Transmission Assets and Infrastructure
2014/10/13 2
Substations
Lines Protection & Control
Outdoor plant
Equipment Age Profile
2014/10/13 3
Transmission Grid: Age of Major Equipment
0
20
40
60
80
100
120
0-5 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45 45-50 50-55
Age in Years
Nu
mb
er
of
un
its
Transformers Transmission Lines Shunt Banks Reactors Series Banks SVC
Age is used for long term planning and plant health assessments are used for
short term planning
2014/10/13 4 2014/10/13 4
Refurbishment - General Principles
• Eskom Project Life Cycle Model (wires PLCM) is followed.
• Investment justifications are based on following criteria:
• Statutory
• Strategic
• Least Economic Cost
• Operating Cost Reduction
• Assets to be refurbished in accordance with asset life-cycle
management plans (LCMP’s).
• Condition, criticality & risk assessment (CCRA) principles are being
implemented for refurbishment investment decisions. (Likelihood of
asset loss vs. criticality of the asset to the network)
Refurbishment Capital Expenditure Drivers
• Refurbishment
• Targeted Asset Performance Improvements
• Refurbishment of existing assets
• Physical security improvements, surveillance and monitoring
• Strategic and operational spares holding (to reduce SML<1 and major incidents risk)
• Compliance (Regulatory, OHS Act, NKP Act, Environmental etc.)
• Asset Purchases
• Specialised equipment for: live-line work; fault location systems, and online condition monitoring.