.
(iii) 2nd F: 2 nos Deputy Secretary room (new accomodation):
Skirting
(i) 2 nos Deputy Secretary room (new accomodation)
(i) G.F: (+) 7'-0" Level
(ii) F.F: 3 nos members room (new accomodation)
Skirting
Grid 13 to 14, D to H
Skirting
8 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
9/55
Item-8
CE's-7.1
(A)
CE's-7.1.42 x 2.00 ft x 3.00 ft = 12.00 sft
3 x 2.00 ft x 3.00 ft = 18.00 sft
5 x 2.00 ft x 3.00 ft = 30.00 sft
2 x 1.67 ft x 3.00 ft = 10.02 sft
7 x 1.67 ft x 3.00 ft = 35.07 sft
2 x 2.00 ft x 3.00 ft = 12.00 sft
2 x 2.00 ft x 3.00 ft = 12.00 sft
10 x = 33.96 sft
= 163.05 sft
= 163.05 x 3.50 ft = 570.68 cft
= 16.16 cum
@ per cum = Tk 109563.35
CE's-7.1.4 ii) Form Work (Wooden Shuttet)
14 x 2 x 3.00 ft x 4.50 ft = 378.00 sft
14 x 2 x 2.00 ft x 4.50 ft = 252.00 sft
9 x 2 x 1.67 ft x 4.50 ft = 135.27 sft
9 x 2 x 3.00 ft x 4.50 ft = 243.00 sft
10 x x 4.50 ft = 152.83 sft
= 1161.10 sft
= 107.87 sqm
@ per sqm = Tk 43686.88
CE's-7.1.4Col-C10 2 x 2.00 ft x 3.00 ft = 12.00 sft
8 x 2.00 ft x 3.00 ft = 48.00 sft
5 x 2.00 ft x 3.00 ft = 30.00 sft
19 x 1.67 ft x 3.00 ft = 95.19 sft
2 x 1.67 ft x 3.00 ft = 10.02 sft
= 195.21 sft
= 195.21 x 4.50 ft = 878.45 cft
Shear wall
4 x 6.50 ft x 1.17 ft x 4.50 ft = 136.89 cft
4 x 8.00 ft x 1.17 ft x 4.50 ft = 168.48 cft
(3.14x2.08x2.08/4)
(Rate is excluding the cost of reinforcement and its fabrication, binding, welding and
placing)
Reinforced cement concrete works using wooden shutter, with minimum cement content
relates to mix ratio 1:2:4 having minimum f 'cr = 24 Mpa, and satisfying, specified
compressive strength f'c=19 Mpa at 28 days on standard cylinders as per standardpractice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM 1 ( 52.5
N) / ASTM-C 150 Type I, best quality sand [50% quantity of best local sand (F.M. 1.2) and50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well
graded picked jhama brick chips conforming ASTM C-33 including breaking chips and
screening, making, placing shutter in position and maintaining true to plumb, making
shutter water-tight properly, placing reinforcement in position; mixing in standard mixer
machine with hoper fed by standard measuring boxes, casting in forms, compacting by
vibrator machine and curing for 28 days,and removing centering-shuttering after specified
time proved; including cost of water, electricity, testing charges of materials and cylinders,
other charges etc. all complete approved and accepted by the Engineer.
Padestals, column capitals, lift walls and walls :Ground Floor
Col-C9
Col-C6
Col-C1
Col-C2
Col-C8
Col-C13
Tk 6780.00
Tk 405.00
For Col-C4
Col-C5
(3.14 x 2.08 x 2.08/4)
Col-C7
i) Concrete
a) At level (+) 25'-0" (In 2nd Floor)
Col-C4
Col-C11
For Col-C1,C2, C5, C8, C9
b) In Column: At level (+) 80'-0" (In 7th Floor)
For Col-C6,C7
Col-C14
Col-C15
i) Concrete
9 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
10/55
2 x 11.00 ft x 1.00 ft x 4.50 ft = 99.00 cft
2 x 5.00 ft x 1.00 ft x 4.50 ft = 45.00 cft
2 x 1.00 ft x 3.00 ft x 4.50 ft = 27.00 cft
2 x 49.00 ft x 1.00 ft x 4.50 ft = 441.00 cft
= 1795.82 cft= 50.85 cum
@ per cum = Tk 364044.73
CE's-7.1.4 ii) Form Work (Wooden Shuttet)
15 x 2 x 3.00 ft x 4.50 ft = 405.00 sft
15 x 2 x 2.17 ft x 4.50 ft = 292.95 sft
21 x 2 x 1.67 ft x 4.50 ft = 315.63 sft
21 x 2 x 3.17 ft x 4.50 ft = 599.13 sft
Shear wall
4 x 2 x 6.50 ft x 4.50 ft = 234.00 sft
4 x 2 x 1.42 ft x 4.50 ft = 51.12 sft
4 x 2 x 8.00 ft x 4.50 ft = 288.00 sft
4 x 2 x 1.42 ft x 4.50 ft = 51.12 sft
2 x 24.63 ft x 4.50 ft = 221.63 sft
2 x 12.63 ft x 4.50 ft = 113.63 sft
2 x 8.50 ft x 4.50 ft = 76.50 sft
2 x 98.00 ft x 4.50 ft = 882.00 sft
= 3530.70 sft
= 328.01 sqm
@ per sqm = Tk 182373.58
(B)
CE's-7.1.5
8 x 20.00 ft x 0.42 ft x 0.50 ft = 33.60 cft (A)
New wall (Grid-8 to 11, E)
1 x 68.00ft x 0.42 ft x 0.50 ft = 14.28 cft
3 x 13.00ft x 0.42 ft x 0.50 ft = 8.19 cft
New wall (Grid-11 to 13, K)
1 x 30.00ft x 0.42 ft x 0.50 ft = 6.30 cft
4 x 5.00ft x 0.42 ft x 0.50 ft = 4.20 cft
1 x 33.00ft x 0.42 ft x 0.50 ft = 6.93 cft
2 x 19.00ft x 0.42 ft x 0.50 ft = 7.98 cft
N/S
4 x 0.83 ft x 19.50 ft x 0.50 ft = 32.37 cft
1 x 0.83 ft x 8.00 ft x 0.50 ft = 3.32 cft
E/W
1 x 0.83 ft x 10.00 ft x 0.50 ft = 4.15 cft
3 x 0.83 ft x 20.33 ft x 0.50 ft = 25.31 cft
3 x 7.00 ft x 0.42 ft x 0.50 ft = 4.41 cft
1 x 42.33 ft x 1.42 ft x 1.50 ft = 90.16 cft
1 x 42.50 ft x 0.42 ft x 0.50 ft = 8.93 cft
3 x 6.33 ft x 0.42 ft x 0.50 ft = 3.99 cft
(+) 3'-0" level
(-) 6'-0" level
At level (-) 9'-0"
For Col-C10,C11, C13
At level (+) 7'-0".
(a) G.F:
For Col-C14,C15
Tk 556.00
i) Concrete
Electric wall
Lift wall
New wall
Tk 7159.00
Lift wall
Electric wall
Tie beam and lintels:Ground Floor
RCC bend for out side pipeline
10 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
11/55
1 x 7.25 ft x 0.42 ft x 0.50 ft = 1.52 cft
= 222.04 cft (B)
= 255.64 cft
= 7.24 cum
@ per cum = Tk 50584.92
CE's-7.1.5 ii) Form Work (Wooden Shuttet)8 x 1 x 20.00 ft x 1.42 ft = 227.20 sft
6 x 1 x 6.00 ft x 1.42 ft = 51.12 sft
= 278.32 sft (A)
1 x 1 x 68.00ft x 1.42 ft = 96.56 sft
3 x 1 x 13.00ft x 1.42 ft = 55.38 sft
1 x 1 x 30.00ft x 1.42 ft = 42.60 sft
4 x 1 x 5.00ft x 1.42 ft = 28.40 sft
1 x 1 x 33.00ft x 1.42 ft = 46.86 sft
2 x 1 x 19.00ft x 1.42 ft = 53.96 sft
4 x 1 x 19.50 ft x 1.83 ft = 142.74 sft
1 x 1 x 8.00 ft x 1.83 ft = 14.64 sft
1 x 1 x 10.00 ft x 1.83 ft = 18.30 sft
3 x 1 x 20.33 ft x 1.83 ft = 111.61 sft
3 x 1 x 7.00 ft x 1.42 ft = 29.82 sft1 x 1 x 42.33 ft x 1.42 ft = 60.11 sft
1 x 1 x 42.50 ft x 1.42 ft = 60.35 sft
1 x 1 x 6.33 ft x 1.42 ft = 8.99 sft
2 x 1 x 7.25 ft x 1.42 ft = 20.59 sft
= 790.91 sft (B)
= 1069.23 sft
= 99.33 sqm
@ per sqm = Tk 34766.83
CE's-7.1.5
2 x 14.24 ft x 0.42 ft x 0.50 ft = 5.98 cft
3 x 2.50 ft x 0.42 ft x 0.50 ft = 1.58 cft2 x 7.50 ft x 0.42 ft x 0.50 ft = 3.15 cft
3 x 2.50 ft x 0.42 ft x 0.50 ft = 1.58 cft
1 x 3.00 ft x 0.42 ft x 0.50 ft = 0.63 cft
Grid-7 2 x 20.33 ft x 0.42 ft x 0.50 ft = 8.54 cft
Grid-8 3 x 20.33 ft x 0.42 ft x 0.50 ft = 12.81 cft
Grid-9 2 x 20.33 ft x 0.42 ft x 0.50 ft = 8.54 cft
1 x 12.25 ft x 0.42 ft x 0.50 ft = 2.57 cft
1 x 14.00 ft x 0.42 ft x 0.50 ft = 2.94 cft
Grid-8-9 1 x 12.17 ft x 0.42 ft x 0.50 ft = 2.56 cft
2 x 12.25 ft x 0.42 ft x 0.50 ft = 5.15 cft
1 x 14.08 ft x 0.42 ft x 0.50 ft = 2.96 cft
Grid-9-10 2 x 23.33 ft x 0.42 ft x 0.50 ft = 9.80 cft1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft
1 x 14.08 ft x 0.42 ft x 0.50 ft = 2.96 cft
Grid-11 2 x 20.33 ft x 0.42 ft x 0.50 ft = 8.54 cft
1 x 10.25 ft x 0.42 ft x 0.50 ft = 2.15 cft
1 x 14.08 ft x 0.42 ft x 0.50 ft = 2.96 cft
Grid-10-11 2 x 23.33 ft x 0.42 ft x 0.50 ft = 9.80 cft
1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft
Grid-E 1 x 13.17 ft x 0.42 ft x 0.50 ft = 2.77 cft
1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft
(ii) F.F: 3 nos members accomodation
North to south
Total =A+B
Total =A+B
(b) F.F:
(i) F.F: Scrutinize & Moderate room:
i) Concrete
Tk 350.00
Tk 6988.00
11 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
12/55
Grid-F 2 x 19.50 ft x 0.42 ft x 0.50 ft = 8.19 cft
1 x 12.25 ft x 0.42 ft x 0.50 ft = 2.57 cft
1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft
3 x 19.50 ft x 0.42 ft x 0.50 ft = 12.29 cft
Grid-EF 1 x 13.17 ft x 0.42 ft x 0.50 ft = 2.77 cft
1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft
Grid-FG 3 x 14.08 ft x 0.42 ft x 0.50 ft = 8.87 cft1 x 15.58 ft x 0.42 ft x 0.50 ft = 3.27 cft
1 x 5.00 ft x 0.42 ft x 0.50 ft = 1.05 cft
2 x 14.75 ft x 0.42 ft x 0.50 ft = 6.20 cft
Grid-IJ 1 x 8.00 ft x 0.42 ft x 0.50 ft = 1.68 cft
1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft
2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft
1 x 13.25 ft x 0.42 ft x 0.50 ft = 2.78 cft
1 x 11.00 ft x 0.42 ft x 0.50 ft = 2.31 cft
1 x 14.67 ft x 0.42 ft x 0.50 ft = 3.08 cft
2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft
1 x 19.50 ft x 0.42 ft x 0.50 ft = 4.10 cft
Grid-JK 1 x 14.67 ft x 0.42 ft x 0.50 ft = 3.08 cft
2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft
1 x 10.00 ft x 0.42 ft x 0.50 ft = 2.10 cft
Grid-R 2 x 10.00 ft x 0.42 ft x 0.50 ft = 4.20 cft
= 193.71 cft (A)
= 222.04 cft (B)
= 415.75 cft
= 11.77 cum
@ per cum = Tk 83055.71
CE's-7.1.5
922.43 ft x 1.42 ft = 1309.85 sft
= 790.91 sft
= 2100.76 sft
= 195.17 sqm
@ per sqm = Tk 73186.99
CE's-7.1.5
2 x 17.75 ft x 0.42 ft x 0.50 ft = 7.46 cft
2 x 10.50 ft x 0.42 ft x 0.50 ft = 4.41 cft
4 x 22.00 ft x 0.42 ft x 0.50 ft = 18.48 cft
= 30.35 cft
= 0.86 cum
@ per cum = Tk 6119.70
CE's-7.1.5 ii) Form Work (Wooden Shuttet)
2 x 1 x 17.75 ft x 1.42 ft = 50.41 sft
2 x 1 x 10.50 ft x 1.42 ft = 29.82 sft
4 x 1 x 22.00 ft x 1.42 ft = 124.96 sft= 205.19 sft
= 19.06 sqm
@ per sqm = Tk 7625.05
CE's-7.1.5
1 x 21.58 ft x 0.42 ft x 0.50 ft = 4.53 cft
1 x 8.83 ft x 0.42 ft x 0.50 ft = 1.85 cft
1 x 14.75 ft x 0.42 ft x 0.50 ft = 3.10 cft
1 x 12.17 ft x 0.42 ft x 0.50 ft = 2.56 cft
Total
Tk 400.00
i) Concrete
(ii) F.F: RCC bend for out side pipeline
i) Concrete
Rft same as (A) =
Total =A+B
Qty same as GF (B)
Tk 7122.00
D) 3rd floor: At level (+) 36'-0"
(d) 3rd floor:
Qty same as GF (B)
ii) Form Work (Wooden Shuttet)
Tk 375.00
Tk 7055.00
(c) 2nd floor:
12 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
13/55
1 x 20.33 ft x 0.42 ft x 0.50 ft = 4.27 cft
1 x 16.58 ft x 0.42 ft x 0.50 ft = 3.48 cft
2 x 13.00 ft x 0.42 ft x 0.50 ft = 5.46 cft
1 x 8.00 ft x 0.42 ft x 0.50 ft = 1.68 cft
1 x 7.00 ft x 0.42 ft x 0.50 ft = 1.47 cft
= 28.40 cft
= 0.80 cum@ per cum = Tk 5781.41
CE's-7.1.5 ii) Form Work (Wooden Shuttet)
1 x 1 x 21.58 ft x 1.42 ft = 30.64 sft
1 x 1 x 8.83 ft x 1.42 ft = 12.54 sft
1 x 1 x 14.75 ft x 1.42 ft = 20.95 sft
1 x 1 x 12.17 ft x 1.42 ft = 17.28 sft
1 x 1 x 20.33 ft x 1.42 ft = 28.87 sft
1 x 1 x 16.58 ft x 1.42 ft = 23.54 sft
2 x 1 x 13.00 ft x 1.42 ft = 36.92 sft
1 x 1 x 8.00 ft x 1.42 ft = 11.36 sft
1 x 1 x 7.00 ft x 1.42 ft = 9.94 sft
= 192.04 sft
= 17.84 sqm
@ per sqm = Tk 7047.21
CE's-7.1.5
6 x 4.50 ft x 0.42 ft x 0.50 ft = 5.67 cft
= 0.16 cum
@ per cum = Tk 1215.08
CE's-7.1.5 ii) Form Work (Wooden Shuttet)
6 x 1 x 4.50 ft x 1.42 ft = 38.34 sft
= 3.56 sqm
@ per sqm = Tk 2454.13
(C)
CE's-7.1.6
E/W
4 x 12.00 ft x 1.00 ft x 1.58 ft = 75.84 cft
N/S
2 x 19.54 ft x 1.00 ft x 1.58 ft = 61.75 cft
2 x 14.50 ft x 1.00 ft x 1.58 ft = 45.82 cft
2 x 19.00 ft x 1.00 ft x 1.58 ft = 60.04 cft
E/W
5 x 10.00 ft x 1.00 ft x 1.58 ft = 79.00 cft
6 x 5.00 ft x 1.00 ft x 1.58 ft = 47.40 cft
E/W4 x 7.50 ft x 1.00 ft x 1.58 ft = 47.40 cft
= 417.25 cft
= 11.81 cum
@ per cum = Tk 83236.61
CE's-7.1.6 ii) Form Work (Wooden Shuttet)
2 x 2 x 12.00 ft x 4.17 ft = 200.16 sft
2 x 1 x 19.54 ft x 4.17 ft = 162.96 sft
2 x 1 x 14.50 ft x 4.17 ft = 120.93 sft
In Tee beam, ELL beam & Rectangular beam
(e) 7th floor:
i) Concrete
Tk 395.00
Tk 7045.00
E/W
Lift room: South lift, N/S
N/S
Main stair attached: N/S
Tk 689.00
Stair-2: 02 nos stair
i) Concrete : At level (+) 80'-0" (In 7th Floor)
Tk 7568.00
Tk 7189.00
13 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
14/55
2 x 1 x 19.00 ft x 4.17 ft = 158.46 sft
5 x 1 x 10.00 ft x 4.17 ft = 208.50 sft
3 x 2 x 5.00 ft x 4.17 ft = 125.10 sft
2 x 2 x 7.50 ft x 4.17 ft = 125.10 sft
= 1101.21 sft= 102.31 sqm
@ per sqm = Tk 62406.20
(D)
CE's-7.1.7
2 x 28.67 ft x 19.00 ft x 0.42 ft = 457.57 cft
1 x 49.00 ft x 17.00 ft x 0.42 ft = 349.86 cft
1 x 49.00 ft x 14.50 ft x 0.42 ft = 298.41 cft
= 1105.84 cft
= 31.31 cum
@ per cum = Tk 220604.99
CE's-7.1.7 ii) Form Work (Wooden Shuttet)
2 x 28.67 ft x 19.00 ft = 1089.46 sft
1 x 49.00 ft x 17.00 ft = 833.00 sft
1 x 49.00 ft x 14.00 ft = 686.00 sft
2 x 2 x 28.67 ft x 0.42 ft = 48.17 sft
2 x 2 x 19.00 ft x 0.42 ft = 31.92 sft
1 x 2 x 49.00 ft x 0.42 ft = 41.16 sft
1 x 2 x 17.00 ft x 0.42 ft = 14.28 sft
2 x 2 x 49.00 ft x 0.42 ft = 82.32 sft
2 x 2 x 49.00 ft x 0.42 ft = 82.32 sft
= 2908.63 sft
= 270.22 sqm
@ per sqm = Tk 172399.03
(E)
CE's-7.1.8
Drop wall
N/S 2 x 70.00 ft x 2.00 ft = 280.00 sft
2 x 26.00 ft x 2.00 ft = 104.00 sft
Planter 2 x 26.00 ft x 2.00 ft = 104.00 sft
E/W 2 x 45.00 ft x 2.00 ft = 180.00 sft
668.00 sft
= 668.00 x 0.29 ft = 194.83 cft
= 5.52 cum@ per cum = Tk 37714.09
CE's-7.1.8 ii) Form Work (Wooden Shuttet)
2 x 2 x 2.00 ft x 0.33 ft = 2.64 sft
1 x 2 x 70.00 ft x 4.33 ft = 606.20 sft
1 x 2 x 26.00 ft x 4.33 ft = 225.16 sft
1 x 2 x 26.00 ft x 4.33 ft = 225.16 sft
1 x 2 x 45.00 ft x 4.33 ft = 389.70 sft
= 1448.86 sft
= 134.60 sqm
@ per sqm = Tk 40111.51
Bottom
Side
Lift room: South lift - 02 nos
Stair-2: 02 nos stair
In Floor & Roof slab;
Cornice, railing, drop walls, louver, fins etc. Ground Floor
Tk 638.00
a) At level (+) 80'-0" (In 7th Floor)
Tk 7045.00
E/W
Tk 6836.00
Main stair-4:
i) Concrete
Tk 610.00
Lift Room: N/S
a) In Ground floor (+7'-0" level)
i) Concrete
Tk 298.00
14 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
15/55
CE's-7.1.8
Drop wall
Gird 13 north side
E/W 1 x 134.00 ft x 3.00 ft = 402.00 sft
N/S 2 x 5.33 ft x 3.00 ft = 31.98 sft
433.98 sft= 433.98 x 0.29 ft = 126.58 cft
= 3.58 cum
@ per cum = Tk 24982.02
CE's-7.1.8 ii) Form Work (Wooden Shuttet)
1 x 2 x 134.00 ft x 3.00 ft = 804.00 sft
1 x 1 x 134.00 ft x 0.63 ft = 83.75 sft
2 x 2 x 5.33 ft x 3.00 ft = 63.96 sft
2 x 1 x 5.33 ft x 0.63 ft = 6.72 sft
1 x 1 x 144.67 ft x 0.46 ft = 66.55 sft
= 1024.97 sft
= 95.22 sqm
@ per sqm = Tk 33137.40
CE's-7.1.8 = 3.56 cum
= 3.56 cum
7.12 cum
@ per cum = Tk 50103.44
CE's-7.1.8
= 95.02 sqm
= 95.02 sqm
190.04 sqm
@ per sqm = Tk 70884.92
CE's-7.1.8 i)Concrete: oty same as 2nd Floor Drop = 3.56 cum
@ per cum = Tk 25418.40
CE's-7.1.8 ii) Form work (Wooden shutter)
Qty same as 2nd Floor = 95.02 sqm
@ per sqm = Tk 37817.96
(F)
CE's-7.1.9
Gird 13 north side
2 7.50 ft x 7.50 ft x 0.25 ft = 28.13 cft
= 0.80 cum
@ per cum = Tk 6000.90
CE's-7.1.8 ii) Form Work (Wooden Shuttet)2 x 1 x 7.50 ft x 7.50 ft = 112.50 sft
2 x 2 x 7.50 ft x 0.33 ft = 9.90 sft
2 x 2 x 7.50 ft x 0.33 ft = 9.90 sft
= 132.30 sft
= 12.29 sqm
@ per sqm = Tk 4965.55
CE's-7.1.9
1 7.50 ft x 8.83 ft x 0.25 ft = 16.56 cft
Railing
Tk 7535.00
Qty same as FF
Tk 348.00
Sunshade, false ceiling:Ground Floor
i)Concrete: qnty same as item-D (a)i
Tk 373.00
ii) Form work
Drop Wall
Qty same as Drop wall
Tk 7037.00
c) In 3rd Floor (+36'-0"+47'-0")
Railing same Drop
Tk 7140.00
False slab
False slab
a) In 2nd floor
i) Concrete
i) Concrete
Tk 404.00
Tk 398.00
i) Concrete
Tk 6970.00
In Railing
b) In 2nd floor (+25'-0"+0+36'-0" level)
d) In 4th Floor (+47'-0"to+58'-0"level)
b) In 3rd floor
15 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
16/55
1 8.83 ft x 5.50 ft x 0.25 ft = 12.14 cft
= 28.70 cft
= 0.81 cum
@ per cum = Tk 5471.34
CE's-7.1.8 ii) Form Work (Wooden Shuttet)
1 x 1 x 7.50 ft x 8.83 ft = 66.23 sft
1 x 2 x 7.50 ft x 0.33 ft = 4.95 sft1 x 2 x 8.83 ft x 0.33 ft = 5.83 sft
1 x 1 x 8.83 ft x 5.50 ft = 48.57 sft
1 x 2 x 8.83 ft x 0.33 ft = 5.83 sft
1 x 2 x 5.50 ft x 0.33 ft = 3.63 sft
= 135.03 sft
= 12.54 sqm
@ per sqm = Tk 5381.46
Item-9
CE's-8.1.1
= 450.47 cft = 5.63 cft
= 1251.54 kg
@ per kg = Tk 101374.45
= 415.75 cft
= 5.20 cft
= 1155.07 kg
@ per kg = Tk 93930.22
= 570.68 cft
= 5.71 cft
= 30.35 cft
= 0.38 cft
= 126.58 cft
= 1.27 cft
= 28.13 cft
= 0.35 cft
= 7.70 cft
= 1712.19 kg
@ per kg = Tk 139783.44
= 28.40 cft
= 0.36 cft
= 251.44 cft
= 2.51 cft
= 28.70 cft
= 0.43 cft
= 3.30 cft
= 733.44 kg
@ per kg = Tk 60113.00
= 125.72 cft
= 1.26 cft
= 279.43 kg
@ per kg = Tk 22991.63
1.0% of this item
3rd floor
cft same as item- 08.E(b)
1.0% of this item
cft same as item- 08.E(c)
cft same as item- 08.B(c)
1st floor
2nd floor
1.25% of this item
1.25% of this item
cft same as item- 08.A(a)
cft same as item- 08.B(a)+08.E(a)
Ground floor
Tk 6733.00
Tk 429.00
1.25% of this item
cft same as item- 08.B(d)
1.0% of this item
Tk 81.32
3420/400-grade(B420/400DWR) / 400G ribbed or deformed bar with minimum fy (ReH)=
420/400 MPa & tensile strength(fu or Rm) at least 525 Mpa, minimum elongation after
fracture and total elongation at maximum force is 16% and 8% respectively.
1.0% of this item
Tk 81.96
cft same as item- 08.F(b)
1.50% of this item
cft same as item- 08.F(a)
Tk 81.64
Tk 82.28
1.25% of this item
cft same as item- 08.E(a)
4th floor
cft same as item- 08.B(b)
1.25% of this item
Tk 81.00
16 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
17/55
Item-10
CE's-11.1
CE's-11.1.5 Chittagong Teak
5 2 x 7.00ft 0.46ft 0.21ft = 6.76 cft
5 1 x 6.00ft 0.46ft 0.21ft = 2.90 cft
G.F 3 2 x 7.00ft 0.46ft 0.21ft = 4.06 cft
3 1 x 6.00ft 0.46ft 0.21ft = 1.74 cft
35 2 x 7.00ft 0.46ft 0.21ft = 47.33 cft
28 1 x 3.33ft 0.46ft 0.21ft = 9.01 cft
7 1 x 2.50ft 0.46ft 0.21ft = 1.69 cft
2 2 x 7.00ft 0.46ft 0.21ft = 2.70 cft
1 1 x 2.50ft 0.46ft 0.21ft = 0.24 cft
1 1 x 3.33ft 0.46ft 0.21ft = 0.32 cft
6 2 x 7.00ft 0.46ft 0.21ft = 8.11 cft
3 1 x 2.50ft 0.46ft 0.21ft = 0.72 cft
3 1 x 3.33ft 0.46ft 0.21ft = 0.97 cft
= 86.56 cft
= 2.45 cum
@ per cum = Tk 525861.51
Item-11
CE's-11.3
8 2 x 4 = 64.00 nos
35 2 x 4 = 280.00 nos
2 2 x 4 = 16.00 nos
6 2 x 4 = 48.00 nos
= 408.00 nos
@Tk 78.00 each = Tk 31824.00
Item-12
CE's-12.1
CE's-12.1.4 Chittagong Teak
7 1 x 2.17ft x 6.83ft = 103.75 sft
2 1 x 2.17ft x 6.83ft = 29.64 sft
(iv) 3rd F: 3 nos Deputy Secretary room (new accomodation)
(iii) 3rd F: 3 nos Deputy Secretary room (new accomodation)
(i) F.F: 3 nos Members room (new accomodation) & others
Supplying and making door and window frames (Chowkat) for all floors with
matured natural seasoned wood of required size including painting two coats of coal
tar to the surface in contact with wall, fitting and fixing in position etc. complete and
accepted by the Engineer. (All sizes of wood are finished).
(iv) 3rd floor:
(ii) 1st floor:
Tk 214544.00
(iii) 2nd floor:
(i)GF: (-) 6'-0" level
Supplying, fitting and fixing 38 mm thick well matured, seasoned (min 10" wide
plank) solid wood single leaf door shutter having top rail style of sections 100 mm x
38 mm, lock rail 125 x 38 mm and bottom rail 225 x 38 mm. Closed joints with 25
mm x 12 mm size wooden peg and provided with best quality 4 Nos. 100 mm iron
hinges 2 (two) Nos. best quality 12 mm dia 300 mm and 200 mm long iron tower
and socket bolts, 2 (two) Nos. heavy type nickel plated handle, hinged cleats, buffer
blocks and finished by sand papering etc. all complete in all floors and accepted by
the Engineer. (All sizes of wood are finished)
Supplying, fitting and fixing M.S. flat bar clamp 150 x 38 x 6 mm size having
bifurcated ends to door and window frames with rowel plug, necessary screws etc.
including cutting groove in Chowkat if necessary etc. complete in all respect
accepted by the Engineer.
(ii) 2nd F: 2 nos Deputy Secretary room (new accomodation)
(iii) 2nd F: 2 nos Deputy Secretary room (new accomodation)
(ii) F.F: 3 nos Members room (new accomodation) & others
(i) G.F
17 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
18/55
3 1 x 3.00ft x 6.83ft = 61.47 sft
3 1 x 2.17ft x 6.83ft = 44.46 sft
= 239.32 sft
= 22.23 sqm
@Tk 9836.00 per sqm = Tk 218690.36
Item-13
CE's-12.4
CE's-12.4.4 Chittagong Teak
(i) Store
4 1 x 6.00ft x 6.83ft = 163.92 sft
(ii) G.F Vault3 1 x 5.67ft x 6.83ft = 116.18 sft
5 1 x 6.00ft x 6.83ft = 204.90 sft
= 485.00 sft
= 45.06 sqm
@Tk 12048.00 per sqm = Tk 542852.05
Item-14
CE's-12.7
CE's-12.7.1
(i)3 nos members accomodation
28 1 x 3.00ft x 6.83ft = 573.72 sft
2 1 x 3.00ft x 6.83ft = 40.98 sft
= 614.70 sft
= 57.11 sqm
@Tk 4156.00 per sqm = Tk 237336.79
Item-15
CE's-12.19
CE's-12.7.1
2nd floor 2 1 x 2.50ft x 2.25ft = 11.25 sft
3rd floor 3 1 x 2.50ft x 2.25ft = 16.88 sft
At level (-) 6'-0" to (-) 9'-0"
Burma Teak veneered
Supplying, fitting and fixing 36 mm thick and having density 400 kg/cum solid
particle board single leaf flush door for all floors for internal use made of well
matured mechanical seasoned Rubber (Malaysian timber) or other approved
wooden frame having finished size 35 x 50 mm around upon which 1.2 mm thick
veneer (total two Nos. of veneers one of 0.7 mm horizontally made of gorjon and
another of 0.5 mm vertically made of Burma Teak or Champa or Chapalish orGarjan wood) with necessary screws are pested on each side by mechanized
process and provided with best quality 4 Nos. 100 mm iron hinges, 2 Nos. best
quality 12 mm iron dia 300 mm and 225 mm long iron tower and socket bolts, 2
(two) Nos. heavy type nickel plated handles, hinged cleats, buffer blocks etc.
complete and accepted by the Engineer.
Supplying, fitt ing and fixing 38 mm thick well matured, natural seasoned (min 10"
wide plank) wooden double leaf panel door shutters. Top rail and styles of sections100 mm x 38 mm, lock rail 125 mm x 38 mm and bottom rail 225mm x 38 mm,
paneling 38 mm thick both sides raised, provided with best quality 6 Nos. 100 mm
iron hinges, 2 (two) Nos. best quality 12 mm dia 300 mm and 225 mm long iron
tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle, 1 No. hatch-
bolt hinged cleats, buffer blocks and finished by sand papering, necessary screws
etc. all complete in all floors and accepted by the Engineer.
(Double leaf. All sizes of wood are finished)
Supplying, fitting and fixing of well matured louver shutter having 75.50mm x 38mm
size all around frame and inner horizontal wooden louver blade 65mm x 20mm
spaced @ 38mm c/c, fixed with frame in grooves including cost of nails, handle,
tower bolt, screws (brass fitting) etc. all complete in all respect as per drawing and
direction of the Engineer in charge.
False slab top
(iii) Presspart
(ii) 2 nos Deputy Secretary room (new accomodation)
18 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
19/55
= 28.13 sft
= 2.61 sqm
@Tk 12417.00 per sqm = Tk 32444.08
Item-16
CE's-12.15.2
4 x 3.50 ft x 7.00 ft = 98.00 sft
= 9.10 sqm
@ Tk 4797.00 per sqm = Tk 43673.91
Item-17
CE's-12.21.2
= 124.40 sqm
@Tk 223.00 per sqm = Tk 27740.78
Item-18
CE's-12.22
18 1 = 18.00 nos
2 1 = 2.00 nos
3 1 = 3.00 nos
= 23.00 nos
@Tk 2014.00 each = Tk 46322.00
Item-19
CE's-12.23.2
8 1 = 8.00 nos
35 1 = 35.00 nos
2 1 = 2.00 nos
6 1 = 6.00 nos
= 51.00 nos
@Tk 767.00 each = Tk 39117.00
Item-20
CE's-13.4.1
1 1 x 19.50ft x 3.00ft = 58.50 sft
N/S 4 1 x 19.50ft x 7.00ft = 546.00 sft
1 1 x 8.00ft x 7.00ft = 56.00 sft
E/W 3 1 x 20.33ft x 7.00ft = 426.93 sft
1 1 x 10.00ft x 7.00ft = 70.00 sft
(i) G.F: (+) 3'-0"
(ii) F.F: 3 nos Members room (new accomodation) & others
Supplying, fitting, fixing window grills of any design made with 25 x 6 mm F.I. bar
including fabrication, welding, cost of electricity workshop charges, carriage, cutting
grooves, mending good the damages, tools and plants etc. complete for all floors
accepted by the Engineer. (Total weight per sqm should be min 42.88 kg. and addor deduct @ Tk. 35.00 for each kg. excess or less respectively)
SS fittings of door
Qty same as item no-12, 13, 14
(iv) 3rd F: 3 nos Deputy Secretary room (new accomodation)
Supplying, fitting and fixing M.S. door shutter made with 1.5 x 1.5 x angle outer frame,inner member1 x F.I. bar, cladding with 16 BWG M.S. sheet, hinged with 2 x 2 x M.S. angle Chowkat.
(i) G.F
(ii) F.F: 3 nos Members room (new accomodation) & others
Supplying, fitting and fixing Rim/ round door lock approved and accepted by the
Engineer.
Extra cost for using brass/ SS fittings in place of iron fitt ings in doors & windows for
all floors (super quality local).
(iv) 3rd F: 3 nos Deputy Secretary room (new accomodation)
Supplying, fitting and fixing of made in hydraulic door closer (big size) including all
necessary tools and accessories etc. all complete approved and accepted by the
Engineer.
(iii) 2nd F: 2 nos Deputy Secretary room (new accomodation)
(iii) 2nd F: 2 nos Deputy Secretary room (new accomodation)
(+) 7'-0"
(ii) F.F: 3 nos members accomodation & others:
19 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
20/55
1 1 x 19.50ft x 3.00ft = 58.50 sft
2 1 x 21.00ft x 3.00ft = 126.00 sft
36 1 x 5.00ft x 4.50ft = 810.00 sft
1 1 x 12.00ft x 9.00ft = 108.00 sft
2 2 x 6.00ft x 4.50ft = 108.00 sft
1 2 x 6.00ft x 4.50ft = 54.00 sft
1 1 x 13.00ft x 4.50ft = 58.50 sft
1 1 x 12.17ft x 4.50ft = 54.77 sft
= 2535.20 sft
= 235.53 sqm
@Tk 2570.00 per sqm = Tk 605300.18
Item-21
CE's-14.2
14.2.2
Bronze colour
G.F 1 1 x 40.00ft x 10.50ft = 420.00 sft
2 2 x 6.00ft x 7.00ft = 168.00 sft
2 1 x 4.50ft x 7.00ft = 63.00 sft
F.F 1 1 x 22.00ft x 10.50ft = 231.00 sft
1 1 x 4.50ft x 7.00ft = 31.50 sft
= 913.50 sft
= 84.87 sqm
@Tk 5296.00 per sqm = Tk 449451.51
Item-22
(iii) 2nd F:2 nos Deputy Secretary room (new accomodation)
(iv) 3rd F: 2 nos Deputy Secretary room (new accomodation)
Supplying fitt ing and fixing of Aluminium swing door as per the U.S.Architectural
Aluminium Manufacturers Association (AAMA) standard specification having 1.8mm thick wall frame size 101.60 mm. 44.45 mm. 83.21 mm). 2.33 mm thick shutter
size (54 mm, 46 mm), 0.99 mm thick door glass bit (size 16.54 mm. 14.49 mm
0.115 kg/m), 2.5 mm thick clousure section (size 101.60 mm, 42.93 mm 1.2 mm),
106.60 mm clousure cover (0.45 kg/m), 4 mm thick floor bottom (size 101.60 mm.
12.70 mm 1 kg/m), 1.8 mm thick shutter bottom (size 82.6 mm, 43.99 mm, 0.60kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) and 2.3 mm to
4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m)
section of all aluminum members will be anodized to aluminium bronze/silver colour
with a coat not less than 15 micrones in thickness and density of 4 mg per square
cm etc. including all accessories like swing door clousure, swing door lock, swing
door mohiar, labour charge, fabrication, fitting fixing in position, carriage and
electricity charge keeping provision for fitting 5 mm thick glass including neoprene
sealant etc. complete in all respect as per drawing and accepted by the Engineer.
(Total weight min 23 kg/m2)
Swing door with fixed partition
Size up to: 2100 mm x 2100 mm.
20 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
21/55
CE's-14.4
14.4.2
Bronze colour
2 1 x 3.50ft x 7.00ft = 49.00 sft
1 1 x 7.50ft x 7.00ft = 52.50 sft
= 101.50 sft
= 9.43 sqm
@Tk 2075.00 per sqm = Tk 19566.38
Item-23
CE's-14.6
14.6.1.2 Size up to: 1500 mm x 1400 mm. (total weight minimum 9.081 kg)
Bronze colour
(i) 3 nos members accomodation
1 2 x 6.00ft x 4.50ft = 54.00 sft
1 1 x 13.00ft x 4.50ft = 58.50 sft
1 1 x 12.17ft x 4.50ft = 54.77 sft36 1 x 5.00ft x 4.50ft = 810.00 sft
= 977.27 sft (A)
2 2 x 6.00ft x 4.50ft = 108.00 sft (B)
2 1 x 6.33ft x 5.50ft = 69.63 sft (C)
3 1 x 9.75ft x 4.50ft = 131.63 sft
5 1 x 4.50ft x 4.50ft = 101.25 sft
= 232.88 sft (D)
Total = 1387.77 sft
(ii) 2 nos Deputy Secretary room (new accomodation)
Supplying, fitting and fixing of Aluminium sliding window as per the U.S.
Architectural Aluminium Manufacturers Association (AAMA) standard specificationhaving 1.2 mm thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top
(size 75.50 mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80, 22 mm),
1.2 mm thick shutter bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size
75.50 mm,19.90 mm), 1.2 mm thick sliding side (size 31 mm, 26 mm),1.2 mm thick
shutter lock (size 49.20 mm 26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm,
32.10 mm) sections all aluminium members (total weight kg/sqm) will be anodized
to aluminium bronze/silver colour with a coat not less than 15 micron in thickness
and density of 4 mg per square cm etc. including all accessories like sliding door
key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and
nuts including sealants, keeping provision for fitting 5 mm thick glass including
labour charge for fitting of accessories, making grooves and mending good
damages, carriage, and electricity complete in all respect as per drawing and
accepted by the Engineer.
Supplying, fitting and fixing of Aluminium sliding doors as per the U.S. Architectural
Aluminium Manufacturers Association (AAMA) standard specification having 1.2mm thick outer bottom (size 75.50 mm, 17.79 mm, 0.528 kg/m), 1.2 mm thick outer
top (size 75.50 mm, 26.80 mm, 0.78 kg/m) 1.2 mm thick shutter top (size 33 mm,
26.80 mm, 0.536 kg/m), 1.2 mm shutter bottom (size 60 mm, 24 mm, 0.736 kg/m),
1.2 mm thick outer side(size 75.50 mm, 19.90 mm, 0.616 kg/m) 1.5 mm thick
shutter lock (size 49.20 mm, 26.20 mm, 0.661 kg/m), 1.2 mm thick inter lock (size
34.40 mm, 32.10 mm, 0.665 kg/m), 1.2 mm thick shutter divider (size 31.75 mm,
0.535 kg/m) sections all aluminium members (Total weight 14.789 kg) will be
anodized to aluminium bronze/silver colour with a coat not less than 15 microns in
thickness and density of 4 mg per square cm etc. including all accessories like
handle, sliding door key lock , sliding door wheel, sliding door mohiar, sliding door
neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick
glass including labour charge for fitting of accessories, making grooves and
mending good damages, carriage, and electricity complete in all respect as per
drawing and accepted by the Engineer.
Size up to: 2100 mm x 2100 mm.
(iii) G.F
21 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
22/55
= 128.93 sqm
@Tk 2370.00 per sqm = Tk 305556.94
14.6.2.2 Size up to: 900 mm x 1400 mm (total weight minimum 7.409 kg)
Bronze colour
2 1 x 6.33ft x 2.50ft = 31.65 sft
2 1 x 6.33ft x 2.00ft = 25.32 sft= 56.97 sft (E)
= 5.29 sqm
@Tk 3120.00 per sqm = Tk 16513.04
Item-24
CE's-14.11
14.11.2 Bronze colour
1 1 x 19.50ft x 3.00ft = 58.50 sft
N/S 4 1 x 19.50ft x 7.00ft = 546.00 sft
1 1 x 8.00ft x 7.00ft = 56.00 sft
E/W 3 1 x 20.33ft x 7.00ft = 426.93 sft
1 1 x 10.00ft x 7.00ft = 70.00 sft
1 1 x 19.50ft x 3.00ft = 58.50 sft
2 1 x 21.00ft x 3.00ft = 126.00 sft
= 1341.93 sft= 124.67 sqm (A)
Scrutinizer & moderation room
1 1 x 12.00ft x 9.00ft = 108.00 sft
1 2 x 7.50ft x 10.50ft = 157.50 sft
1 2 x 12.00ft x 10.50ft = 252.00 sft
3 6 x 6.00ft x 7.00ft = 756.00 sft
2 1 x 14.00ft x 7.00ft = 196.00 sft
= 1469.50 sft
= 136.52 sqm (B)
Total= A+B = 261.19 sqm
@Tk 3154.00 per sqm = Tk 823787.65
Item-25
CE's-14.14
CE's-14.14.2 (A) 5mm thick tinted glass
= 101.50 sft
= 1375.11 sft
= 1476.61 sft
= 913.50 sft
= 124.67 sft
Supplying, fitt ing and fixing in Aluminium door frames, windows, partitions andcurtain wall distortion free glass of approved quality and shade including cost of
fitt ing fixing all necessary accessories etc. complete in all respect as per drawing
and accepted by the Engineer.
Qty same as item no-21
Qty same as item no-24(A)
(i) 2 nos Deputy Secretary room (new accomodation)
Qty same as item no-22
Qty same as item no-23(A+B+D+E)
(+) 7'-0"
(ii) F.F: 3 nos members accomodation & others:
(+) 3'-0"
Supplying fitting and fixing of Aluminium fixed fan light as per the U.S. Architectural
Aluminium Manufacturers Association (AAMA) standard specification mm, 0.313kg/m) 1.2 mm thick bottom cover (size 76.2 mm, 38.10 mm, 0.76 kg/m) and 2.5 mm
thick grouve cover section (size 57.15mm, 15.80 mm, 0.425 kg/m) and 1.2 thick top
and side section (76.20 mm, 16 mm, 38.10 mm, 0.961 kg/m) fixed with above
mentioned frames and all aluminium members (Total weight 5.365kg) will be
anodized to aluminium bronze/silver colour with a coat not less than 15 micron in
thickness and density of 4 mg per square cm etc. including all accessories,
neoprene, sealant, nut and bolt etc. complete in all respect as per drawing and
accepted by the Engineer.
(i) G.F
22 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
23/55
6 x 4.50 ft x 4.50 ft = 121.50 sft
2 x 6.33 ft x 2.50 ft = 31.65 sft
2 x 6.33 ft x 2.00 ft = 25.32 sft
3 x 9.75 ft x 4.50 ft = 131.63 sft
6 x 6.83 ft x 3.50 ft = 143.43 sft
2 x 7.50 ft x 5.50 ft = 82.50 sft2 x 2.25 ft x 5.50 ft = 24.75 sft
2 x 4.17 ft x 7.00 ft = 58.38 sft
1 x 5.75 ft x 7.00 ft = 40.25 sft
1 x 5.75 ft x 2.00 ft = 11.50 sft
1 x 4.00 ft x 7.00 ft = 28.00 sft
2 x 3.75 ft x 7.00 ft = 52.50 sft
= 751.41 sft
Total = 3266.18 sft
= 303.44 sqm
@Tk 1073.00 per sqm = Tk 325586.65
CE's-14.14.3 (B) 5mm thick frosted glass
= 1469.50 sft
= 108.00 sft
= 1577.50 sft
= 146.55 sqm
@Tk 1152.00 per sqm = Tk 168829.43
Item-26
Analysis rate
18 x 22.00 ft x 14.50 ft = 5742.00 sft
18 x 3.00 ft x 14.50 ft = 783.00 sft= 6525.00 sft= 606.19 s m
@ Tk 3951.00 per sqm = Tk 2395045.99Item-27
CE's-15.1
= 1551.00 sft
= 144.09 sqm (A)
@ per sqm = Tk 26512.82
= 4123.00 sft
42 x 2 x 0.42 ft x 3.50 ft = 123.48 sft
= 443.00 ft x 0.50 ft = 221.50 sft
42 x 0.42 ft x 0.83 ft = 14.64 sft
= 4482.62 sft
= 416.45 sqm (B)
@ per sqm = Tk 80374.01
(i) Scrutinizer & moderation room
Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) having with fresh cement to wall
both inner-and outer surface, finishing the corner and edges including washing of sand
cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and
other charges etc. all complete in all respect as per drawing and accepted by the Engineer.
(Cement: CEM-II/A-M)
Sft same as item -3B(B) x 2
Tk 184.00
6 mm thick tempered reflected glass
Top of wall
At level (+)80'-0"
Offset
Sft same as item -3C(B) x 2
Tk 193.00
At level (+) 25'-0"
Offset
At level (+) 7'-0" to (+) 25'-0"
(+) 7'-0" level
Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall
tempered reflected glass of approved quality and shade including cost of fitt ing fixing all
necessary accessories etc. complete in all respect as per drawing and accepted by the
Engineer.
Qty same as item no-23(B)
Qty same as item no-24(B)
(ii) 2 nos Deputy Secretary room (new accomodation)
Outside
23 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
24/55
= 7980.38 sft
78 x 2 x 0.42 ft x 3.50 ft = 229.32 sft
= 1330.06 ft x 0.50 ft = 665.03 sft
78 x 0.42 ft x 0.83 ft = 27.19 sft
Stair & lift wall
Outside 2 x 28.92 ft x 10.50 ft = 607.32 sft
E/W 2 x 14.83 ft x 10.50 ft = 311.43 sft
Main Stair
N/S 2 x 46.00 ft x 10.50 ft = 966.00 sft
E/W 2 x 14.00 ft x 10.50 ft = 294.00 sft
Lift Portion
2 x 46.00 ft x 13.00 ft = 1196.00 sft
E/W 2 x 11.50 ft x 13.00 ft = 299.00 sft
= 12575.67 sft
= 1168.31 sqm ( C )
Inside plaster
N/S 4 x 25.50 ft x 10.50 ft = 1071.00 sft
E/W 2 x 12.50 ft x 10.50 ft = 262.50 sft
Main Stair
N/S 2 x 12.50 ft x 10.50 ft = 262.50 sft
E/W 2 x 20.50 ft x 10.50 ft = 430.50 sft
Electric room
N/S 2 x 6.50 ft x 10.50 ft = 136.50 sft
E/W 2 x 13.00 ft x 10.50 ft = 273.00 sft
= 2436.00 sft
= 226.31 sqm ( D )
= 1394.62 sqm ( E )
@ per sqm = Tk 365390.02
Item-28
CE's-15.2
Open terrece wall side
2 x 1 x 4.00 ft = 8.00 rft
N/s 2 x 9.58 ft = 19.16 rft
E/W 2 x 2 x 2.25 ft = 9.00 rft
N/s 2 x 2 x 41.50 ft = 166.00 rft
2 x 2 x 23.00 ft = 92.00 rft
2 x 2 x 13.00 ft = 52.00 rft
= 346.16 rft
= 173.08 sft
= 16.08 sqm
@ Tk 238.00 per sqm = Tk 3826.93
2 x 2 x 48.33 ft = 193.32 rft
2 x 2 x 39.82 ft = 159.28 rft
Oftset
2 x 2 x 6 x 1.67 ft = 40.08 rft
(+47'-0"to+58'-0"level) 392.68 rft
= 196.34 sft
47'-0"Level
Open terrace Skirting
Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth
wall (1:4) with cement up to 150 mm below ground level with neat cement finishingincluding washing of sand, finishing the edges and corners and curing at least for 7 days,
cost of water, electricity and other charges etc. all complete in all respect as per drawing
and accepted by the Engineer. (Cement: CEM-II/A-M) Ground floor.
Stair Chillakota S-E & N-W
Top of wall
Offset
Total = (C+D)
Stair Chillakota S-E & N-W
Offset
Tk 262.00
Sft same as item -H(C) x 2
36'-0"Level
24 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
25/55
= 18.24 sqm
@ Tk 247.00 sqm = Tk 4505.39
Item-29
CE's-15.4
4 x 2.00 ft x 19.50 ft x 10.00 ft = 1560.00 sft
1 x 0.83 ft x 8.00 ft x 10.00 ft = 66.40 sft
E/W sft
1 x 2.00 ft x 10.00 ft x 10.00 ft = 200.00 sft
3 x 2.00 ft x 20.33 ft x 10.00 ft = 1219.80 sft
0.5 4 25.00 ft x 0.83 ft x 3.50 ft = 145.25 sft
sft
2 x 2 x 9.67 ft x 0.50 ft = 19.34 sft
2 x 2 x 9.67 ft x 0.50 ft = 19.34 sft2 x 2 x 9.67 ft x 4.50 ft = 174.06 sft
2 x 2 x 0.83 ft x 3.50 ft = 11.62 sft
2 x 2 x 5.92 ft x 3.50 ft = 82.88 sft
2 x 2 x 10.75 ft x 1.58 ft = 67.94 sft
2 x 2 x 6.17 ft x 3.58 ft = 88.35 sft
2 x 2 x 5.67 ft x 3.58 ft = 81.19 sft
sft
2 x 2 x 5.50 ft x 3.50 ft = 77.00 sft
2 x 2 x 5.50 ft x 4.00 ft = 88.00 sft
sft
1 x 2 x 34.67 ft x 3.17 ft = 219.81 sft
= 4120.99 sft
3 1 x 6.33 ft x 10.00 ft = 189.90 sft1 1 x 7.25 ft x 14.00 ft = 101.50 sft
= 291.40 sft
= 9017.84 sft
= 13430.23 sft
= 1247.70 sqm
@ per sqm = Tk 200879.48
3 1 x 6.33 ft x 10.00 ft = 189.90 sft
1 1 x 7.25 ft x 14.00 ft = 101.50 sft
= 291.40 sft
= 20844.64 sft
= 21136.04 sft= 1963.59 sqm
@ per sqm = Tk 333809.66
Lift door gap
2 2 x 5.00ft x 9.00ft = 180.00 sft
E/W 2 2 x 22.00 ft x 10.00 ft = 880.00 sft
2 2 x 20.00 ft x 10.00 ft = 800.00 sft
N/S 2 2 x 11.50 ft x 10.00 ft = 460.00 sft
2 1 x 9.50 ft x 10.00 ft = 190.00 sft
At level (+) 7'-0"
ii) At level (-) 6'-0"
Sft same as item -3B(A) x 2
(i) 2 nos Deputy Secretary room (new accomodation)
Middle stair grid-16
(East west side)
i) Duct wall
C) At level (+) 25'-0"
Tk 170.00
For 02 nos ramp (East west side)
For 02 nos ramp (East west side)
A) G.F
Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:6) having with fresh cement to wall
both inner-and outer surface, finishing the corner and edges including washing of sand
cleaning the surface, scaffolding and curing at least for 7 days, cost of water, electricity and
other charges etc. all complete in all respect as per drawing and accepted by the Engineer.
(Cement: CEM-II/A-M)
B) FF: At level (+) 14'-0" (3 nos members accomodation)
Tk 161.00
Sft same as item -3(A) x 2
i) Duct wall
25 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
26/55
2 1 x 10.50 ft x 10.00 ft = 210.00 sft
2 2 x 3.50 ft x 10.00 ft = 140.00 sft
= 2860.00 sft
Door -2 x 3.33 ft x 7.00 ft = -46.62 sft
-2 x 2.50 ft x 7.00 ft = -35.00 sft
-2 x 3.50 ft x 7.00 ft = -49.00 sft
Window -4 x 6.00 ft x 4.50 ft = -108.00 sft= 2621.38 sft
= 243.53 sqm
@ per sqm = Tk 43592.25
Lift door gap
2 2 x 5.00ft x 9.00ft = 180.00 sft
E/W 1 x 21.58 ft x 10.50 ft = 226.59 sft
1 x 8.83 ft x 10.50 ft = 92.72 sft
N/S 1 x 14.75 ft x 10.50 ft = 154.88 sft
1 x 12.17 ft x 10.50 ft = 127.79 sft
E/W 1 x 20.33 ft x 10.50 ft = 213.47 sft1 x 16.58 ft x 10.50 ft = 174.09 sft
N/S 2 x 13.00 ft x 10.50 ft = 273.00 sft
1 x 8.00 ft x 10.50 ft = 84.00 sft
Toilet inside 1 x 7.00 ft x 8.00 ft = 56.00 sft
= 1582.52 sft
= 147.02 sqm (A)
@ persqm = Tk 27639.70
Lift door gap
2 2 x 5.00ft x 9.00ft = 180.00 sft
= 16.72 sqm
@ persqm = Tk 3294.31
Lift door gap2 2 x 5.00ft x 9.00ft = 180.00 sft
= 16.72 sqm
@ persqm = Tk 3444.82
Lift door gap
2 2 x 5.00ft x 9.00ft = 180.00 sft
= 16.72 sqm
@ persqm = Tk 3846.15
Item-30
CE's-15.5
= 2518.09 sft
= 233.94 sqm (A)
@ per sqm = Tk 35558.30
= 2100.76 sft
= 195.17 sqm (A)
E) 4th floor: At level (+) 47'-0"
Tk 197.00
F) 5th floor: At level (+) 58'-0"
Tk 206.00
G) 6th floor: At level (+) 69'-0"
(i) 2 nos Deputy Secretary room (new accomodation)
Tk 230.00
Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling
R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall,
louvers, fins and finishing the corners and edges including washing of sand cleaning the
surface, scaffolding and curing at least for 7 days, cost of water, electricity and other
charges etc. all complete in all respect as per drawing and accepted by the Engineer.
(Cement: CEM-II/A-M)
DS room attached to exam. Controller (Non-Cadre)
Tk 188.00
DS room attached to exam. Controller (cadre)
D) 3rd floor: At level (+) 36'-0"
Tk 179.00
A) G.F:
Sft same as item- 8.B(a-ii)+8.E(a-ii)
Sft same as item- 8.B(b-ii)
Tk 152.00
Deduct
B) F.F:
26 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
27/55
@ per sqm = Tk 31421.62
= 1161.10 sft
14 x 3.00 ft x 2.00 ft = 84.00 sft
9 x 1.67 ft x 3.00 ft = 45.09 sft
10 x = 33.96 sft
= 1324.15 sft
= 123.02 sqm (A)
= 1362.46 sft
= 126.58 sqm (B)
Total = 249.59 sqm (C)
@ per sqm = Tk 42430.77
= 2372.66 sft
= 220.43 sqm (A)
@ per sqm = Tk 39456.11
= 1022.80 sft
= 95.02 sqm (A)
@ per sqm = Tk 17008.58
= 3530.70 sft
15 x 3.00 ft x 2.00 ft = 90.00 sft
21 x 1.67 ft x 3.00 ft = 105.21 sft
= 3725.91 sft
= 346.15 sqm (A)
Cornice 2 1 x 48.00 ft x 1.00 ft = 96.00 sftN/S 2 1 x 49.00 ft x 1.50 ft = 147.00 sft
E/W 2 1 x 11.50 ft x 1.00 ft = 23.00 sft
2 1 x 11.50 ft x 1.50 ft = 34.50 sft
side 2 1 x 48.00 ft x 0.67 ft = 64.32 sft
2 1 x 49.00 ft x 0.42 ft = 41.16 sft
E/W 2 1 x 13.50 ft x 0.67 ft = 18.09 sft
2 1 x 14.50 ft x 0.42 ft = 12.18 sft
N/S 2 2 x 27.25 ft x 1.50 ft = 163.50 sft
E/W 2 2 x 14.50 ft x 1.50 ft = 87.00 sft
side 2 2 x 27.25 ft x 0.42 ft = 45.78 sft
2 2 x 14.50 ft x 0.42 ft = 24.36 sft
N/S 2 1 x 48.00 ft x 1.50 ft = 144.00 sft
E/W 2 1 x 14.00 ft x 1.50 ft = 42.00 sft
side 2 1 x 48.00 ft x 0.42 ft = 40.32 sft
2 1 x 17.25 ft x 0.42 ft = 14.49 sft
1 1 x 9.50 ft x 17.00 ft = 161.50 sft
Sft same as item- 8.A(b-ii)
F) 7th. F:
Sft same as item- 8.B(d-ii)+8.C(c-ii)+8.F(b-ii)
Tk 179.00
E) 4th. F:
Sft same as item- 8.C(d-ii)
Sft same as item- 8.B(b-ii)+8.C(b-ii)+8.F(a-ii)
Top of column
(3.14 x 2.08 x 2.08/4)
Tk 161.00
C) 2nd. F:
D) 3rd. F:
Tk 179.00
Sft same as item- 8.A(a-ii)
Tk 170.00
Lift 1st roof & 2nd roof bottom: slab, cornice, side
Stair Chillakota S-E & N-W: Slab, cornice, side
RCC wall
Main Stair Chillakota: Slab, cornice, side
Inside Lift room (North part)
At level (+)80'-0"
27 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
28/55
N/S 2 1 x 17.00 ft x 7.75 ft = 263.50 sft
E/W 2 1 x 9.50 ft x 7.75 ft = 147.25 sft
2 1 x 7.50 ft x 1.50 ft = 22.50 sft
Electric room ceiling
2 1 x 13.50 ft x 6.50 ft = 175.50 sft
1 1 x 21.00 ft x 13.50 ft = 283.50 sft
2 1 x 26.50 ft x 13.50 ft = 715.50 sft
= 2766.95 sft
= 257.06 sqm (B)
Total = 603.20 sqm (C)
@ per sqm = Tk 130291.51
Item-31
Analysis rate
(A)
= 1 x 69.50 ft x 180.00 ft = 12510.00 sft
= 1 x 43.50 ft x 90.00 ft = 3915.00 sft
= 16425.00 sft (A)
(B)
= 16320.00 sft
= 355.61 ft x 0.42 ft = 149.36 sft
1 x 19.00 ft x 12.00 ft = 228.00 sft
2 x 17.50 ft x 12.00 ft = 420.00 sft
4 x 9.50 ft x 8.50 ft = 323.00 sft15 x 2.00 ft x 3.00 ft = 90.00 sft
21 x 1.67 ft x 3.00 ft = 105.21 sft
2 x 19.00 ft x 1.00 ft = 38.00 sft
4 x 9.50 ft x 1.00 ft = 38.00 sft
4 x 3.00 ft x 1.00 ft = 12.00 sft
2 x 2.00 ft x 1.00 ft = 4.00 sft
2 x 3.00 ft x 1.00 ft = 6.00 sft
Main stair wall
1 x 21.00 ft x 1.00 ft = 21.00 sft
Electric room wall
2 x 11.00 ft x 1.00 ft = 22.00 sft
2 x 5.00 ft x 1.00 ft = 10.00 sft2 x 3.00 ft x 1.00 ft = 6.00 sft
4 x 8.00 ft x 1.17 ft = 37.44 sft
4 x 6.50 ft x 1.17 ft = 30.42 sft
4 x 12.00 ft x 0.42 ft = 20.16 sft
2 x 15.00 ft x 0.42 ft = 12.60 sft
2 x 16.00 ft x 0.42 ft = 13.44 sft
Main stair attached:
2 x 10.00 ft x 0.42 ft = 8.40 sft
2 x 5.00 ft x 0.42 ft = 4.20 sft
1 x 16.00 ft x 0.42 ft = 6.72 sft
Lift:Column:
R.C.C wall:
Lift wall:
Shear w
Brick/W
At level (+) 80'-0"
Sft as per Architectural plan
Deduct:
5" brick wall
Stair:
Grid 13 to 16 (D to L)
Grid 16 to 18
At level (+) 25'-0"
75 mm thick cement concrete (C.C) works with 25 mm x 25 mm mesh expanded metal
using 1st class brick chips of proportion 1:2:4 with net cement finishing on roof including
breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7
days including the supply of water, electricity and other charges and costs of tools and
plants etc. as per direction of Engineer-in-charge
Tk 216.00
Beam side
Stair room: Main & S-E & N-W stair
28 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
29/55
(-) = 1605.95 sft
= 14714.05 sft (B)
= 31139.05 sft
= 2892.89 sqm
@ per sqm = Tk 3020175.79
Item-32
CE's-03.5.2
A
2 x 69.50 ft = 139.00 rft2 x 180.00 ft = 360.00 rft2 x 43.50 ft = 87.00 rft2 x 90.00 ft = 180.00 rft
14 x 2 x 3.00 ft = 84.00 rft14 x 2 x 2.00 ft = 56.00 rft
9 x 2 x 3.00 ft = 54.00 rft9 x 2 x 1.67 ft = 30.06 rft
10 x 1 x 6.53 ft = 65.30 rft= 1055.36 rft
0.50 x 1055.36 x 0.42 ft x 0.50 ft = 110.81 cft AB
E/W 4 x 159.17 ft = 636.68 rftN/S 4 x 47.17 ft = 188.68 rft
8 x 1.50 ft = 12.00 rft4 x 14.00 ft = 56.00 rft2 x 11.08 ft = 22.16 rft2 x 46.00 ft = 92.00 rft
= 1007.52 rftDeduct: Lift core 2 x 19.50 ft = 39.00 rft
= 968.52 rft0.50 x 968.52 x 0.42 ft x 0.50 ft = 101.69 cft (B)
15 x 2 x 3.83 ft = 114.90 rft15 x 2 x 2.00 ft = 60.00 rft21 x 2 x 3.83 ft = 160.86 rft21 x 2 x 1.67 ft = 70.14 rft
= 405.90 rft0.50 x 405.90 x 0.42 ft x 0.50 ft = 42.62 cft (C)
= 255.13 cft= 7.22 cum
er cum = Tk 45932.23Item-33
Tk 1044.00
Total = (A+B)
Stair attached:Lift attached:
Column Side :
Total = (A + B + C)
Tk 6358.00
Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2
Column Side :
At level (+) 80'-0"Ghoondy
Mass concrete (1:2:4) in foundation or floor with cement, sand (F.M. 1.2) and picked jhama
chips including breaking chips, screening, mixing, laying, compacting to levels and curing
for at least 7 days including the supply of water, electricity and other charges and costs of
tools and plants etc. all complete and accepted by the Engineer. (Cement: CEM-II/A-M)
At level (+) 25'-0"Ghoondy
29 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
30/55
CE's-19.1.3
2 x 8.00 ft x 7.00 ft = 112.00 sft
= 10.41 sqm
@ Tk 4236.00 per sqm = Tk 44075.81
Item-34
CE's-16.6
12 x 7.00 ft = 84.00 rft
= 25.60 rm
@ Tk 816.00 per rm = Tk 20891.19
Item-35
CE's-16.6
= 168.00 sft
12 x 0.50 ft x 7.00 ft = 42.00 sft
6 x 3.00 ft x 7.00 ft = 126.00 sft
= 2535.20 sft
= 2871.20 sft
= 266.74 sqm
@ Tk 150.00 per sqm = Tk 40011.08
Item-36
CE's-16.8.2
1 x 176.00 ft x 69.00 ft = 12144.00 sft
Wall 2 4 x 20.00 ft x 12.00 ft = 1920.00 sft
A) At level (-) 6'-0"
At level (+) 7'-0"
Manufacturing, supplying, fitting and fixing M.S. tube (angle box) post (bottom end
bifurcated) made by thorough welding of two Nos. 38 x 38 x 6 mm M.S. angle and verticallyplacing the post into C.C. or R.C.C. foundation including cutting angle to required shape
and size including covering the top of the post with 6 mm thick M.S. plate etc. all complete
as per drawing. (Rate is excluding the cost of C.C./R.C.C. foundation and paint)
Chillakota
Member & DS
Plastic emulsion paint of approved best quality and colour delivered from authorized localagent of the manufacturer in a sealed container, applying to wall and ceiling in two coats
over lime putty of specified brand applied on primer or sealer elapsing specified time for
drying/recoating including cleaning drying, making free from dirt, grease, wax, removing all
chalked and scaled materials, fungus, mending good the surface defects, sand papering
the surface and necessary scaffolding, spreading by brush/ roller/spray etc. all complete in
all floors accepted by the Engineer. Lime putty to be applied as per manufacturer
instructions approved and accepted by the Engineer.
Ceiling
sft same as item- 20
Painting to door and window frames and shutters in two coats with approved best quality
and colour of synthetic enamel paint delivered from authorized local agent of the
manufacturer in a sealed container, having highly water resistant, high bondibilty, flexible,
using specific brand thinner applied by brass/roller/spray over a coat of priming elapsing
time for drying including surface cleaning from dust, oil or dirt, smoothening, finishing and
polishing with sand paper and necessary tools, scaffolding, testing charges etc. all
complete in all floors approved and accepted by the Engineer.
Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made
of 3/4" x 3/4" x 1/8" channel placed @ 112 mm c/c vertically and connecting the same with
each other by 20 x 3 mm M.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows
including cutting the different M.S. members to required sizes, fabricating, welding, riveting
with required size rivets, providing required size wheels, pulling handles on both sides,
suitable locking arrangement, electrodes, grease and finally placing the same in position in
between 2 (two) Nos. 50 x 50 x 6 mm M.S. Tee rail made by welding 2 Nos. 50 x 6 mm M.S.
flat bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall
with required Nos. 150 mm to 225 mm long 38 x 6 mm M.S. flat bar clamps one end welded
with the gate member and the other end bifurcated and embedded in C.C. at the respective
point including cutting holes and mending good the damages by pouring concrete (1:2:4)
into the holes and finishing, etc complete, painting 2 (two) coats with approved best quality
synthetic enamel paint over a coat of anticorrosive painting, both end carriage, including
greasing, electrodes, curing etc. complete as per drawing and design and accepted by the
Engineer.(Rate is excluding the cost of paint).
sft same as item- 14x1.5
30 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
31/55
2 2 x 20.00 ft x 8.00 ft = 640.00 sft
= 14704.00 sft
= 1366.03 sqm
1 x 180.00 ft x 70.00 ft = 12600.00 sft
BeamN/S 2 21 x 19.50 ft x 1.50 ft = 1228.50 sft
Rib 2 7 x 19.50 ft x 1.50 ft = 409.50 sft
E/W 2 32 x 20.00 ft x 1.50 ft = 1920.00 sft
Wall 2 1 x 45.00 ft x 17.50 ft = 1575.00 sft
Vault room
Wall N/S 1 1 x 13.00 ft x 17.50 ft = 227.50 sft
1 1 x 12.75 ft x 17.50 ft = 223.13 sft
1 1 x 11.58 ft x 17.50 ft = 202.65 sft
1 1 x 11.83 ft x 17.50 ft = 207.03 sft
E/W 1 1 x 12.17 ft x 17.50 ft = 212.98 sft
1 1 x 10.25 ft x 17.50 ft = 179.38 sft
1 1 x 11.33 ft x 17.50 ft = 198.28 sft1 1 x 11.75 ft x 17.50 ft = 205.63 sft
Self 1 2 x 10.25 ft x 6.00 ft = 123.00 sft
Colm 25 1 x 10.50 ft x 17.50 ft = 4593.75 sft
Porch
1 x 90.00 ft x 44.00 ft = 3960.00 sft
Beam
N/S 15 2 x 42.00 ft x 2.63 ft = 3313.80 sft
2 1 x 42.00 ft x 3.00 ft = 252.00 sft
2 1 x 42.00 ft x 2.92 ft = 245.28 sft
E/W 2 1 x 86.00 ft x 2.92 ft = 502.24 sft
7 2 x 86.00 ft x 2.63 ft = 3166.52 sft
Colm 5 1 x 10.50 ft x 17.67 ft = 927.68 sft
= 36473.82 sft
= 3388.50 sqm
= 370.40 sqm
= 3652.00 sqm
= 1128.18 sqm
= 9905.12 sqm
@ Tk 186.00 per sqm = Tk 1842352.12
Item-37
CE's-16.4
= 1584.75 sqm
= 469.16 sqm
2 x 9.17 ft x 22.00 ft = 403.48 sft
2 x 13.42 ft x 22.00 ft = 590.48 sft
3 x 32.00 ft x 22.00 ft = 2112.00 sft
4 x 6.17 ft x 22.00 ft = 542.96 sft
3 x 9.33 ft x 22.00 ft = 615.78 sft
4 x 3.33 ft x 22.00 ft = 293.04 sft
1 x 30.50 ft x 22.00 ft = 671.00 sft
2 x 17.50 ft x 22.00 ft = 770.00 sft
On exterior surface applying as per manufacturer instructions 3 coat of weather coat of
approved quality and colour delivered from authorized local agent of the manufacturer in a
sealed container complete in all respect in all loors and accepted by the Engineer.
Sqm same as item-27 (B+C)
Sqm same as item- 30 (A + B + C(B)+D+E+F(B))
East- West side
Outside +3'-0" to +25'-0" level
Sqm same as item- 27 (A+D)
Sqm same as item- 29
B) At level (+) 7'-0" & Porch
Ceiling
Grid-13 to 16
Ceiling
Sqm same as item-30(C(B)+F(B))
31 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
32/55
2 x 12.17 ft x 22.00 ft = 535.48 sft
Southside 2 x 7.75 ft x 22.00 ft = 341.00 sft
2 x 2.42 ft x 22.00 ft = 106.48 sft
2 x 9.75 ft x 22.00 ft = 429.00 sft
2 x 12.25 ft x 22.00 ft = 539.00 sft
2 x 8.33 ft x 22.00 ft = 366.52 sft
2 x 4.92 ft x 22.00 ft = 216.48 sft1 x 9.33 ft x 22.00 ft = 205.26 sft
Beam E/W 12 x 9.67 ft x 2.17 ft = 251.81 sft
9 x 9.67 ft x 1.00 ft = 87.03 sft
4 x 9.75 ft x 1.00 ft = 39.00 sft
Drop Bott. 1 x 65.50 ft x 3.33 ft = 218.12 sft
Southside Ceil 1 x 65.50 ft x 6.00 ft = 393.00 sft
2 x 6.00 ft x 1.50 ft = 18.00 sft
4 x 4.00 ft x 1.50 ft = 24.00 sft
1 x 65.50 ft x 3.00 ft = 196.50 sft
West & East side
Curve line 2 x 49.00 ft x 4.50 ft = 441.00 sft
16 x 2.33 ft x 0.50 ft = 18.64 sft
2 x 49.00 ft x 4.00 ft = 392.00 sft
2 x 44.50 ft x 0.50 ft = 44.50 sft
4 x 2.00 ft x 0.50 ft = 4.00 sft
2 x 1.00 ft x 0.50 ft = 1.00 sft
Deduct: Door/ Window
E & W side -8 x 4.50ft x 4.50ft = -162.00 sft
-4 x 6.33ft x 2.50ft = -63.30 sft
-4 x 6.33ft x 2.00ft = -50.64 sft
-3 x 7.50ft x 5.50ft = -123.75 sft
-2 x 6.25ft x 5.50ft = -68.75 sft
-5 x 14.33ft x 6.83ft = -489.37 sft
-3 x 9.67ft x 6.83ft = -198.14 sft
-1 x 3.00ft x 7.00ft = -21.00 sft
-2 x 8.00ft x 2.25ft = -36.00 sft
-4 x 9.75ft x 4.50ft = -175.50 sft
-2 x 3.00ft x 3.83ft = -22.98 sft
-1 x 3.00ft x 3.83ft = -11.49 sft
-1 x 3.00ft x 14.00ft = -42.00 sft
= 9401.63 sft
= 873.43 sqm
Total = 2927.35 sqm
@ per sqm = Tk 485940.02
Item-38
CE's-16.7
2 2 x 21.00 ft x 10.00 ft = 840.00 sft2 2 x 11.25 ft x 10.00 ft = 450.00 sft
Ceil. 2 1 x 21.00 ft x 11.25 ft = 472.50 sft
Door -2 x 3.00 ft x 7.00 ft = -42.00 sft-1 x 9.75 ft x 4.50 ft = -43.88 sft-1 x 4.00 ft x 4.50 ft = -18.00 sft
Tk 166.00
Grid-7H col
Store room south east
Deduction
Beam
Curve wall
Approved best quality and colour synthetic polyvinyl distemper delivered from authorized
local agent of the manufacturer in a sealed container, applying to wall and ceiling in 2 coats
over a coat of brand specified primer or sealer elapsing specified time for drying/ recoating
matt finish including cleaning and sand papering making the surface free from loose and
flaky materials, dirt, grease, wax, polish, scraping all chalked and scaled materials, applyingthe paint by brush/roller and necessary scaffolding etc. all complete in all floors accepted
by the Engineer.
A) At level (+) 3'-0"
32 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
33/55
Ceil. 1 1 x 43.00 ft x 44.50 ft = 1913.50 sftBeam 2 4 x 20.33 ft x 1.50 ft = 243.96 sft
2 2 x 19.54 ft x 1.50 ft = 117.24 sftColm 1 1 x 10.50 ft x 21.50 ft = 225.75 sft
1 1 x 7.83 ft x 21.50 ft = 168.35 sftwall 2 1 x 44.50 ft x 21.00 ft = 1869.00 sft
cobla 4 1 x 0.42 ft x 21.00 ft = 35.28 sft1 1 x 43.00 ft x 21.50 ft = 924.50 sft
Door -1 x 19.50 ft x 2.17 ft = -42.32 sftwall 2 2 x 4.50 ft x 9.17 ft = 165.06 sft
2 2 x 7.17 ft x 9.17 ft = 263.00 sft1 2 x 24.50 ft x 9.17 ft = 449.33 sft
Door -4 x 8.00 ft x 7.00 ft = -224.00 sft-4 x 8.00 ft x 2.00 ft = -64.00 sft-4 x 5.50 ft x 2.00 ft = -44.00 sft-1 x 19.25 ft x 2.00 ft = -38.50 sft
= 7620.77 sft= 707.99 sqm
@ Tk 122.00 per sqm = Tk 86374.40Item-39
CE's-16.14
(i) Store
4 2.5 x 6.00ft x 6.83ft = 409.80 sft
(ii) G.F Vault
3 2.5 x 6.00ft x 7.00ft = 315.00 sft
5 2.5 x 6.00ft x 6.83ft = 512.25 sft
= 1237.05 sft
(i) North side hallroom attached officers toilet
Door 5 1.25 x 2.50ft x 7.00ft = 109.38 sft
2 1.25 x 3.00ft x 7.00ft = 52.50 sft
4 2.5 x 3.00ft x 7.00ft = 210.00 sft
2 2.5 x 6.00ft x 7.00ft = 210.00 sft
Door 2 1.25 x 3.00ft x 7.00ft = 52.50 sft
2 1.25 x 2.50ft x 7.00ft = 43.75 sft
= 678.13 sft
(i) Sft qnty. Same as ground floor = 678.13 sft(ii)3 nos members accomodation
28 2.5 x 3.00ft x 6.83ft = 1434.30 sft
5 2.5 x 2.17ft x 6.83ft = 185.26 sft
= 2297.69 sft
Door 2 2.5 x 7.00ft x 3.33ft = 116.55 sft
2 1.25 x 7.00ft x 2.50ft = 43.75 sft
Sub-station
(iii) Presspart
(i) 2 nos Deputy Secretary room (new accomodation)
At 2nd floor
At level (-) 6'-0" to (-) 9'-0"
French polishing to door and window frames and shutters three coats over a coat of priming
including putty, cleaning finishing and polishing with sand paper etc. all complete in all
floors accepted by the Engineer.
At ground floor
(ii) Porchside
At first floor
Deduction
Deduction
33 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
34/55
Louv. 2 2.5 x 2.50ft x 2.25ft = 28.13 sft
= 188.43 sft
Total = 4401.29 sft
= 408.89 sqm
@ per sqm = Tk 94044.63
Item-40
CE's-18.2.3
3 22.00 ft x 22.08 ft = 1457.28 sft
Scrutinize & Moderate room
1 45.00 ft x 40.00 ft = 1800.00 sft
1 42.50 ft x 23.08 ft = 980.90 sft
1 19.00 ft x 21.50 ft = 408.50 sft
1 19.00 ft x 20.67 ft = 392.73 sft
1 39.08 ft x 42.83 ft = 1673.80 sft2 4.75 ft x 5.83 ft = 55.39 sft
1 6.00 ft x 7.58 ft = 45.48 sft
1 15.50 ft x 21.67 ft = 335.89 sft
1 8.00 ft x 9.00 ft = 72.00 sft
1 20.67 ft x 12.00 ft = 248.04 sft
1 5.08 ft x 8.50 ft = 43.18 sft
1 13.67 ft x 21.17 ft = 289.39 sft
1 13.83 ft x 21.17 ft = 292.78 sft
2 13.58 ft x 12.75 ft = 346.29 sft
2 13.58 ft x 12.75 ft = 346.29 sft
2 13.58 ft x 12.75 ft = 346.29 sft
1 25.75 ft x 32.75 ft = 843.31 sft
1 12.50 ft x 12.75 ft = 159.38 sft
1 9.25 ft x 12.33 ft = 114.05 sft
1 6.83 ft x 8.00 ft = 54.64 sft
1 23.08 ft x 31.83 ft = 734.64 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
Supplying, fitting and fixing of 9 mm thick perforated gypsum board false ceiling with
aluminium T bar frame in natural anodized frame at 600 mm x 600 mm grid suspended
from ceiling by 12 SWG double ply G.I. Wire
Rest room
Member (N-W)
Rest room
Member (N-E)
Rest room
(+) 69'-0" Level
Member (N-E)
Rest room
(+) 58'-0" Level
Member (S-W)
Rest room
Member (S-E)
Rest room
Conference
Member (S-W)
Rest room
Member (N-W)
Rest room
Exam. Contr. Non-Cadre
D.S room(S-W)
D.S room(S-E)
Director room(S-E)(+) 47'-0" Level
Chairman room
(+) 36'-0" Level
Secretary room
Rest room
J.S room
Rest room
Exam. Contr. Cadre
(+) 25'-0" Level
Commission room
Meeting room
Lobby
Library
Member
(+) 14'-0" Level: 3 nos members room (new accomodation)
Tk 230.00
34 OF 55
7/28/2019 Remaining works of superstructure-18-09-12.xls
35/55
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft
1 7.58 ft x 8.08 ft = 61.25 sft
1 24.67 ft x 24.83 ft = 612.56 sft1 7.58 ft x 8.08 ft = 61.25 sft
4 19.50 ft x 46.00 ft = 3588.00 sft
4 8.00 ft x 11.50 ft = 368.00 sft
8 4.50 ft x 13