0 0 0 0
COUNTRY OF
INSTALLATIONSITE EQUIPMENT TYPE
Year Year YEAR 2016 Year Year Year Year
Poland Turów Power Plant
Replacemnet of the Current
Transformers of the Power Lead
[in progress]
Modernisation 3 Units 24 kV 10 kA
Poland SGL RacibórzHigh Current Connection
[in progress]
High Current
Busbar1 set 0,4 kV 150 kA
Poland
Thermal-Electric
Power Plant Kraków
Łęg
Overpressure System
Modernisation/ new delivery
[in progress]
Overpressure
System5 Units - kV - kA
Poland
Thermal-Electric
Power Plant Kraków
Łęg
Maintenance work of Non-
Segergated Phase Busduct
Existing Busduct
modernization 800 m 12 kV 4 kA
Iraq Al. Mansurya PPBallance of works of Isolated Phase
Busduct1 set - kV - kA
Turkey Kiğı HEP Segregated Phase Busduct HONR(S)-17,5/2,5 3 x20m Units 17,5 kV 2,5 kA
PolandPKN Orlen Płock
Power PlantNon-Segregated Phase Busduct EHON-7,2/1,6 115 m 7,2 kV 1,6 kA
Kazachstana Tengiz 5High Current 8,6 kA
Aluminium Connection Unit
Power Block
Neutral Block1 set 17,5 kV 8,6 kA
Poland Opole Power Plant
Excitation System
Cast Resin Insulated Busduct
[in progress]
EB-1,1/5 AC
EB-1,1/6 DC
GT1: 50
GT2: 50m 1,1 kV
5
6kA
Thailand Mae Moh PPExcitation System
Non-Segregated Phase Busduc
EHON-1/5(AC)
EHON-1/6,1(DC)
23
16m 1,1 kV
5
6,1kA
Thailand Mae Moh PP Non-Segregated Phase Busduct HONR-12/4 Cu 250 m 12 kV 4 kA
Poland PKN Orlen PłockNon-Segregated Phase Busduct
[in progress]EHON-36/2,5 2050 m 36 kV 2,5 kA
PolandChemical Plants
Kędzierzyn-Koźle
Power Lead
Non-Segregated Phase BusductEHON-12/4 176 m 12 kV 4 kA
PolandPlant of Thermal
Neutralizing Waste
Szczecin
Power Lead
Non-Segregated Phase Busduct
[in progress]
EHON-12/2,5 45 m 12 kV 2,5 kA
Year Year YEAR 2015 Year Year Year Year
PolandCzechowice-
DziedziceNon-Segregated Phase Busduct
HONR-17,5/1
HONR-12/1
3
5m
17,5
12kV 1 kA
Poland
ABB Sp. z o.o.
Tranformers plant
Łódź
High Current Connection 1 set 1 kV 8 kA
Poland Pątnów PP
Main Transformer TB1 Connection
Modernisation
Site works
1 set 24 kV 10 kA
Poland Pątnów PP
Main Transformer TB2 Connection
Modernisation
Site works
1 set 24 kV 10 kA
Poland Mondi, Swiecie HP Non-Segregated Phase Busduct EHON-12/4 63m m 12 kV 4 kA
Egypt Ataqua
Isolated Phase Busduct
PSP manufacturing
HOLDUCT - Engineering
HOIO-24/7 4×60 m 24 kV 7 kA
RATED
CURRENT
RATED
VOLTAGEVOLUME
0 0 0 REFFERENCES
1
Egypt Mahmodia
Isolated Phase Busduct
PSP manufacturing
HOLDUCT - Engineering
HOIO-24/7 2×60 m 24 kV 7 kA
Egypt West Damietta Isolated Phase Busduct HOIO-24/7 4×60 m 24 kV 7 kA
Egypt New AssuitIsolated Phase Busduct
[in progress]HOIO-24/7 8×60 m 24 kV 7 kA
Poland SGL RacibórzHigh Current Connection
[in progress]Busbars 135 m 0,4 kV 150 kA
Year Year YEAR 2014 Year Year Year Year
Saudi ArabiaYanbu 3
Shuqaiq
Non-Segregated Phase Busduct
(generator excitation)
[in progress]
EHON-1/5,5(AC)
EHON-1/5,5(DC)
5 × 60
4 × 63m 1 kV
5,5
6,5kA
PolandCzechowice-
DziedziceNon-Segregated Phase Busduct
HONR-17,5/1
HONR-12/1
3
5m
17,5
12kV 1 kA
Israel Eskhol Transformer Connection Box 3 pcs
PolandArcelorMittal,
ŚwiętochłowiceNon-Segregated Phase Busduct EHON-7,2/1,6
20
23m 7,2 kV 1,6 kA
Republic of
South AfricaKusile 5
Ballance of works of Isolated Phase
Busduct1 unit
PolandPower Plant
Skawina
Isolated Phase Busduct, Generator
Circuit Breaker assembly & Site
Erection
[in progress]
HOIO-17,5/2,5 100 m 17,5 kV 2,5 kA
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice SW-I
Copper Mine
Cast Resin Insulated Busduct,
Site Erection
EB-1,1/5
EB-1,1/5,5 DC
28
14m 1,1 kV
5
5,5kA
Poland
K.G.H.M. Polska
Miedź o/Z.G. Rudna
R-VII
Copper Mine
Cast Resin Insulated Busduct,
Site Erection
EB-1,1/2,5
EB-1,1/3 DC
72
11m 1,1 kV
2,5
3kA
Poland
K.G.H.M. Polska
Miedź o/Z.G. Rudna
R-III
Copper Mine
Cast Resin Insulated Busduct,
Site Erection
EB-1,1/2,2
EB-1,1/5,9 DC
26
20m 1,1 kV
2,2
5,9kA
PolandCooper Mine
Głogów
Non-Segregated Phase Busduct
& Site Erection
[in progress]
EHON-12/4 616 m 12 kV 4 kA
Great Britain Drax Cast Resin Insulated Busduct EB-1,1/1,7 2 × 5 m 1,1 kV 1,7 kA
SwedenPower Plant Vartan
(Stockholm)
Isolated Phase Busduct
& Site Erection
[in progress]
HOIO-17,5/10 200 m 24 kV 10 kA
Algeria Biskra Isolated Phase Busduct HOIO-24/12 2 x 172 m 24 kV 12 kA
Poland EC NowaNon-Segregated Phase Busduct
& Site ErectionEHON-17,5/4 100 m 17,5 kV 4 kA
Poland EC KrakówOn site modernization
of Isolated Phase Busdcut,HOIO-24/12 3 Units m 24 kV 10 kA
Poland EC Nowa Disconnector HDS 24kV; 4kA HDS-24/4 5 pcs 24 kV 4 kA
Poland EC Rzeszów Non-Segregated Phase Busduct EHON-12/2,5 25 m 12 kV 2,5 kA
Poland Elektrownia RybnikOn site modernization
of Isolated Phase BusdcutUnit 8 1 unit 17,5 kV 10 kA
YEAR 2013 Year Year Year Year
Poland EC Głogów Non-Segregated Phase Busduct EHON-12/3,6 51 m 12 kV 3,6 kA
Poland ZA Puławy Non-Segregated Phase Busduct HONR-36/1 7,2 m 36 kV 1 kA
2
Poland ZA Puławy Non-Segregated Phase Busduct EHON-12/2,5 60 m 12 kV 2,5 kA
Republic of
South AfricaKusile 4
Ballance of works of Isolated Phase
Busduct1 unit
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice P-VI
Copper Mine
Cast Resin Insulated Busduct,
Site Erection
EB-1,1/6
EB-1,1/6,5 DC
16,4
17m 1,1 kV
5
7kA
Israel Ruttenberg Isolated Phase Busduct HOIO-24/2,5 2 unit 24 kV 2,5 kA
Malaysia Tanjung BinBallance of works of Isolated Phase
Busduct1 unit
Estonia NarvaBallance of works of Isolated Phase
Busduct1 unit
RussiaZAO
TechnographiteHigh Current DC Busbars - 50 m 1 kV 50 kA
Year Year YEAR 2012 Year Year Year Year
Poland EC Elbląg Non-Segregated Phase Busduct EHON-12/3,2 1 unit 12 kV 3,2 kA
Great Britain Rolls RoyceCast resin insulated busbar,
Site Erection EB-1,1/6,65 m 0,4 kV 6,6 kA
PolandZakłady Azotowe w
Tarnowie
Non-Segregated Phase Busduct
and Site ErectionEHON-12/4 12 m 12 kV 4 kA
Poland Power Plant RybnikOn site modernization
of Isolated Phase BusdcutUnit 5 1 unit 17,5 kV 10 kA
Iraq Al. MansuryaBallance of works of Isolated Phase
Busduct4 unit
Poland BochniaLow voltage busduct,
Site Erection HON-1/3,2 24 m 1 kV 3,2 kA
PolandZakłady Azotowe w
Tarnowie
Non-Segregated Phase Busduct
and Site ErectionEHON-12/4 12 m 12 kV 4 kA
Kingdom of
Saudi Arabia
Al Qurayat
Extension
Ballance of works of Isolated Phase
Busduct2 unit
Israel Maor David Isolated Phase Busduct HOIO-24/2,5 2 unit 24 kV 2,5 kA
Republic of
South AfricaKusile 2 & 3
Ballance of works of Isolated Phase
Busduct2 unit
Sweden IggesundIsolated Phase Busduct
and Site erectionHOIO-17,5/5 84 m 17,5 kV 5 kA
Poland EW ŻydowoGenerator Switchgear and
5 kA DisconnectorPoland EW Żydowo Disconnector HDS 12kV; 5kA HDS-12/5 8 pcs 12 KV 5 kA
Malaysia ManjungBallance of works of Isolated Phase
Busduct1 unit
Slovenia SostanjiBallance of works of Isolated Phase
Busduct1 unit
Kingdom of
Saudi ArabiaYanbu 2 Isolated Phase Busduct HOIO-24/12 3 unit 24 kV 12 kA
Year Year YEAR 2011 Year Year Year Year
Kingdom of
Saudi ArabiaWasit Isolated Phase Busduct
HOIO-17,5/4
HOIO-27/6,5
2
4unit
17,5
27kV
4
6,5kA
Luxemburg ViandenBallance of works of Isolated Phase
Busduct1 unit
Republic of
South AfricaKusile
Ballance of works of Isolated Phase
Busduct1 unit
Kingdom of
Saudi ArabiaRabigh
Ballance of works of Isolated Phase
Busduct4 unit
PolandBOT Opole
Power Plant
Modernization of generator
Isolated Phase Busdcut,
Site Erection
- 1 Unit 24 kV 12 kA
Israel Ruttenberg Cable box - 2 sets 12 kV kA
3
Polska
K.G.H.M. Polska
Miedź o/Z.G. Rudna
Copper Mine
Non-Segregated Phase Busduct
and Site ErectionEHON-12/4 167 m 12 kV 4 kA
Kingdom of
Saudi ArabiaAl Qurayat
Ballance of works of Isolated Phase
Busduct2 unit
Israel Tzafit ADD-ON Un.4 Isolated Phase Busduct 24kV; 7kA HOIO-24/7 108 m 24 kV 7 kA
Poland SGL RacibórzHigh Current Connections
440V/21kABusbars 440V/21kA 2 × 4 m 440 V 21 kA
Bahrain SULB Non-Segregated Phase Busduct HONR-12/3,5 12 m 12 kV 3,5 kA
Kingdom of
Saudi ArabiaMarafiq
Isolated Phase Busduct
24kV/14kA; 2,5kA
HOIO-24/14
HOIO-24/2,5
114
108m 24 kV
14
2,5kA
United Kingdom Dinorwig First HPP Isolated Phase Busduct 12kV; 3kA HOIO-12/3 59 m 12 KV 3 kA
Spain
La Muela II Pump
Storage Power
Plant
Ballance of works of Isolated Phase
Busduct4 unit
Year Year YEAR 2010 Year Year Year Year
AustriaLimberg II Power
PlantIPB Site Erection 2 Units
PolandElektrownia
Ostrołęka
Modernization of generator
Isolated Phase Busdcut,
Site Erection
HOIO-24/9 3 × 45 m 24 kV 9 kA
The Netherlands Claus Centrale IPB Site Erection 3 units
Jordan Samra Isolated Phase Busduct HOIO-24/9 2 x 120 m 24 kV 9 kA
United Kingdom Dinorwig First HPP Isolated Phase Busduct 12kV; 3kA HOIO-12/3 33 m 12 KV 3 kA
FranceFlamanville Nuclear
Power Plant
Ballance of works of Isolated Phase
Busduct1 unit
Romania Ford Craiova Non-segregated Phase Busduct EHON-24/1,25 10 m 24 kV 1,25 kA
Algeria ShoaibaBallance of works of Isolated Phase
Busduct3 unit
PolandInternational Paper
KwidzynNon-segregated Phase Busduct EHON-24/2,5 32 m 24 kV 2,5 kA
Kingdom of
Saudi ArabiaMa'aden IPB Site Erection HOIO-24/5 2 × 75 m 24 kV 5 kA
Year Year YEAR 2009 Year Year Year Year
UK West BurtonBallance of works of Isolated Phase
Busduct3 unit
PolandElektrownia
Ostrołęka
Modernization of generator
Isolated Phase Busdcut,
Site Erection
HOIO-24/9 3 × 45 m 24 kV 9 kA
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice
Copper Mine
Cast resin insulated busbar,
Site Erection
EB-1,1/6
30 m 1,1 kV 6 kA
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice
Copper Mine
Cast resin insulated busbar,
Site Erection
EB-1,1/6,5 DC
14 m 1,1 kV 6,5 kA
Poland Łagisza Power PlantCast resin insulated busbar,
Site Erection EB-1,1/610 m 1,1 kV 6 kA
Indonesia Muara TavarBallance of works of Isolated Phase
Busduct2 unit
4
Algeria Terga Power PlantBallance of works of Isolated Phase
Busduct3 unit
PolandBełchatów Power
Plant
Cast resin insulated busbar,
Site Erection EB-1,1/6,1 DC28 m 1,1 kV 6,1 kA
PolandBełchatów Power
Plant
Cast resin insulated busbar,
Site Erection EB-1,1/5,521 m 1,1 kV 5,5 kA
Poland
K.G.H.M. Polska
Miedź o/Z.G. Rudna
Copper Mine
Cast resin insulated busbar,
Site Erection
EB-1,1/4,4
35 m 1,1 kV 4,4 kA
Poland
K.G.H.M. Polska
Miedź o/Z.G. Rudna
Copper Mine
Cast resin insulated busbar,
Site Erection
EB-1,1/8,8 DC
32 m 1,1 kV 8,8 kA
PolandFORTUM
CzęstochowaIsolated Phase Busduct HOIO-12/5 150 m 12 kV 5 kA
PolandFORTUM
CzęstochowaNon-segregated Phase Busduct EHON-12/1,6 40 m 12 kV 1,6 kA
Year Year YEAR 2008 Year Year Year Year
France CombigolfeBallance of works of Isolated Phase
Busduct1 unit
Poland ERA WarszawaCast resin insulated busbar,
Site ErectionEB-1,1/5,1 18 m 1,1 kV 5,1 kA
Netherlands FlevoBallance of works of Isolated Phase
Busduct2 unit
Kingdom of
Saudi ArabiaMa'aden Isolated Phase Busduct HOIO-24/5 2 × 75 m 24 kV 5 kA
United Arab
EmiratesEmal Supporting structure 2 unit
Poland BochniaCast resin insulated busbar,
Site ErectionHON-1/3,2 14 m 1 kV 3,2 kA
France Vaires Sur MarneBallance of works of Isolated Phase
Busduct GT1 unit
EB-1,1/3,4 22 3,4
EB-1,5/2,5 15 2,5
EB-1,5/2,9DC 30 2,9
Lybia Benghazi Misurata Supporting structure 4 unit
United Kingdom GrainBallance of works of Isolated Phase
Busduct and supporting structures3 unit
PolandElektrownia
Ostrołęka
Modernization of generator
Isolated Phase Busdcut,
Site Erection
HOIO-24/9 3 × 45 m 24 kV 9 kA
Spain Granadilla IIBallance of works of Isolated Phase
Busduct GT1 & GT22 unit
EHON-12/2,5 25 2,5
EHON-12/4 27 4
PolandHydro Power Plant
DobrzeńCast resin insulated busbar EB-1,1/1,7 12 m 1,1 kV 1,7 kA
Ireland AghadaBallance of works of isolated phase
busduct1 unit
PolandPetrochemical Plant
Lotos GdańskCast resin insulated busbar EB-1,1/3,5 24 m 1,1 kV 3,5 kA
PolandKozienice Power
PlantNon-Segregated Phase Busduct EHON-12/2,5 87 m 12 kV 2,5 kA
Poland ŚwiecieModernization of generator
Isolated Phase BusdcutHOIO-12/5 36 m 12 kV 5 kA
Poland
kV1,1WhitegateIreland
kAkV12mNon-Segregated Phase Busduct
and Site Erection
Petrochemical Plant
Lotos Gdańsk
kACast resin insulated busbar,
Site assembly supervisionm
5
Egypt Eagrium Non-Segregated Phase Busduct EHON-12/2,5 12 m 12 kV 2,5 kA
Algeria RelizaneBallance of works of Isolated Phase
Busduct3 unit
HONR-17,5/1,5 8 1,5
HONR-17,5/2,5 24 2,5
Madagascar Ambatovy Non-Segregated Phase Busduct EHON-17,5/4 240 m 17,5 kV 4 kA
Italy Imola Isolated Phase Busduct HOIO-17,5/1,6 1 unit 17,5 kV 1,6 kA
Italy Imola Non-Segregated Phase Busduct HONR-17,5/1,6 1 unit 17,5 kV 1,6 kA
IndonesiaDarajat II Power
Plant
Non-Segregated Phase Busduct
performance and site erectionEHON-12/2 25 m 12 kV 2 kA
United Arab
EmiratesDubal GTX
Ballance of works of Isolated Phase
Busduct1 unit
Germany EmslandBallance of works of Isolated Phase
Busduct ST1 unit
Poland BelchatowNon-Segregated Phase Busduct
performance and site erectionEHON-12/2,5 1200 m 12 kV 2,5 kA
Vietnam Nhon TrachBallance of works of Isolated Phase
Busduct ST1 unit
Poland BelchatowBallance of works of Isolated Phase
Busduct1 unit
Poland Belchatow Busduct systems 858MW unit
Australia Bluewaters 2Ballance of works of Isolated Phase
Busduct1 unit
Egypt EPPC Non-Segregated Phase Busduct HONR-12/1 72 m 12 kV 1 kA
Year Year YEAR 2007 Year Year Year Year
Germany EmslandBallance of works of Isolated Phase
Busduct GT1 & GT22 unit
Italy Ganda Non-Segregated Phase Busduct HONR-17,5/3,5 10 m 17,5 kV 3,5 kA
Oman Shadeed Non-Segregated Phase Busduct HONR-12/3,5 10 m 12 kV 3,5 kA
Espania Algeciras Non-Segregated Phase Busduct HONR-12/3,5 11 m 12 kV 3,5 kA
IndonesiaDarajat II Power
Plant
Isolated Phase Busduct
performance and site erectionHOIO-24/5 100 m 24 kV 5 kA
Vietnam Nhon Trach Supporting constructions 2 set
Vietnam Nhon TrachBallance of works of Isolated Phase
Busduct2 unit
Poland KWK Makoszowy Direct current circuit Switchboard 1 pcs
Great Britain LangageBallance of works of Isolated Phase
Busduct 3 unit
Espania MalagaBallance of works of Isolated Phase
Busduct1 unit
IndonesiaDarajat II Power
Plant
Isolated Phase Busduct
performance and site erectionHOIO-24/1,2 54 m 24 kV 1,2 kA
Espania Soto de RibieraBallance of works of Isolated Phase
Busduct1 unit
Espania Central Barranco IIBallance of works of Isolated Phase
Busduct1 unit
Australia TallawaraBallance of works of Isolated Phase
Busduct1 unit
Australia BluewatersBallance of works of Isolated Phase
Busduct1 unit
Saudi ArabiaTasnee
PetrochemicalsNon-segregated phase busducts
HONR-12/1,5
HONR-12/3,556 m 12 kV 3,5 3,5
Poland OMAG Oświęcim Cast Resin Insulated EB-1/0,3 30 m 1 kV 0,3 kA
17,5m kV kAShuqaiq Non-Segregated Phase BusductSaudi Arabia
6
PolandRettig heating
RybnikCast Resin Insulated
EB-1/2,6
EB-1/3,76 3
m
m1 kV
2,6
3,7kA
Qatar Qatar Gas II Non-segregated phase busducts EHON-24/4 72 m 24 kV 4 kA
Italy Forli Non-segregated phase busducts HONR-12/1 80 m 12 kV 1 kA
Malaysia JimahBallance of works of Isolated Phase
Busduct2 unit
Oman SoharBallance of works of Isolated Phase
Busduct4 unit
Spain CastejonBallance of works of Isolated Phase
Busduct1 unit
Germany Hamm site installation of IPB 1 unit
Spain Cas TresorerBallance of works of Isolated Phase
Busduct1 unit
Malaysia Petronas Rafinery Bus riser panel 2 set 12 kV 0,8 kA
Poland Koksownia Przyjaźń Non-segregated phase busducts EHON-12/3,2 140 m 12 kV 3,2 kA
AlgeriaHamma Desalting
PlantCast Resin Insulated Busduct EB-1/5,6 35 m 1 kV 5,6 kA
AlgeriaHamma Desalting
PlantNon-segregated phase busducts EHON-12/4 40 m 12 kV 4 kA
Germany Herdecke site installation of IPB 2 unit
Year Year YEAR 2006 Year Year Year Year
PolandPątnów Power
PlantCast resin insulated busduct EB-1/6 30 m 1 kV 6 kA
Poland EC ŻerańOverhaul and maintenance job of
existing busductsUnited Arab
EmiratesDubai
Ballance of works of Isolated Phase
Busduct- 2 sets
Al. WasitBallance of works of Isolated Phase
Busduct- 2 sets
Vietnam CAM PHA Cement Non-segregated phase busducts HONR-12/3,5 31 m 12 kV 3,5 kA
Turkey Petkim Isolated phase busducts HOIO-17,5/4 57 m 17,5 kV 4 kA
Italy Ferrara Non-segregated phase busducts HONR-12/1 80 m 12 kV 1 kA
Argentina AluarBallance of works of Isolated Phase
Busduct- 2 sets
Vietnam Dai NinhBallance of works of Isolated Phase
Busduct- 2 sets
Algeria Sona Hess Non-segregated phase busducts HONR-12/3,5 18 m 12 kV 3,5 kA
Puerto Rico San Juan Non-segregated phase busducts HONR-24/4 16 m 24 kV 4 kA
Italy Torrevaldaliga Nord Non-segregated phase busducts EHON-12/4 160 m 12 kV 4 kA
Poland Turów Power Plant Isolated phase busducts HOIO-24/12 350 m 24 kV 12 kA
Spain As PuentesBallance of works of Isolated Phase
Busduct 2 unit
Saudi Arabia Al. FaselNon-segregated phase busduct
12kV; 2kAHONR-12/2,5 20 m 12 kV 2,5 kA
Saudi Arabia Al. FaselCast Resin Insulated Busduct
1kV; 5kAEB-1/5,6 35 m 1 kV 5,6 kA
Saudi Arabia Al. FaselCast Resin Insulated Busduct
1kV; 3kAEB-1/3,6 62 m 1 kV 3,6 kA
Sweden SCA Ostrand Isolated Phase Busduct HOIO-12/5 100 m. 12 kV 5 kA
Indonesia INCO BalambanoModernization of existing isolated
phase busductHOIO-24/5 10 m. 24 kV 5 kA
7
IndonesiaDarajat III Power
PlantIsolated Phase Busduct HOIO-24/10 105 m. 24 kV 10 kA
Sudan Merowe HPPBallance of works of Isolated Phase
Busduct
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice Copper
Mine
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 13 m 1 kV 2,5 kA
PolandCoal Mine
Jankowice
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 13 m 1 kV 2,5 kA
different
countriesAreva
FKG generator circuit breakers
encapsulationsFKG 120 pc
Australia BraemarBallance of works of Isolated Phase
Busduct
Year Year YEAR 2005 Year Year Year Year
Iran Marun 2 Isolated Phase Busduct HOIO-24/3 80 m 24 kV 3 kA
Jordan Samra Non-segregated phase busduct HONR-12/2,5 108 m 1 kV 4 kA
Italy Italy Non-segregated phase busduct HONR-12/2,5 12 m 12 kV 2,5 kA
Italy Monselice Non-segregated phase busduct HONR-12/3,5 19 m 12 kV 3,5 kA
UK FfestiniogBallance of works for Alstom
Isolated Phase Busuduct1 unit
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 13 m 1 kV 2,5 kA
Cast Resin Insulated Busduct
1kV; 4kA DCEB -1/4DC 20 m 1 kV 4 kA
PolandSmolice Hydro
Power Plant
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 12 m 1 kV 2,5 kA
Poland EC ŻerańOverhaul and maintenance job of
existing busducts
PolandŻarnowiec Hydro
Power Plant
Cast Resin Insulated Busduct
1kV; 1,6kAEB -1/1,6 12 m 1 kV 1,6 kA
Finland Neste Oil, Porvoo Non-segregated phase busduct HONR-12/4 54 m. 12 kV 4 kA
Lybia ZawiaBallance of works for Alstom
Isolated Phase Busuduct2 unit
IndonesiaMUSI Hydro Power
PlantIsolated Phase Busduct HOIO-17,5/5 900 m. 17,5 kV 5 kA
Finland Boliden Non-segregated phase busduct HONR-12/3,5 7,5 m. 12 kV 3,5 kA
different
countriesAreva
FKG generator circuit breakers
encapsulationsFKG 180 pc
Poland Stacja Rakowice Cast Resin Insulated Busduct
1kV; 2,4kAEB -1/2,4 15 m 1 kV 2,4 kA
Year Year YEAR 2004 Year Year Year Year
Poland OMAG OświęcimCast Resin Insulated Busduct
1kV; 0,3kAEB-1/0,3 43,2 m 1 kV 0,3 kA
Poland
Thermal Electric
Power Station
Kraków
Modernization of Isolated Phase
Busduct
Italy TorviscosaSegregated Phase Busduct
12kV; 3,5kAHONR -12/3,5 61 m 12 kV 3,5 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 2
Modernization of step-up
transformer terminal
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice Copper
Mine
8
Poland EC IP Kwidzyn S.A.
Current conductors of Neutral
Point and Power Output
Generators
PolandCoal Mine
Jankowice
Cast Resin Insulated Busduct
1kV; 4kAEB -1/4 29 m 1 kV 4 kA
ItalyCandela Power
Plant
Non-segregated Phase Busduct
12kV; 2,5kAHONR -12/2,5 5,7 m 12 kV 2,5 kA
France Generator Neutral Point Elements. 1 set
PolandSGL Carbon Group
RacibórzFlexible joints Cu 12 set
Poland
Power Plant Turów
Rehabilitation
of Unit 6
Cast Resin Insulated Busduct
1kV; 0,63kAEB-1/0,63 36 m 1 kV 0,63 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 6
Connection between Transformer
06 MKT10
and cubicle MKC
EB-1/2 8 m 1 kV 8 kA
FranceEnclosure of Circuit Breaker
Generator66 pcs
ItalyTorreValdaliga Sud
Power Plant
Non-segregated Phase Busduct
12kV; 2,5kA CuHONR -12/2,5 79,5 m 12 kV 2,5 kA
GermanyCast Resin Insulated Busduct
1kV; 3,2kAEB -1/3,2 11 m 1 kV 3,2 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 6
Cast Resin Insulated Busduct
1kV; 3,2kAEB-1/3,2 6 m 1 kV 3,2 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 6
Cast Resin Insulated Busduct
1kV; 2,5kAEB-1/2,5 4 m 1 kV 2,5 kA
Poland
Power Plant Turów
Rehabilitation
of Units 6-8
Cast Resin Insulated Busduct
1kV; 0,63kAEB-1/0,63 350 m 1 kV 0,63 kA
Year Year YEAR 2003 Year Year Year Year
Poland
Power Plant Turów
Rehabilitation
of Unit 4
Power Output Busduct. Isolated
Phase Busduct 24kV; 12kA
with overpressure system.
HOIO -24/12 100 m 24 kV 12 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 4
Basic and Stand-by Supply
Busducts. Non-segregated Phase
Busduct 12kV; 2,5kA with
overpressure system.
EHON -12/2,5 370 m 12 kV 2,5 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 4
Maintenance supply
Cast Resin Insulated Busduct
1kV; 0,6kA
EB -1/0,6 85 m 1 kV 0,6 kA
9
Poland
Power Plant Turów
Rehabilitation
of Unit 4
Cast Resin Insulated Busduct
1kV; 3,2kAEB -1/3,2 10 m 1 kV 3,2 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 4
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 4 m 1 kV 2,5 kA
Poland
Thermal-Electric
Power Plant
Czechnica
Cast Resin Insulated Busduct
1kV; 2kAEB -1/2 23 m 1 kV 2 kA
PolandWrigley Factory
Poznań
Cast Resin Insulated Busduct
1kV; 4kAEB -1/4 14 m 1 kV 4 kA
ItalyNon-segregated Phase Busduct
24kV; 2,5kAHONR -24/2,5 5 m 24 kV 2,5 kA
Brasil
Gas Chemical
Complex
Rio Polimeros,
Brasil
Supply from Transormers
to switchgears. Non-segregated
Phase Busduct 12kV; 2,5kA
HONR -12/2,5 66 m 12 kV 2,5 kA
ItalyPower Plant
Chivasso Italy
Supply from Transormers
to switchgears. Non-segregated
Phase Busduct 12kV; 2,5kA
HONR -12/2,5 32 m 12 kV 2,5 kA
Italy
Connection between switchgears.
Non-segregated Phase Busduct
24kV; 2kA
HONR -24/2 5,5 m 24 kV 2 kA
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice
Cast Resin Insulated Busduct 1kV;
4kA EB -1/4 16 m 1 kV 4 kA
PolandJanuszkowice
Station
Cast Resin Insulated Busduct 1kV;
1,6kA EB -1/1,6 4 m 1 kV 1,6 kA
PolandCopper Plant
Głogów
Busduct between Generator
TG-3 and switchgear.
Non-segregated Phase Busduct
12kV; 3,6kA with overpressure
system.
EHON -12/3,6 65 m 12 kV 3,6 kA
Italy Centrale Di Sulcis
Supply from Transformer 2TU
to switchgears.
Non-segregated Phase Busduct
12kV; 4kA
HONR -12/4 75 m 12 kV 4 kA
Italy Centrale Di Sulcis
Busduct between switchgears 2A1,
2A2, 2AG Non-segregated Phase
Busduct 12kV; 3kA
HONR -12/3 18 m 12 kV 3 kA
Italy Centrale Di SulcisNon-segregated Phase Busduct
12kV; 2,5kAHONR -12/2,5 4 m 12 kV 2,5 kA
ItalyTorreValdaliga Sud
Power Plant
Connection Between Trafo 1TU
and Switchgear 1A.
Non-segregated Phase Busduct
12kV; 3,5kA Cu
HONR -12/3,5 10 m 12 kV 3,5 kA
10
ItalyTorreValdaliga Sud
Power Plant
Connection Between Switchgears
1AU1 and 1AU1. Non-segregated
Phase Busduct 12kV; 2,5kA Cu
HONR -12/2,5 8 m 12 kV 2,5 kA
ItalyTorreValdaliga Sud
Power Plant
Connection Between Switchgears
1AU1, 1AU2 and 7AG1. Non-
segregated Phase Busduct 12kV;
1kA Cu
HONR -12/1 27 m 12 kV 1 kA
ItalyTorreValdaliga Sud
Power Plant
Connection Between Switchgears
7AG1 and 7AG2 . Non-segregated
Phase Busduct 12kV; 1kA Cu
HONR -12/1 10 m 12 kV 1 kA
ItalyTorreValdaliga Sud
Power Plant
Connection Between Switchgears
2AU and 4A Bis. Non-segregated
Phase Busduct 12kV; 2,5kA Cu
HONR -12/2,5 26 m 12 kV 2,5 kA
ItalyTorreValdaliga Sud
Power Plant
Connection Between Trafo 2TU
and switchgear 2A Non-segregated
Phase Busduct 12kV; 3,5kA Cu
HONR -12/3,5 10 m 12 kV 3,5 kA
ItalyTorreValdaliga Sud
Power Plant
Connection Between Switchgears
4A Bis and 2AU. Non-segregated
Phase Busduct 12kV; 1kA Cu.
HONR -12/1 19 m 12 kV 1 kA
ItalyTorreValdaliga Sud
Power Plant
Connection Between Sections
Switchgear 2AU
Non Segragated Busduct 12kV;
2,5kA Cu
HONR -12/2,5 7 m 12 kV 2,5 kA
RomaniaS.C. Termoelectrica
S.A. Romania
Phase Reversion Cubicle for
Excitation of Generator1 set
Poland
Power PlantTurów
Rehabilitation
of Unit 6
Power output busduct
Isolated Phase Busduct
24kV; 12kA with overpressure
system.
HOIO -24/12 100 m 24 kV 12 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 6
Basic and stend-by supply
busducts. Non-segregated Phase
Busduct 12kV; 2,5kA with
overpressure system.
EHON -12/2,5 370 m 12 kV 2,5 kA
EB -1/6 14 m 1 kV 6 kA
EB -1/7 50 m 1 kV 7 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 6
Current Transformer type
PPGK-30/A 12000/5/5/5/5A
PPGK-30/B 12000/5/5/5/5A
9 pcs
Poland OMAG OświęcimCast Resin Insulated Busduct
1kV; 0,3kAEB-1/0,3 43,2 m 1 kV 0,3 kA
PolandPower Plant
Połaniec
Current Transformer type
PPGK-20/A 12000/5/5/5/5A1 pcs
Cast Resin Insulated Busduct
1kV; 6kA
Cast Resin Insulated Busduct
1kV; 7kA DC
Poland Copper Plant Rudna
11
France Generator Neutral Point Elements. 1 set
FranceEnclosure of Circuit Breaker
Generator.24 pcs
PolandPower Plant Łaziska
Unit 12
Temporary Transformer Terminal
Connection3 pcs
Year Year YEAR 2002 Year Year Year Year
Poland
Power Plant Turów
Rehabilitation
of Unit 5
Power Output Busduct. Isolated
Phase Busduct 24kV; 12kA with
overpressure system
HOIO -24/12 100 m 24 kV 12 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 5
Basic and Stand-by Supply
Busducts. Non-segregated Phase
Busduct 12kV; 2,5kA with
overpressure system
EHON -12/2,5 370 m 12 kV 2,5 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 5
Maintenance supply
Cast Resin Insulated Busduct
1kV; 0,6kA
EB -1/0,6 79 m 1 kV 0,6 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 5
Cast Resin Insulated Busduct
1kV; 3,2kAEB -1/3,2 10 m 1 kV 3,2 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 5
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 4 m 1 kV 2,5 kA
AlgieriaPower Plant Hassi
Mesauod Algieria
Power Output Busduct. Isolated
Phase Busduct 17,5kV; 8kAHOIO -17,5/8 89 m 17,5 kV 8 kA
EB -1/2,5 33 m 1 kV 2,5 kA
EB -1/4 DC 16 m 1 kV 4 kA
Poland
Power PlantTurów
Rehabilitation
of Unit 5
Basic and Stand-by Supply
Bbusducts. Non-segregated Phase
Busduct 12kV; 2,5kA with
overpressure system
EHON -12/2,5 310 m 12 kV 2,5 kA
QatarPower Plant Ras
Laffan Qatar
Non-segregated Phase Busduct
12kV; 3,2kAEHON -12/3,2 8,2 m 12 kV 3,2 kA
FranceGenerator Power Output
Elements.9 set
FranceEnclosure of Circuit Breaker
Generator.27 set
FranceEnclosure of Circuit Breaker
Generator.42 set
Poland OMAG OświęcimCast Resin Insulated Busduct
1kV; 0,4kAEB -1/0,4 60 m 1 kV 0,4 kA
Poland
Steel Plant
"Stalprodukt" S.A.
Bochnia
Cast Resin Insulated Busduct
1kV; 3,2kA EB -1/3,2 14 m 1 kV 3,2 kA
Cast Resin Insulated Busduct
1kV; 2,5kA
Cast Resin Insulated Busduct
1kV; 4kA DC
Poland
K.G.H.M. Polska
Miedź o/Z.G.
Polkowice
12
GermanyPower Plant Basell
Germany
Non-segregated Phase Busduct
12kV; 3,2kAEHON -12/3,2 10 m 12 kV 3,2 kA
EB -1/1,6 8 m 1 kV 1,6 kA
EB -1/3,2 79 m 1 kV 3,2 kA
EB -1/4 30 m 1 kV 4 kA
PolandHydro Power Plant
Zielisko
Cast Resin Insulated Busduct
1kV; 1,6kAEB -1/1,6 3 m 1 kV 1,6 kA
Year Year YEAR 2001 Year Year Year Year
PolandK.G.H.M.. Polska
Miedź o/ZG Rudna
Cast Resin Insulated Busduct
1kV; 4kA DCEB -1/4 30 m 1 kV 4 kA
PolandK.G.H.M.. Polska
Miedź o/ZG Rudna
Cast Resin Insulated Busduct
1kV; 4kA EB -1/4 50 m 1 kV 4 kA
EB -1/3,2 50 m 1 kV 3,2 kA
EB -1/1,6 8 m 1 kV 1,6 kA
PolandChemical Plant
Tarnów S.A.
Non-segregated Phase Busduct
12kV; 3kAEHON -12/3 29 m 12 kV 3 kA
Poland
Steel Plant
"Stalprodukt" S.A.
Bochnia
Cast Resin Insulated Busduct
1kV; 3,2kA EB -1/3,2 14 m 1 kV 3,2 kA
Poland
MAAG GEAR
Zamech Sp. z
o.o.
Cast Resin Insulated Busduct
1kV; 1,25kA EB -1/1,25 48 m 1 kV 1,25 kA
MalaysiaHydro Power Plant
Petrona Malezja
Non-segregated Phase Busduct
12kV; 2,5kAHONR -12/2,5 15 m 12 kV 2,5 kA
PolandPower Plant
Bełchatów
Modernization
of Non-segregated Phase Busduct
with overpressure system.
300 m
Year Year YEAR 2000 Year Year Year Year
PolandPOLFLOAT
Strzemieszyce
Cast Resin Insulated Busduct
1kV; 3kAEB -1/3 30 m 1 kV 3 kA
NigeriaKainji Power Plant
Nigeria Units 7,8
Isolated Phase Busduct
24kV; 7kAHOIO -24/7 70 m 24 kV 7 kA
NigeriaKainji Power Plant
Nigeria blok 11
Isolated Phase Busduct
24kV; 4kAHOIO -24/4 24 m 24 kV 4 kA
SwitzerlandGenerator Circuit Breaker
Encapsulation HEC - 7/8 10 set
EB -1/1,25 12 m 1 kV 1,25 kA
EB -1/1,25 DC 8 m 1 kV 1,25 kA
Cast Resin Insulated Busduct 1kV;
3,2kA
Cast Resin Insulated Busduct 1kV;
1,6kA
Cast Resin Insulated Busduct 1kV;
1,25kA
Cast Resin Insulated Busduct 1kV;
1,25kA DC
Poland
Poland
DIAMOND Busines
Park Warszawa
Piaseczno
Power Plant
Szczecin
Poland
Cast Resin Insulated Busduct
1kV; 1,6kA
Cast Resin Insulated Busduct
1kV; 3,2kA
Cast Resin Insulated Busduct
1kV; 4kA
Thermal-Electric
Power Plant
Chorzów
13
Poland
Thermal-Electric
Power Plant Kraków
Łęg
Maintenance work of Insulated
Phase Busduct 24kV; 7kA - power
output from generator
Poland
Thermal-Electric
Power Plant
Siekierki
Non-segregated Phase Busduct
12kV; 2,5kA
EHON -12/2,5
moderniz.70 m 12 kV 2,5 kA
SwitzerlandGenerator Circuit Breaker
Encapsulation 14 set
Poland
VALEO
AUTOSYSTEMY Sp. z
o.o.
Cast Resin Insulated Busduct
1kV; 3kAEB -1/3 33 m 1 kV 3 kA
PolandHotel HYATT
Warszawa
Cast Resin Insulated Busduct
1kV; 4kAEB -1/4 11 m 1 kV 4 kA
PolandPower Plant
Szczecin
Current conductors of Neutral
Point and Power Output
Generators
1 set
PolandPackage Factory
in Walec - K. Koźle
Cast Resin Insulated Busduct 1kV;
2kAEB -1/2 25 m 1 kV 2 kA
PolandPower Plant
Bełchatów
Current Transformer
PPGK-30 12000/5/5/5/5A6 set
Year Year YEAR 1999 Year Year Year Year
Poland Power Plant Turów
Non-segrgated Phase Busduct
12kV; 2,5kA. Exchange
of damaged busduct.
EHON -12/2,5 40 m 12 kV 2,5 kA
Poland
Power Plant Turów
Rehabilitation
of unit 3
Non-segregated Phase Busduct
12kV; 1,6kAEHON -12/1,6 19 m 12 kV 1,6 kA
Poland
Power Plant Turów
Rehabilitation
of unit 3
Non-segregated Phase Busduct
12kV; 2,5kA with overpressure
system.
EHON -12/2,5 63 m 12 kV 2,5 kA
SenegalPower Plant Dakar,
Senegal
Non-segrgated Phase Busduct
12kV; 4kAEHON -12/4 10 m 12 kV 4 kA
Poland
Power Plant Turów
Rehabilitation
of unit 3
Non-segregated Phase Busduct
12kV; 1,6kA with overpressure
system
EHON -12/1,6 200 m 12 kV 1,6 kA
Poland
Power Plant Turów
Rehabilitation
of unit 3
Isolated Phase Busduct 24kV;
10kAHOIO -24/10 105 m 24 kV 10 kA
PolandThermal Power
Plant Białystok
Non-segregated Phase Busduct 10
kV; 2,5 kAExisting Busduct
modernization
PolandPower Plant
Skawina
Non-segregated Phase Busduct 10
kV; 2,5 kA
Existing Busduct
modernization
NigeriaKainji Hydropower
Project - Nigeria
Isolated Phase Busduct
24kV; 4kAHOIO -24/4 42 m 24 kV 4 kA
14
EHON -1/4 11 m 1 kV 4 kA
EHON -1/4 DC 24 m 1 kV 4 kA
EHON -1/4 30 m 1 kV 4 kA
EHON -1/4 DC 12 m 1 kV 4 kA
Year Year YEAR 1998 Year Year Year Year
Poland
Power Plant Turów
Rehabilitation
of Unit 2
Cast Resin Insulated Busduct
1kV; 1,8kAEB -1/1,8 6,4 m 1 kV 1,8 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 2
Cast Resin Insulated Busduct
1kV; 2,3kAEB -1/2,3 4,2 m 1 kV 2,3 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 2
Cast Resin Insulated Busduct
1kV; 2,3kAEB -1/2,3 4,1 m 1 kV 2,3 kA
HOIO -24/4 150 m 24 kV 4 kA
HOIO -24/1 18 m 24 kV 1 kA
HOIO -17,5/8 142 m 17,5 kV 8 kA
HOIO -17,5/2 40 m 17,5 kV 2 kA
SwitzerlandGenerator Circuit Breaker
Encapsulation HEC - 3/6 180 set
SwitzerlandHGF Enclosure of Circuit Breaker
Generator50 set
SwitzerlandHGC - 3 Enclosure of Circuit
Breaker Generator21 set
SwitzerlandGenerator Circuit Breaker
Encapsulation HEC - 7/81 set
Germany HKW COTBUS 2
Cubicle of Power Output
HGCC12/4 with equipment Star
point connection with equipment.
1 set
Poland
Thermal-Electric
Power Plant
Gorzów
Cubicle of Power Output
HGCC12/4,5 with equipment Star
point connection with equipment.
1 set
EB -1/4 64 m 1 kV 4 kA
EB -1/4 DC 25 m 1 kV 4 kA
Poland BATERPOL Cast Resin Insulated Busduct 1kV;
2,5kAEB -1/2,5 6 m 1 kV 2,5 kA
HOIO -24/10 46 m 24 kV 10 kA
Hungary
Isolated Phase Busduct
17,5kV; 8kA
Isolated Phase Busduct
17,5kV; 2kA
Laos
Isolated Phase Busduct
24kV; 4kA
Isolated Phase Busduct
24kV; 1kA
Non-segregated Phase Busduct
1kV; 4kA
Non-segregated Phase Busduct
1kV; 4kA DC
K.G.H.M.. Polska
Miedź o/ZG
Polkowice
Poland
K.G.H.M.. Polska
Miedź o/ZG LublinPoland
Isolated Phase Busduct
24kV; 10kA
Isolated Phase Busduct
24kV; 2kA
Power Plant HOUAY
- HO Laos Unit 1
and 2
Cast Resin Insulated Busduct 1kV;
4kA
Cast Resin Insulated Busduct 1kV;
4kA DC
PolandElectric Power Plant
Łaziska
K.G.H.M.. Polska
Miedź o/ZG LublinPoland
Power Plant Liter
Hungary Unit 1
Non-segregated Phase Busduct
1kV; 4kA
Non-segregated Phase Busduct
1kV; 4kA DC
15
HOIO -24/2 110 m 24 kV 2 kA
PolandPower Plant
Czechnica
Cast Resin Insulated Busduct 1kV;
1,6kAEB -1/1,6 5 m 1 kV 1,6 kA
PolandThermal Power
Plant II GdańskCubicles for electrical equipment modernization
EB -1/4 3 m 1 kV 4 kA
EB -1/2,5 6 m 1 kV 2,5 kA
45 m 20 kV 7 kA
80 m 20 kV 2 kA
30 m 10 kV 2,5 kA
PolandThermal Power
Plant Wrocław
Non-segregated Phase Busduct
12kV; 1,6kAEHON -12/1,6 3 m 12 kV 1,6 kA
HOIO -17,5/6 40 m 17,5 kV 6 kA
HOIO -17,5/2 60 m 17,5 kV 2 kA
Czech RepublicPower Plant SILON
PLANAIsolated Phase Busduct 12kV; 4kA HOIO -12/4 235 m 12 kV 4 kA
HONR -1/2 3 m 1 kV 2 kA
HONR -12/1 3 m 12 kV 1 kA
HONR -2/1 6 m 2 kV 1 kA
PolandPower Plant Turów
Unit 1 and 2
Cast Resin Insulated Busduct 1kV;
0,6kAEB -1/0,6 125 m 1 kV 0,6 kA
HOIO -17,5/8 17,5 kV 8 kA
HOIO -24/8 24 kV 8 kA
PolandSwing Factory
Częstochowa
Cast Resin Insulated Busduct 1kV;
0,16kAEB -1/0,16 48 m 1 kV 0,16 kA
PolandPower Plant Turów
Unit 1
Non-segregated Phase Busduct
12kV; 1,6kAEHON -12/1,6 28 m 12 kV 1,6 kA
PolandPower Plant
Jaworzno III
Non-segregated Phase Busduct
12kV; 1,6kAEHON -12/1,6 8 m 12 kV 1,6 kA
PolandThermal-Electric
Power Plant Łódź IVNon-segregated Phase Busduct
Existing Busduct
modernization
PolandThermal-Electric
Power Plant Kraków Busduct replacement
Existing Busduct
modernization
Poland
Thermal-Electric
Power Plant
Czechnica
Non-segragated Phase Busduct
12kV; 4kAEHON -12/4 40 m 12 kV 4 kA
Adaptation for overpressure
system. Non-segragated Phase
Busduct 20kV; 7kA Non-
segregated Phase Busduct 20kV;
2kA Non-segregated Phase
Busduct 10kV; 2,5kA
Isolated Phase Busduct
24kV; 10kA
Isolated Phase Busduct
24kV; 2kA
Cast Resin Insulated Busduct
1kV; 4kA
Cast Resin Insulated Busduct
1kV; 2,5kA
Thermal Power
Plant Wrocław
PolandElectric Power Plant
Łaziska
Poland
Poland Retting Heating
Hassi Messaoud
Power Plant-
Algieria Unit 1, 2, 3
Isolated Phase Busduct
17,5kV; 8kA
Isolated Phase Busduct
24kV; 8kA
m 400Algieria
Isolated Phase Busduct 17,5kV;
6kA
Isolated Phase Busduct 17,5kV;
2kA
Non-segregated Phase Busduct
1kV; 2kA
Non-segregated Phase Busduct
12kV; 1kA
Non-segregated Phase Busduct
2kV; 1kA
Thermal Power
Plant II GdańskPoland
Slovakia
Power Plant
VOJANY
Unit 5
16
Poland Jedlińsk StationNon-segregated Phase Busduct
12kV; 1,25kAEHON -12/1,25 18 m 12 kV 1,25 kA
PolandThermal-Electric
Power Plant Kraków
Insulated Phase Busduct with
adaptation for overpressure
system
Existing Busduct
modernization
PolandPower Plant Turów,
Unit 2
Non-segregated Phase Busduct
12kV; 1,6kAEHON -12/1,6 24 m 12 kV 1,6 kA
PolandCoal Mine
Dębieńsko
Non-segregated Phase Busduct
12kV; 1,6kAEHON -12/1,6 240 m 12 kV 1,6 kA
PolandStation Koszalin -
Dunowo
Non-segrgated Phase Busduct
30kV; 2kA with SF6 insulationEHON -30/2 44 m 30 kV 2 kA
Poland
Glass Work
POLFLOAT
Strzemieszyce
Cast Resin Insulated Busduct
1kV; 2kAEB -1/2 24 m 1 kV 2 kA
PolandThermal-Electric
Power Plant Kraków
Cast Resin Insulated Busduct
1kV; 2kAEB -1/2 18 m 1 kV 2 kA
Poland OMAG Oświęcim Cast Resin Insulated Busduct
1kV; 0,4kAEB -1/0,4 66 m 1 kV 0,4 kA
Poland
Thermal-Electric
Power Plant
Siekierki
Non-segregated Phase Busduct
7,2kV; 1,5kAHONR -7,2/1,5 90 m 7,2 kV 1,5 kA
PolandHydro Power Plant
Rożnów
Cast Resin Insulated Busduct
1,2kV; 2kAEB -1,2/2 15 m 1,2 kV 2 kA
SwitzerlandGenerator Circuit Breaker
Encapsulation HEC - 3/6238 set
SwitzerlandGenerator Circuit Breaker
Encapsulation HGF24 set
SwitzerlandGenerator Circuit Breaker
Encapsulation HEK - 618 set
SwitzerlandGenerator Circuit Breaker
Encapsulation HGC - 39 set
PolandThermal Power
Plant Wrocław
Cast Resin Insulated Busduct
1kV; 2kAEB -1/2 18 m 1 kV 2 kA
Switzerland Bratysława Renovation of cubicles HEC - 3/6
Poland
Power Plant Turów
Rehabilitation
of Unit 1 and 2
Non-segregated Phase Busduct
12kV; 2,5kA with overpressure
system
EHON -12/2,5 220 m 12 kV 2,5 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 1 and 2
Non-segregated Phase Busduct
12kV; 1,6kA with overpressure
system.
EHON -12/1,6 400 m 12 kV 1,6 kA
Year Year YEAR 1997 Year Year Year Year
17
Poland
Power Plant Turów
Rehabilitation
of Unit 1 and 2
Power Output Isolated Phase
Busduct 24kV; 10kA with
overpressure system
HOIO -24/10 210 m 24 kV 10 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 1
Cast Resin Insulated Busduct 1kV;
1,8kAEB -1/1,8 6,5 m 1 kV 1,8 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 1
Cast Resin Insulated Busduct 1kV;
2,3kAEB -1/2,3 4,2 m 1 kV 2,3 kA
Poland
Power Plant Turów
Rehabilitation
of Unit 1
Cast Resin Insulated Busduct 1kV;
2,3kAEB -1/2,3 4,1 m 1 kV 2,3 kA
Year Year YEAR 1996 Year Year Year Year
EHON -12/5 48 m 12 kV 5 kA
EHON -12/1,6 45 m 12 kV 1,6 kA
EHON -12/1 85 m 12 kV 1 kA
SwedenPower Plant
Tuggen, Sweden
Isolated Phase Busduct
12kV; 4kAHOIO -12/4 24 m 12 kV 4 kA
Poland Steel Works Łaziska
High Current Connections
45 kA for furnace Insulated Phase
Busduct
10 m
PolandTransformer Station
RETTING - Silesia
Cast Resin Insulated Busduct
1kV; 3kAEB -1/3 22 m 1 kV 3 kA
PolandTransformer Station
Warszawa Wola
Non-segragated Phase Busduct
15kV; 1,5kAEHON-15/1,5 14 m 15 kV 1,5 kA
PolandPetrochemistry
Płock
Non-segragated Phase Busduct
12kV; 4kAEHON -12/4 70 m 12 kV 4 kA
Poland
Thermal-Electric
Power Plant
Siekierki
Non-segragated Phase Busduct
12kV; 4kAEHON -12/4 81 m 12 kV 4 kA
Poland
Thermal-Electric
Power Plant Kraków
Łęg Unit 1, Unit 3
Adaptation for overpressure
system
Existing Busduct
modernization
Poland
Thermal-Electric
Power Plant Kraków
Łęg
Non-segragated Phase Busduct
ELPO 10kV; 2,5kA for switchgear
OBC Adaptation to overpressure
system.
Existing Busduct
modernization 700 m 10 kV 2,5 kA
PolandTransformer Station
Piaseczno
Non-segragated Phase Busduct
15kV; 1,6kAEHON -15/1,6 70 m 15 kV 1,6 kA
Poland
Thermal-Electric
Power Plant II
Bielsko-Biala
Non-segrgated Phase Busduct
12kV; 5kA
Non-segrgated Phase Busduct
12kV; 1,6kA
Non-segrgated Phase Busduct
12kV; 1kA
18
Switzerland
Generator Circuit Breaker
Encapsulation HEC Instalation
of overpressure in Isolated Phase
Busduct 17,5kV; 5kA
124 set
SwedenPower Plant
Kimistad, Sweden
Isolated Phase Busduct
12kV; 5kA with Overpressure
System
HOIO -12/5 60 m 12 kV 5 kA
Poland Power Plant ŁaziskaNon-segragated Phase Busduct
12kV; 2,5kAEHON -12/2,5 8 m 12 kV 2,5 kA
PolandPower Plant Dolna
OdraFlexible joints 2500A 12 set
PolandPetrochemistry
Płock
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 10 m 1 kV 2,5 kA
PolandPetrochemistry
Płock
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 30 m 1 kV 2,5 kA
PolandPetrochemistry
Płock
Cast Resin Insulated Busduct
1kV; 2,5kAEB -1/2,5 24 m 1 kV 2,5 kA
Poland
Glass Work
POLFLOAT
Strzemieszyce
Cast Resin Insulated Busduct
1,2kV; 2,5kAEB -1,2/2,5 100 m 1,2 kV 2,5 kA
Poland Power Plant TurówNon-segragated Phase Busduct
12kV; 2,5kAEHON 12/2,5 280 m 12 kV 2,5 kA
PolandCoal Mine
Dębieńsko
Non-segregated Phase Busduct
12kV; 1,6kAHON -12/1,6 1700 m 12 kV 1,6 kA
PolandCoal Mine
Jastrzębie
Non-segregated Phase Busduct
12kV; 1,6kAHON -12/1,6 60 m 12 kV 1,6 kA
Poland Steel Works ŁaziskaNon-segregated Phase Busduct
12kV; 2,5kAHON -12/2,5 860 m 12 kV 2,5 kA
Refrences older than 1996 available on request.
19