Regional info sessionPaso de los TorosFebruary, 2020
| © UPM
Regional info session- Contents
Introduction
• UPM Paso de los Toros project status report
• Installation of the first housing blocks for construction workers
• Responsible and preventive plan for transportation in the community
• The value of opportunities in central Uruguay– Evolution of the workforce reaches 1,000 workers
– “Vía Trabajo” tool as employment enabler
– First stage of recruitment and training for 35 technicians and professionals
• The spirit behind opportunities (video testimonies)
• Closing and reception of queries and suggestions
| © UPM
UPM Paso de los Toros project status report
| © UPM
UPM Paso de los Toros pulp mill construction
4
Site preparationand access roads
Mechanical,automation and electricalinstallations
Startup andproduction trials
Civil construction
Commissioningand water runs
2020H1
2021H1
2022H1
2023H1
| © UPM
UPM Paso de los Toros project status
• Temporary offices and accesses were established at the mill construction site
• Fencing works finalized. General earth moving, Camino del Tala works and construction of the landfill at the mill site are proceeding
• Temporary housing works continue in Paso de los Toros, Pueblo Centenario, and Durazno city
• Dredging and filling works at the specialized pulp terminal in Montevideo´s port continue. Construction of the embankment began according to the plan
• ANDRITZ to supply complete pulp mill to UPM in central Uruguay.
5
| © UPM
ANDRITZ to supply complete pulp mill to UPM in central Uruguay
• UPM has selected technology group ANDRITZ to supply energy-efficient and environmentally leading equipment and processes for all main process islands in fiber production and chemical recovery for its new pulp mill.
• The scope of supply includes a complete wood processing plant, the world’s largest single-line Fiberline, including state-of-the-art continuous cooking with efficient heat recovery and unique washing and bleaching technology, all contributing towards high-quality pulp, highest operational time, and low chemical consumption, thus having lowest environmental impact.
• A new and innovative pulp drying system, an energy-efficient black liquor evaporation plant, in addition to a recovery boiler features energy-efficient flue gas cooling and feed water preheating technologies to maximize steam production for power generation.
• ANDRITZ will also supply a biomass Power Boiler and a complete white liquor plant.
• ANDRITZ also supplied a complete pulp mill in Fray Bentos, Uruguay, which was started up successfully in 2007.
6
| © UPM
• Installation of housing blocks in Charrúa neighborhood (Paso de los Toros) is progressing. Around 1,000 workers will be accommodated by the end of March
• Construction of the permanent houses continues in Paso de los Toros and will start soon in Pueblo Centenario. Once the mill construction phase is finalized, 60 permanent houses will be transferred to the State
• Construction of temporary housing solutions will start soon in Carlos Reyles community.
Installation of the first housing blocks for construction workers
7 | © UPM
More information on the housing solution plan on UPM YouTube channel
| © UPM
Responsible and preventive plan for transportation in the community
Bus transporation service for workers as of April, 2020
• UPM is responsible for organizing and coordinating the transportation network exclusively for the construction workers to and from the mill site
• The service will be carried out with a pre-established route with stops and fixed schedules in coordination with local authorities from Paso de los Toros and Durazno department
The highest standards in safety and comfort for the workers
• Requirement of the highest standards in road safety even exceeding the local regulations
• Bi-monthly vehicle control programme; preventive check programmes before starting trips; route tracking; telephone line "How do I drive?", among other planned actions
• Buses in excellent conditions.
8
| © UPM9
Peak hours06:30 to 08:0017:30 to 19:00
Bus frequencyStarting with 3 to 5 buses per day in Paso de los Toros, gradually increasing
A maximum frequency of 35 buses is estimated at the peak of the mill construction
Paso de los Toros and Pueblo CentenarioPre-established route with stops and fixed schedules
| © UPM10
Peak hours05:30 to 09:0017:00 to 19:00
Bus frequencyStarting with approx. 2 buses per day from the bus terminal, increasing gradually
A maximum frequency of 23 buses is estimated at the peak of the mill construction Durazno city
To the mill site
Durazno cityPre-established route with stops and fixed schedules
| © UPM
Responsible and preventive plan for transportation in the community
• Road safety workshops for the community jointly planned with local authorities in Paso de los Toros and Durazno
• Schools from Paso de los Toros, Pueblo Centenario and Durazno city will be invited to participate in road safety programmes for children led by a local NGO named DESEM Young Entrepreneurs
• Free transportation service between Pueblo Centenario and Paso de los Toros for young students.
11
| © UPM
The value of opportunities in central Uruguay
| © UPM13
workers500 mill site200 port specialized terminal300 housing solutions
~1000Labour opportunities and workforce evolution
* Up to February 1st 2020
~50%regional workers mainly from Paso de los Toros and Durazno
| © UPM
Job opportunities for the construction phase
• People interested in job opportunities for the construction of the mill may register through Via Trabajo database of the Ministry of Labour and Social Security (MTSS)
• All contractor companies involved in the construction have access to the database to hire their workers
• Registration is open at the following link: viatrabajo.mtss.gub.uy
• Personnel is not hired neither CV’s are received at the construction sites nor at the UPM office in Paso de los Toros.
| © UPM15
THE VALUE OF
OPPORTUNITIES
| © UPM16
UPM is looking for its production team35 TECHNICIANS AND PROFESSIONALS
Jr. engineers
Technicians in mechanical, electronics, mechatronics and automation and control
Experts in industrial processes
Apply in www.advice.com.uy
| © UPM
The project as employment enhancerNew labour opportunities in central Uruguay
• Project Assistant, General • Specialist, HR• Sr. Specialist, Claims Management• Sr. Specialist, SHR • Supervisor, Food Services• Business Analyst, Mill Project Controlling• Supervisor, Cleanning Services• Supervisor, Regional Services, Transport and
Housing• Supervisor, Enviroment
More information www.upm.uy/empleo
17
• Supervisor, Safety & OHS
• Administrative, Officer
• Supervisor, Enviroment
• Supervisor, Planning
• Coordinator, Environment
More information advice.com.uy
| © UPM
Free guided tours: getting to know the experience of UPM Fray Bentos pulp mill
• Buses departing from UPM´s office in Paso de los Toros twice a month
– First Tuesday of the month at 6:30 am
– Third Thursday of the month at 8:00 am
• Only for visitors over 18 years
• Those interested must sign up at UPM´s office in Paso de los Toros or via WhatsApp +598 98 909 797, or by e-mail: [email protected]
18
| © UPM19
THE VALUE OF
OPPORTUNITIES