Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering Chester Water Authority April 24, 2013 PA AWWA Annual Conference

Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Embed Size (px)

Citation preview

Page 1: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Rehabilitation of Chester Water

Authority’s Pine Grove Dam

Tainter Gates

Brian P. MacEwen, P.E.

Director of Engineering

Chester Water Authority

April 24, 2013

PA AWWA Annual Conference

Page 2: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 3: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 4: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Pine Grove Dam

650 ft. long, 65 ft. high at maximum

138 sq. mile watershed

Storage: 2.2 billion gallons

Uncontrolled ogee spillway 71.5 ft. long

Two 44 ft. wide by 30 ft high Tainter Gates

Gate Crest Elevation: 280 ft

Gate Sill Elevation: 250 ft

Low-Head Hydropower Facility (520 kw)

FERC Regulated Dam

Page 5: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 7: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Tainter Gate Section

Page 8: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 9: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 10: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Folsom Dam, California

Page 11: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

U.S. Bureau of Reclamation

1955

Page 12: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Imagine you’re the

person who went to

open up a Tainter Gate

on Monday morning,

July 17, 1995 …

Page 13: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

• Sustained Release of

25,800 MGD

• Drained 40% of reservoir

until flow stopped

Page 14: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Folsom Dam, California

Forensic Analysis

Diagonal brace joint next to trunnion was the initial

point of failure

Friction in the trunnion was not considered in the

design

Page 15: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 16: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 17: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Trunnion

Page 18: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

FERC Response to Folsom Dam

FERC required ALL dams with tainter gates to

analyze whether friction was accounted for in

the design of the gate structure

Conduct a full gate opening every 5 or 10 years,

depending on category of dam

Conduct a close-up, detailed inspection every 10

years

Page 19: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Project Team & Schedule

Consultant - Gannett Fleming Structural Analysis and Design in response to FERC directive

Preparation of the Bid Document

Services during Construction

Bid Project - March 2005 Crofton Diving Corporation, Newport News, VA

Construction Phase: Field work started Fall 2005

Fabrication of Bulkhead and Abutment Plates – 2006/07

Gate 1 – 2008 and Gate 2 - 2009

Stored Bulkhead in Summer of 2010

Page 20: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Challenges at Pine Grove Dam

No stop-log or bulkhead arrangement in original

construction that would allow for inspection of

the gates in a dewatered condition

Reservoir and water supply intake had to stay in

operation 24/7

Plant personnel had to be very nimble with

flood events while one gate was out of service

No winter work

Page 21: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

How?

Customized Floating Bulkhead

6 caissons – 25” thick by 58” high by 44’ wide

Valves for flooding caisson with water and pumping

air for flotation

Abutment Plates – 304 SS

10” wide face for bulkhead seating

59 anchor bolts for each abutment

Installation with cofferdam

Page 22: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 23: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 24: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 25: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Anchor Bolts

Abutment Plates – 59 anchor bolts each side

1.25” and 1.50” diameter bolts with 11” to 16”

embedment

Loaded to 25,600 lbs

Tested 25% of anchor bolts after installation

Page 26: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 27: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 28: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 29: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 30: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Barge

Page 31: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 32: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 33: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 34: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 35: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 36: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 37: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Abutment Plates

Page 38: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 39: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 40: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 41: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 42: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 43: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 44: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 45: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Bulkhead

• Delivery to Site

• Installation - Rigid

Page 46: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 47: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 48: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 49: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 50: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 51: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 52: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 53: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 54: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 55: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 56: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 57: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 58: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 59: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 60: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 61: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 62: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 63: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Repairs

Page 64: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 65: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 66: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 67: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 68: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 69: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 70: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 71: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 72: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 73: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 74: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 75: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 76: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 77: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 78: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 79: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 80: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 81: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 82: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 83: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 84: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 85: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 86: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 87: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 88: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 89: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 90: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 91: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 92: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 93: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 94: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 95: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 96: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 97: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 98: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 99: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 100: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 101: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 102: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 103: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Full Height Lift

Page 104: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 105: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 106: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 107: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 108: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 109: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 110: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 111: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 112: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 113: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 114: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Bulkhead Removal

Process

• Roll-up Garage Door

Page 115: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 116: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 117: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 118: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 119: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 120: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 121: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 122: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 123: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 124: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 125: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Caisson Storage

• Location: Fishing HQ

• Power washed & touch-up paint

• Treated seals to prevent dry-rot

• Purge chambers with nitrogen

Page 126: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 127: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering
Page 128: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

Final Project Costs

Engineering - $ 150,000

Construction - $1,728,000

Thanks to:

Treatment Plant Staff

Gannett Fleming – Richard Horvath, P.E.

Crofton Diving Corporation

Jay Crofton & Kurt Feairheller

Page 129: Rehabilitation of Chester Water - Pennsylvania Section · Rehabilitation of Chester Water Authority’s Pine Grove Dam Tainter Gates Brian P. MacEwen, P.E. Director of Engineering

QUESTIONS?