1. Dixie Engineering Inc: Gary Wysocki President (Consulting)
Refrigeration Design FACILITY Tropical Cheese Industries Perth
Amboy, NJ (1989) --- Design/Installation of (2) Frick MCM Screw
compressors (R-22) along with (1) BAC Ice building unit and
Chester-Jensen Instant Chilling system for high volume cooling on
(2) 300 Gallon Flash Vat Pasteurizers (cheese cultures). FACILITY
Drake Bakeries Wayne, NJ (1991) --- Design/Installation addition of
(1) 1000 ton Trane Centra-VAC Centrifugal Ammonia Compressor for
the cooling of warmed chocolate which enrobed numerous snake cake
products.
2. Refrigeration Design(continued2) FACILITY Whitlock Packaging
Fort Gibson, OK (2003) --- Design & installation of (2)
Dunham-Bush Freon systems (R-22) for the production cooling of
Pepsis Mountain DEW Amp energy drink in order to saturate CO2
within solution. Design included all exchangers, valving, PLC logic
control, EPR and BPR components.
3. Refrigeration Design(continued3) Dixie Engineering Inc
(Consulting) --- Sewaren, NJ (2005-2013) 1. Jasper Products Joplin,
MO Designed a 1650 HP FES ammonia system for the cooling and
production of Soy Proteins and Soy Milks. Supplied mechanical and
electrical scope of work, PIDs, BOMs, equipment rigging etc. 2.
Sara Lee Inc Robinsville, SC Designed 800 HP FES ammonia system and
BAC tower for spiral freezing of Pie dough.
4. 3. Water Lillie Foods Astoria, NY Designed PID for 130 ton
Chiller system installation for storage cooler (Trane).
Refrigeration Revamping/Modifications McCain-Ellios Foods Lodi, NJ
(1994)--- Added WONDERWARE Control system platform (HMI)(In-Touch)
to existing 1300 HP Mycom Ammonia screw compressor system. Changed
out numerous level controls to 4-20ma, changed out Mycom liquid
ammonia pumps with durable Hansen liquid supply/return pumps from
intercoolers. Installed new (BPR) valving on Surge tanks.
5. Refrigeration Installations FACILITY Krauzsers Dairy Edison,
NJ (1984) ---- Installation of (2) Frick MRI ammonia Piston
Compressors and PID diagrams along with (2) Chester- Jensen single
stage cascade Ice Builders for chilling process water. Krauzsers
Dairy Edison, NJ (1985) ---- Installation of 60 x 40ft concrete
floor with heated glycol system. Installation of (2) Interstage
upright Frick Piston Ammonia Compressors and (1) Niagara NO-Frost
sub-zero cooling unit for Dolly Madison Ice Cream storage.
6. Refrigeration Installations(Continued2) FACILITY Pillsbury
Company/Haagen Dazs Woodbridge, NJ (1997) ---- Installation of (2)
FES Ammonia Screw Booster Compressors and related piping for (2) 80
foot Ice Cream Cooling Tunnels and APV Votators.
7. OTHER: NOTE: Engineered and maintained the largest ammonia
system in New Jersey (Haagen- Dazs facility) with 76,000lbs of
Anhydrous Ammonia. Incident Commander for the entire facility in
relation to township evacuations, and TCPA protocols. HAZMAT/SCBA
Training Centrifugal Screw Compressor Design Environmental Code
Compliance Member ASHRAE/SMACNA