REFLECS project. Marco Bomben – LPNHE, Paris. Outline. Reflecs project: goals, constraints & manpower, scope What can be done within REFLECS?. REFLECS: THE PROJECT. Project goals. Develop a µ-channel based cooling system exploiting the possibilities offered by 2-phase CO 2 - PowerPoint PPT Presentation

Citation preview

Page 1: REFLECS  project

Marco Bomben – LPNHE, Paris

1M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 2: REFLECS  project

Outline

• Reflecs project: goals, constraints & manpower, scope

• What can be done within REFLECS?

2M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 3: REFLECS  project

REFLECS: THE PROJECT

3M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 4: REFLECS  project

Project goals

• Develop a µ-channel based cooling system exploiting the possibilities offered by 2-phase CO2

– REFroidissement Léger au CO2 en Silicium

• Aim: Atlas Phase-II; data taking: from 2024 onwards

4M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 5: REFLECS  project

Project constraints

Time: all budget must be used by the end of 2014Money: we have been assigned 16 k€Expenses:

1. we cannot hire people2. we can buy material, having work done elsewhere3. we can pay a stagiaire4. we can pay travel expenses

5M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 6: REFLECS  project

Project: groups, people involved

LPNHE: Giovanni Calderini (senior researcher), M.B. (Post-doc) Filipe de Matos (research engineer)

IEF: Jean-Rene Coudevylle (research engineer), Frédéric Hamouda (research engineer)

CMM: Maurizio Boscardin (senior researcher) MPI: Anna Macchiolo (senior post-doc)

6M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 7: REFLECS  project

Project scope

1. A demonstrator consisting of a pixel detector module cooled via µ-channels and CO2

– Probably not enough budget to accomplish this…

2. Work on connections between different modules

Silicon substrate – 300 - 700 µmSilicon substrate – 300 - 700 µm

R.O. chip – 100-150 µmR.O. chip – 100-150 µm

Sensor – 200 µmSensor – 200 µm

7M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 8: REFLECS  project

Upgrade tracker pixel stave

• How to deliver efficiently the coolant?Find suitable in plane connections

z

φ

R

carbon frame suppor

t

module w/

cooling channel

s

Scheme: courtesy of J.W.

parallel coolant

distribution

8M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 9: REFLECS  project

I-beam stave concept

9M. Bomben - REFLECS project kickoff meeting - 02/04/2014

40 – 100 cm

40 – 100 cm

Page 10: REFLECS  project

I-beam stave concept

Pixel module

Pixel module

10M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 11: REFLECS  project

I-beam stave concept

Outer coolant route

Inner coolant route

11M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 12: REFLECS  project

Cooling requirements needs for new pixels

• To avoid negative annealing future sensors must be operated well below 0 °C ideally: -20 °C

• Sensor+chip will dissipate ~ W/cm2

• Important constraint: very low material budget envisaged ( < 1% X0)

A very efficient cooling system is needed

12M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 13: REFLECS  project

WHAT CAN BE DONE WITHIN REFLECS?

13M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 14: REFLECS  project

What can be done: cooling plates

• Realize some (how many?) cooling plates for FEI4 sensors-chip assemblies (size: 20 x 20 mm2)

In our case:~ 10 – 15 parallel channels3x side length ~ 60 mm longChannels: 70-100 µm deep

500-1000 µm

Pyrex closure? Or Silicon?Possibility to etch 6” wafers? 8”?Buried channels?Etch channels on sensors? (unlikely)But still: can we etch the support wafer of our edgeless production?

LHCb - CNM

FBK-CMM

14M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Some examples from literature

Page 15: REFLECS  project

What can be done: cooling distribution system?

• Long staves (400-1000 mm) requires a coolant distribution system “parallel” to the stave

• Microfluidic tapes?

– Below the stave?– If yes: how can we create holes in the cooling plate?

15M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 16: REFLECS  project

Backup material

16M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 17: REFLECS  project

A STUDY CASE: UPGRADE OF THE ATLAS PIXEL DETECTOR

17M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 18: REFLECS  project

LHC in a nutshell

18M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 19: REFLECS  project

Atlas

19M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 20: REFLECS  project

Current Atlas pixel detector

20M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 21: REFLECS  project

Upgrade Inner Detector Layout (LoI – DRAFT)

Forward extensionForward

extension

More disksMore disks

More pixel

layers

More pixel

layers

More strip layers

More strip layers

21M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 22: REFLECS  project

Upgrade LoI pixel barrel

X

Beam

22M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 23: REFLECS  project

Upgrade LoI pixel barrel

First layer

23M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 24: REFLECS  project

Upgrade LoI pixel barrel

Second layer

24M. Bomben - REFLECS project kickoff meeting - 02/04/2014

Page 25: REFLECS  project

Phase-II LoI pixel barrel

I-beam stave

25M. Bomben - REFLECS project kickoff meeting - 02/04/2014