,/ S'~ MAHAVITARAN Maharashtra State Electricity Distribution Co, Ltd. Maharashtra State Electricity Distribution Co. Ltd. Prakashgad, Plot No.G-9, Bandra (East), Mumbai - 400051 (P) 26474753, (0) 26474211 126472131, Fax- 26472366,Website : www.mahadiscom.in Ref. No. PR-3/Tariff/ NI 11 23 4 CIRCULAR No. i <? "i Dated: 5 APR 2014 Sub: FACfor the month of January 2014 to be billed in the month of April 2014. Ref: Letter No. MSEDCL/PP/FAC/L1/ received via email dt. 04/04/2014. The Competent Authority has accorded approval for levy of category wise and slab wise FACfor the month of January 2014 to be billed in the month of April 2014. The category wise and slab wise FACto be billed in the month of April 2014 has been indicated in "Annexure "A". ~~------ Chief Engineer (Commercial) Copy s. w. r. to: The Secretary, Maharashtra Electricity Regulatory Commission, 13 th Floor, Cuff Pared Colaba, Mumbai, Copy s. w. r. to: The Managing Director, MSEB, Holding Company Ltd. The Managing Director, M.S.E.D. Company Ltd. The Managing Director, M.5.E.T. Company Ltd. The Managing Director, M.5.E.P.G. Company Ltd. The Director, (Finance), M.S.E.D. Company Ltd. The Director, (Operations), M.S.E.D. Company Ltd. The Director (V & S), M.S.E.D. Company Ltd. Copy s. w. r. to: The Executive Director (Commercial), MSEDCL,Mumbai. The Executive Director (Corporate Planning), MSEDCL, Mumbai. The Executive Director (Project), MSEDCL, Mumbai. The Executive Director (H.R.), MSEDCL, Mumbai. The Regional Executive Director - I, MSEDCL, Kalyan. The Regional Executive Director - 11, MSEDCL, Pune. The Regional Executive Director - Ill, MSEDCL, Nagpur. Copy f. w. c. s. to:- 1) The C.G.M. (IT), MSEDCL, Prakashganga, Bandra Kurla Complex. 2) The Chief Engineers of All 0 & M Zones, MSEDCL. Copy to: As per mailing list

Ref. No. PR-3/Tariff/ NI 2 3 Dated: • 5 APR 2014€¦ · Ref: Letter No. MSEDCL/PP/FAC/L1/ received via email dt. 04/04/2014. The Competent Authority has accorded approval for levy

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ref. No. PR-3/Tariff/ NI 2 3 Dated: • 5 APR 2014€¦ · Ref: Letter No. MSEDCL/PP/FAC/L1/ received via email dt. 04/04/2014. The Competent Authority has accorded approval for levy

,/

S'~MAHAVITARANMaharashtra State Electricity Distribution Co, Ltd.

Maharashtra State Electricity Distribution Co. Ltd.Prakashgad, Plot No.G-9, Bandra (East), Mumbai - 400051

• (P) 26474753, (0) 26474211 126472131, Fax- 26472366,Website : www.mahadiscom.in

Ref. No. PR-3/Tariff/ NI 1 1 2 3 4CIRCULAR No. i <? "i

Dated: • 5 APR 2014

Sub: FACfor the month of January 2014 to be billed in the month of April 2014.

Ref: Letter No. MSEDCL/PP/FAC/L1/ received via email dt. 04/04/2014.

The Competent Authority has accorded approval for levy of category wise and slab wise FACforthe month of January 2014 to be billed in the month of April 2014.

The category wise and slab wise FACto be billed in the month of April 2014 has been indicated in"Annexure "A".

~~------Chief Engineer (Commercial)

Copy s. w. r. to:The Secretary, Maharashtra Electricity Regulatory Commission,13th Floor, Cuff Pared Colaba, Mumbai,

Copy s.w. r. to:The Managing Director, MSEB, Holding Company Ltd.The Managing Director, M.S.E.D. Company Ltd.The Managing Director, M.5.E.T. Company Ltd.The Managing Director, M.5.E.P.G. Company Ltd.The Director, (Finance), M.S.E.D. Company Ltd.The Director, (Operations), M.S.E.D. Company Ltd.The Director (V & S), M.S.E.D. Company Ltd.

Copy s. w. r. to:The Executive Director (Commercial), MSEDCL,Mumbai.The Executive Director (Corporate Planning), MSEDCL,Mumbai.The Executive Director (Project), MSEDCL,Mumbai.The Executive Director (H.R.), MSEDCL, Mumbai.The Regional Executive Director - I, MSEDCL, Kalyan.The Regional Executive Director - 11, MSEDCL, Pune.The Regional Executive Director - Ill, MSEDCL, Nagpur.

Copy f. w. c. s. to:-

1) The C.G.M. (IT), MSEDCL, Prakashganga, Bandra Kurla Complex.2) The Chief Engineers of All 0 & M Zones, MSEDCL.

Copy to:As per mailing list

Page 2: Ref. No. PR-3/Tariff/ NI 2 3 Dated: • 5 APR 2014€¦ · Ref: Letter No. MSEDCL/PP/FAC/L1/ received via email dt. 04/04/2014. The Competent Authority has accorded approval for levy

..:

Copy f. w. c. to:The Chief Engineer (Dist.)/(IR)/(L.M.)/(Special Project Cell)/(APDRP)/ Power Purchase/ MSEDCL, Mumbai,The Chief Legal Adviser, MSEDCL, Mumbai,The Chief Project Manager (MIS), Mumbai.The Chief General Manager (Tech. Estt.)/(F.& A.)/(IA)/(Personnel)/(Corp. Communication), MSEDCL,Mumbai,The Chief Engineer (TRD), MSEDCL,Nasik,The Company Secretary, MSEDCL,Mumbai,The General Manager (SB)/ (Corp. Account)/ (Inspection), MSEDCL, Mumbai,The R.A. 0., Government Audit, Prakashgad, Mumbai,The Superintending Engineer (TRC)MSEDCL, Mumbai.The O.S.D. to Managing Director, MSEDCL, Mumbai,The E.O. (HRD), MSEDCL,Mumbai,The Dy. Director (V, S & E), MSEDCL,Pune / Nagpur / MumbaiThe G.M., Computer Centre, MSEDCL,Mumbai,Pune/Nagpu r/ Aura ngabad/ Akola/Nasik/Vashi/Bha nd up/Kalya n/Kol hapu rThe System Analyst, Computer Centre, MSEDCL,Bhandara/Buldhana/Dhule/Jalgaon/Latur/Nanded/Satara/Solapur/PenThe Programmer, Computer Centre, MSEDCL,Ahmadnagar/Amravati/Chandrapur/Palghar/Ratnagiri/Sangli/YavatmalAll Flying Squads, MSEDCL,

Copy f. w. c. to:1) The Chief Engineer (Elect.), Public Work Dept. Govt. of Maharashtra, Adm. Building,

3,dfloor, Ramkrishna Chemburkar Marg, Chembur (East), Mumbai - 400 071.2) The Commissioner, (Labour), Office of the Commissioner of Labour,

G.O.M, Commerce Centre, Tardeo, Mumbai- 34.3) The Economic Officer, Govt. of India, Ministry of Labour Dept. & Employment,

Labour Bureau, 71, B Shram Safalya,N. G. Acharya Marg, Chembur,Mumbai-400 071.

4) Vice President- Bhiwandi Operations, Torrent Power Ltd., Old Agra Road, Anjur Phata,

Bhiwandi-421 302.

5) M/s. SPANCOLtd., Nagpur.

6) M/s. G.T.L. Ltd., Aurangabad.

7) M/s. Crompton Greaves Ltd., Jalgaon.

Copy to:-

1) The Superintending Engineers of All 0 & M Circles, MSEDCL.2) The Executive Engineers of All 0 & M Divisions, MSEDCL.3) The Dy. Executive Engineers of All 0 & M Sub-Divisions, MSEDCL.4) The Assistant Engineers of All 0 & M Sub-Divisions, MSEDCL.

C:\RBB\FAC\Circular_FAC_ApriI14.docx

Page 3: Ref. No. PR-3/Tariff/ NI 2 3 Dated: • 5 APR 2014€¦ · Ref: Letter No. MSEDCL/PP/FAC/L1/ received via email dt. 04/04/2014. The Competent Authority has accorded approval for levy

"ANNEXURE "ACategory-wise & Slab-wise FAC For the Month of

April 2014

Sr.FAC to be charged

No.Category in billing month of

April 2014

LT Category (Paise/kWH)

1 LT I DomesticA BPL (0-30 Units) 2.45B Consumption> 30 Units Per Month

iD-lOO Units 10.78ii 101-300 Units 17.04iii 301-500 Units 13.84iv 500 -1000Units 22.79v above 1000 units 29.10

2 LT II-Non Residential or Commercial

A 0-20 kW

a 0-200 Units 20.87b Above 200 Units 26.98B >20- 50 kW 33.28C >50 kW 43.68

3 LTIIIPWW

A 0-20 kW 7.03B 20-40 kW 9.68

C 40-50 kW 13.44

4 LT IV Agriculture

A LT Af!. Metereda Metered Tariff (Including Poultry

4.23Farms)

5 LT V Industrial

A 0-20 KW 19.58B Above 20 KW 29.93

6 LT VI Streetlight

A Grampanchayat, A, B & C Class12.46

Municioal CouncilB Municipal Corporation Areas 16.16

7 LT VII- Temporary ConnectionA Temporary Connections (Religious) 11.09B Temporary Connections (Other 51.13

Purposes)8 LT VIII Advertisement & Hoardings 74.98

9LT IX - Crematoriums & Burial

14.15Grounds

Unmetered Consumer Category AG

LT Category Rs./HP/Month

4 LT IV Agriculture

B LT Ag Un-metered

a Zones with Consumption norm >13184.91

hrs/HP/annumb Zones with Consumption norm <1318

2.28hrs/HP annum

Category-wise & Slab-wise FAC For the Month ofApril 2014

Sr.FAC to be charged in

No.Category billing month of April

2014

LT Category (Paise/kWH)

10 Public ServicesA 0-20 KW

i 0 - 200 Units 18.19ii Above 200 Units 26.74B > 20 kW and < 50 kW 26.43C > 50 kW 27.96

Category-wise & Slab-wise FAC For the Month ofApril 2014

Sr.FAC to be charged in

No.Category billing month of April

2014

HT Category (Paise/kWH)

1 HT-I Industries

A Continuous (Express Feeders) 17.11B Non-Continuous (Non Express 16.41

Feeders)C HT-I Seasonal 26.69

2 HT-II Commercial

A Express Feeder 25.22

B Non-express Feeder 24.933 HTP III Railways 21.04

4 HT IV- Public Water Works (PWW)

A Express Feeders 14.50

B Non Express Feeders 12.36

5 HT V Agricultural 13.616 HT VI Bulk Supply

A Residential Complex 11.71

B Commercial Complex 27.86

7 HT VII Temporary Supply

A Religious 11.09

BOther 43.50

8 HT IX Public Services

A Express Feeder 27.86

B Non-express Feeder 25.969 HT X Ports 33.18