REFUEL 13 REFUEL 13 April 8, 2002 April 8, 2002 Pre-Outage Presentation Pre-Outage Presentation

Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

REFUEL 13REFUEL 13April 8, 2002April 8, 2002

Pre-Outage PresentationPre-Outage Presentation

Page 2: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Agenda• General Introduction and Plant Status (Greg Halnon)• Outage Overview (Alan Torres)

- Major Modifications- Major Maintenance- Shutdown Safety

• Major Efforts (Gary Moffatt)- Hot Leg Follow-up- MSIP- NRC Bulletin 2002-01

• I&C Modernization (Steven Fipps)- Main Feedwater Pump Controls- Alterrex Voltage Regulator

• Closing Comments (Steve Byrne)

Page 3: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13 Overview

A D Torres,Manager of Outage & Work Controls

Page 4: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Duration� Approximately 33 Days

� Cost� Budgetary Goal Is $12.3 Million

Page 5: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Number 1 Outage Goal� Safety

� Nuclear� Industrial� Radiological

Page 6: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� What�s in Our Outage (7000 Items)� Modifications� Non-conformance Notices /Condition

Evaluation Reports� Maintenance Work Requests� Preventive Maintenance� Surveillance Tests� Support Activities

Page 7: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Critical Path� Shutdown� RV Disassembly� Core Off-Load� CCW Exchanger Repair� Core Reload� Startup

Page 8: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Modifications� FWP Digital Controls� Excitation Upgrade� MSIP Process� Reroute of Condenser Transmitter Lines� RHR Miniflow Switch Relocation� D/G Day Tank Level Instruments� D/G Air Start Receiver Relief Valve

Page 9: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Modifications� D/G Fuel Oil Strainer Sensing Lines Redesign� Replacement of RB Component Cooling

Isolation Valve (XVC-9689CC)� FWP Drain Isolation Valve� Dynamic Brake for Refueling Bridge� S/G Cover Modification� FW Heater Instrumentation Manifold Rework

Page 10: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13� License Amendments

� Amendment 154 - Pressure Isolation Valve LeakageAllowance

� Amendment 155 - Corrects Reactor Trip Settings forMain Steam Safety Valve Testing

� Amendment 156 - Provisions for Performing RTDCross-calibration With MSIVs Closed

� Amendment 157 - Requires High Flux Reactor TripsBe Operable for Rod Withdrawal in Source Range(NSAL 01-016)

� Amendment 158 - Extends Elimination of ResponseTime Testing for Additional 7300 Process Cards

Page 11: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� PRA Review of Modifications� None of These Projects will Increase the Long

Term Risk at VCS� The DG fuel oil instrumentation and the RHR

sensing modifications will have an elevated risk dueto major component out of service, but manageableunder 10CFR50.65a(4)

Page 12: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13� Major Maintenance Work

� Major FWP Work: 3 Pumps/1turbine� CCW Heat Exchanger Repair� 2 Reactor Coolant Pump Seal Jobs� Repair of Steam Generator Sludge Covers� Flow Accelerated Corrosion Inspection and

Pipe Replacement� Condenser and Heat Exchanger Cleaning� Reactor Vessel Head Inspections

Page 13: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Potential Issues� RCS Hot Leg Nozzle Inspection� FWP Digital Modification� Scope of CCW Heat Exchanger Repair� RBCU Testing� Startup Testing

Page 14: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Why Are They Potential Issues� Schedule Impact High� Potential Startup Delays� Repair Scope Unknown� Personnel Hazard

Page 15: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13

� Dealing with Risks� Contingency Planning� Potential Repair Plans Developed� Employing HIT Team Project Mentality� Evaluating Additional Options

Page 16: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

0

1

2

3

4

5

6

Refuel 13 Relative Risk Profile

Depresurrize

RCS

9" below

flange

flange level

Flooded Up,

"A" Train

Outage

Core

Offloaded "A"

"A" Train

In

230 kV

Outage

230 kV Back

in Service,

"B" Train

Outage

"B" Train in

service

Core re-loaded

1 DB Outage

1DB In service

Upper Internal

Installed

9" below

flange

RCS

Intact

115 kV

Outage

115 kV In

service

4/20/2002 5/205/54/284/254/24 5/125/115/75/6 5/14 5/185/16

Page 17: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Reactor Coolant Hot Legs &Reactor Vessel Head

Gary Moffatt,Manager of Design Engineering

Page 18: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

B & C Hot Leg Plan:

Mechanical Stress Improvement Process(MSIP)

Page 19: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

A Loop Hot Leg - New Weld with Alloy 690 Material

A,B, &C Cold Legs - WCAP 15615 > 25 years(Low Temperature = Low Stress)

HOT LEG LOOP LOCATION LENGTH

ORIENTATION (EDDY CURRENT)

C 309/CIRC 0.5�

B 35/CIRC 0.6�

B 200.8/AXIAL 0.25�

B 348/AXIAL 0.25�

VC Summer RF 12 Relevant Indications

Page 20: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

B & C Hot Leg NDE Plan� UT Examination Complemented by ET Examination.�ET Indications From RF-12 will Be Scrutinized byAxial and Circumferential ET.�Whole Weld will Be Examined by Circumferential UTand ET.�Screening Criteria will Be Applied to ET Indications.�Flaws will Be Characterized by UT.�Our Expectation: We will See the Same Indications�NDE Inspection Before & After Mitigation Application

Page 21: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

TENSILE STRESSSr ≈ Sy

MATERIALS ENVIRONMENT

TENSILE STRESSSr << Sy

ENVIRONMENT

(a) AS WELDED

(b) AFTER MSIP

MATERIALS

Removal of Tension Provides Permanent Protection ofWeldments Against Stress Related Cracking

MSIP Principle

CONDITIONS FOR STRESSRELATED CRACKING EXIST

Page 22: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

� MSIP

� Invented, Developed, and First Used in 1986

� Mitigates Stress Related Cracking in Nuclear Reactor Plant Piping Weldments

� Permanently Removes Weld Residual Tensile Stresses and Generates Compressive Residual Stresses

� Displacement Controlled - Verifiable by Measuring Pipe Hoop Contraction

Mechanical Stress ImprovementProcess - MSIP

Page 23: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

a. Application of Pressure to Contract Pipe

b. Schematic of Permanent Deformation after MSIP

c. Mechanism of Compression Generation in Axial and Hoop Directions

*Deformation in pictures are exaggerated for viewing purposes

*

*

Basic Concept Of MSIP

Page 24: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

V. C. Summer Hot Leg Nozzle Weld Region

Page 25: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

V. C. Summer Hot Leg Nozzle As-weldedResidual Stress (Axial)

Page 26: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

V. C. Summer Hot Leg Nozzle WeldPost-MSIP Residual Stress (Axial)

Page 27: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

� Used Since 1986 on Over 1300 Welds Including more than 500Nozzle and Safe-End Welds in Over 30 BWR Units Worldwide

� Applied to Welds Without and With Stress Corrosion Cracks

� No Indications Found in Treated Welds

� Pre-existing Cracks Arrested; No Crack Growth after MSIPDuring Subsequent Fuel Cycles

� Verified by Argonne National Laboratory and EPRI for PipeSpecimens and Nozzle Specimens Without and With Cracks

MSIP Experience

Page 28: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

MSIP Acceptance Criteria AndRepair Contingency

� Nureg 0313 Acceptance Criteria� < 10% of the Circumference� < 30% of the Wall Thickness

� Code Repairs for Flaws > MSIP AcceptanceCriteria� Localized Repair� Weld Replacement� Spool Piece Replacement

� MSIP After Code Repair

Page 29: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

MSIP Qualification Mock-up For VC Summer

Page 30: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Rigging Upper Clamp Into Position

Page 31: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

MSIP Clamp In Place In VC Summer Mock-up

Page 32: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Hot Leg Surface After Qualification Test

Page 33: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Hot Leg Plan Conclusions

� Inspection Plan Is Sound / Effective� MSIP - Effective Aging Management

Preventive / Mitigative / Repair Process for theB & C Hot Legs

� Arrangements With NRR for Rapid InspectionResults Communication and SER Turn Around

Page 34: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

NRC Bulletin 2002-01Reactor Vessel Head Degradation

� Vessel Head Inspection & Maintenance Programs -Defense in Depth

� Corner Stone: Prevent / Manage Leaks Above the Head� Programs Have Been Effective & Meet the Regulatory

Requirements� Very Low Susceptibility to CRDM Penetration Cracking� 2 Very Minor Conoseal Leaks W/ Minor Boric Acid� No Boric Acid on the Insulation or Head� Best Effort Remote Visual Inspection Under the Insulation

in RF 13

Page 35: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13I&C Modernization

Steven F. Fipps,Design Engineering Supervisor &

I&C Modernization Committee Chairman

Page 36: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Driving Issues� Reliability and Availability

� Operating Costs� Obsolescence

� Improved Operational Performance� Staff Utilization

Page 37: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Modernization History Phase I

� Start With BOP NNS Systems� Choose a Standard Platform� Identified Training Needs� Establish Implementation Schedule� Apply Lessons Learned

Page 38: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Implemented Digital ControlModifications

� Turbine Building Closed Cycle

Cooling

� Moisture Separator Reheater Controls

� Feedwater Heater Vents and Drains

Page 39: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

DCS ModificationsLessons Learned

� No Problems With Digital� Improved Problem Identification and

Resolution� Improved Control & Mitigation of

Transients/events� Fewer Initiating Events� Improved System Redundancy� Operator Simulator Training - High Priority

Page 40: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Refuel 13 I&C Modernization

� Main Feedwater Pump Digital SpeedControl

� Main Electrical Generator Alterrex DigitalVoltage Regulator

� Feedwater Heater Vents and DrainsInstrumentation Manifold (Follow-up)

Page 41: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Main Feedwater PumpDigital Speed Control

Why� Obsolescence of Existing Controls� Maintenance Cost Increasing� System Reliability

What� Replace Analog Controller With Bailey (ABB)

INFI-90 Digital Control System� Replace Mechanical Controller With Hydraulic

Servo Actuator� Upgraded Turbine Supervisory Instrumentation� Upgrade FWP Re-circulation Valve Control

Page 42: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Main Feedwater PumpDigital Speed Control (Benefits)

� Improved Operator Controls and Indication� Reduced Maintenance Cost� Improved Reliability & Availability� Improved Operational Performance� Improved Human Factors� Improved Problem Identification� Improved Mitigation of Events

Page 43: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Main Electrical Generator AlterrexDigital Voltage Regulator

Why� Obsolescence of Existing Controls� Maintenance Cost Increasing� System Reliability� Operational Performance

What� Replace GE Analog Alterrex Voltage Regulator

With a GE Digital Alterrex Voltage Regulator

Page 44: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Main Electrical Generator AlterrexDigital Voltage Regulator (Benefits)

� Improved Problem Identification� Reduced Maintenance Cost� Improved Reliability & Availability� Improved Operational Performance� Improved Human Factor

Page 45: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Feedwater Heater Vents And DrainsInstrumentation Manifold (Follow-up)

Why� System Reliability� Operational Performance

What� Re-pipe the Instrumentation Manifolds� Replace Globe Valves With Ball Valves

Page 46: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Feedwater Heater Vents And DrainsInstrumentation Manifold (Benefits)

� Reduced Maintenance Cost� Improved Reliability & Availability� Improved Operational Performance� Improved Mitigation of Events

Page 47: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

I&C Modernization Phase II

� Control Room Review� Main Turbine EHC Control� Radiation Monitoring� Moduflash Control Room Display Unit� Plant Process Computer� DA/hotwell Level Control� ESF D/G Digital Controls� Digital Rod Position� 7300 Process Racks (ASICS)

Page 48: Refuel 13, April 8, 2002 Pre-Outage Presentation. · ORIENTATION (EDDY CURRENT) ... Œ Invented, Developed, and First Used in 1986 Œ Mitigates Stress Related Cracking in Nuclear

Closing Remarks

Steve Byrne,Senior Vice Presidentof Nuclear Operations