04/18/23 © The University of Sheffield
3
Background
• 13,000 PCs on campus
• Over 100 IT services
• Two data centres
• Centralised and distributed printing
04/18/23 © The University of Sheffield
4
PC Energy usage
• Work done by Chris Cartledge/Ian Jenkinson on processor wattage
• Work on monitor energy usage needed
• Work on other components (disc drives, memory?)
• Thin client solutions
04/18/23 © The University of Sheffield
6
Printing
• 50 million sheets of paper used 2007-2008
• Only 28% of paper recycled
• 2010 – 98% ‘recycled or environmentally preferable’
• 835,000 Kwh p/a; 450 tonnes CO2
Printing• Environmental Print Review
• Recommendations
• Print Audit
• Print submissions software
• Pulling together print/photocopying under CiCS
• Student Printing• Prepay replaced old collect and pay system
04/18/23 © The University of Sheffield
7
04/18/23 © The University of Sheffield
8
Data Centres
• Main activities• Virtualisation
• Simple fixes
• Air-conditioning
04/18/23 © The University of Sheffield
9
Virtualisation
• Pre 2010• 50ish physical Intel
servers
• 100ish physical Sparc servers
• Doesn’t include HPC
• 2010• 20ish physical Intel
servers inc 4 VM boxes
• 110 VMs
• 50ish physical Sparc machines
• 4 Sparc zone hosts
• Further consolidation on the way
04/18/23 © The University of Sheffield
10
VM Savings
• 1 physical server c£250 p/a energy
• 1 Virtual server c£750 p/a energy
• 4 virtual servers running 110 VMs
• Savings = £500 * 106 = £10,600 p/a
04/18/23 © The University of Sheffield
11
Virtualisation - disk
• Pre 2007• 15 different disk
enclosures
• Directly attached storage on Novell and windows servers
• 2007-2010• 2 physical disk
enclosures
• Staged removal of DAS
• Nearly all storage now on NetApp disks
04/18/23 © The University of Sheffield
12
Simple fixes
• HPC – low energy memory
• Lower energy processors (AMD HE)
• Environmental considerations part of every project
• Air conditioning
04/18/23 © The University of Sheffield
15
Free Cooling project
• Hot aisle containment
• Chiller units only active when ambient temperature rises above input temperature
• Savings of c£60,000 p/a approx
• Capital cost may be between £200k-£400k
• Pump-priming money may be available (Salix)