10
Page Blk Hrs Blk/Day Schedule Commentary 2 Base-specific Staffing & Line History 3 CRJ200 CRJ200: Numbers and Percentage of Each Pairing Length 4 10,403 336 CRJ200: Credit Hours and Percentage of Each Pairing Length 5 (+1,226) (+30) CRJ200: Calendar Distribution of Pairing-Days 6 (+10%) CRJ7&9: Numbers and Percentage of Each Pairing Length 7 CRJ7&9: Credit Hours and Percentage of Each Pairing Length 8 CRJ7&9 CRJ7&9: Calendar Distribution of Pairing-Days 9 6,369 205 (-59) (-9) (-4%) All CRJ 16,772 541 (+1,167) (+21) (+4%) Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Dec 2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 YtY Δ Blk hrs 9697 9347 10514 13904 13973 14583 15539 15383 14614 15005 15764 15605 16772 7075 Blk day 313 312 350 463 466 470 518 496 471 500 509 520 541 228 % Chg -4.1% -0.4% 12.5% 32.2% 0.5% 1.0% 10.1% -4.2% -5.0% 6.1% 1.7% 2.3% 4.0% 73.0% Regional Scheduling Representative Report ORD CRJ December 2017 Block Hour History [email protected] Prepared by Matt Caldwell Blk Hr Summary Table of Contents The purpose of this report is to provide a technical analysis of the pairings available in the monthly bid along with a historical comparison over the past year. Reports are prepared each month for each domicile & aircraft fleet as well as the entire SkyWest system. These reports can be useful in both your monthly bid and in considering a transfer or transition to another domicile or aircraft type. You can access archived reports for any domicile online at the SAPA website (www.sapapilot.org) under Resources -> RSR Reports & Scheduling Surveys. Please contact your RSR if you have any specific input. Often the schedules are constrained by greater considerations that your RSR may be able to explain, but sometimes your input makes a difference in future schedules. Interpret this data: The number of scheduled block hours is useful to see whether flying in a domicile is growing, shrinking, or remaining relatively constant. The block per day is presented because each bid month may be 30 or 31 days long. Because airline schedules vary seasonally, a year-over-year comparison is provided in the last column to compare the current bid month vs. one year ago.

Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Embed Size (px)

Citation preview

Page 1: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Page

Blk Hrs Blk/Day Schedule Commentary 2

Base-specific Staffing & Line History 3

CRJ200 CRJ200: Numbers and Percentage of Each Pairing Length 4

10,403 336 CRJ200: Credit Hours and Percentage of Each Pairing Length 5

(+1,226) (+30) CRJ200: Calendar Distribution of Pairing-Days 6

(+10%) CRJ7&9: Numbers and Percentage of Each Pairing Length 7

CRJ7&9: Credit Hours and Percentage of Each Pairing Length 8

CRJ7&9 CRJ7&9: Calendar Distribution of Pairing-Days 9

6,369 205

(-59) (-9)

(-4%)

All CRJ

16,772 541

(+1,167) (+21)

(+4%)

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 YtY Δ

Blk hrs 9697 9347 10514 13904 13973 14583 15539 15383 14614 15005 15764 15605 16772 7075

Blk day 313 312 350 463 466 470 518 496 471 500 509 520 541 228

% Chg -4.1% -0.4% 12.5% 32.2% 0.5% 1.0% 10.1% -4.2% -5.0% 6.1% 1.7% 2.3% 4.0% 73.0%

Regional Scheduling Representative ReportORD CRJ

December 2017

Block Hour History

[email protected]

Prepared by Matt Caldwell

Blk Hr Summary Table of Contents

The purpose of this report is to provide a technical analysis of the pairings available in the monthly bid along with a historical comparison over the past year. Reports are prepared each month for each domicile & aircraft fleet as well as the entire SkyWest system.

These reports can be useful in both your monthly bid and in considering a transfer or transition to another domicile or aircraft type. You can access archived reports for any domicile online at the SAPA website (www.sapapilot.org) under Resources -> RSR Reports &Scheduling Surveys.

Please contact your RSR if you have any specific input. Often the schedules are constrained by greater considerations that your RSR may be able to explain, but sometimes your input makes a difference in future schedules.

Interpret this data: The number of scheduled block hours is useful to see whether flying in a domicile is growing, shrinking, or remaining relatively constant. The block per day is presented because each bid month may be 30 or 31 days long. Because airline schedules vary seasonally, a year-over-year comparison is provided in the last column to compare the current bid month vs. one year ago.

Page 2: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Please give us your commentary on this month's pairings!

https://www.surveymonkey.com/r/J757238

ORD Report on CRJ Aircraft for December 2017 Bid Month

Schedule Commentary by Matt Caldwell

Staffing

Page 2

Commentary

Bid Average:87FA

Grntee Target Total Rsrve Rsrve%

482

(+37)

526 635 109 20.7%

(+29) (-28)(+1) (-6.8)

CRJ FO

209 220 220 0

Bid Average:88

0.0%

(+14) (+14) (+10) (-4) (-1.9)

CRJ CA

209 224 243 19

Bid Average:89

8.5%

(+14) (+9) (-2) (-11) (-5.5)

1-Day: 364 11.6%

5-Day: 0 0.0%

2-Day: 254 13.7%

3-Day: 224 20.1%

4-Day: 355 39.8%

Pairing Breakdown

# % Ttl Credit

SDO: 461 14.8%

Hello all.

December promises to be a busy month for us on the ORD CRJ. Block hours are higher than they've ever been, both company wide and for our domicile. However, because of the significant increase in staffing this past spring, year over year average line credits are not significantly higher than usual for December, which is always a busy month due to increased schedules around the holidays. Unfortunately, in order to keep the average credits no higher than 88 or 89, we are left with zero FO reserves and 19 (11 fewer than Nov) CA reserves.

If you like locals or CDOs (standups), you may look at page 4 and notice there are a lot fewer of those trips on the CRJ 200 fleet. This will be offset by an increase in shorter trips on the larger RJ variants. For instance, total CDOs are only down by 22 pairings, which is inconsequential compared to the number of CDOs (nearly 500). Locals tell a similar story if you do the math, but its not as significant a change as the graphs appear.

(incidentally, this report will start combining the CRJ200 and CRJ700/900 into one CRJ page soon, to address this issue.)

The reduction of shorter trips (and the resultant increase in longer ones) is largely due to the high number of block hours in the system this month. When hours are high, each crew has to fly more in order to cover all the flying. This leads to longer trips. It also leads to more efficient trips, and you can see that average credit per day is the same or higher than last month for literally every pairing type except 700/900 4 day trips, where it is down by only 5 (1.5%) minutes to 5:20/day.

Remember we are bidding for the winter holidays now, and the bid month runs to the 31st of Dec.

If you have any questions please contact me.

Matt Caldwell740-547-4158

Page 3: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

Total CA 172 175 184 229 228 235 241 245 237 241 244 245 243

Tgt CA 146 143 157 194 207 210 214 218 204 206 218 215 224

% CA RSV 17.8% 22.4% 17.2% 18.0% 10.1% 11.9% 12.6% 12.4% 16.2% 17.0% 11.9% 14.0% 8.5%

Line Credit 87 82 85 87 85 85 87 85 86 86 88 88 89

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

Total FO 166 158 179 192 208 226 241 235 223 204 209 210 220

Tgt FO 144 135 158 192 203 204 207 212 198 200 209 206 220

% FO Rsv 15.3% 17.0% 13.3% 0.0% 2.5% 10.8% 16.4% 10.8% 12.6% 2.0% 0.0% 1.9% 0.0%

Line Credit 87 86 83 88 83 86 88 84 87 87 88 88 88

ORD Report on CRJ Aircraft for December 2017 Bid Month

ORD CRJ Captain Staffing

Page 3

ORD CRJ First Officer Staffing

Interpret this data: Staffing is presented for each seat for the specific domicile & equipment type of this report. Total staffing is the sum of targeted line holders & reserve lines, and represents the total number of bidders for a particular month. Target Lineholders is an estimate of the number of line holders in the bid month based on scheduled flying and pre-assigned duties, leave, etc.

% Reserve is estimated based on the number of reserve lines divided by target lineholders. The reserve estimate does not includepilots who are completing training and will not bid until the following month, but who may be assigned flying and/or reserve days in the interim.

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

0

50

100

150

200

250

300

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

Total CA Tgt CA % CA RSV

0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

12.0%

14.0%

16.0%

18.0%

0

50

100

150

200

250

300

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

Total FO Tgt FO % FO Rsv

Page 4: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 229 260 275 259 306 343 318 316 329 337 344 327 247

1-Day 135 146 125 205 194 189 164 192 221 420 431 395 244

2-Day 84 60 67 75 62 126 137 68 75 139 116 136 176

3-Day 75 120 156 209 216 209 238 93 93 101 96 110 123

4-Day 203 120 138 224 197 183 190 288 230 121 148 147 233

5-Day 0 0 0 0 0 0 0 0 0 0 0 0 0

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 20.4% 26.1% 24.4% 17.1% 20.7% 22.2% 20.0% 21.2% 23.9% 25.4% 25.1% 23.6% 16.3%

1-Day 8.0% 9.8% 7.4% 9.0% 8.8% 8.2% 6.9% 8.6% 10.7% 21.1% 20.9% 19.0% 10.8%

2-Day 10.0% 8.0% 7.9% 6.6% 5.6% 10.9% 11.5% 6.1% 7.3% 14.0% 11.3% 13.1% 15.5%

3-Day 13.4% 24.1% 27.7% 27.7% 29.3% 27.1% 29.9% 12.5% 13.5% 15.2% 14.0% 15.9% 16.3%

4-Day 48.2% 32.1% 32.6% 39.5% 35.6% 31.6% 31.8% 51.6% 44.6% 24.3% 28.8% 28.3% 41.1%

5-Day 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Percentage of Total Pairing-Days Offered by Each Pairing Length

ORD Report on CRJ 200 for December 2017 Bid MonthPage 4

Numbers of Each Pairing Length

Interpret this data: These graphs show the absolute numbers of each pairing lengths, and the percentage of pairing-days that pairing length contributes to all the pairing-days in the bid package.

From the table, you might see that 4-day pairings contribute 50% of all the pairing days. From this you can conclude that if everybody wants 4-day trips, you'll have to be above 50% seniority to get them.

0

50

100

150

200

250

300

350

400

450

500

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

Page 5: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 6:10 6:00 5:42 5:58 6:04 5:50 5:48 5:56 5:53 6:02 5:57 6:06 6:06

1-Day 5:41 5:40 5:20 5:12 5:27 5:41 5:39 5:47 5:52 5:48 5:46 5:49 5:53

2-Day 5:14 5:19 4:57 5:01 4:55 4:56 4:52 5:01 5:10 5:07 5:22 5:03 5:07

3-Day 5:25 5:10 5:05 4:57 5:10 5:11 5:11 5:13 5:12 5:22 5:30 5:19 5:26

4-Day 5:19 5:12 5:12 5:15 5:21 5:25 5:22 5:14 5:13 5:05 5:07 5:08 5:13

5-Day 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 16% 21% 19% 14% 17% 17% 16% 17% 19% 20% 20% 19% 13%

1-Day 9% 11% 8% 10% 10% 9% 8% 10% 13% 24% 24% 22% 12%

2-Day 10% 9% 8% 7% 5% 11% 11% 6% 8% 14% 12% 13% 16%

3-Day 14% 25% 29% 28% 30% 28% 31% 13% 14% 16% 15% 17% 17%

4-Day 50% 34% 35% 42% 38% 34% 34% 54% 47% 25% 29% 29% 42%

5-Day 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Percentage of Total Credit Offered by Each Pairing Length

ORD Report on CRJ 200 for December 2017 Bid MonthPage 5

Average Credit Hours Per Day in Each Pairing Length

Interpret this data: Instead of dealing with pairing-days as on the previous page, these graphs show the distribution of credit per day, and the percentage of credit that each pairing length contributes to all the credit in the bid package.

For example, if you're in a domicile that's made up of mostly commuters, and the senior bidders commute, most bidders will want 4-day pairings. From the table, you might see that 4-day pairings contribute 50% of all the pairing credit. From this you can conclude that if everybody wants 4-day trips, you'll have to be above 50% seniority to get them.

4:12

4:26

4:40

4:55

5:09

5:24

5:38

5:52

6:07

6:21

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

Page 6: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

31 1 2 3 4

74

63 37 17 7 0

63 54 71 76 78 78

66

78 81 81 80 80 79 72

81 81 80 79 82 78

ORD Report on CRJ 200 Aircraft for December 2017 Bid MonthPage 6

87 69

SaturdaySunday Monday FridayTuesday Wednesday

Total Duty Periods by Date for All Pairings (Includes Carry-in)

6983 83

Thursday

86 86 85 84

Interpret this data. This calendar shows how many duty periods from all pairings fall on each day. For example, a 3-day pairing starting on the 10th shows one day on the 10th, one on the 11th and one on the 12th.

Carry-in pairings are included. For example, if there was a 4-day pairing starting on the last day of the previous month, it is counted on the first three days of this month.

This can help you guess when you might be forced to work on a popular day, likeChristmas. If, for example, there are 50 trips on Christmas and your seniority is less than 50 from the bottom, you can bid knowing you'll likely have to work that day.

Page 7: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 52 45 68 88 88 93 85 112 137 95 95 156 214

1-Day 9 92 117 50 24 62 22 45 72 60 13 60 120

2-Day 31 39 45 65 43 34 29 42 64 50 71 110 78

3-Day 36 27 37 72 72 74 76 81 72 90 91 154 101

4-Day 47 84 86 102 128 128 156 158 149 182 206 108 122

5-Day 0 0 0 0 0 0 0 0 0 0 0 0 0

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 17.5% 10.3% 13.4% 14.1% 13.6% 13.9% 12.0% 14.3% 16.9% 11.0% 10.2% 16.6% 23.1%

1-Day 2.0% 14.1% 15.3% 5.3% 2.5% 6.2% 2.1% 3.8% 5.9% 4.6% 0.9% 4.3% 8.6%

2-Day 13.9% 11.9% 11.8% 13.9% 8.9% 6.8% 5.5% 7.2% 10.5% 7.7% 10.2% 15.6% 11.2%

3-Day 24.3% 12.4% 14.5% 23.1% 22.3% 22.1% 21.5% 20.7% 17.7% 20.8% 19.6% 32.8% 21.8%

4-Day 42.2% 51.3% 45.0% 43.6% 52.8% 51.0% 58.9% 53.9% 49.0% 56.0% 59.1% 30.7% 35.2%

5-Day 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

ORD Report on CRJ 7&9 for December 2017 Bid MonthPage 7

Numbers of Each Pairing Length

Percentage of Total Pairing-Days Offered by Each Pairing Length

Interpret this data: These graphs show the absolute numbers of each pairing lengths, and the percentage of pairing-days that pairing length contributes to all the pairing-days in the bid package.

For example, if you're in a domicile that's made up of mostly commuters, and even the senior bidders commute, most bidders will want 4-day pairings. From the table, you might see that 4-day pairings contribute 50% of all the pairing days. From this you canconclude that if everybody wants 4-day trips, you'll have to be above 50% seniority to get them.

0

50

100

150

200

250

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

Page 8: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 6:17 5:24 5:28 5:45 5:58 5:28 6:10 5:46 5:32 5:15 5:48 5:35 5:55

1-Day 5:00 5:57 6:03 5:59 5:19 5:02 5:22 6:24 6:02 6:36 6:26 5:53 6:05

2-Day 5:10 5:03 5:09 5:17 5:01 5:19 5:27 5:12 4:55 5:25 5:05 4:48 4:55

3-Day 5:52 5:38 5:34 5:37 5:27 5:34 5:31 5:30 5:27 5:23 5:32 5:12 5:47

4-Day 5:22 5:20 5:19 5:21 5:14 5:16 5:18 5:20 5:22 5:09 5:20 5:25 5:20

5-Day 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017

SDO 14% 7% 9% 10% 11% 10% 10% 11% 12% 8% 8% 12% 18%

1-Day 2% 16% 18% 6% 3% 6% 2% 5% 7% 6% 1% 5% 10%

2-Day 14% 11% 12% 14% 9% 7% 6% 7% 10% 8% 10% 15% 11%

3-Day 27% 13% 15% 25% 24% 24% 23% 22% 19% 22% 21% 34% 25%

4-Day 43% 52% 46% 45% 54% 53% 60% 55% 52% 56% 61% 33% 37%

5-Day 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

ORD Report on CRJ 7&9 for December 2017 Bid MonthPage 8

Average Credit Hours Per Day in Each Pairing Length

Percentage of Total Credit Offered by Each Pairing Length

Interpret this data: Instead of dealing with pairing-days as on the previous page, these graphs show the distribution of credit per day, and the percentage of credit that each pairing length contributes to all the credit in the bid package.

For example, if you're in a domicile that's made up of mostly commuters, and the senior bidders commute, most bidders will want 4-day pairings. From the table, you might see that 4-day pairings contribute 50% of all the pairing credit. From this you can conclude that if everybody wants 4-day trips, you'll have to be above 50% seniority to get them.

4:12

4:40

5:09

5:38

6:07

6:36

7:04

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017

SDO 1-Day 2-Day 3-Day 4-Day

Page 9: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

31 1 2 3 441 21 12 4 0

48

41 32 50 51 51 52 47

47 50 52 52 53 53

45

48 47 49 49 48 48 42

53 50 49 52 52 50

52 48

Sunday Monday Tuesday Wednesday Thursday

ORD Report on CRJ 7&9 for December 2017 Bid MonthPage 9

Total Duty Periods by Date for All Pairings (Includes Carry-in)

Friday Saturday

Interpret this data: This calendar shows how many duty periods from all pairings fall on each day. For example, a 3-day pairing starting on the 10th shows one day on the 10th, one on the 11th and one on the 12th.

Carry-in pairings are included. For example, if there was a 4-day pairing starting on the last day of the previous month, it is counted on the first three days of this month.

This can help you guess when you might be forced to work on a popular day, likeChristmas. If, for example, there are 50 trips on Christmas and your seniority is less than 50 from the bottom, you can bid knowing you'll likely have to work that day.

Page 10: Regional Scheduling Representative Report - SIAoursia.org/wp-content/uploads/2017/11/2017-12-ORD-CRJ.pdf · ORD Report on CRJ Aircraft for December 2017 Bid Month ORD CRJ Captain

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

31 1 2 3 4

121

104 58 29 11 0

104 86 121 127 129 130

108

125 131 133 132 133 132 120

129 128 129 128 130 126

117

136 136 135 137 136 133 114

139

ORD Report on All CRJ for December 2017 Bid Month

Total Duty Periods by Date for All Pairings (Includes Carry-in)

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Interpret this data: This calendar shows how many duty periods from all pairings fall on each day. For example, a 3-day pairing starting on the 10th shows one day on the 10th, one on the 11th and one on the 12th.

Carry-in pairings are included. For example, if there was a 4-day pairing starting on the last day of the previous month, it is counted on the first three days of this month.

This can help you guess when you might be forced to work on a popular day, likeChristmas. If, for example, there are 50 trips on Christmas and your seniority is less than 50 from the bottom, you can bid knowing you'll likely have to work that day.