17
Reliability of GE’s 1.5MW Turbine A Component View John T. Murphy Product Service and Warranty GE Wind Energy June 17, 2009

Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

Embed Size (px)

Citation preview

Page 1: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

Reliability of GE’s 1.5MW Turbine

A Component View

John T. MurphyProduct Service and Warranty

GE Wind Energy

June 17, 2009

Page 2: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

2 /

GE /

Wind Services – GE Perspective

GE differentiation

> Resources to scale

> Fleet understanding

> Technology

Scale to 20% → managing large systems

> Organization

> Processes

> Systems and Metrics

Cumbersome at 1000 unitsEffective at 10,000Essential technology at 100,000

g imagination at work

Page 3: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

3 /

GE /

Top Level Metrics Drive Reliability Focus

turbine

Avail

FW21

Relia

FW21

fault

rate

DT/Fault

[hrs]

Froidchapelle 2 91.1 91.9 3 5.0

Froidchapelle 7 98.7 98.7 6 0.4

Froidchapelle 8 100 100 1 0.0

Kleisthoehe II 8 96.1 98.4 0 0.0

Kleisthoehe II 9 98.3 99.8 1 2.9

Wilhelmshaven 2.5xl DEWI 98.8 (95.7) 100 0 0.0

FLEET 97.2 98.1 1.8 3.1

09FW21 Availability Review

0.0

6.0

12.0

18.0

24.0

30.0

36.0

42.0

48.0

54.0

60.0

0.0 2.5 5.0 7.5 10.0 12.5

last 4 weeks - faults/unit/week

last

4 w

eeks - downtim

e p

er fa

ult [hrs

]

Mandate:“The best-performing fleet in the world.”

Page 4: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

4 /

GE /

Fleet and Services Growth

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Sep-02 Jan-04 May-05 Oct-06 Feb-08 Jul-09 Nov-10

Inst

alled B

ase

0

20

40

60

80

100

120

PAC/M

onth

Page 5: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

5 /

GE /

0

10

20

30

40

50

60

Pum

p

Low O

il Lev

elRi

ng G

ear

Main

Bear

ing

HS P

inion

Fittin

gs/S

enso

rsCo

oler

HS G

ear

LS G

ear

Plan

et G

earSp

litBr

eath

erHo

using

IM Pinion

Low O

il Pre

ssur

e

Slip R

ing

TubeFil

ter

HS B

earin

gsIM

Gea

rOi

l Tem

pSu

n Pinion

Carri

er

Carri

er B

earin

gsLS

Bea

rings

LS Pinion

Plan

et B

earin

gs

Serv

ice Inquiries

A

B

C

D

E

Gearbox Issue Breakdown

Multiple suppliers – insight to entitlement

Page 6: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

6 /

GE /

Site B vs. Fleet – Gearbox Low Oil Faulting

EM51 Trips by Supplier - FW43-52 - 2008

0%

20%

40%

60%

80%

100%

A B C D E

Site B

Fleet

GE Fleet knowledge informs corrective actions for site issues

Page 7: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

7 /

GE /

Supplier A High-Speed Bearing Failure

Failure of HS shaft tapered rollerRCA: root cause fit tolerance, housing detailIdentified LAT, monitor, replace as requiredWeibull would have predicted >150 failures11 total incidents, all repaired up tower

’07 – 1.7, 1300 hrs

Page 8: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

8 /

GE /

Supplier B Sun Pinion Failures

FailurePictures

WeibullPictures

Fracture of sun pinion gear teethRCA with supplierMajority associated with 1 meltIdentify affected population, monitorNo additional failures since ‘08GE supplier audit, process improvementsSupplier proactively tightening specifications

’08 – 1.0, 4.4M hrs

Page 9: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

9 /

GE /

Supplier C LS Gear Failure

Fracture of 1 or more LS gear teethFailure not always obvious

Failure times distortedSite concentration

2/3 of all failures at only 2 sitesRCA needs to accommodate operator

Time, (t)

Unreliability, F(t)

100.000 100000.0001000.000 10000.0000.100

0.500

1.000

5.000

10.000

50.000

90.000

99.000

0.100

’09 – 2.1, 82k hrs

A

C

E

F

G

B

D

Site Breakdown

Page 10: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

10 /

GE /

Site A vs. Fleet – Gearbox Replacement

Characteristic Life by Supplier

0

50,000

100,000

150,000

200,000

250,000

A B All

Supplier

Life (h

rs)

Fleet

Site A

Fleet big picture vs. particular site or customer

Page 11: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

11 /

GE /

Gearbox Replacement Rate

Generational improvement, SLE’s better than S’sReplacement rate for both improving

0.0

0.5

1.0

1.5

2.0

2.5

3.0

2001

Q1

2001

Q3

2002

Q1

2002

Q3

2003

Q1

2003

Q3

2004

Q1

2004

Q3

2005

Q1

2005

Q3

2006

Q1

2006

Q3

2007

Q1

2007

Q3

2008

Q1

2008

Q3

2009

Q1

Repla

cem

ents

/Qrtr (%

Inst

alled B

ase

)

1.5S

1.5SLEOld Technology

New Technology

Page 12: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

12 /

GE /

Weibull Characteristic Life

1.E+04

1.E+05

1.E+06

1.E+07

Nov-07 Feb-08 Jun-08 Sep-08 Dec-08 Mar-09 Jul-09

Eta

(hrs

)A

B

C

D

More consistent results among suppliersRelative supplier performance shifts over time

Page 13: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

13 /

GE /

Material Cleanliness

Fatigue fracture of gears

> Frequently able to trace to actual inclusion, type and size

> Several suppliers, steel producers tightening requirements

GE finalizing gear specification

> In line with supplier/producer trend

> Reference more common specs, American and European

Page 14: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

14 /

GE /

HALT Testing

Introduced as requirement by GE in 2004-5 time period

> Standardize test and evaluation among suppliers

> Enable more rapid endurance testing of gearbox

> Reproduce observed field failure modes in controlled environment

> Need to continue to evaluate results and requirements in context of field observations

Page 15: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

15 /

GE /

Inspection and Characterization

Phased Array UT Inspection of Ring Gear

> Extension of GE Energy process for steam turbine rotors

> Instrumention available from GE Inspection Technologies

> Enables examination of entire ring gear from outer surface

Page 16: Reliability of GE’s 1.5MW Turbine A Component Viewwindpower.sandia.gov/2009Reliability/PDFs/Day1-12-JohnMurphy.pdf · Reliability of GE’s 1.5MW Turbine A Component View ... P

16 /

GE /

CBM

Vibration and particle monitoring

Reduce unplanned downtime

Coordinate with planned

maintenance

Reduction of collateral damage