Upload
lore
View
38
Download
0
Tags:
Embed Size (px)
DESCRIPTION
REFLECS project. Marco Bomben – LPNHE, Paris. Outline. Reflecs project: goals, constraints & manpower, scope What can be done within REFLECS?. REFLECS: THE PROJECT. Project goals. Develop a µ-channel based cooling system exploiting the possibilities offered by 2-phase CO 2 - PowerPoint PPT Presentation
Citation preview
Marco Bomben – LPNHE, Paris
1M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Outline
• Reflecs project: goals, constraints & manpower, scope
• What can be done within REFLECS?
2M. Bomben - REFLECS project kickoff meeting - 02/04/2014
REFLECS: THE PROJECT
3M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Project goals
• Develop a µ-channel based cooling system exploiting the possibilities offered by 2-phase CO2
– REFroidissement Léger au CO2 en Silicium
• Aim: Atlas Phase-II; data taking: from 2024 onwards
4M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Project constraints
Time: all budget must be used by the end of 2014Money: we have been assigned 16 k€Expenses:
1. we cannot hire people2. we can buy material, having work done elsewhere3. we can pay a stagiaire4. we can pay travel expenses
5M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Project: groups, people involved
LPNHE: Giovanni Calderini (senior researcher), M.B. (Post-doc) Filipe de Matos (research engineer)
IEF: Jean-Rene Coudevylle (research engineer), Frédéric Hamouda (research engineer)
CMM: Maurizio Boscardin (senior researcher) MPI: Anna Macchiolo (senior post-doc)
6M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Project scope
1. A demonstrator consisting of a pixel detector module cooled via µ-channels and CO2
– Probably not enough budget to accomplish this…
2. Work on connections between different modules
Silicon substrate – 300 - 700 µmSilicon substrate – 300 - 700 µm
R.O. chip – 100-150 µmR.O. chip – 100-150 µm
Sensor – 200 µmSensor – 200 µm
7M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Upgrade tracker pixel stave
• How to deliver efficiently the coolant?Find suitable in plane connections
z
φ
R
carbon frame suppor
t
module w/
cooling channel
s
Scheme: courtesy of J.W.
parallel coolant
distribution
8M. Bomben - REFLECS project kickoff meeting - 02/04/2014
I-beam stave concept
9M. Bomben - REFLECS project kickoff meeting - 02/04/2014
40 – 100 cm
40 – 100 cm
I-beam stave concept
Pixel module
Pixel module
10M. Bomben - REFLECS project kickoff meeting - 02/04/2014
I-beam stave concept
Outer coolant route
Inner coolant route
11M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Cooling requirements needs for new pixels
• To avoid negative annealing future sensors must be operated well below 0 °C ideally: -20 °C
• Sensor+chip will dissipate ~ W/cm2
• Important constraint: very low material budget envisaged ( < 1% X0)
A very efficient cooling system is needed
12M. Bomben - REFLECS project kickoff meeting - 02/04/2014
WHAT CAN BE DONE WITHIN REFLECS?
13M. Bomben - REFLECS project kickoff meeting - 02/04/2014
What can be done: cooling plates
• Realize some (how many?) cooling plates for FEI4 sensors-chip assemblies (size: 20 x 20 mm2)
In our case:~ 10 – 15 parallel channels3x side length ~ 60 mm longChannels: 70-100 µm deep
500-1000 µm
Pyrex closure? Or Silicon?Possibility to etch 6” wafers? 8”?Buried channels?Etch channels on sensors? (unlikely)But still: can we etch the support wafer of our edgeless production?
LHCb - CNM
FBK-CMM
14M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Some examples from literature
What can be done: cooling distribution system?
• Long staves (400-1000 mm) requires a coolant distribution system “parallel” to the stave
• Microfluidic tapes?
– Below the stave?– If yes: how can we create holes in the cooling plate?
15M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Backup material
16M. Bomben - REFLECS project kickoff meeting - 02/04/2014
A STUDY CASE: UPGRADE OF THE ATLAS PIXEL DETECTOR
17M. Bomben - REFLECS project kickoff meeting - 02/04/2014
LHC in a nutshell
18M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Atlas
19M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Current Atlas pixel detector
20M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Upgrade Inner Detector Layout (LoI – DRAFT)
Forward extensionForward
extension
More disksMore disks
More pixel
layers
More pixel
layers
More strip layers
More strip layers
21M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Upgrade LoI pixel barrel
X
Beam
22M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Upgrade LoI pixel barrel
First layer
23M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Upgrade LoI pixel barrel
Second layer
24M. Bomben - REFLECS project kickoff meeting - 02/04/2014
Phase-II LoI pixel barrel
I-beam stave
25M. Bomben - REFLECS project kickoff meeting - 02/04/2014