4
162 References REFERENCES Brown and Caldwell and Seattle Public Utilities. 2002. DWW Systems/ Alaskan Way Viaduct Alternatives; Project summary. October 2002. East, R. and T. King. 2004. Personal communication (email) of January 21, 2004, from Russell S. East, Director, Terminal Engineering, and Tim King, Washington State Ferries, to Maureen Sullivan (WSDOT). Ecology (Washington State Department of Ecology). 1995a. Elliott Bay Waterfront Recontamination Study Volume 1: Field Investigation Report. Publication # 95-335. Prepared by the Washington State Department of Ecology, Elliott Bay/Duwamish Restoration Panel, Panel Publication 9. July 1995. Ecology (Washington State Department of Ecology). 1995b. Sediment Management Standards - WAC 173-204, Washington State Department of Ecology, Olympia, WA. EDC (Economic Development Council of Seattle and King County). 2003. Research and data: Economic base, international trade, The City of Seattle, office market, transportation. Available at http://www.edc- sea.org/research_data. King County. 2004. Regional Wastewater Services Plan. Existing Wastewater System. Available at: http://dnr.metrokc.gov/wtd/rwsp/graphics/80200a.pdf. Accessed 2/2/2004. National Register of Historic Places. 2001. Registration Form. Received by the United States Department of Interior, National Park Service. November 6, 2001. Parametrix. 2003a. Final Revised Screening of Design Concepts. June 2003. Parametrix. 2003b. Final Revised Screening of Seawall Concepts. June 2003. Parsons Brinckerhoff. 2002. Rebuild/Retrofit Alternative Report. August 2002. Parsons Brinckerhoff. 2003. Rebuild/Retrofit 500, 500-Year Design Earthquake. April 2003. Parsons Brinckerhoff. 2004. Business Inventory Survey Report. Prepared for the Federal Highway Administration, Washington State Department of Transportation, and City of Seattle SR 99: Alaskan Way Viaduct & Seawall Replacement Project. February 2004. Phelps, M.L. 1978. Public Works in Seattle: A Narrative History, The Seattle Engineering Department 1875-1975. Additional contributing authors: Leslie Blanchard, James R. Robertson, C.E. Buckner, and Roy W. Morse. PSRC (Puget Sound Regional Council). 2002. 2001 Population and employment forecasts, central Puget Sound region. Available at http://www.psrc.org/datapubs/forecasts_2001.htm. PSRC (Puget Sound Regional Council). 2003a. 2002 parking inventory for the central Puget Sound region. Available at http://www.psrc.org/datapubs/pubs /parking2002.htm. PSRC (Puget Sound Regional Council). 2003b. 2002 small area forecasts of population and employment, central Puget Sound region. Seattle Times. 2001. Seattle Sea Wall a New Quake Risk? Written by Andrew Garber, Seattle Times staff reporter. September 11, 2001. Shannon and Wilson, Inc. 2003. Geotechnical Analyses for Existing Alaskan Way Seawall. January 2003. WSDOT (Washington State Department of Transportation). 2003. Environmental Procedures Manual, EM 31-11. March 2003. Washington State Ferries. 2003. Our Fleet. Available at http://www.wsdot.wa.gov/ferries/your_wsf/our_fleet/. LIST OF PREPARERS

ReferencesListPreparers · Title: ReferencesListPreparers.pdf Author: lisar Created Date: 3/19/2004 9:00:46 PM

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ReferencesListPreparers · Title: ReferencesListPreparers.pdf Author: lisar Created Date: 3/19/2004 9:00:46 PM

162 References

REFERENCES

Brown and Caldwell and Seattle Public Utilities. 2002. DWW Systems/

Alaskan Way Viaduct Alternatives; Project summary. October 2002.

East, R. and T. King. 2004. Personal communication (email) of January

21, 2004, from Russell S. East, Director, Terminal Engineering, and

Tim King, Washington State Ferries, to Maureen Sullivan (WSDOT).

Ecology (Washington State Department of Ecology). 1995a. Elliott Bay

Waterfront Recontamination Study Volume 1: Field Investigation

Report. Publication # 95-335. Prepared by the Washington State

Department of Ecology, Elliott Bay/Duwamish Restoration Panel, Panel

Publication 9. July 1995.

Ecology (Washington State Department of Ecology). 1995b. Sediment

Management Standards - WAC 173-204, Washington State Department

of Ecology, Olympia, WA.

EDC (Economic Development Council of Seattle and King County).

2003. Research and data: Economic base, international trade, The City

of Seattle, office market, transportation. Available at http://www.edc-

sea.org/research_data.

King County. 2004. Regional Wastewater Services Plan. Existing

Wastewater System. Available at:

http://dnr.metrokc.gov/wtd/rwsp/graphics/80200a.pdf. Accessed

2/2/2004.

National Register of Historic Places. 2001. Registration Form. Received

by the United States Department of Interior, National Park Service.

November 6, 2001.

Parametrix. 2003a. Final Revised Screening of Design Concepts. June

2003.

Parametrix. 2003b. Final Revised Screening of Seawall Concepts. June

2003.

Parsons Brinckerhoff. 2002. Rebuild/Retrofit Alternative Report.

August 2002.

Parsons Brinckerhoff. 2003. Rebuild/Retrofit 500, 500-Year Design

Earthquake. April 2003.

Parsons Brinckerhoff. 2004. Business Inventory Survey Report.

Prepared for the Federal Highway Administration, Washington State

Department of Transportation, and City of Seattle SR 99: Alaskan Way

Viaduct & Seawall Replacement Project. February 2004.

Phelps, M.L. 1978. Public Works in Seattle: A Narrative History, The

Seattle Engineering Department 1875-1975. Additional contributing

authors: Leslie Blanchard, James R. Robertson, C.E. Buckner, and Roy

W. Morse.

PSRC (Puget Sound Regional Council). 2002. 2001 Population and

employment forecasts, central Puget Sound region. Available at

http://www.psrc.org/datapubs/forecasts_2001.htm.

PSRC (Puget Sound Regional Council). 2003a. 2002 parking inventory

for the central Puget Sound region. Available at

http://www.psrc.org/datapubs/pubs /parking2002.htm.

PSRC (Puget Sound Regional Council). 2003b. 2002 small area forecasts

of population and employment, central Puget Sound region.

Seattle Times. 2001. �Seattle Sea Wall a New Quake Risk?� Written by

Andrew Garber, Seattle Times staff reporter. September 11, 2001.

Shannon and Wilson, Inc. 2003. Geotechnical Analyses for Existing

Alaskan Way Seawall. January 2003.

WSDOT (Washington State Department of Transportation). 2003.

Environmental Procedures Manual, EM 31-11. March 2003.

Washington State Ferries. 2003. Our Fleet. Available at

http://www.wsdot.wa.gov/ferries/your_wsf/our_fleet/.

LIST OF PREPARERS

Page 2: ReferencesListPreparers · Title: ReferencesListPreparers.pdf Author: lisar Created Date: 3/19/2004 9:00:46 PM

Alaskan Way Viaduct & Seawal l Replacement Project Draft Environmental Impact Statement 163

LIST OF PREPARERS

Page 3: ReferencesListPreparers · Title: ReferencesListPreparers.pdf Author: lisar Created Date: 3/19/2004 9:00:46 PM

LIST OF PREPARERS

164 List of Preparers

Page 4: ReferencesListPreparers · Title: ReferencesListPreparers.pdf Author: lisar Created Date: 3/19/2004 9:00:46 PM

LIST OF PREPARERS

Alaskan Way Viaduct & Seawal l Replacement Project Draft Environmental Impact Statement 165