13
Yuan H. A SWOT analysis of successful construction waste management. J Cleaner Prod 2013; 39:1–8. Yuan, H.P., Shen, L.Y., Hao, J.J.L., Lu, W.S., 2011. A model for cost benefit analysis of construction and demolition waste management throughout the waste chain. Resour. Conserv. Recycl. 6, 604-612. Ling YY, Leo KC. Reusing timber formwork: importance of workmen’s efficiency and attitude. Building and Environment 2000; 35 (2):135–43. xde pdf Duran X, Lenihan H, O’Regen B. A model for assessing the economic viability of construction and demolition waste recycling – the case of Ireland. Resources, Conservation and Recycling 2006;46:302–20. xde pdf Lu W., Yuan H., 2011. A framework for understanding waste management studies in construction. Waste Manage. 6, 1252-1260. Suresh Kumar Lachimpadi, Joy Jacqueline Pereira, Mohd Raihan Taha & Mazlin Mokhtar, (2012) Andrew Baldwin, Chi-Sun Poon, Li-Yin Shen, Simon Austin & Irene Wong (2009) Environmental Protection Department (EPD) (2012) Hong Kong Environment 2012. Hong Kong Government.

reference intro+LR

  • Upload
    ain

  • View
    214

  • Download
    0

Embed Size (px)

DESCRIPTION

reference intro+LR

Citation preview

Yuan H. A SWOT analysis of successful construction waste management. J Cleaner Prod 2013; 39:18.Yuan, H.P., Shen, L.Y., Hao, J.J.L., Lu, W.S., 2011. A model for cost benefit analysis of construction and demolition waste management throughout the waste chain. Resour. Conserv. Recycl. 6, 604-612.Ling YY, Leo KC. Reusing timber formwork: importance of workmens efficiency and attitude. Building and Environment 2000; 35 (2):13543. xde pdfDuran X, Lenihan H, ORegen B. A model for assessing the economic viability of construction and demolition waste recycling the case of Ireland. Resources, Conservation and Recycling 2006;46:30220. xde pdfLu W., Yuan H., 2011. A framework for understanding waste management studies in construction. Waste Manage. 6, 1252-1260.Suresh Kumar Lachimpadi, Joy Jacqueline Pereira, Mohd Raihan Taha & Mazlin Mokhtar, (2012)Andrew Baldwin, Chi-Sun Poon, Li-Yin Shen, Simon Austin & Irene Wong (2009)Environmental Protection Department (EPD) (2012) Hong Kong Environment 2012. Hong Kong Government.Poon CS, Yu TWA, Jaillon L. Reducing building waste on construction sites in Hong Kong. Construction Management and Economics June 2004; 22:46170.L. Jaillon, C.S. Poon, Y.H. Chiang (2009)HKEPD (Hong Kong Environment Protection Department). Monitoring of solid waste in Hong Kong. HKEPD; 2007, _https://www.wastereduction.gov.hk/en/materials/info/msw2007.pdf_.

Lu WS, Tam VWY. Construction waste management policies and their effectiveness in Hong Kong: A longitudinal review. Renewable & Sustainable Energy Reviews 2013; 23:21423.Yuan HP, Lu WS, Hao JL. The evolution of construction waste sorting on-site. Renewable and Sustainable Energy Reviews 2013; 20:48390.Legislative Council Panel of the HKSARG, 2006. Progress Report on the Management of Construction and Demolition Materials. Environmental Affairs, 24 April. HKSARG, Hong Kong.CIDB. http://www.cidb.gov.my/v6/?q=en/content/ibs-centre/constructionindustry-master-plan-cimp-malaysia; 2012 [accessed 06.03.12].CIDB. http://www.cidb.gov.my/v6/?q=en/content/ibs-centre/ibs-roadmap-2003-2010; 2011 [accessed 23.08.11].

Effie P, Christopher P, Rory P, Anis AA. Sustainable construction waste management in Malaysia: a contractors perspective. In: Management and innovation for a sustainable built environment; 2011.Hamzah NH, Nafi MNA, Yacob J, Ashari AH, Daud Z, Sulain AS. A study on the acceptance of IBS in construction industry in Kelantan: application of logistic regression analysis; 2010, http://instatmy.org.my/downloads/RCSS10/Proceedings/28P.pdf [accessed 28.05.12].Hamid ZA, Kamar KAM, Zain MZM, Ghani MK, Rahim AHA. Industrialised building system (IBS) in Malaysia: the current state and R&D initiatives. Malaysian Construction Research Journal 2008;1(2):111. xdee pdfTam VWY, Tam CM, Zeng SX, Ng WCY. Towards adoption of prefabrication in construction. Building and Environment 2007b;42(10):364254. xde pdfKibert CJ. The next generation of sustainable construction. Building Research & Information 2007;35(6):595601. Begum RA, Satari SK, Pereira JJ. Waste generation and recycling: comparison of conventional and industrialized building systems. American Journal of Environmental Sciences 2010;6(4):3838.Legislative Council Panel of the HKSARG, 2006. Progress Report on the Management of Construction and Demolition Materials. Environmental Affairs, 24 April. HKSARG, Hong Kong.Begum RA, Siwar C, Pereira JJ, Jaafar AH. A benefit-cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia. Resources, Conservation and Recycling 2006;48:8698. xde pdfTatum C, Vanegas JA, Williams J. Constructability improvement using prefabrication,preassembly, and modularization:. Austin, USA: Bureau of Engineering Research,University of Texas at Austin; 1987. xde pdfChiang Y-H, Hon-Wan Chan E, Ka-Leung Lok L. Prefabrication and barriers to entryacase study of public housing and institutional buildings in Hong Kong. HabitatInt 2006;30:48299.Yee AA, Eng PHD. Social and environmental benefits of precast concrete technology. PCI J 2001;46:149.Aye L, Ngo T, Crawford R, Gammampila R, Mendis P. Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules. EnergyBuild 2012;47:15968. xde pdfZhang X, Shen L, Wu Y. Green strategy for gaining competitive advantage in housing development: a China study. J Cleaner Prod 2011;19:15767. xde pdf

blum cari pdf:Li Z, Shen GQ, Xue X. Critical review of the research on the management of prefab-ricated construction. Habitat Int 2014;43:2409.Tam CM, Tam VW, Chan KW, William CY. Use of prefabrication to minimize construction waste-a case study approach. Int J Constr Manage 2005;0:91101.Riduan Yunus, Jay Yang, 2011CIRIA, 1999. Standardisation and pre-assembly adding value to construction projects. Report 176. CIRIA, London, UK.Lawton, T., Moore, P., Cox, K., Clark, J., 2002. The gammon skanska construction system. In: Proceedings of the International Conference Advances in Building Technology. vol. 2, Hong Kong, China, 46 December, pp. 10731080.Tam VW, Tam C, Ng WC. On prefabrication implementation for different project types and procurement methods in Hong Kong. J Eng Des Technol2007a;5:6880.Tam, V.W.Y., Shen, L.Y., Tam, C.M., 2007c. Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations. Build. Environ. 42 (3), 14711477.Poon CS, Yu TW, Ng LH. A guide for managing and minimizing building and demolition waste. The Hong Kong Polytechnic University; 2001.V. . Mega, Sustainable Cities for the Third Millennium: The Odyssey of Urban Excellence. Springer Science, 2010.B.-G. Hwang and Z. B. Yeo, Perception on benefits of construction waste management in the Singapore construction industry, Engineering, Construction and Architectural Management, vol. 18, no. 4, pp. 394406, 2011.Z. M. Darus, N. A. Hashim, E. Salleh, L. C. Haw, A. K. A. Rashid, S. Nurhidayah, and A. Manan, Development of Rating System For Sustainable Building In Malaysia, Wseas Transactions on Environment and Development, vol. 5, no. 3, pp. 260272, 2009.D. Shiers, J. Weston, E. Wilson, J. Glasson, and L. Deller, Implementing new EU environmental law: the short life of the UK Site Waste Management Plan Regulations, Journal of Environmental Planning and Management, no. July, pp. 120, May 2013.CIPS, How to Develop a Waste Management and Disposal Strategy, United Kingdom, 2007.H. Abanda, J. H. M. Tah, F. Cheung, and W. Zhou, Measuring the embodied energy , waste , CO 2 emissions , time and cost for building design and construction, in Proceedings of the International conference on Computing in Civil and Building Engineering, 2010, no. 2000, pp. 20002005.D. Hou, A. Al-Tabbaa, P. Guthrie, and K. Watanabe, Sustainable waste and materials management: national policy and global perspective., Environmental science & technology, vol. 46, no. 5, pp. 24945, Mar. 2012.A. Vijayaraghavan, C. Yuan, and N. Diaz, Green Manufacturing. Boston, MA: Springer US, 2013, pp. 117152.D. A. Plesea and S. Visan, Good Practices Regarding Solid Waste Management Recycling, The Bucharest Academy of Economy Studies, vol. 12, no. 27, pp. 228 241, 2010.Defra, Government Revew of Waste Policy in England 2011, United Kingdom, 2011.K.-L. Kramer, User Experience in the Age of Sustainability: A Practitioners Blueprint. United States of America: Elsevier, 2012.Department of Environment Affairs, Approach: Waste Hierachy and Regulatory Model, Department of Environment Affairs: Natiopnal Waste Management Strategy, 2010.M. Osmani, Construction Waste Minimization in the UK: Current Pressures for Change and Approaches, Procedia - Social and Behavioral Sciences, vol. 40, pp. 3740, Jan. 2012.WRAP, Achieving Good Practice Waste Minimisation and Management, United Kingdom, 2012.Y. Li and X. Zhang, Web-based construction waste estimation system for building construction projects, Automation in Construction, May 2013.R. Bhagwat, Site Waste Management Practices in Construction Industry in United Kingdom, University of the Aegean, 2008.L. Jaillon, C. S. Poon, and Y. H. Chiang, Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong, Waste Management, vol. 29, no. 1, pp. 309320, 2009.Ben, Construction Waste - Lessons from Hong Kong, Waste Management World, 2013.W. Lu and H. Yuan, Off-site sorting of construction waste: What can we learn from Hong Kong?, Resources, Conservation and Recycling, vol. 69, pp. 100108, Dec. 2012.Hong Kong Housing Authority, Use of Recycled Aggregates, The Government of the Hong Kong Special Administrative Region, 2011. [Online]. Available: http://www.housingauthority.gov.hk/en/business-partnerships/resources/use-of-recycledaggregates.Zhang Chao, Ding Jizhong, Guo Jinsheng. (2002). Use of scrap concrete materials in semi rigid base-course. Journal of Changan University (Natural Science Edition),china, 22,1-4.Chi Sun Poon, Dixon Chan (2006). Feasible use of recycled concrete aggregates and crushed clay brick as unbound road sub-base. Construction and Building aterials, 20,578-585.A. T. W. Yu, C. S. Poon, A. Wong, R. Yip, and L. Jaillon, Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong., Waste management (New York, N.Y.), vol. 33, no. 1, pp. 13846, Jan. 2013.

R. E. Cordato, The Polluter Pays Principle: A Proper Guide for Environmental Policy, 2001.J. Harrison, THE ROLE OF MATERIALS IN SUSTAINABLE CONSTRUCTION, vol. 30, 2006.D. Hoornweg, T. T. Leader, P. Lam, and M. Chaudhry, Waste Management in China : Issues and Recommendations May 2005, 2005.M. A. Shelbourn, D. M. Bouchlaghem, C. J. Anumba, P. M. Carillo, M. M. K. Khalfan, and J. Glass, Managing Knowledge In The Context Of Sustainable Construction, vol. 11, no. December 2005, pp. 5771, 2006.K. Chung, I. Plant, and D. Works, Site Management Plan for Trip Ticket System, 2007.S. Chung and C. W. H. Lo, Evaluating sustainability in waste management: the case of construction and demolition, chemical and clinical wastes in Hong Kong, Resources, Conservation and Recycling, vol. 37, no. 2, pp. 119145, Jan. 2003.Environmental Protecting Department, The Government of the Hong Kong Special Administrative Region, Laws & Regulation: Environmetal Legislation, 2012.National Bereau of Statistics of China, China Statistical Yearbook, 2009.R. Li and S. Liu, Municipal Solid Waste Management in China, Roskilde University Digital Archive, 2010.Danish Environmental Protection Agency, Waste in Denmark, 2012.R. B. H. Tan and H. H. Khoo, Impact assessment of waste management options in Singapore., Journal of the Air & Waste Management Association (1995), vol. 56, no. 3, pp. 24454, Mar. 2006.A. Proverb, The Singapore Green Plan 2012, Singapore, 2012.Y. L. Wang, Sustainable Infrastructure and its Application in Singapore, Advanced Materials Research, vol. 450451, pp. 10691073, Jan. 2012.K. C. Chew, Singapores strategies towards sustainable construction, The IES Journal Part A: Civil & Structural Engineering, vol. 3, no. 3, pp. 196202, Aug. 2010.H. Yuan, L. Shen, and J. Wang, Major obstacles to improving the performance of waste management in Chinas construction industry, Facilities, vol. 29, no. 5/6, pp. 224242, 2011.P. Villoria Saez, M. del Ro Merino, A. San-Antonio Gonzlez, and C. Porras-Amores, Best practice measures assessment for construction and demolition waste management in building constructions, Resources, Conservation and Recycling, vol. 75, pp. 5262, Jun. 2013.Bossink, A.G. and Brouwers, H.J.H. (1996), Construction waste: quantification and source evaluation, Journal of Construction Engineering and Management, Vol. 122 No. 1, pp. 55-60.Dantata, N., Touran, A. and Wang, J. (2005), An analysis of cost and duration for deconstruction and demolition of residential buildings in Massachusetts, Resources, Conservation and Recycling, Vol. 44 No. 1, pp. 1-15.Hadjieva-Zaharieva, R., Dimitrova, E. and Buyle-Bodin, F. (2003), Building waste management in Bulgaria: challenges and opportunities, Waste Management, Vol. 23 No. 8, pp. 749-61.Poon, C.S., Yu, A.T.W., Ng, L.H., 2003. Comparison of low-waste building technologies adopted in public and private housing projects in Hong Kong. Eng. Constr. Architect. Manage. 10 (2), 8898.Esin, T., Cosgun, N., 2007.Astudy conducted to reduce construction waste generation in Turkey. Build. Environ. 42 (4), 16671674.Hongping Yuan, 2013. Key indicators for assessing the effectiveness of waste management in construction projectsLi W, Xu SH. The building junk status quo research. Construction Technology2007;1:4803.Alam Flora Sdn. Bhd. (2007). Recycle Now! You can make a difference. Retrieved from http://www.alamflora.com.my/V3/recycling1.html [Accessed 3rd January 2010]Nadzri Yahaya. (2007). Solid Waste Management. National Solid Waste Department. Conference on Climate Change Preparedness. Retrieved from http://inet02.undp.org.my/uploads/c_Solid_Waste_ Management_MHLG.pdf [Accessed 23rd December 2009]Japan International Cooperation Agency (2006). The study on national waste minimisation in Malaysia.Papargyropoulou, Preece, Padfield and Anis (2011) - SUSTAINABLE CONSTRUCTION WASTE MANAGEMENT IN MALAYSIA: A CONTRACTORS PERSPECTIVEFishbein, B.K.., Building for The Future: Strategies to Reduce Construction and Demolition Waste in Municipal Projects,http://www.informinc.org/cdreport.html (12 January 2008).Kang, X.P. (2005), The research of reducing methods of construction waste, Masters thesis, Shenzhen University, Shenzhen (in Chinese).

http://www.bca.gov.sg/professionals/iquas/iso14000.html

http://www.wrap.org.uk/content/building-firms-set-benefit-bre%E2%80%99s-smartwaste-tool-and-wrap%E2%80%99s-waste-landfill-reporting-portal-

K. Siddiqui, The Political Economy of Development in Singapore, Research in Applied Economics, vol. 2, no. 2, pp. 131, 2010.J. Marusiak, Sustainable construction: Waste wanted, Asia Pacifics Sustainable Business Community, 2012. [Online]. Available: http://www.ecobusiness.com/news/sustainable-constructionwaste-wanted/. [Accessed: 08-Jun-2013].