Chairman of
Beijing IWHR Technology Co., Ltd.
Dr. De Kuan Wang
Progress and Challenges
in Hydropower Automation in China
Modernization of Hydropower In China
In the past two decades, China has built hundreds huge and
uncountable medium and small sized hydropower stations.
Modernization of Hydropower In China
No. Name of Power Station Number and
capacity of units
SCADA Supplier
1 Left bank of 3G 14x700=9800 Alstom
2 Right & underground of 3G 18x700=12600 H9000 BITC
3 Xiluodu 18x700=12600 H9000 BITC
4 Xiangjiaba 8x800=6400 H9000 BITC
5 Longtan 9x700=6300 NARI
6 Nuozhadu 9x650=5850 NARI
7 Jinpin II 8x600=4800 NARI
8 Xiaowan 6x700=4200 NARI
9 Pubugou 6x600=3600 H9000 BITC
10 Jinpin I 6x600=3600 NARI
All hydropower stations, including the old one built earlier, are equipped or
rehabilitated with automation systems from governors, excitations,
SCADAs for generation control to condition monitoring systems.
SCADA for Generation Control
Condition Monitoring
Operator Training System
Water Management & Dispatching
Management Information System
Governor
Excitation
Protection
Sensors & automates
Fire, security and access control
CCTVDam Safety Monitoring
Auxiliary Equipment Control
Time Synchronizing
Sluice Gate Control
Electricity Accounting
Automation Solution for Hydropower
Modernization of Hydropower In China
… …
… …
Most of the power stations along one river are remotely controlled by one
centralized control center of the basin, with no-man on-duty in the
stations.
Modernization of Hydropower In China
No. Name of River Basin Number and
capacity of units
SCADA Supplier
1 3G-Gezhouba cascade 25400 ABB
2 Downstream of Jinsha 19000 H9000 BITC
3 Upstraem of Yellow River 12640 H9000 BITC
4 Yuan River etc. 8384 H9000 BITC
5 Lancang River U/A NARI
6 Wujiang River U/A NARI
7 Yalong River U/A NARI
Most of the automation systems for huge hydropower stations are now
supplied by BITC, NARI and a few by others.
Automation not only improves the reliability and quality of the
energy supplied, but also alleviates the hardness of the daily job
with higher efficiency.
Modernization of Hydropower In China
The hydropower in China will focus more and more on efficient
operation and management, to become more competitive to meet the
requirements of market.
So “smart hydropower”, “conditional maintenance”, “centralized
control of hydropower with wind and photovoltaic” will be the key
issues of automation in the coming years.
Challenges in hydropower automation still exist in following respects:
Trends and challenges
in Hydropower Automation
There are now so many automation systems, supplied by different
suppliers, running in the same hydropower plant, so their
interconnection, to share information and transmit control
instructions, becomes a mission more and more fastidious.
Should we link them? and how?
What is the optimal connection strategy?
These are the questions one must ask oneself. Different schemes
are under consideration or trial in China.
How to interconnect automation systems?
I think for the moment it’s still difficult for one supplier to supply a set
complete of automations for hydropower because of the gap between
applications.
So a hierarchical, distributed, relatively independent and
interconnected structure may be realistic
How to interconnect automation systems?
Maintenance in China:
How to predict the conditions of equipment?
Most of the big hydropower : with monitoring systems.
But great attention must be pay on more effective analysis and
evaluation methods.
Conventional analysis techniques for condition assessment :
“Smart hydropower” : a fashion in China.
Some boast themselves as smart one already
while many others try to take their initials.
But what does it really mean “smart hydropower”?
Some define them by extending the concept of “smart grid”.
How to define “smart hydropower”?
A smart hydropower plant:
Good example the progress made in China.
Three Gorges: the biggest hydropower station ever built in the world,
with 32 units of 700MW each, installed respectively in left-bank, right-
bank and underground power stations.
All equipment for left-bank of Three Gorge, including automation, is
supplied by foreign company, with joint-venture or joint-bidding with
domestic company.
Late for the right-bank and underground: domestic manufacturers,
SCADA: supplied by BITC with its H9000 V4.0.
Progress in Three Gorges
Progress in Three Gorges
The most impressive work recently done by BITC is the automation
systems for Xiangjiaba and Xiluodu, 200km and 360km respectively
to Chengdu, together the centralized control system for cascade
dispatching center (CDC) located in Chengdu.
Chengdu
Xiluodu
200km
Xiangjiaba
360km
Progress in Three Gorges
Dispatching and
control center of
Chengdu of Jinsha
Cascade
The generating units Xiluodu and Xiangjiaba are transferred to CDC
after 72h test run and remotely operated by CDC, while the local
control center is no-man-on-duty.
Thus the target of “unified dispatching and remote control” of Xiluodu,
Xiangjiaba at CDC is achieved.
DVG2000
Revolution in Governor
Elimination:
Integrating a set of standard digital logical cartridge valves.
electro-hydraulic converter
main distribution valve
a new type of governor / IWHR ,
Remarkable progress in:
Regulation behavior:
energy saving for it low leakage
Speedy + Precision
DVG2000 governor for hydro-turbine units
Revolution in Governor
Operational:
for >500 units
biggest unit: 250MW
all types of units:
francis, kaplan
pelton, bulb
China & abroad
No. Name of
power station
Country Unit type Unit capacity
MW
1 Shuikou Fujian, China Kaplan 200
2 Tishirin Syria Kaplan 105
3 Honghua Guangxi, China Bulb 38
4 Zhexi Hunan, China Francis 250
great future It’s a revolution!
DVG2000 governor for hydro-turbine units
Thank you for your attention!