Proposed Interventions
Public Toilet Mother Care Waiting Lounge Pedestrian Safety Refurbishment of
Subway
Subway PlanSubway Length –95.9M
•Existing Subway is being
connected with upcoming
Metro Terminal
•Renovation of existing subways
with proper ventilation, lighting,
fire safety equipment, signage,
painting and fixing of floor and
wall tiles.
Design brief on electrical system LT POWER DISTRIBUTION
LT Power from Existing Panel Board is carried to Sub main Panel Proposed now
The Main Panel supplies power to various other sub panels.
DG BACK UP
Considering 100% Back up for the renovated area as well as the existing area proposed DG
of 250 KVA Capacity with the AMF
LIGHTING
•Type of Light Fixtures shall be LED
• Emergency lighting is proposed in public areas and at selected places by using Inverter
power.
•All Common area lighting have 100% DG back up
•Power sockets have been provided at suitable intervals to facilitate Advertisement
boards/TVs etc.
Design brief on electrical system COMMUNICATIONS
Telephone points have been provided in Common areas and Individual rooms.
EARTHING
•Earthing will be designed as per Indian Standards (IS 3043).
•Copper earthing will be considered for neutral of D.G. sets and Transformers.
•G.I. earthing will be considered for body earthing, etc.
•Earthing shall be in line with local regulations and practice.
Design brief on HVACDedicated Ventilation system ( Jet
Fans) towards Russel market side has
been considered.
Fresh air will be supplied through Shaft
near Pass Counter to suffice subway
ventilation (Fresh Air Axial Fan & Jet )
Minimum of 6 ACPH considered for all
the above.
All the fans will be operated through
Timer to achieve Energy Efficiency
system.
Estimated HVAC Electrical Demand
load around 7 KW.