MCC PETROLEUM DMCC
Area J Building 3 18th Floor Office No. 30011720 DMCC DUBAI UAE
Reference List
Country Title Project Brief Scope
of Work
Client
Project Duration Contract
Value (US$) Start Finish
Iraq Zubair IPF’s &
Interconnection Piping
Pipeline Rehabilitation Project included extensive E&I Works
PC Basrah Gas Company
2015 x 15,000,000
Iraq Noor Oilfield
Tanks Construction
EPC of 2x5000 m3 Tanks EPC Misson Oil Company
2014 x 5,600,000
Iraq Fao Terminal.
Crude Oil Load-ing Farm
Cable Trays, Conduit Installation, Wire Pulling
EPC
Leighton Offshore / South Oil Company
2014 2014 5,000,000
Iraq
Water Crossings for
The West Qurna Field (2nd Phase)
850 m Water Canal Crossing, 42'' Pipe by Open Cut.
EPC Lukoil
Middle East
2013 2014 8,500,000
Iraq 104 km 48”
Pipeline Con-struction
104 km 48” Pipeline Construction (E&I Works, OHL, Telecom Sys-
tems)
EPC Technoen-gineering
2013 2013 30,000,000
Iraq Garraf CPF
Cable Trays, Conduit Installation,
Wire Pulling, Fire & Gas Detec-
tion, Field Instruments, Cathodic
Protection, Earthing System,
Emergency Communication Sys-
tem, Fiber Optic Networks
EPC Weather-
ford, Petronas
2012 2012 12,000,000
Iraq Bina Bawi CPF Construction of 5,000 barrels per
day Crude Processing Facility PC
Weather-ford,
Petronas 2012 2012 6,000,000
Iraq Basian Refinery
Civil Works
Construction of all civil works for
20,000 barrels per day refinery PC Basian 2012 2013 9,000,000
Iraq Erbil –Turkey Crude Export
Pipeline
Construction of 50 km of 36” pipeline
C KAR Indus-
tries 2012 2013 8,000,000
Iraq Canal Crossing
of Pipeline
Construction of Dual 600 meter 48” Pipeline across Basra area
canal C SCOP 2015 2015 1,300,000
Iraq
MCC PETROLEUM DMCC
Area J Building 3 18th Floor Office No. 30011720 DMCC DUBAI UAE
Iraq Baqouba Gas
Pipeline
32” Gas Pipeline from Naft Khana to Mansouriya Power Plant Sta-
tion (40) km EPC IGC 2011 2012 33,000,000
Iraq Karbala Power Plant Station
8 Fixed Roof Tanks (size 2000 m3) With Two Units and Network
EPC BETA 2011 2012 4,000,000
Iraq Diwaniya
Power Plant Station
8 Fixed Roof Tanks (size 2500 m3) EPC STX 2011 2012 3,500,000
Iraq Stell Structure Superstructure (Steel) Pipe Rack
Inside CPF EPC
CNPCC/CPECC
2011 2012 3,600,000
Iraq FSF Pipeline Construction
6” Flow Line and 16” Trunk Line EPC CNPCC/CPECC
2011 2012 53,000,000
Iraq WS2 Pipeline 24” and 36” Water Pipeline Car-
bon Steel in Ahdeb Oil Field (20) km
EPC CNPCC/CPECC
2010 2011 12,000,000
Iraq Ahdleb Oil Field
Pipeline Phase 1
B1 of EXL 2 and 3, 72 km Crude Oil Pipline 10'' and 72 km Gas
Pipeline 16'' EPC
CNPCC/CPECC
2010 2011 27,000,000
Iraq Ahdleb Oil Field
Pipeline Phase 2
B2 of EXL 3 32 km Gas Pipeline 16''
EPC CNPCC/CPECC
2010 2011 9,000,000
Country Title Project Brief Scope
of Work
Client
Project Duration Contract
Value (US$) Start Finish
Iraq Kut Depot Extension
2 Nos. of 10000 m3 Gasoline Stor-age Tanks-Carbon Steel-Floating Roof Type. Piping Network 6”,
8” and 12” dia.
EPC Oil
Pipeline Company
2008 2009 4,500,000
Iraq Samawa Refinery
3 Nos. of 2000 m3 Diesel Tanks-Fixed Roof Type
EPC Samawa Refinery
2008 2009 1,500,000
Iraq Nasiriya
Basra Gas Pipeline
40 km Gas Pipeline of 42” dia EPC South Oil Company
SOC 2007 2008 12,000,000
Iraq Nasiriya Gas
Pipeline Rehabilitation of 100 km Dry Gas
Pipeline of 42” dia EPC
SOC South Oil
Company 2006 2007 2,000,000
Iraq Mussaib Power
Plant Station
4 Nos. of 6800 m3 Carbon Steel Diesel Storage Tanks-Floating
Roof Type. 2Nos. Demi Raw Water Tanks
(Dome Self-Su port Type)
EPC
South East Texas
Industrial Services
(STIS)
2005 2006 3,000,000
MCC PETROLEUM DMCC
Area J Building 3 18th Floor Office No. 30011720 DMCC DUBAI UAE
Country Title Project Brief Scope
of Work
Client Project
Duration Contract
Value (US$) Start Finish
Iraq Diwaniya Depot
Extension
7 Nos. of 10000 m3 Carbon Steel Diesel Storage Tanks-Fixed and
Floating Roof Type EPC
Oil Pipeline
Company 2005 2006 7,000,000
Iraq Wet Oil
Treatment at Baba Dome
12 km of Piping Network of Differ-ent Sizes 1/2”-32”Dia.
Three Units - 150 KBPD EPC
North Oil Company
NOC 2004 2005 5,500,000
Iraq
Wet Oil Treatment at
Bai Hassan South
12 km of Piping Network of Differ-ent Sizes 1/2”-32”Dia. Two Units - 105 KBPD
EPC North Oil Company
NOC 2003 2004 4,000,000
Iraq Rashidiya
Pipeline 12” Dia 3 km of 12”Crude Oil Carbon Steel
Pipeline EPC
North Oil Company
NOC 2003 2003 450,000
Iraq NaftKhana
Pipeline Contract 2
120 km Crude Oil Pipeline of 12”Dia.- Carbon Steel Type in
Rough Topography. From Iran-Iraq Border Passing by Baqouba to Dowra Refinery in Baghdad-IRAQ
EPC Oil
Pipeline Company
2001 2002 2,500,000
Iraq NaftKhana
Pipeline Contract 1
Boring Works-Horizontal Drilling, Casing and Under Laying for All 120 km Pipeline. From Iran-Iraq Border Passing by Baqouba to
Dowra Refinery in Baghdad-IRAQ
EPC Oil
Pipeline Company
2001 2002 1,300,000