Page 1: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

rok

om

ple

x F

ran

kli

ns

tra

ße

Be

rlin

© T

om

ek

Kw

iato

sz

Page 2: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value Client

Franklinstraße Berlin

Berlin,

Germany

All trades and works (excluding FF&E) for the new

office complex (3 buildings, about 40.000 m² NGF).

Site installation

Surveillance

Masonry works

Core drilling

Locksmith works

Screed

Heating

Ventilation

Sanitary installations

Electrical installations

Plastering works

Fire Protaction

Tiling works

Painting works

Doors

Building automation

Sunscreen

Outdoor facilities

Flooring works

Earthworks

Scaffolding work

Insulation

~ 43,0 Mio. € Patron Mawson S.á r.l.

6, Avenue Pasteur

2310 Luxembourg

Rüthlingstraße Munich

Munich,

Germany

Energetic renovation and modernization of a

residential building (42-party tenement) with

underground parking.

Surveillance

Demolition works

Carcass work

Carpenter / Roffer

Outdoor facilities

Screed

Tiling works

Flooring works

Locksmith works

Heating

Ventilation

Sanitary installations

Electrical installations

Plastering works

Painting works

~ 3,0 Mio. € Habermann GbR

Widderstraße 20

81679 Munich

Germany

Motel One Berlin Ku´damm

Berlin,

Germany

Renovation of 248 guestrooms and public areas. All

finishing works incl. FF&E.

tiling

painting works

flooring

carpentery

loose furniture

textile decoration

lamps

~ 2,5 Mio. € Motel One Betriebs GmbH

Tegernseer Landstraße 165

81539 Munich

Germany

25hours Hotel Munich The Royal

Bavarian

Munich,

Germany

Conversion and renovation of the listed building

(carcass works, building services, as well as overall

finishing and completion) from a former telegraph

office to a hotel.

Site installation

Dry construction

Cavity floors and double floors

Laying of screed

Industrial floor coatings

Waterproofing of buildings

Plastering works

Artificial stone works

Laying of tiles

Metalwork

Glass and mirror works

Painting and wallpapering works

Flooring works

Joinery works

Construction of doors / fire doors

Air-conditioning systems (rooms)

Sanitary systems (rooms)

Sanitary installations

~ 20 Mio. € Fieldcustom S.à.r.l.

1, Allée Scheffer

2520 LUXEMBOURG

LUXEMBURG

Lots

2018 Page 2 of 17

Page 3: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Adina Apartment Hotel Leipzig

Leipzig,

Germany

Renovation and conversion of an office building into a

hotel with 166 rooms (planning, carcass and finishing

works, incl. building services).

Planning

Preservation of evidence

Measuring

Pollution control

Sound insulation

Statics

Fire protection

Construction signs

Security service / Construction

site surveillance

Demolition works

Carcass work

Core drilling

Masonry works

Waterproofing of roofs

Concrete components

External wall insulation system

Façade metal

Façade decorative element

Window/façade

Civil engineering works

Laying of screed

Screed coating

Steel works

Plastering works

Dry construction works

Laundry chute

WC partition walls

Mobile partition walls

Double floor

Tiling works

Natural stone works

Flooring works

Parquet works

Locksmith works

Wooden doors

Metal doors

Glass doors/glass door elements

Joinery works

Gastronomy kitchen

Locking system

Electrical installations

Heating/air-conditioning/

ventilation/sanitary

ICA (instrumentation, control and

automation)

Heating and cooling ceilings

Fire protection

Elevator systems

Inclined elevator

Pool/Pool technics

Sauna

Industrial cleaning

Loose furniture

Lighting

Outdoor facilities

Advertising structures

Signage

~ 18,5 Mio. € Leipziger Stadtbau AG

Reichsstraße 1-9

04109 Leipzig

Deutschland

Kimpton De Witt Amsterdam

Amsterdam,

Niederlande

Renovation of 274 rooms including public areas with

all trades including TGA. The Kimpton Amsterdam is

considered the first hotel of this brand outside

America.

Screed, dry construction

Concrete works

Tiling works

Painting works

Flooring works

Doors, Joinery works

~ 14,6 Mio. € YC Amsterdam BV

Nieuwezijds

Voorburgwal 5

1012 RC AMSTERDAM

Niederlande

2018 Page 3 of 17

Page 4: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

NH Hotel Hamburg Mitte

Hamburg,

Germany

Conversion and renovation of 127 rooms(finishing

and completion package including technical facility

equipment - HVAC).

Demolition works

Laying of screed

Dry construction works

Tiling works

Painting works

Flooring works

Doors

Textile decoration

Electrical installation

Lighting

Loose lighting

Industrial cleaning works

~ 7,8 Mio. € NH Hotels Deutschland GmbH

Friedrichstraße 96

10117 Berlin

Deutschland

Zur Krone Niedersonthofen

Niedersonthofen,

Germany

Furniture production for 20 modern guest rooms carpentery ~ 75 T € R&S Mayer GmbH

Laubener Straße 18

87439 Kempten:Hirschdorf

Germany

Huus Gstaad Hotel

Saanen-Gstaad,

Switzerland

Renovation of the public areas. All finishing works

incl. FF&E.

tiling

painting works

flooring

carpentery

loose furniture

textile decoration

lamps

~ 1,6 Mio. € Huus Gstaad AG

Schönriedstr. 74

3792 Gstaad-Saanen

Switzerland

2018 Page 4 of 17

Page 5: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

The Ritz Carlton Berlin

Berlin,

Germany

Conversion and renovation of 1st floor (finishing and

completion package).

building site equipment

demolition

dry walling

painting works

flooring

carpentery

loose furniture

textile decoration

~ 1,2 Mio. € The Ritz-Carlton Hotel Company GmbH

Postdamer Platz 3

10785 Berlin

Germany

Land & Golf Hotel Stromberg

Stromberg,

Germany

Renovation of 109 rooms and suites in the main

building of the private hotel. One of the challenges for

us was the very short execution period of only 4

weeks.

demolition

dry walling

painting works

flooring

carpentery

loose furniture

textile decoration

electrical installation

lighting

lamps

~ 1,5 Mio. € BUL Verwaltungs- und Beteiligungsgesellschaft

mbH

am See 27,

76646 Bruchsal

Germany

2018 Page 5 of 17

Page 6: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Hotel Palace Berlin

Berlin,

Germany

Renovation of 76 rooms during ongoing hotel

operation including all finishing trades.

demolition

windows, outer door

dry walling

painting works

flooring

carpentery

loose furniture

furnishing

textile decoration

electrical installation

lamps

sanitary installations

~ 1,8 Mio. € Hotel im Europa Center Verwaltungsgesellschaft

mbH & Co.KG

Budapester Straße 45

10787 Berlin

Germany

Capri by Fraser Frankfurt

Frankfurt,

Germany

Construction of an apartment building of the brand

Fraser Place with 153 rooms (joinery works room +

kitchen incl. kitchen appliances, safe, vanity and

mirror).

carpentery loose furniture ~ 1,2 Mio. € GBI AG Gesellschaft für Beteiligungen und

Immobilienentwicklungen

PBMG Projekt- und Baumanagementgesellschaft

mbH

Königstor 35,

34117 Kassel

Germany

The Hague Marriott Hotel

Den Haag,

The Netherlands

Interior fittings for 306 Rooms and Suites plus Public

Areas. The Hotel has two Bars, Brasserie The Great

Room and restaurant The Gallery.

scaffolding work

demolition

shell works

dry walling

tiling

painting works

flooring

metal works

doors and carpentery

roller shutter

lighting

sanitary installations

building cleaning

~ 6,8 Mio. € Westmont UK,

Projektsteuerung über

ChandlerKBS

Königsallee 11

40212 Düsseldorf

Germany

2018 Page 6 of 17

Page 7: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

RIU Plaza Berlin

Berlin,

Germany

Interior fittings for 357 Rooms and Suites plus Public

Areas, including technical facility equipment - HVAC

demolition

screed

cavity works

plaster and stucco works

dry walling

natural and artificial stone works

tiling works

painting works

flooring works

metal works

doors and carpentery

furnishing

shutter and sun-protection works

HVAC

~ 30 Mio. € Codes Capital Partners S.L.

Niederlassung Berlin

Hardenbergstraße 4-5

10623 Berlin

Germany

Mövenpick Hotel Münster

Münster,

Germany

Partial soft refurbishment of the hotel in the areas:

guest rooms and corridors in the section "Altbau" (old

building).

building site equipment

painting works

flooring

carpentery

loose furniture

equipment

textile decoration

electrical installations

lighting

lamps

building cleaning service

≈ 1 Mio. € Mövenpick Hotels Deutschland GmbH

Am Hauptbahnhof 2

45127 Essen

Germany

JW Marriott Venice

Resort & SPA

Venice,

Italy

On behalf of the Aareal Bank AG, hagenauer GmbH

was carrying out the complete interior construction of

266 guest rooms, suites and public areas on Sacca

Sessola, an island in the Venetian Lagoon.

carpenetry

textiles decoration

lighting

loose furniture

dry walling

screed

paint works

natural stone

tiling

metal works

parquet

carpets

~ 13 Mio. € La Sessola S.r.L.

Via Mercadante 12/14

00198 Rom

Italy

Contact:

Wilhelm Wüst

+49 611 348 2791

2018 Page 7 of 17

Page 8: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Hotel Meliá Vienna

Vienna,

Austria

Complete FF&E furnishings for 242 Standard Rooms,

six Honeymoon Suites, four Suites, one Presidential

Suite plus the entire Public Areas - two restaurants,

three bars, Conference Rooms, three kitchens - as

well as for the total of the Back of House area

carpentry

textiles decoration

lighting

loose furniture

OS&E

kitchen installations

~ 5,3 Mio. € VIENNA DC Tower 1

Liegenschaftsbesitz GmbH

Donau-City-Straße 1

1220 Vienna

Austria

Contact

Dipl.-Ing. Thomas Jakoubek

Lindner Congress

Hotel Düsseldorf

Düsseldorf,

Germany

Interior fittings for 90 guestrooms including corridors demolition

dry walling

tiling

paintworks

flooring

carpentry

electrical installations

sanitary installations

lighting

~ 3,0 Mio. € Lindner Rheinstern GmbH & Co KG

Emanuel-Leutze-Straße 17

40547 Düsseldorf

Germany

Contact

Dirk Dietrich

T +49 211 5997 1389

Siegfried Wenzelmann

T +49 211 5997-337

25hours Hotel Bikini Berlin

Berlin,

Germany

Complete fittings and interior fittings for 127

guestrooms and 22 suites, public areas (check-in,

conference areas, wellness area including sauna,

restaurant, kitchen and bar) and back-of-house area

(office, staff rooms, etc.)

Refurbishment of approx. 6.000 m² industrial surface,

transformation into a lifestyle hotel, implementation of

a design concept

dry walling

ventilation spaces and double

floors

screed

industrial floor finishing

sealing works

plasterworks

artificial stone works

tiling

metal works

mirrors / glass

paintworks

paperhanging

flooring

carpentry

doors

fire protection doors

ventilation / air conditioning

sanitary installations

sanitary objects

~ 6,0 Mio. € Bayerische Hausbau GmbH & Co. KG

Niederlassung Berlin

Hardenbergplatz 2

10623 Berlin

Germany

2018 Page 8 of 17

Page 9: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

INNSIDE by Melia

Düsseldorf

Düsseldorf,

Germany

Transformation of an office building (Colorium) into a

4* design hotel.

Interior fittings for guestrooms and public areas

(check-in, bar, breakfast room and kitchen).

screed

dry walling

concrete works

tiling

paintworks

flooring

doors

carpentry

locking system

~ 2,1 Mio. € Ibing Immobilien GmbH & Co. KG

Am Töllershof 31

40489 Düsseldorf

Germany

Contact

Kai 18 Projekte GmbH

Oliver Ziehe

René Lück

T +49 211 - 540 750 0

Büropark Mollstraße 1

Berlin,

Germany

Core reconstruction of an office building including

facade works and building equipment (HVACR).

10.000 m² useable surface, excluding basement,

consisting of a 10 storey high rise building and a 3-

storey low rise building.

demolition

shell works

sealing works (roofs)

facade works

windows

exterior doors

outdoor facilities

screed

plaster and stucco works

dry walling

fire protection facilities

tiling

concrete works

paintworks

flooring

fitting works

electrical installations

telecommunication circuit facilities

sanitary installations

ventilation and air conditioning

facilities and appliances

lifts

~ 13,5 Mio. € Mollstraße 1, Objektgesellschaft mbH

c/o Suprema Immobilienverwaltung GmbH

Rosenthaler Straße 13

10119 Berlin

Germany

Contact

Suprema Immobilienverwaltung GmbH Dipl.-Ök.

Janet Greulich

T +49 30 612 86 662

Generator Hostel

Berlin Mitte

Berlin,

Germany

Core reconstruction and transformation of an office

building into a design hostel.

Fitting and furnishing for guestrooms and public areas

(reception, bar, lobby, café, breakfast room and

kitchen).

demolition

sealing works (basement)

statics

structural works

masonry works

exterior windows

screed

dry walling

sealing works

tiling

electrical installations

heating / ventilation

sanitary installations

flooring

paintworks

doors

carpentry

loose furniture

lighting

lift facilities

facade works

outdoor installations

advertising structures

signage

~ 8,0 Mio. € Patron Mitte Properties GmbH

Generator Hostels

Storkowerstraße 160

10407 Berlin

Germany

Contact

Generator Hostels LTD

Tarna Schmidt

T +49 30 417 24044

2018 Page 9 of 17

Page 10: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Doubletree by Hilton

Luxembourg

Luxemburg

Refurbishment of guestrooms and 6 suites and public

areas (lobby, reception, business centre, restaurant,

bar, meeting areas).

in an operational hotel

demolition

paintworks

natural stone

tiling

flooring

carpentry

loose furniture

textile decoration

sanitary installations

electric installations

~ 6,0 Mio. € Westmont Hospitality Group Europe

SW19 4DT London

United Kingdom

Contact

Westmont Hospitality Group Europe

Mitchell Binks

T +44 208 944 6666

Steigenberger Hotel

Bad Neuenahr,

Germany

Interior fittings for 63 guestrooms including bathrooms

(7 suites, 56 rooms), conference rooms an corridors,

public areas, hotel hall including lobby, check-in and

bar.

demolition

masonry

windows

screed

dry walling

natural stone

tiling

paintworks

flooring

doors

carpentry

loose furniture

textile decoration

decorative lighting

glass plates

sanitary installations

~ 2,6 Mio. € Steigenberger Hotels AG

Lyonerstrasse 40

60528 Frankfurt / Main

Germany

Contact

Steigenberger Hotels AG

Dr. Michael Schicker

T +49 69 665 646 39

Hilton Munich Park Hotel

Munich,

Germany

Refurbishment of guestrooms and suites, public

areas, lobby, restaurants, bar, executive lounge, ball

room and kitchen.

demolition

screed

dry walling

tiling

paintworks

flooring

doors

carpentry

loose furniture

textile decoration

electrical installations

lighting

sanitary installations

~ 8,0 Mio. € Hilton München Park

Zweigniederlassung der Hilton International Co.

Am Tucherpark 7

80538 München

Germany

Contact

Hilton München Park

Zweigniederlassung der Hilton International Co.

Christoph Glaser

T +49 89 384 523 00

2018 Page 10 of 17

Page 11: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Panoramahotel

Oberjoch;

Germany

Interior fittings for 113 guestrooms and suites plus

public areas.

carpentry

furniture

textile decoration

lighting

sanitary objects

sanitary accessories

~ 1,5 Mio. € Wellnesshotel Oberjoch GmbH

Salzstraße 10

87435 Kempten

Germany

Contact

BreFa Bauunternehmung GmbH

Gerhard Breher

T +49 170 61 38 07 5

Hotel Giardino Mountain

St. Moritz,

Switzerland

Refurbishment of 78 guestrooms and suites including

bathrooms.

screed

dry walling

natural stone

tiling

plasterworks

glass elements

paintworks

flooring

doors

carpentry

furniture

lighting

textile decoration

accessories

sanitary items

sanitary accessories

~ 4,5 Mio. € Centaurium Immobilien AG

Schulstrasse 27

2572 Möringen

Switzerland

Contact

Hotel Giardino Mountain

Philippe Frutiger

T +41 91 785 88 88

Hotel Austria Trend

Park Royal Palace

Vienna,

Austria

Interior fittings for 232 guestrooms and suites

including bathrooms and public areas.

sealing works

natural stone

tiling

paintworks

paperhanging

flooring

doors

carpentry

loose furniture

textile decoration

~ 5,0 Mio. € Mariahilferstrasse 212

Verwertungs GmbH

Favoritenstrasse 7/2

1040 Wien

Austria

Contact

PD Projektmanagement GmbH

Karl Resch

T +43 67 655 55 99 0

2018 Page 11 of 17

Page 12: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Mövenpick Hotel Lausanne

Lausanne,

Switzerland

Refurbishment of 72 guestrooms including

bathrooms, corridors, staircases, meeting rooms an

public bathrooms.

dry walling

sealing works

paintworks

natural stone

tiling

flooring

doors

carpentry

loose furniture

textile decoration

lighting

~ 2,5 Mio. € CLAIR AG

MAS Immobilienmanagement

Seestrasse 1

6330 Cham

Switzerland

Contact

CLAIR AG

MAS Immobilienmanagement

Tobias Achermann

T +41 41 783 8052

Apart-Hotel

operated by Hilton Zürich

Zurich,

Switzerland

Refurbishment of 67 guestrooms including corridors. demolition

flooring

loose furniture

textile decoration

lighting

~ 0,38 Mio. € Westmont Hospitality Group - Europe

SW19 4DT London

United Kingdom

Contact

Westmont Hospitality Group - Europe

Mitchell Binks

T +44 208 944 6666

Marriott Renaissance Paris Le

Parc Trocadero Hôtel

Paris,

France

Refurbishment of 100 guestrooms and 20 suites

including corridors, lift-landings, staircases, public

areas, hotel hall, check-in, bar, concierge and office

accommodations.

demolition

structural works

sealing works

steel construction

dry walling

doors / fire protection doors

handicapped accessible

furnishings

stucco works

natural stone n

tiling

paintworks

flooring

fitting works

carpentry

mirrors / glass

furniture fittings

furniture

textile decoration

electrical installations

lighting

sanitary installations

fire protection

sprinkler system

alarm system

ventilation / air conditioning

~ 5,6 Mio. € Westmont Hospitality Group - Europe

SW19 4DT London

United Kingdom

Contact

Westmont Hospitality Group - Europe

Mitchell Binks

T +44 208 944 6666

2018 Page 12 of 17

Page 13: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Fairmont

Le Montreux Palace

Montreux,

Switzerland

Phase 3:

Refurbishment of 41 guestrooms and 8 suites

Phase 1+2:

Refurbishment of 80 guestrooms and 23 suites

including bathrooms and corridors

in an operational hotel

demolition

dry walling

stucco works

paintworks

fitting works

doors

flooring

mirrors / glass

furniture

electrical installations

lighting

textile decoration

~ 8,4 Mio. € Fairmont Le Montreux Palace

Grand Rue 100

1820 Montreux

Switzerland

Contact

Fairmont Le Montreux Palace

Michael Smithuis

T +41 219 621 000

Hilton Stockholm Slussen

Stockholm,

Sweden

Refurbishment of 178 guestrooms including corridors

plus executive lounge

in an operational hotel

demolition

paintworks

flooring

carpentry

mirrors / glass

loose furniture

textile decoration

electrical installations

lighting

~ 2,8 Mio. € Hilton Stockholm Slussen

Guldgränd 8 Box 15270

10465 Stockholm

Sweden

Contact

Hilton Stockholm Slussen

Mr Peter Eriksson

T +46 8517 353 00

Hilton Berlin Hotel

am Gendarmenmarkt

Berlin,

Germany

Refurbishment of public areas (lobby, restaurant,

executive lounge, meeting rooms) plus 597

guestrooms and suites including corridors.

in an operational hotel

demolition

structural works

screed

dry walling

natural stone

tiling

paintworks

flooring

fitting works

carpentry

mirrors / glass

furniture

textile decoration

electrical installations

lighting

ventilation / air conditioning

~ 13,1 Mio. € Domhotel GmbH

Mohrenstrasse 30

10117 Berlin

Germany

Contact

Hilton Berlin

Zweigniederlassung der Hilton International Co.

Ronald van Weezel

T +49 30 20 23 40 00

2018 Page 13 of 17

Page 14: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Copenhagen Marriott Hotel

Copenhagen,

Denmark

Refurbishment of the reservation back office, check-

in, lobby, restaurant and bar including „front-cooking

area“.

demolition

dry walling

natural stone n

tiling

paintworks

paperhanging

flooring

doors

carpentry

furniture fittings

upholstered furniture

loose furniture

textile decoration

electrical installations

kitchen technology and

installations

technical and decorative lighting

fire protection

~ 1,2 Mio. Marriott Copenhagen Hotelinvest Kalvebod A/S /

Kalvebod Brygge 5

1560 Copenhagen

Denmark

Contact

Axios Hospitality Real Estate

Mr. Guy Greer

T +44 208 879 5140

Radisson Blu Ambassador Hotel

Paris

Paris,

France

Refurbishment of public areas (lobby, hotel hall, bar,

conference rooms, fitness studio, executive lounge

and board rooms)

in an operational hotel

demolition

dry walling

natural stone

tiling

paintworks

flooring

carpentry

mirrors / glass

furniture

textile decoration

electrical installations

lighting

sanitary installations

~ 1,5 Mio. € Westmont Hospitality Group

SW19 4DT London

United Kingdom

Contact

Westmont Hospitality Group

Mitchell Binks

T +44 208 944 6666

The Ritz Carlton, Vienna

Vienna,

Austria

Interior fittings for 177 guestrooms, 29 suites and 1

presidential suite including bathrooms and corridors.

dry walling

sealing works

natural stone

paintworks

flooring

fitting works

carpentry

mirrors / glass

furniture

textile decoration

electrical installations

lighting

sanitary installations

~ 11,0 Mio. € BAI Bauträger Austria Immobilien GmbH

1020 Wien

Austria

Contact

BAI Bauträger Austria Immobilien GmbH

DI Robert Hahn

T +43 1 33 146 45 20

2018 Page 14 of 17

Page 15: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Mövenpick Hotel Egerkingen

Egerkingen,

Switzerland

Refurbishment of 95 guestrooms and suites including

corridors plus board rooms and fitness centre

demolition

structural works

dry walling

natural stone

tiling

paintworks

flooring

fitting works

carpentry

mirrors / glass

furniture

textile decoration

electrical installation

lighting

ventilation / air conditioning

~ 1,82 Mio. € Mövenpick Hotel Egerkingen

Höhenstrasse 12

4622 Egerkingen

Switzerland

Contact

Chandler KBS

Baukonstruktion & Kostenmanagement

Dane Hutchinson

T +49 211 992 101

Hilton Munich Park Hotel

Munich,

Germany

Refurbishment of check-in area, ball room,

conference rooms and interior fittings for a new

fitness centre

in an operational hotel

demolition

dry walling

tiling

paintworks

fitting works

flooring

carpentry

textile decoration

fire protection doors

~ 1,03 Mio. € Hilton München Park

Zweigniederlassung der Hilton International Co.

Am Tucherpark 7

80538 München

Germany

Contact

Hilton Berlin

Zweigniederlassung der Hilton International Co.

Kurt Marosky

T +49 30 2023 1232

Starwood

Hotel Prince de

Galles

Paris,

France

Mock-up room screed

dry walling

stucco works

paintworksflooring

doors

carpentry

glass elements

mirrors

GLEEDS

7, rue d’Artois

Fra-75008 Paris

Contact:

GLEEDS

Herr David Grant

+33 40 38 64 24

2018 Page 15 of 17

Page 16: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Hilton Zürich Airport Hotel

Zurich,

Switzerland

3 phase refurbishment of 259 guestrooms including

bathrooms and corridors, executive lounge, meeting

rooms and restaurant

in an operational hotel

demolition

dry walling

natural stone

tiling

paintworks

flooring

carpentry

loose furniture

textile decoration

electric installation

lighting

sanitary installations

heating / air conditioning

~ 6,3 Mio. € Elba I Swiss GmbH

Hohenbühlstrasse 10

8152 Opfikon

Switzerland

Contact:

Chandler KBS

Baukonstruktion & Kostenmanagement Dane

Hutchinson

+49 211 992 101

Hotel Breidenbacher Hof

Düsseldorf, a Cappella Hotel

Düsseldorf,

Germany

Interior fittings for 79 guestrooms, 6 junior suites, 8

executive suites, 2 presidential suites and public

areas.

dry walling

stucco works

natural stone

paintworks

flooring

doors

carpentry

~ 6,5 Mio. € Chandler KBS

Baukonstruktion & Kostenmanagement

Königsallee 11

40212 Düsseldorf

Germany

Contact

Chandler KBS

Baukonstruktion & Kostenmanagement

Craig Maunder

T +49 211 992 101

The Dolder Grand Zürich

Zürich,

Switzerland

Interior fittings for 114 guestrooms and junior suites

including corridors.

dry walling

stucco works

natural stone

paintworks

flooring

carpentry

fire protection elements for

corridors

~ 10,5 Mio. € The Dolder Grand

Kurhausstrasse 65

8032 Zürich

Switzerland

Contact

Itten & Brechbühl AG

Kuno Zimmermann

T +41 796 890 892

2018 Page 16 of 17

Page 17: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Grand Hôtel de Bordeaux

Bordeaux,

France

Interior fittings for 150 guestrooms, public areas and

shopping arcade

dry walling

sealing works

stucco works

natural stone

paintworks

flooring

doors

carpentry

furniture

textile decoration

lighting

~ 13,5 Mio. € SNC Paris Le Havre

33000 Bordeaux

France

Contact

HF Architecture

Henrich Fitger

T +33 671 74 96 47

Hilton Dresden Hotel

Dresden,

Germany

Refurbishment of executive and business floors:

311 guestrooms including corridors, construction of

an executive lounge including business centre and of

a conference centre

in an operational hotel

demolition

dry walling

tiling

paintworks

flooring

doors

carpentry

textile decoration

lighting

~ 2,67 Mio. € Hilton Dresden

An der Frauenkirche 5

01067 Dresden

Germany

Contact

Chandler KBS

Baukonstruktion & Kostenmanagement

Dane Hutchinson

T +49 211 992 101

Crowne Plaza Heidelberg

Heidelberg,

Germany

Refurbishment of 232 guestrooms including corridors. demolition

dry walling

natural stone

tiling

paintworks

flooring

doors

carpentry

furniture

textile decoration

electric installations

lighting

~ 3,0 Mio. € Limnä Hotelbetriebs GmbH & Co. Verwaltungs KG

Kurfürstenanlage 1

69221 Heidelberg

Germany

Contact

Westmont Hospitality Group

Mitchell Binks

T +44 208 944 6666

2018 Page 17 of 17

Page 18: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Luxury Apartments

Divonne-les-Bains,

France

Turnkey construction of 3 residential buildings

comprising 19 luxury apartments

earthworks

building shell

carpentry / roofing

exterior windows

screed

dry walling

sealing works

natural stone, tiling

electrical installations

sanitary installations

heating / ventilation

metal works

flooring

paintworks

doors

wooden staircases

carpentry

fixtures

sanitary objects

elevators

facade works

garages

outdoor facilities

~ 7,8 Mio. € Chandler KBS

Baukonstruktion & Kostenmanagement

Königsallee 11

40212 Düsseldorf

Germany

Contact

Chandler KBS

Baukonstruktion & Kostenmanagement

Craig Maunder

T +49 211 992 101

Grand Elysée Hotel Hamburg

Hamburg,

Germany

Refurbishment of 230 guestrooms and suites

including public areas, ball room, wellness area.

New construction of an annexe building plus

refurbishment of existing areas .

screed

dry walling

sealing works

stucco works

natural stone

tiling

paintworks

flooring

fitting works

doors / fire protection doors

carpentry

mobile partition walls

loose furniture

textile decoration

lighting

~ 11,7 Mio. € Atacasa Grundstücksver-waltungsgesellschaft

mbH & Co

55252 Wiesbaden

Germany

Contact

Anwaltskanzlei Costard

Dr. Andreas Costard

T +49 40 303 88 80

Pride of Hawaii

Cruise liner

Norwegian Cruise Line

Papenburg

Germany

Cruise liner fittings for the areas Italian Restaurant,

Cigar Lounge, Champagne Bar, Tepanyaki Bar, Beer

Bar.

dry walling

natural stone

tiling

fitting works

doors

carpentry

metal ceilings

fire-retarding sealing

~ 1,5 Mio. € Meyer Werft GmbH

Postfach 1555

26855 Papenburg

Germany

Contact

Meyer Werft GmbH

Hannes Wüstnienhaus

T +49 160 471 8541

2018 Page 18 of 17

Page 19: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Norwegian Jewel

Cruise liner

Norwegian Cruise Line

Papenburg

Germany

Cruise liner fittings for the areas French Restaurant,

Cigar Lounge, Champagne Bar, Martini Bar, Beer Bar

dry walling

natural stone

tiling

fitting works

doors

carpentry

metal ceilings

fire-retarding sealing

~ 1,4 Mio. € Meyer Werft GmbH

Postfach 1555

26855 Papenburg

Germany

Contact

Meyer Werft GmbH

Hannes Wüstnienhaus

+49 160 471 8541

Jewel of the Seas

Cruise liner

Royal Caribbean International

Papenburg,

Germany

Ship-Refurbishment for the area Sportsbar. dry walling

natural stone

tiling

fitting works

doors

carpentry

metal ceilings

fire-retarding sealing

~ 500 T€ Meyer Werft GmbH

Postfach 1555

26855 Papenburg

Germany

Contact:

Meyer Werft GmbH

Hannes Wüstnienhaus

+49 160 471 8541

Serenade of the Seas

Cruise liner

Royal Caribbean International

Papenburg,

Germany

Ship-Refurbishment for the area Sportsbar. dry walling

natural stone

tiling

fitting works

doors

carpentry

metal ceilings

fire-retarding sealing

~ 520 T€ Meyer Werft GmbH

Postfach 1555

26855 Papenburg

Germany

Contact:

Meyer Werft GmbH

Hannes Wüstnienhaus

+49 160 471 8541

2018 Page 19 of 17

Page 20: References€¦ · 25hours Hotel Munich The Royal Bavarian Munich, Germany Conversion and renovation of the listed building (carcass works, building services, as well as overall finishing

References

Project Scope of performance Value ClientLots

Hilton München City Hotel

Munich,

Germany

Refurbishment in 3 phases of 493 guestrooms

including corridors, public areas (lobby, reception,

business centre) plus construction of an executive

lounge

in an operational hotel

demolition

dry walling

tiling

paintworks

flooring

doors

carpentry

lighting

technical facility equipment -

HVAC

~ 4,3 Mio. € Hilton International Germany GmbH

Zweigniederlassung München

Rosenheimer Str. 15

81667 München

Germany

Contact

Chandler KBS

Baukonstruktion & Kostenmanagement

Ulf Oebius

+49 211 992 101

Deutsche Lufthansa

First Class Terminal Frankfurt

Airport

Frankfurt,

Germany

Interior fittings for the customer area of the first class

lounge, approx. 1.800 m².

dry walling

sealing works

natural stone

tiling

paintworks

flooring

fitting works

doors / fire protection doors

carpentry

electrical installations

lighting

textile decoration

metal ceiling

technical equipment

~ 2,5 Mio. € Deutsche Lufthansa AG

50679 Köln

Germany

Contact

Architekten K2

Klaus Kampmann

T +49 241 989 033 11

Hilton Düsseldorf Hotel

Düsseldorf,

Germany

Refurbishment of 375 guestrooms and suites

including corridors, public areas (lobby, reception,

bar, restaurant, wellness area, ball room)

in an operational hotel

demolition

masonry

dry walling

natural stone

tiling

paintworks

flooring

doors / fire protection doors

carpentry

textile decoration

~ 8,02 Mio. € Hilton International Germany GmbH

Zweigniederlassung Düsseldorf

Georg-Glock-Str. 20

40474 Düsseldorf

Germany

Contact

Chandler KBS

Baukonstruktion & Kostenmanagement

Andreas Schulz

T +49 211 992 101

2018 Page 20 of 17