REDMOND CENTRAL CONNECTOR MASTER PLAN May 10 ,2011

Redmond Central Connector

Embed Size (px)

DESCRIPTION

Redmond has been shaped by the railroad that ran through the City’s heart since 1889 when the Seattle, Lake Shore & Eastern Railway (SLS&E ) began to serve Redmond. The City and its economy matured and grew around the railroad. Today the railroad is gone, yet the railroad right-of-way remains, currently as a no man’s land dividing the Downtown and running through the beautiful Sammamish Valley. The Redmond Central Connector will reclaim the abandoned railroad corridor by creating a regional trail with park and cultural amenities that becomes a dynamic destination for people to experience Redmond and create community. The Connector will be a catalyst for economic growth in Downtown by bringing more people to Redmond to live, work, socialize, and recreate.

Citation preview

Page 1: Redmond Central Connector

REDMOND CENTRAL CONNECTORMASTER PLAN May 10 ,2011

Page 2: Redmond Central Connector
Page 3: Redmond Central Connector

Strengthening Redmond as....

an increasingly urban community | a city strongly connected to naturea small town rooted in history | a forward-looking city shaping the world’s future

R E D M O N D C E N T R A L C O N N E C T O RM A S T E R P L A N

Page 4: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | IntRoduCtIon

forEword

The railroad has been at the heart of Redmond since 1889, before the City incorporated in 1912. It brought commerce, and with that, jobs and people. As

the City grew, the railroad began to divide the City—the north from the south, the new from the old, and eventually split the commercial area in two. Over

the past 15 years, the City has continued to develop and is now an urban center. In 2008, the railroad abandoned the tracks in Redmond.

Now the rail corridor is owned by the City, and the Redmond Central Connector will play a key role in the revitalization of Downtown Redmond. This

place will build community through enhanced pedestrian and transit connections, personal interaction, and opportunities to connect businesses with

customers. Redevelopment of this corridor allows us to connect to the heart of our downtown and build a stronger community for our citizens.

In the future, Downtown Redmond will have a vibrant mix of businesses, residences, and open spaces for recreation and relaxation. The City is taking

tangible steps toward realizing its vision for Downtown Redmond, signaling its commitment to private developers to encourage continued investment in

the neighborhood. The implementation of the comprehensive plan policies and master plans for proposed developments in Downtown will:

• Create an economically healthy, vibrant Downtown that emphasizes pedestrian activities 18 hours a day.

• Develop a cohesive system of public places in Downtown that attract people and build community through interactive events and features.

• Link the north and south parts of the Downtown through various pedestrian and vehicular connections.

• Improve the aesthetic appeal of Downtown through enhanced landscaping, integration of iconic and interactive art, thoughtful preservation of historic

elements, highlight local landmarks, and develop gateways and gathering places.

• Increase mobility and promote environmental quality by providing for convenient transit, pedestrian, and bicycle routes to and from the Downtown.

Downtown Redmond is creating choice by becoming a vibrant urban center with a variety of dining, shopping, recreating and living options. As a regional

growth center, more than 6,000 new residents and 4,000 new workers are expected in Downtown Redmond by 2020. In preparation for this growth,

private development has recently completed nearly 1,500 new residential units in Downtown.

Page 5: Redmond Central Connector

To support and encourage future developments of this nature, the City is planning projects that make Downtown Redmond a more attractive place to live

and work, including:

• Continued acquisition and development of Downtown Central Park, which is integral to attracting residents and businesses to Downtown and the

future hub for entertainment and recreation.

• Implementation of the Downtown East/West Corridor projects, which include an overhaul of the Downtown street grid system, eliminating one-way

streets and construction of complete streets.

• Development of the Redmond Central Connector—a regional trail and linear park, utility corridor, and transit way for East Link light rail.

The Redmond Central Connector could see up to 50,000 users a month during peak season. The goal is to make the Connector a year-round destination

and even attract users to local businesses and cultural attractions. Bringing tens of thousands more people to the Redmond Central Connector is an

economic benefit to all Downtown businesses.

In the end, this project will be a key element to growing a sustainable urban center in Redmond by making significant aesthetic improvements in

Downtown, increasing access to trails, parks and art; improving transportation alternatives; enhancing the environment through stormwater and park

projects; and spurring economic growth.

Yours Truly,

Mayor John Marchione

Page 6: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | IntRoduCtIon

Page 7: Redmond Central Connector

Collaborating Partners

Leonard McGhee, Sound Transit

Monica Clarke, King County

Kevin Brown, King County

Consultants

Berger Partnership, Landscape Architecture & Urban Design

KPG, Engineers

Weinstein A|U, Architects & Urban Designers

Perri Lynch, Artist

Norton-Arnold & Company, Public Involvement

GeoEngineers, Environmental Assessment

BOLA, Historic Interpretation

PB, Light Rail Consultation

ACknowledgements

City of Redmond

Mayor John Marchione

Craig Larsen, Director of Parks and Recreation

Bill Campbell, Director of Public Works

Rob Odle, Director of Planning

Greg Byszeski, Deputy Director of Parks and Recreation

Ron Grant, Deputy Director of Public Works

Lori Peckol, Long Range Planning Manager

Carolyn Hope, Senior Park Planner

Joel Pfundt, Principal Transportation Planner

Mike Haley, Senior Engineer

Gary Lee, Senior Planner

Pete Sullivan, Senior Planner

Tim Cox, Principal Planner

Mike Paul, Manger of Construction Management

Rob Crittenden, Manager Transportation Operations

Page 8: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | IntRoduCtIon

Cool Image! teaseR...

Page 9: Redmond Central Connector

Contents

PRojeCt oveRvIewthe vIsIon

the sIte

uRban analysIs

desIgn PRInCIPles

desIgn FRamewoRkFluCtuatIons

landIngs

Islands & eddIes

tIes

the desIgn2016: a vIsIon

desIgn evolutIon: 2012-2025

sammamIsh valley

aRt IntegRatIon

desIgn ConsIdeRatIonsPlannIng guIdelInes

tRansPoRtatIon

PlantIng ConsIdeRatIons

mateRIals and FuRnIshIngs

stoRmwateR/low ImPaCt develoPment

sIte gRadIng

9595

99

105

106

107

108

3740

64

78

82

2324

31

32

33

17

12

4

8

Page 10: Redmond Central Connector
Page 11: Redmond Central Connector

PRojeCt oveRvIew

1

Page 12: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | PRojeCt oveRvIew

2

the Redmond CentRal ConneCtoR - vIsIon

Page 13: Redmond Central Connector

PRo

jeC

t o

veR

vIew

3

The master plan process started by engaging every City department, the Parks and Trails

Commission, the Arts Commission, the Pedestrian and Bicycle Advisory Committee, the

Planning Commission, the Design Review Board, the Lodging and Tax Advisory Committee, the

City Council, the Redmond Historical Society, neighboring businesses and property owners,

and partner agencies including Sound Transit and King County. Hundreds of members of the

community were also engaged through public open houses, helping to shape the project as a

reflection of Redmond. (Public involvement summaries are included in Appendix D.)

This master plan process has resulted in two distinct components. The first was the Infrastructure

Alignment Plan (IAP) (Appendix A), which was developed in coordination with partner agencies

to identify where different infrastructural elements would be located within the corridor to facilitate

and not interfere with the long-term development of the corridor. The IAP includes memorandums

of understanding from partner agencies and environmental and critical areas analyses. The IAP

was adopted by the Redmond City Council in October 2010 and became the basis from which

the remaining master plan work was developed. The IAP is available for review at: http://www.

redmond.gov/PlansProjects/Parks/RedmondCentralConnector/documents/.

The second component of this planning effort is a master plan design that gives form to the City’s

vision for the Connector. What has emerged is not just a trail to Downtown and through the City,

but a new destination filled with the energy and vitality of the community that surrounds it. The

Connector will unite Downtown Redmond as a cohesive whole and eventually extend through the

Sammamish Valley and beyond. Beyond physical connections, it will be an experience by drawing

people in to enjoy the City’s culture, art, and environment. The Downtown section of the Connector

will enliven Downtown, bring commerce, reinforce community, and create a strengthened

residential and commercial heart for the City. The Sammamish Valley section of the Connector will

enhance the pedestrian experience through one of the most beautiful view corridors in the City and

improve access to many businesses along Willows Road and West Park.

thE vision

Redmond has been shaped by the railroad that ran through the City’s heart since 1889 when the

Seattle, Lake Shore & Eastern Railway (SLS&E ) began to serve Redmond. The City and its economy

matured and grew around the railroad. Today the railroad is gone, yet the railroad right-of-way

remains, currently as a no man’s land dividing the Downtown and running through the beautiful

Sammamish Valley. The Redmond Central Connector will reclaim the abandoned railroad corridor

by creating a regional trail with park and cultural amenities that becomes a dynamic destination for

people to experience Redmond and create community. The Connector will be a catalyst for economic

growth in Downtown by bringing more people to Redmond to live, work, socialize, and recreate.

This corridor has long been recognized for its importance to a growing Redmond and the City

adopted comprehensive planning policies and goals relating to the acquisition and development of

the railroad corridor for nearly a decade. In 2004, the City adopted comprehensive planning policies

to support the many possible uses of the corridor that are generally described below.

The City recognizes the value of the former rail corridor to serve the community as a site for valued

and needed infrastructure, including:

• A regional trail.

• Sound Transit’s planned light rail transit way.

• Improved transportation connections.

• Providing local and regional utility needs such as King County, Puget Sound Energy (PSE), etc.

The City’s vision for the corridor was bold, imagining an inspired public open space converting miles

of unused space into a corridor that integrates a trail, open space, historical elements and art into the

community as a whole, by:

• Creating a new and exciting entry to Downtown.

• Improving the corridor’s aesthetic appeal through park and art amenities.

• Honoring Redmond’s history.

• Incorporating iconic, interactive art.

• Linking the corridor to Central Park and other Downtown attractions.

• Enhancing the economic vitality of Downtown.1

In June 2010, the City of Redmond acquired the Redmond section of the former Burlington Northern

Santa Fe (BNSF) corridor and immediately began master planning the corridor. The Redmond Central

Connector Master Plan accomplishes all of the Redmond Comprehensive Plan goals for the corridor.

1 More City policies from the Comprehensive Plan can be found at http://www.codepublishing.com/WA/redmond/

CompPlan/PDF/index.html

Page 14: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | PRojeCt oveRvIew

4

The Redmond Central Connector is a 3.89-mile-long linear property ranging in width from

approximately fifty feet to one hundred feet. It starts from the end of King County’s East

Lake Sammamish Trail, just west of the SR 520/SR 202 interchange and Bear Creek, to

NE 124th Street. The corridor passes both natural and cultural features and qualities that

make it a uniquely inspiring series of spaces that the Redmond Central Connector can

draw upon in creating a trail and linear park connection unlike any other.

Marymoor ParkSR 520

Redmond TownCenter

Downtown Park

Anderson Park

Heron Rookery

Redmond Way

NE 85th St.

NE 90th St.

Avondale Way

Bear Creek Pkwy

Sammamish Valley Park 60 Acres

Park

154t

h A

ve N

E

NE 116th St.

Willow

s Road N

E

NE 124th St.

Sam

mam

ish

Riv

er T

rail

Bear

Cre

ek Tr

aildowntown

samm

amIsh

valley

the Redmond ConneCtoR sIte

Page 15: Redmond Central Connector

PRo

jeC

t o

veR

vIew

5

downtown & sAmmAmish vAllEy The Redmond Central Connector Master Plan establishes a common vision for both the

Sammamish Valley and Downtown, yet recognizes the different physical and cultural

characteristics between the two areas. The Sammamish Valley area has more natural

qualities and will be less intensively developed, keeping with a more typical design

for multi-use trails in this region. There are currently no significant projects planned or

funded within the Sammamish Valley length of the Connector. Conversely, the Downtown

has numerous public and private projects in various stages of planning, design and

construction including the construction of a regional stormwater trunk line, the extension

of 161st Avenue NE and 164th Avenue NE across the corridor, construction of two

mixed-use residential developments adjacent to the corridor, and eventually construction

of light rail. In 2012, the first phase of the Redmond Central Connector regional trail

will be constructed from Bear Creek to the Sammamish River. With the immediacy of

funded projects within the Downtown section of the Connector and regional planning

considerations such as light rail, the master plan provides a more detailed vision for

the Downtown portion of the Redmond Central Connector than the Sammamish Valley

section.

Page 16: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | PRojeCt oveRvIew

6

downtown

The Downtown Study Area runs from the east bank of the Sammamish River to the west bank of Bear Creek. This stretch of

trail includes seven zones: Sammamish River Crossing, Higher Ground, Station, Promenade, Open Space, Neighborhood,

and Creekside. The Sammamish River Crossing and Higher Ground consist of elevated railroad grades perched on

abutments west of 161st Avenue NE and east of 170th Avenue NE. Redmond’s Downtown historically occupied the northern

side of the railroad grade, and buildings turned their front sides away from the railroad. The southern side of the railway

corridor includes from west to east a large City-owned property on the station block, NE 76th Street and Redmond Town

Center from the Promenade to the Neighborhood zone, and commercial development and natural areas in Creekside. While

the developers of the Redmond Town Center and the City took efforts to integrate the shopping center with the historical

Downtown area by connecting street grids and having new buildings providing active storefronts toward Downtown,

the corridor proved to be a stubborn and significant barrier between the two areas that still exists today. The creation of

the Redmond Central Connector as a trail and linear park provides the opportunity to knit the two pieces of Downtown

Redmond together in a way that they have never been before, providing seamless bike and pedestrian connections and

complementing City transportation planning efforts to unite the two areas, notably the Downtown East/West Corridor Study

(DEWCS).

sAmmAmish vAllEy

The Sammamish Valley Study Area starts at the northern City limits of NE 124th Street and extends south to the east bank

of the Sammamish River. The character of the corridor is predominantly rural, in spite of its location along a high volume

road between three major metropolitan centers (Kirkland, Woodinville and Redmond). The trail parallels the west edge of

the Sammamish Valley with views of natural and agricultural landscapes, evergreen forested hillsides to the east, and the

Cascade Mountains beyond. The southern portions of the valley become increasingly developed with office parks and light

industrial uses before reaching the Sammamish River. This is a historically important part of the City with the Sammamish

River being a resource to Native American tribes and later to pioneers who farmed the valley on the banks of the river.

Dow

ntow

n St

uDy

AreA

Zon

eS

Sammamish River Crossing

Higher Ground

Station

Promenade

Open Space

Neighborhood

Creekside

Bear

Cre

ek T

rail

Sam

mam

ish

Riv

er T

rail

Page 17: Redmond Central Connector

PRo

jeC

t o

veR

vIew

7

Page 18: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | PRojeCt oveRvIew

8

uRban analysIs

Existing and planned projects shape the Redmond

Central Connector site, particularly in the Downtown,

where multiple projects will change the corridor quickly.

The master plan process has considered the many

conditions of this evolving City and the resulting design

is shaped to both accommodate and benefit from this

change.

City And sound trAnsit EnvEloPEs

At the onset of the master planning process, the City

worked diligently with Sound Transit to determine the

needs for current and future public works projects

within the corridor in order to optimize the planning

of the regional stormwater trunk line and regional trail

within the corridor. The City envelope for development

is the northern portion of the corridor and the Sound

Transit envelope for development is the southern

portion of the corridor and part of NE 76th Street.

These envelopes are documented in detail in the

Infrastructure Alignment Plan (IAP) (Appendix A) and

Section 5.2. Figure 1.2.1 shows the general location

and a cross section of the envelopes.

Figure 1.2.1

neAr

-ter

m e

nvel

ope

long

-ter

m e

nvel

ope

Page 19: Redmond Central Connector

PRo

jeC

t o

veR

vIew

9

Crossings And ConnECtions

The master plan has been

developed recognizing the

Connector’s importance as a multi-

modal transportation hub. The

Connector will be a pedestrian and

bicycle corridor and will connect

with numerous other pedestrian

connections such as other trails,

pedestrian-friendly streetscapes,

mid-block connections, sharrows,

and bike lanes, which will provide

a range of route alternatives for the

diversity of bike users, ranging from

family cyclists to advanced cyclists.

In its existing state, the Connector is

crossed by three street crossings;

however, another three street

crossings are planned as part of the

Downtown East-West Corridor Study

(DEWCS) and numerous mid-block

and service street connections will

provide pedestrian access to the

Connector.

exiS

ting

veh

icul

Ar c

onne

ctio

nS

exiS

ting

AnD

pro

poSe

D m

ulti

-moD

Al c

onne

ctio

nS

exiSting AnD propoSeD non-motoriZeD connectionS

Page 20: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | PRojeCt oveRvIew

10

Corridor foCusEd growth

In its existing state, few buildings front on

the corridor, with many placing service

areas toward the historically undesirable

railroad. New developments are already

starting to respond to the future Connector,

a trend that will surely continue as new

projects front on the corridor in more active

ways, infusing it with energy.

neAr

-ter

m f

ront

Age

long

-ter

m f

ront

Age

viEws And viEw Corridors

The Connector’s location in the heart of Downtown near the intersection

of several different City grids presents the opportunity to enhance visual

connections between key civic features such as Downtown Central Park

to the Connector or the current transit station to the Connector. Several

new and planned streets end at the corridor, becoming important spaces

along the Connector and providing the opportunity for iconic elements

to reinforce street-end views. The Redmond Central Connector will

eventually bring more people to the Sammamish Valley, where there are

spectacular views of key natural features from the Sammamish River to

Mount Rainier and the Cascade foothills and mountains.

look

ing

nort

h Do

wn

160t

h Av

e ne

to

clev

elAn

D St

.

Page 21: Redmond Central Connector

PRo

jeC

t o

veR

vIew

11

historiCAl AnAlysis And intErPrEtAtion

Historically, Redmond emerged as a crossroads that became a

village and then a town engaged in the production, harvesting and

transportation of natural resources. It became a place from the

presence of a river and the placement of a rail line and the activities

of growing and moving resources that came from the land, and

from the hands and then the minds of its occupants. The Redmond

Central Connector is the evolution of the former rail corridor which

played a significant role in shaping Redmond, a history that should

be honored.

How does this history inform the future vision of the Redmond

Central Connector Master Plan? How does the design use and

re-purpose the specific history of Redmond? It does this by

identifying broad patterns of the past and the present that remain

the backdrop of daily living. History, through interpretation in the

plan, becomes a means of identifying the special circumstances

and soul of this place.

The master plan authenticates the character of Redmond. The

design does not “caption” the past or place artifacts out of

context as historic symbols in a new setting. Moreover, it does

not attempt re-creation. Rather it interprets the elements of the

rail corridor, early agriculture, and the emergence of technology

by incorporating abstracted features of the past in new, inventive

ways. In doing so, the Connector will promote curiosity, and

encourage residents and visitors to discover the unique aspects of

history that made the City what it is today.

Page 22: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | PRojeCt oveRvIew

12

the ConneCtoR evolves oveR tIme

The City of Redmond has long had a vision for how the Connector could become an

integral part of the City. The master plan gives form to that vision with a framework

of recommendations and design guidance to lead the corridor forward to reality. The

change to the corridor from its existing state to the full vision of the master plan is

significant with many elements that are beyond the City’s control including developments

by private parties (adjacent property owners) and other public agencies (Sound Transit).

The master plan provides three distinct milestones on the way to realizing the full vision

for the corridor.

2012

The first phase of development is a trail connecting the Bear Creek Trail and Sammamish

River Trail through Downtown, creating the first physical connection and laying the

foundation for the character and culture of the trail experience to be developed in the

future.

2016

The 2016 vision is the build-out of the Connector to the degree the City can control it,

respecting conditions and realities as the City now understands them to be. The design

includes the space south to NE 76th Street (as no light rail is yet constructed) and

properties along the north edge of the Connector are evolving with many existing corridor

uses by neighboring property owners (primarily as surface parking) still remaining.

2025

The 2025 vision is the ultimate build out of the corridor including the completion of the

light rail transit way and station in the heart of the City. The northern properties will evolve

with new development fronting the corridor bringing commerce and activity, and more

street and pedestrian connections to the Connector. By this time, all corridor leases will

end, returning the space to the City as public open space. 2012

Page 23: Redmond Central Connector

PRo

jeC

t o

veR

vIew

13

2016 2025

Page 24: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | PRojeCt oveRvIew

14

the ConneCtoR evolves oveR tIme2012 2016

Page 25: Redmond Central Connector

PRo

jeC

t o

veR

vIew

15

2025

Page 26: Redmond Central Connector
Page 27: Redmond Central Connector

desIgn PRInCIPles

2

Page 28: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn PRInCIPles

18

make It Redmond: Past, PResent, FutuRePRInCIPles

Several overriding opportunities emerged throughout

the master plan design process and were embraced by

the design team, City staff and the public. These ideas

have inspired and guided the design of the master plan

and should continue to shape the implementation of the

Redmond Central Connector.

Make the Connector unique to Redmond. Honor and celebrate

Redmond’s past, but do not try to artificially recreate it. Acknowledge

Redmond of today and welcome its evolution into the future by

making the Connector a forward-looking place. Celebrate and

welcome the opportunity for the Connector to evolve over time for a

future we cannot predict.

how it might manifest itself in implementation:

Save and reuse historic elements from the railroad in new and

imaginative ways to bring history to life and give them new use.

Celebrate connections to existing historic structures such as the

Justice White House and to others in Downtown through connections

beyond the corridor. Create a structure for celebrating history through

integrated art, to be implemented and changed over time, allowing

responsiveness to the current cultural climate.

not just a PlaCe wIth aRt, a PlaCe that Is aRt

The Connector presents the opportunity not only to house art, but

to be art and to be a catalyst to shape an ever more artistically

engaged community.

how it might manifest itself in implementation:

The master plan is shaped at its most basic structure by the art-

driven concept of Fluctuations, detailed in Section 3.0. Within the

Connector there are numerous layers of art and art opportunities,

ranging from art integrated into the design of functional elements

of the corridor, permanent commissioned pieces of art to changing

curated collections. Required design elements in the Connector

such as bollards, furnishings and visual utility elements should

be completed in a more artful way, starting with site restoration

after installation of the trunk line producing inspired landforms and

interim art where seeded meadow would typically suffice. Imagine

the corridor as a catalyst for Redmond becoming home to artists

and their studios.

Page 29: Redmond Central Connector

des

Ign

PR

InC

IPle

s

19

make It magnetIC. . . ConneCt the CommunIt y

Create design elements that provide visual interest and invite physical

interaction. This magnetic quality should encourage users of the

corridor to be engaged, to linger longer in specific spaces, and can

also be a means to encourage visitors to move down the Connector to

more distant areas beyond their planned destination. These corridor

qualities will also influence the unique design of private development

along the Connector.

how it might manifest itself in implementation:

Imagine human-scale building blocks that users of the corridor can

move to make their own creations. Imagine a stormwater feature

where you control the flow of water. Imagine a zen-like garden

where you create never before made patterns. Imagine a puzzle that

requires and inspires you to walk the whole of the corridor to solve

the challenge. Imagine furnishings and canopies that can be moved,

opened and closed by you to respond to sun, shade and rain.

The physical connections made by the Connector are key to

physically connecting the City. The more ambitious and rewarding

goal is for the Connector to create connections between people. The

Connector will create experiences that bring strangers together in

sharing a common experience and making personal connections that

might otherwise not occur.

how it might manifest itself in implementation:

Interactive creations can connect people by drawing individuals in yet

requiring more than one person to fully activate the artwork or park

element. Imagine a game that requires recruiting multiple players to

play. Imagine mobile elements that require multiple people to move

them.

The confines of the corridor are not enough to realize the vision for

the Connector. The City around it must do its part by activating the

corridor and broader Downtown with the commerce and activity

that comes with it. The Connector can be both a catalyst for and a

beneficiary of new commerce and the urban activity that comes with it

as new businesses choose to front on Redmond’s iconic public space

and people solicit those businesses and activate the surrounding park

spaces.

how it might manifest itself in implementation:

Buildings that currently turn their back on the Connector will be re-

imagined to front on it. A range of appropriate commercial uses such

as restaurants, athletic clubs, galleries and artist studios will spill out

of buildings to outdoor spaces, blurring the line between the public

Connector and the adjacent private developments. Those attracted to

Downtown Redmond for its retail and cultural quality will enhance their

Downtown experience with a stroll down the Connector.

Catalyst FoR CommeRCe

Page 30: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn PRInCIPles

20

It’s easy to imagine a lively, charged Connector bustling during

daylight hours; yet in the Northwest during much of the year our skies

are dark for more than 15 hours a day and much of that time is when

key social activities occur, when we expect the City to come to life as

a bustling hub of commerce and activity. The Connector embraces

the opportunity to be even more engaging in the evening than during

the day. Beyond mitigating the darkness of evening with ample light,

the Connector seeks to utilize light as one of its defining experiential

elements.

how it might manifest itself in implementation:

Zone-based lighting and lighting strategies assure that there are a

number of different lighting treatments along the corridor. In some

places the levels of light are specific and performance-based, such

as at intersections to meet defined guidelines. At locations more

distant from intersections the lighting can be more subjective, while at

significant “events” along the trail the lighting is a powerful part of the

Connector experience, possibly including interactive light elements

that complement art or are art in themselves.

It’s easy to imagine a lively, charged Connector bustling during

daylight hours; yet in the Northwest during much of the year our skies

are dark for more than 15 hours a day and much of that time is when

key social activities occur, when we expect the City to come to life as

a bustling hub of commerce and activity. The Connector embraces

the opportunity to be even more engaging in the evening than during

the day. Beyond mitigating the darkness of evening with ample light,

the Connector seeks to utilize light as one of its defining experiential

elements.

how it might manifest itself in implementation:

Zone-based lighting and lighting strategies assure that there are a

number of different lighting treatments along the corridor. In some

places the levels of light are specific and performance-based, such

as at intersections to meet defined guidelines. At locations more

distant from intersections the lighting can be more subjective, while at

significant “events” along the trail the lighting is a powerful part of the

Connector experience, possibly including interactive light elements

that complement art or are art in themselves.

CelebRate the weatheR exPeRIenCe the nIght

The Connector, as with all parks, will be a heavily used and sought

after destination in times of dry weather, and particularly so in warmer

weather. The opportunity of the Connector is to continue to be that

destination year round, continuing to be a gathering place and

catalyst for community life in all types of weather. Instead of simply

trying to mitigate what might be considered inclement weather, the

Connector seeks to celebrate it and use it as one of the elements that

gives the Connector its identity.

how it might manifest itself in implementation:

Rain… it’s in our DNA and the corridor seeks to celebrate it in a

way that Redmondites will say, “it’s raining, let’s go down to the

Connector!” The Connector provides strategic overhead weather

protection to allow pedestrian links in the City with building canopies,

freestanding pavilions and even artwork. Integral to the experiential

design of the Connector are low impact development strategies

that utilize stormwater to energize the site even as they provide

environmental benefit. Imagine stormwater from all adjacent

structures being routed down facades facing the Connector to

provide water features that celebrate the rainfall.

CaPtuRe the sky

The Connector is a significant space in the heart of the City, yet the

park and trail experience gets as narrow as 30 feet between the

buildings and future light rail transit way. Properties on the north side

of the Connector may reach 65 feet or higher, and light rail catenary

structures to the south can reach as high as 30 feet. Recognizing the

narrow, linear quality and surrounding height, the treatment of the

space above the corridor becomes a critical opportunity to enhance

the corridor experience, celebrating the “urban canyon” quality, or

helping to mitigate it.

how it might manifest itself in implementation:

Portions of the Connector could be deliberately kept free of vertical

and overhead obstructions, maximizing the valued open space to the

sky as a welcomed relief. Conversely some spaces might create an

overhead presence, be it lighting, vegetation, overhead canopy or art,

emphasizing the space as an outdoor room both utilizing adjacent

verticals and mitigating them. Another opportunity is to utilize the

space over the Connector for park elements, particularly art, which

might not best fit on the ground, helping turn people’s eyes to the sky.

Page 31: Redmond Central Connector

des

Ign

PR

InC

IPle

s

21

Page 32: Redmond Central Connector
Page 33: Redmond Central Connector

desIgn FRamewoRk

3

Page 34: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn FRamewoRk

24

stRengthenIng Redmond as...

An increasingly uRban community | A city strongly connected to natuRe

A community rooted in hIstoRy | A FoRwaRd-lookIng city shaping the world

a FluCtuatIon Is:

• a state of ongoing change

• a wave-like motion

• a critical combination of events

• the motion of fluid, usually water, when collected in an artificial or natural cavity

FluCtuatIons

thIs Image Is an exPloRatIon by PeRRI lynCh, the masteR Plan’s aRtIst, oF the Idea oF

FluCtuatIons, whICh gReatly InFluenCed the desIgn FoR the Redmond ConneCtoR.

Through the master plan process, two powerful juxtapositions about Redmond emerged, one physical and one

cultural. The master plan embraces the ever changing fluctuation of these juxtaposed conditions.

Page 35: Redmond Central Connector

des

Ign

FR

am

ewo

Rk

25

Page 36: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn FRamewoRk

26

a seRIes oF vaRyIng CondItIons

Marymoor Park

SR 520

Redmond TownCenter

Downtown Park

Anderson Park

Heron Rookery

Redmond Way

NE 85th St.

NE 90th St.

Avondale Way

Bear Creek Parkway

Sammamish Valley Park 60 Acres Park

154t

h A

ve N

E

NE 116th St.

Willow

s Road N

E

NE 124th St.

Sam

mam

ish

Riv

er T

rail

Bear

Cre

ek

Redmond Way

natu

Ral

natuRal

natuRal

uRban

uRban

uRban

Page 37: Redmond Central Connector

des

Ign

FR

am

ewo

Rk

27

PhysiCAl fluCtuAtions

Redmond is an increasingly urban community filled with human activity and development,

yet Redmond is also a City that is ringed and tied together with the natural environment

that surrounds it. The Redmond Central Connector exemplifies these conditions. From

the north:

• Natural: In the Sammamish Valley rural and natural conditions dominate the

experience feeling well removed from the City.

• Urban: West Park provides a glimpse of Redmond’s development, yet with a lower

density than Downtown, and the area does not yet front on the corridor.

• Natural: The Sammamish River crossing and the approaching abutment (from west

of 154th Avenue NE to Redmond Way) is perched above the surrounding City and

immersed in trees.

• Urban: From 161st Avenue NE to 170th Avenue NE, the corridor is energized by

existing and planned new developments, and crossed by six planned or existing

intersections mixing all modes for traffic, including pedestrians, bikes, cars and more.

• Natural: The Bear Creek Crossing immerses the corridor in a restored natural

landscape.

• Urban: The trail passes through the SR 520 interchange and emerges in Southeast

Redmond, connecting to the East Lake Sammamish Trail.

CulturAl fluCtuAtions

Redmond has worked hard to maintain its small town feel and character, yet the

community and its residents are shaping the future of our world. Simply put, Redmond is

small town/big tech.

• Small Town: Redmond’s Downtown core, centered on Leary Way, is a reflection of

its historic small town character. One- and two-story buildings and historic structures

are filled with locally owned and supported businesses. With the development of

Redmond Town Center, the City avoided the creation of another typical regional mall,

instead pioneering the trend toward lifestyle centers, creating a development style

that reflects the values of Redmond. Redmondites foster a sense of pride in their

community as regionally unique and aspire to define their City on their own terms, not

on the expectation or perceptions of others.

• Big Tech: Redmond is shaping the way the entire world sees itself and interacts

with one another. Redmond is home to technological visionaries Microsoft, Digipen,

Aerojet, Nintendo, more than half of the world’s gaming companies, and dozens

of other forward-looking companies that will shape our lives tomorrow. Beyond the

presence of these companies is the social contribution of their workforce who makes

Redmond home, bringing with them a diversity of backgrounds and a spirit that

makes the City an incubator for new ideas that will shape our future.

These juxtapositions, between natural and urban, and between small town and big

tech, are positive and an ever-changing balance between one another and represent

fluctuations within the Redmond Central Connector.

uRban

Page 38: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn FRamewoRk

28

These fluctuations give form to the corridor through the character and experiential quality of elements throughout the corridor, predominately through the fluctuations between Redmond’s

character as both natural and urban, and a small town yet forward-looking and shaping the world.

exPeRIentIal FluCtuatIons

sammamIsh RIveR beaR CReekdowntown

Page 39: Redmond Central Connector

des

Ign

FR

am

ewo

Rk

29

othEr fluCtuAtions shAPing thE Corridor

Machined/Crafted Passive/Active Open/Enclosed

Stable/Dynamic Light/Dark Planted/Wild Hardscape/Softscape

Fixed/Evolving

Page 40: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn FRamewoRk

30

sPatIal FluCtuatIons

landIngs tIesIslands & eddIes

Fluctuations also give form to the corridor as physical elements. The design framework consists of a vocabulary of features and

spaces that collectively make up the Connector. Although each feature serves a practical function for ensuring a safe, interesting

trail experience, their composition and considerations for integrated art express the character of Redmond and contribute to the

creation of the corridor as something more than just a trail.

Page 41: Redmond Central Connector

des

Ign

FR

am

ewo

Rk

31

landIngsLandings are major events along the Connector, and contained within the corridor. These spaces are infused with integrated art to produce a dramatic aesthetic when

seen from afar and a strong experience from within, drawing people to the corridor and encouraging them to gather and linger. The spaces are typically located in mid-

block locations and aligned with existing or planned street-end connections with Cleveland Street. Landings may include sculptural landscapes of earthworks, canopies,

lighting features, and water features to create signature moments and punctuated points of interest and connectivity along the corridor. Each landing is a uniquely different

experience that is meaningful and engaging, yet when experienced and considered as a collective whole, provides a greater understanding of Redmond’s unique social

and environmental character.

Page 42: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn FRamewoRk

32

Islands & eddIesIslands and eddies are secondary elements and events along the Connector, complementing but not competing with landings,

providing small spaces that add visual and experiential interest. Recognizing how the flow of people along the corridor is inherently

linear, islands and eddies provide relief from that flow as places for pause and escape. Islands could include landscape, site

furniture, art, fountains, canopies, pavilions and more. Eddies are inseparably tied to islands, places where the flow of people in the

corridor slows and gathering naturally occurs and is supported with seating and other discoveries that enrich the space.

Page 43: Redmond Central Connector

des

Ign

FR

am

ewo

Rk

33

tIesJust as railroad ties connect two separate rails into a functioning whole, the ties in the Connector are linear design elements that create

physical and visual connections across the corridor to produce a more cohesive, functioning corridor that is woven into the City’s urban

fabric. The ties are expressed in a number of ways to serve a variety of functions. They may be flush, extruded or elevated. The ties

are rhythmic elements that provide the visual cues and physical space necessary for trail and park users to intuitively slow down and

respond to the changes and options that are present along the trail, such as approaching landings and intersections.

Page 44: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | desIgn FRamewoRk

34

Page 45: Redmond Central Connector

des

Ign

FR

am

ewo

Rk

35

fluCtuAtions ArE rootEd in rEdmond

The concept of fluctuations from impression, to experience, to physical space is physically anchored in the geography of Downtown Redmond, inspired

from existing conditions and integrated in the master plan design.

Page 46: Redmond Central Connector
Page 47: Redmond Central Connector

the desIgn

4

Page 48: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

38

the desIgnthe downtown study aRea

thE rEdmond CEntrAl ConnECtor ExPEriEnCE

The Downtown Study Area is a series of zones shaped by different physical

characteristics, growth and activity patterns (both urban and natural) that exist

now and will evolve into the future. The zones include:

• Sammamish River Crossing and Higher Ground

• Station and Promenade Blocks

• Open Space

• Neighborhood Blocks

• Creekside

The design of these zones is a response to the unique existing and evolving

conditions that surround them, yet their design is tied together with common

elements. This vision of the downtown area focuses on the 2016 Vision showing

the build-out of the corridor to the degree the city can control it, respecting

conditions and realities as the city now understands them to be. This vision

presents the NE 76th Street corridor in roughly its current use and configuration,

and typically reflects adjacent privately owned properties as they exist now or

with development proposals already underway. The Downtown Study Area is

presented moving from west to east from the Sammamish River to Bear Creek.

thE rEdmond CEntrAl ConnECtor’s Evolution

The Connector will undergo a significant evolution to move from its current state

to fully realize the City’s vision for what it will become. The master plan provides

a framework for that evolution to occur, with design elements that provide

physical cues to guide its evolution, as well as a flexible planning framework to

guide future decisions and development that are beyond resolution at this time.

This framework for evolution is presented as two additional milestones of the

Connector’s development, 2012 and 2025, and the transitions that will occur

between those visions:

• 2012 Plan

• The 2016 Vision

• Transitioning to 2025

thE sAmmAmish vAllEy study ArEA

The development of the Redmond Central Connector in the Sammamish Valley

will proceed on a longer term and yet to be established timetable. Its schedule

for development will be honed as opportunities present themselves or new

priorities and funding opportunities emerge. Because of the longer term timetable

and undefined variables, a single vision for the Sammamish Valley is presented

(Section 4.4) and provides for a number of options and flexibility for development

as future conditions are further defined.

Page 49: Redmond Central Connector

the

des

Ign

39

2012The first phase of development is a trail connecting the

Bear Creek Trail and Sammamish River Trail through

downtown, creating the Connector’s first physical

presence and laying the foundation for the character

and culture of the trail experience to be developed in the

future. This vision reflects estimated scope for a Phase 1

project that is currently funded.

2016 vIsIon...

The 2016 vision is the build-out of the Connector to the

degree the city can control it, respecting conditions and

realities as the city now understands them to be. The design

includes the space south to NE 76th (as no light rail is yet

constructed) and properties along the north edge of the

Connector are evolving with many corridor leases and

encroachments.

...tRansItIonIng to 2025The ultimate realization of the City’s vision for the Connector,

East Link Light Rail ties the heart of the City to the broader

region as part of a new NE 76th Street. Adjacent properties

have been redeveloped fronting on the corridor with lively

edges that complete and merge with the Redmond Central

Connector.

Page 50: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

40

the desIgn: 2016the Redmond CentRal ConneCtoR

sammamIsh RIveR tRestle & hIgheR gRound the statIon

Redmond Way

161st ave ne

samm

amish

RiveR

161st ave ne

beaR cReek pkWy.

Redmond Way

Page 51: Redmond Central Connector

the

des

Ign

41

the PRomenade oPen sPaCe neIghboRhood stRoll CReeksIde

164th ave ne

166th ave ne

LeaRy Way

ne 76th st.

170th ave n

e

beaR cReek tRaiL

Page 52: Redmond Central Connector

2012

2016

2025

2012

2025

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

42

sammamIsh RIveR CRossIng & hIgheR gRound

Crossing the Sammamish River Trestle is one of the highlights of the Connector,

providing views to the river, down the corridor, and to the evolving City beyond.

Trestle railing has integrated art and historic interpretation elements while the new

decking preserves the effect of the heavy timber spacing and feeling of height.

Ascending the north side of the trestle abutment, the Sammamish River Spur ties

the Connector to the Sammamish River Trail, both in ramp and stair connections,

anchored in a plaza along the Sammamish River Trail that provides a place for

pause and rest while providing intuitive clues and signage for the Redmond

Central Connector.

exIstIng today....

Page 53: Redmond Central Connector

the

des

Ign

43

tRansItIonIng to 2016

Page 54: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

44

154th avenue ne to 161st avenue ne

The Sammamish River crossing and the higher ground that leads to it are a

powerful experience, defining a space the master plan call the “Higher Ground.”

While in the midst of humming urban activity, the combination of the higher

ground’s height and the trees that have reclaimed its slopes provides a feeling of

placid natural escape from the surroundings, as though perched in a tree canopy.

This zone and Creekside to the east, at Bear Creek, provide “bookends” that

highlight Redmond’s strong connection to the natural environment and create

transitions into the City’s urban Downtown. The design reclaims the historic

sammamIsh RIveR CRossIng & hIgheR gRound

railroad grade as the trail and seeks to preserve and enhance the unique qualities

of the route, improving the forests that line the trail, adding access points to the

City below and providing unique experiences and vistas from the higher ground.

2012

2016

2025

2012

2025

downtown key maP

Redmond toWn centeR

ne 76th st.

beaR cReek pWy.

cLeveLand st.

LeaR

y W

ay

166th ave ne

164th ave ne

170th ave n

e161s

t av

e n

e

Redmond Way

sam

mam

ish

Riv

eR

beaR

cRe

ek

Page 55: Redmond Central Connector

the

des

Ign

45

Trail wayfinding signage identifies the Redmond Central Connector, provides direction to Downtown and amenities, and provides information about trails and bicycle routes in the Redmond area.

The historic and iconic Sammamish River crossing retains its iconic trestle, which is re-decked to allow safe crossing while honoring its unique character and experience, making it a “landing” and providing art and interpretation to celebrate the history of Redmond.

The “Sammamish Spur” consists of visual portals, an accessible ramp, and stairs create a gateway to the City from the Sammamish River Trail and provide for an iconic entry to the Connector and higher ground.

Redmond Way Crossing is an oddly introverted experience despite its perch, unlike the Sammamish River trestle, and becomes an opportunity for art to both benefit from and mitigate the obscured quality of crossing the bridge, perhaps including lighting and a cover over the bridge. (Eventually this bridge might be replaced due to a stormwater and road regrading project allowing increased transparency and improved views to the City.)

Visual portals and stairs at the Redmond Way Crossing create a gateway to the City and an iconic entry to the Connector, linking

from the street to the top of the higher ground, while the East Portal also provides a secondary ADA accessible path connecting to the

trail near 161st Avenue NE.

Perches provide areas for escape and pause from the trail, cantilevering off the higher ground and providing views to the surrounding community.

The trail alignment is perched on the higher ground and narrows to as little as 10 feet.

Existing deciduous and evergreen trees on the higher ground are maintained and enhanced

for long-term forest health.

Stairs connect streets and mid-block access points to the trail; in time, potentially linking to adjacent redeveloped properties.

New development at 161st Ave NE includes a smaller scale pavilion anchoring the corner with retail and a

plaza creating a mixing zone for all trail users crossing 161st Ave NE.

The higher ground “touches down” in the heart of Redmond, at the plaza east of 161st Avenue NE, and

future Sound Transit station. This is a transition area where the wooded hillside gives way to open sloping grass and views eastward along corridor and into the

City.

161st ave ne

sammamish RiveR

cLeveLand st.

Redmond Way

beaR cReek pkWy.

Page 56: Redmond Central Connector

2012

2016

2025

2012

2025

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

46

the statIon

exIstIng today....

Page 57: Redmond Central Connector

the

des

Ign

47 tRansItIonIng to 2016

tRansItIonIng to 2025

Page 58: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

48

The station block will ultimately be the most intensively used of the Redmond

Central Connector as it becomes the terminus for East Link Light Rail, bringing

thousands of riders a day. Until light rail arrives, the block is a valued link between

Downtown and Redmond Town Center. The block also links Downtown with the

recreational riches of the City, connecting to the Heron Rookery, the Town Center

Open Space, and the Bear Creek and Sammamish River Trails. In setting the

tone for the future light rail station, the design for the block includes a paved

linear plaza that incorporates the mixed-use trail along with canopies and retail

the statIon

pavilions with station-like architectural character. The future light rail station is

“claimed” with playful topography and planting interconnected with paths and

canopies suggestive of the spacing and rhythm of the future platform. This space

is envisioned as an art platform for displaying works created by artists in the

community and with the community, and becoming a tool to promote and build

support for the Redmond Connector.

2012

2016

2025

2012

2025

downtown key maP

Redmond toWn centeR

ne 76th st.

beaR cReek pWy.

cLeveLand st.

LeaR

y W

ay

166th ave ne

164th ave ne

170th ave n

e161s

t av

e n

e

Redmond Way

sam

mam

ish

Riv

eR

beaR

cRe

ek

Page 59: Redmond Central Connector

the

des

Ign

49

The new 161st Avenue NE intersection provides connections to and from the Heron Rookery trail that provides a southern connection to Dudley Carter Park and the Sammamish River Trail as well as a northern connection to Cleveland Street and Old Town.

The rhythm of ties increases approaching the end of the park blocks, intuitively warning and slowing those on the Connector approaching intersection

points.

A single iconic “Heritage Tree” becomes a visual terminus of both the higher ground and the Downtown section of the Connector.

Evergreen groves are used throughout, providing year-round visual interest and

buffering, bringing their ever-visible presence in Redmond into the heart of

the City.

Ties reach out into the community, including connecting the future Downtown Park north of Cleveland Street.

Brown Street is transformed to a shared street where cars and pedestrians safely co-mingle, and its design draws people between Downtown Central Park on Cleveland Street and the Connector.

Brown Street “Jewelbox” provides a small-scale retail pavilion to infuse the Connector with commerce and its associated vitality and strengthens the connection to Cleveland Street.

New buildings provide service/parking entry at mid-block connections between Cleveland Street and the Connector.

Artfully designed canopies provide weather protection, places for gathering, potential uses for Saturday Market vendors or other street vendors, and opportunities for inspired lighting to welcome Connector users in all weather and conditions.

An interim forest edge of densely planted trees encloses the south edge of the Connector on the City-owned former King County shop site. This will provide a visual buffer to any interim uses, such as a proposed temporary parking lot.

As a City-owned property, the “Shop Site” can be graded and prepared for any number of interim uses, from a grassy meadow that can become an interim home to Redmond events (Saturday Market, art sales, Derby Days, etc.) or an interim parking lot. However, the long-term goal for this property is for a performing arts center or similar civic use that will provide an economic benefit to the City.

The future light rail station is occupied by landscaped mounds and depressions (potential rain gardens) interconnected with paths and canopies suggestive of the spacing and rhythm of the future station platform, while creating an interim “art platform” for displaying works created by artists in the community.

As the visual terminus of Brown Street, a grassy berm invites interaction, seating for planned or spontaneous events and a passive spot for escape.

161st ave ne

LeaRy Way

cLeveLand st.

beaR cReek pWy.

ne 76th st.

Page 60: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

50

The promenade block has the opportunity to be the most urban of the Redmond

Central Connector, particularly in the near-term, forging a strong link between

the historic heart of Redmond and Redmond Town Center. This block is a space

infused with art, commerce and activity, making it a connection as well as a

destination with spaces for people to gather and stroll. The role of adjacent

developments immediately abutting this block and close by is critical, providing

retail and commercial frontages that enliven the Connector with uses that invite

people in and encourage them to linger. With the intensity of use and activity on

the PRomenade

these blocks, the Connector is predominately paved with the character of an

urban plaza through which the mixed-use trail has been routed and delineated,

but also integrated. The design creates conditions that allow for safe bike and

pedestrian behavior for such an intensively used “mixing zone.” Planting is used

strategically to shape behavior and provide the greatest impact and experience.

This softscape is also an important element on the southern edge of the corridor

in the near term as a buffer to NE 76th Street, while also occupying the future light

rail transit way, minimizing investment in areas that would ultimately be removed.

2012

2016

2025

2012

2025

downtown key maP

Redmond toWn centeR

ne 76th st.

beaR cReek pWy.

cLeveLand st.

LeaR

y W

ay

166th ave ne

164th ave ne

170th ave n

e161s

t av

e n

e

Redmond Way

sam

mam

ish

Riv

eR

beaR

cRe

ek

Page 61: Redmond Central Connector

the

des

Ign

51

Islands of vegetation buffer the corridor experience from vehicular street traffic, while creating eddies for small gathering spaces, seating, and art elements.

The Leary Way “Jewelbox” provides a small-scale retail pavilion as an iconic contemporary commercial building located in the NW corner of the block that can be an icon for the forward-looking quality of the Redmond

Connector, and possibly a catalyst to move the Connector forward to reality.

The Gilman landing is a visual endpoint to Gilman Street and becomes a significant “event” and gathering space on the promenade. It is

predominately hardscape with strategically placed natural element intended to soften the space.

The Leary Way intersection offers safe crossing for pedestrians and is a key element in tying Redmond’s historic

Downtown to Redmond Town Center, creating a strong connection all the way from Cleveland Street to the Justice

White House.

Justice White House is a historical and architectural gem across from the SW corner of this block and is embraced by the Connector as materials and design elements “jump” NE

76th Street and engage the house, strengthening it as the gateway to the City. Its historic architecture is a complimentary

juxtaposition to the Leary Way Jewelbox across.

Adjacent buildings are encouraged to seamlessly blend with the Connector, providing an “activity zone” charged with energy from commerce within the building.

The Promenade is a mixed-use space that includes the trail corridor and opportunities for parallel secondary pedestrian circulation routes.

Gilman Street becomes a shared street, safely mixing cars and pedestrians, providing public parking, rain gardens, and meeting the operations and access needs of adjacent buildings.

Art walls/screens provide seating and become eddies for small gathering and aesthetic focal points moving down the Connector.

LeaRy Way

164th ave ne

ne 76th st.

cLeveLand st.

Page 62: Redmond Central Connector

2012

2016

2025

2012

2025

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

52

oPen sPaCe

exIstIng today....

Page 63: Redmond Central Connector

the

des

Ign

53

tRansItIonIng to 2016

tRansItIonIng to 2025

Page 64: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

54

The open space is unique along the Downtown portion of the Redmond

Connector. While the majority of the Connector is bordered on the south by

NE 76th Street (and eventually light rail) and the north is bordered by private

development rising to 65 feet and potentially higher, this block opens to Cleveland

Street, providing a welcomed relief along the corridor. While the width and area

of the Connector does not significantly increase, the perception of width and

openness greatly increases because of the adjacent street rights-of-way including

Cleveland Street and 166th Avenue NE. The design celebrates and builds on the

oPen sPaCe

feeling of openness and the activity from the three adjacent streetscapes creating

the biggest gathering space of the Connector and the opportunity to make this

space the biggest “landing” along the Connector. The design seeks to be very

deliberate and conscious of not “filling” this open space unnecessarily with clutter,

but using vertical and overhead elements strategically to capture the sky. The

open space is also unique in that the City controls most of its edges in existing

conditions (as right-of-way) making it a candidate for this to be one of the first

permanent art/landing features to be developed.

2012

2016

2025

2012

2025

downtown key maP

Redmond toWn centeR

ne 76th st.

beaR cReek pWy.

cLeveLand st.

LeaR

y W

ay

166th ave ne

164th ave ne

170th ave n

e161s

t av

e n

e

Redmond Way

sam

mam

ish

Riv

eR

beaR

cRe

ek

Page 65: Redmond Central Connector

the

des

Ign

55

Vertical art/screen elements create a visual buffer of surface parking to the north and provide seating elements that reinforce views to

the south and up and down the Connector while becoming eddies of small gathering and an aesthetic focal point moving down the

Connector.

Artistically designed canopy islands provide cover in wet weather and shade in hot weather for those moving along the Connector as well as

providing places for pause and small gatherings.

Planting and earth-formed mounds provide visual interest to the Connector’s southern edge while also buffering NE 76th Street.

The designated route of the multi-use trail is on the southern side of the site, allowing a gathering space to occur to the north between the trail and Cleveland Street.

Existing conifers are maintained buffering the open space for 166th Avenue NE.

A large, predominately hardscape area anchors the open space providing room for gathering and events.

The 164th Avenue NE crossing has a different character than all other crossings, with a

reduced width and speed for vehicles and wider, potentially non-signalized crossings for

those on the trail corridor.

164th Avenue NE is a slower speed shared street, where cars and non-motorized users safely coexist. This character may extend to

the south matching the character of NE 74th Street as it passes through Redmond Town

Center’s center court.

A depressed rain garden provides a buffer along Cleveland Street without introducing a vertical obstruction.

The Cleveland Street sidewalk is routed through the open space while a secondary pedestrian connection is maintained along the Cleveland Street curb.

New conifers and deciduous trees buffer the remaining surface parking lot.

The existing surface parking on the corridor is partially maintained, though the southern reach is eliminated to allow near-term use of the full expanse between Cleveland Street and NE 76th Street.

164th ave ne

166th ave nene 76th st.

cLeveLand st.

Page 66: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

56

Of all the Redmond Central Connector zones in the Downtown Study Area, this

stretch is likely to see the greatest change from existing conditions. In its existing

state, the north edge of the corridor is predominately low density commercial

development surrounded by expansive surface parking lots, many of which

are on City-owned Connector property. It is assumed redevelopment of these

properties to the north is likely to occur over the next several years, bringing

much taller and denser development. The master plan also assumes that when

redeveloped, these projects will face onto the Connector, yet will do so with an

increasingly residential character such as urban townhomes and live/work lofts.

The Connector’s character on this block reflects the transition from the more

intensive areas to the west including commercial activity. This block, which will

the neIghboRhood stRoll

2012

2016

2025

2012

2025

eventually be separated into two blocks, is defined by more softscape and

reduced hardscape, becoming more park-like. With this increased softscape

and planting come more opportunities for rain gardens and other low impact

development strategies to have a bigger visual presence and become larger

functioning systems. As this new development takes shape, surface parking will

transition back for the Connector’s use as public space. Because of the evolving

and unpredictable nature of redevelopment of the adjacent properties, the

design for the Connector focuses on claiming the trail alignment and creating a

framework for future landings and other design elements to frame the character of

the space and evolve over time.

downtown key maP

Redmond toWn centeR

ne 76th st.

beaR cReek pWy.

cLeveLand st.

LeaR

y W

ay

166th ave ne

164th ave ne

170th ave n

e161s

t av

e n

e

Redmond Way

sam

mam

ish

Riv

eR

beaR

cRe

ek

Page 67: Redmond Central Connector

the

des

Ign

57

A plaza with raised planters, seat walls and specialty paving provides cues for the trail users coming from the east to their arrival in an increasingly urban and high traffic area while also providing places for small gatherings and setting the tone for future Connector improvements to come.

Rain gardens become gateways to the neighborhood blocks and may potentially form an interconnected system flowing east to existing wetland systems and Bear Creek beyond.

Landings begin to claim the space in an interim form (until redevelopment of adjacent sites) with a combination of

playful topography, planting, paving and interim or curated art, all inviting interaction and play.

Existing surface parking lots on the City-owned property are assumed to remain on a short-term basis, but cease with redevelopment of the properties prior to construction of light rail.

Tie elements bring a rhythm to the trail that honors the future completion of the Downtown street grid, increasing in frequency, then stopping at the location of the future Avondale Way extension crossing.

Art/screen elements along the north side of the trail provide visual relief from adjacent parking and back-of-building uses, focusing views down the corridor and to the south.

A small plaza with planting and specialty paving creates an

urban gateway to the Connector for those arriving from the east.

170th ave n

e

166th ave ne

ne 76th st.

cLeveLand st.

Page 68: Redmond Central Connector

2012

2016

2025

2012

2025

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

58

CReeksIde

exIstIng today....

Page 69: Redmond Central Connector

the

des

Ign

59

tRansItIonIng to 2016

tRansItIonIng to 2025

Page 70: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

60

From 170th Avenue NE to Bear Creek, the Redmond Central Connector is

enveloped in nature, and in combination with the higher ground zone, forms a

bookend that immerses trail users in a natural character and creates a transition

to and from the urban environment of Downtown. A landing at the intersection with

Bear Creek Trail alerts those passing that the Redmond Connector is a unique

urban trail, and invites those wanting such an urban experience into Downtown.

The trail reclaims the historic railroad grade, and existing wetlands adjacent to the

trail are enhanced with new plantings of native trees and shrubs that buffer trail

users from the service side of adjacent buildings and businesses.

CReeksIde

2012

2016

2025

2012

2025

downtown key maP

Redmond toWn centeR

ne 76th st.

beaR cReek pWy.

cLeveLand st.

LeaR

y W

ay

166th ave ne

164th ave ne

170th ave n

e161s

t av

e n

e

Redmond Way

sam

mam

ish

Riv

eR

beaR

cRe

ek

Page 71: Redmond Central Connector

the

des

Ign

61

A small plaza with planting and specialty paving creates a transition between urban and natural areas of

the Connector.

Existing wetlands remain and are enhanced with native planting, particularly trees that screen the adjacent

buildings.

Trail alignment on top of the existing railroad grade narrows to as little as 10

feet in width. Existing wetlands adjacent to NE 170th Street are crossed with

a new bridge or abutment, with path geometry and character alerting trail

users to the NE 170th Street intersection.

The creekside landing is located west of the junction of the Bear Creek Trail and has character and materials unique to the Connector, intuitively transitioning trail users to the unique mixed-use qualities of the trail as it

passes through Downtown Redmond.

Trail wayfinding signage identifies the Redmond Central Connector, provides direction to Downtown and amenities, and provides

information about trails and bicycle routes in the Redmond area.

The Connector terminates beyond the intersection with the Bear Creek Trail at an overlook of the creek that incorporates the historic railroad trestle.

The Bear Creek Trail proceeds north and provides a connection along Redmond Way in the near term to the East Lake Sammamish Trail.

Existing wetlands adjacent to NE 170th Street are crossed with a new bridge or abutment, with path geometry

and character alerting trail users to the NE 170th Street intersection.

170th ave n

e

beaR cReek

ne 76th st.

Page 72: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

62

the Redmond CentRal ConneCtoR’s evolutIon

thE rEdmond CEntrAl ConnECtor’s Evolution

2012...The first phase of development will occur in 2012, which will include a

trail connection from Bear Creek to the Sammamish River. The trail will claim

the alignment of the 2016 vision by building a 12-foot paved trail with 2-foot

shoulders. A goal of Phase 1 is to make the corridor feel like the urban trail it

is envisioned to be, but to do so before the Connector has the urban critical

mass to which the master plan is designed. Key elements include:

• Trail amenities intended to welcome a full spectrum of trail users, including

all skill levels of cyclists, pedestrians and other wheeled users.

• Permanent or interim paving materials and finishes will provide a desired

level of “friction,” mimicking the character of the intensively mixed-use trail

that it will ultimately become.

• Some ties are integrated into and abutting the trail, possibly with interim

treatment, particularly at areas near intersections, intuitively warning and

slowing trail users as they approach areas of potential conflict.

• Limited planting, specialty paving, and furnishings will provide interest and

places for pause along the trail and suggest the more developed corridor

that is to come.

• Interim art and playful grading is used to claim future landings and open

space adjacent to the trail.

The resulting first phase of the Redmond Central Connector will be firmly

anchored in the realities of making a safe and functional connection between

Bear Creek and the Sammamish River, yet also designed to the highest ideals

and laying a foundation for the future.

Page 73: Redmond Central Connector

the

des

Ign

63

2016... The Connector is built out to the degree the City can control it, respecting existing limitations and

boundaries and laying the groundwork to shape future improvements, as described in the previous section.

2025...As a result of forward-looking planning, adjacent private properties have largely been redeveloped

in keeping with the vision of the Redmond Central Connector Master Plan. Close coordination with Sound

Transit has resulted in a light rail line along the corridor that adds visual interest and enlivens all Downtown

with its thousands of daily riders. In spite of all the change, the design framework established in 2016 and

2012 remains largely intact. Key elements in this evolution include:

• A side-running transit way of just under 30 feet in width creates the corridor’s southern edge, replacing

what was predominately interim green space buffering NE 76th Street.

• Surface parking lots and other private uses that once encroached on the Connector have been reclaimed

as public open space.

• Adjacent properties have been redeveloped, fronting on the Connector and enlivening it with compatible

commerce or residential uses.

• NE 76th Street is reconfigured, likely eliminating the center turn lane/median to allow for transit way

width with consideration of bicycle accommodations, such as sharrows, bike lanes, or bikeway to

accommodate advanced riders who might choose to avoid the slower speeds and conflicts of a multi-use

trail.

• Poles and catenary structures providing electrical supply to rail are typically centered between tracks.

However, they could be located to one side or other with longer cantilevered arms and could provide an

artistic element or be designed in theme with the corridor.

• Trail routing at intersections is reconfigured to the north and intersections re-signalized for control with the

addition of light rail trains to the corridor.

While more distant, the 2025 vision provides an ideal build-out of the corridor providing guidance for future

decision makers and development to fully realize the potential of the Redmond Central Connector.

Page 74: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

64

desIgn evolutIon

sammamIsh RIveR tRestle & hIgheR gRound

20

25

20

12

the statIon

20

16

Redmond Way

161st ave ne

samm

amish

RiveR

161st ave ne

Redmond Way

beaR cReek pkWy

Page 75: Redmond Central Connector

the

des

Ign

65

CReeksIdethe PRomenade oPen sPaCe neIghboRhood stRoll

164th ave ne

166th ave ne

LeaRy Way

170th ave n

e

beaR cReek tRaiL

Page 76: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

66

sammamIsh RIveR tRestle and hIgheR gRound

2025

2012

2025 highlightsWith much of the trail realized in the 2016 vision, and no plans to extend light rail beyond 161st Avenue NE, the Sammamish River crossing and higher ground evolve as a result of the ongoing development of the City around this zone.

Redmond Way

Redmond Way

161s

t av

e n

e16

1st

ave

ne

1

1

2

2

3

2

1 1

1 1

Page 77: Redmond Central Connector

the

des

Ign

67

2025 highlights1. New denser and taller development likely abuts the Connector providing active frontage,

most likely residential but possibly commercial as well. New developments may make direct, elevated, publicly accessible connections to the trail and abutment from the top of building podiums.*

2. New or enhanced furnishings, trail elements and permanent and curate art pieces continue to enrich the Connector quality and experience.

*Proposed developments in the 2016 and 2025 visions are shown for illustrative purposes only to indicate potential treatments and interactions between adjacent private development and the Connector. With the exception of the “Shop Site,” all adjacent properties along the Connector are private property and decisions regarding redevelopment of those properties are by the private ownership.

2012 - first stEPs1. The initial trail connection is made from the new 161st Avenue NE to the Sammamish River. 2. Sammamish Spur and Junction at Sammamish River Trail. (The trail does not reach west

beyond the spur in 2012, meaning the Sammamish River crossing is not yet complete.)3. Redmond Way crossing is modified including new decking to allow trail passage.

Page 78: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

68

the statIon

2025 highlightsWith the arrival of light rail, and construction of the terminus station, this zone will undergo the greatest transition of any block along the Connector. At this location, the transit way has its greatest footprint as it widens to allow platforms and other station infrastructure. The construction of these facilities will also have an impact beyond their built limits. However, the design framework established in the 2016 vision serves as the basis for the redevelopment of the area.

2012

2025

161s

t av

e n

e

161s

t av

e n

e

LeaR

y W

ay

beaR cReek pkWy

sound tRansit Light RaiL

7

6

3

2

1

1

2

3 4

4

5 5

4

10

8

9

4

5

4

Page 79: Redmond Central Connector

the

des

Ign

69

2025 highlights1. A consistent track/transit way width is maintained and is flanked by a side platform station.*2. The north edge of the station is integrated into the adjacent linear park and trail zone, with multiple access

points.3. The south edge of the station is integrated into the adjacent “kiss ’n ride” and plaza.4. New Jewelbox spaces may be added fronting on the corridor as supported by ever increasing trail and

transit traffic.5. The adjacent “Shop Site” may be redeveloped as a public or private project, possibly a performing arts

center with interior parking.6. A “kiss ’n ride” off Bear Creek Parkway and new bus stops provide multimodal connections to the light rail

terminus. 7. A “Bike Barn” like no other provides infrastructure support to make biking an increasingly integral part of

Redmond’s transportation system.8. While the north side of the station is the primary circulation route, the south side of the station provides a

secondary route for those choosing to avoid the areas of highest activity and circulations.*9. The Brown Street connection to the Downtown Park and the park and ride beyond becomes increasingly

important and heavily used as part of the City’s transportation infrastructure.10. Replacing the 2016 landing, the station itself becomes a landing, and station architecture and surrounding

elements provide the artistic landing and furnishing elements that assure the block continues to provide places for pause, escape, gathering and activity.

* All light rail narrative elements indicate assumptions or preferred conditions for the City of Redmond at the time of the master plan development. The master plan recognizes Sound Transit design is a separate, more distant design process and any number of development scenarios may evolve with the structure of Infrastructure Alignment Plan.

2012 - first stEPs1. The trail is “claimed” in the location around which the 2016 vision will take shape. 2. Some ties are integrated in and abutting the trail, possibly with interim treatments, to create

desired “friction” of an urban trail, particularly at areas near intersections.3. The future landing space is claimed with earth forms and limited temporary paving/edge

elements.4. Intersection treatments are completed to provide safe crossing, including limited use of

specialty paving to intuitively increase awareness of traffic “mixing zones.”5. Planting of trees in both interim and long-term locations is encouraged.

Page 80: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

70

the PRomenade

2025

2012

2025 highlightsWith the arrival of light rail transit way, the promenade block will be reduced in width, losing much of the green space along its southern edge, and becoming the narrowest portion of the Downtown trail. The design framework established in the 2016 vision remains largely intact.

164th ave ne164th ave ne

LeaRy Way

ne 76th st.

ne 76th st.

cLeveLand st.

sound tRansit Light RaiL 5

1 2

3 4

5 6

4 4 3 2

1

Page 81: Redmond Central Connector

the

des

Ign

71

2025 highlights1. A transit way of just under 30 feet creates the promenade’s southern edge. 2. Linear art walls continue to provide seating and screening, but also become a barrier

separating the Connector users from the adjacent transit way without taking on an undesirable barrier quality.

3. Planting between the Connector and transit way creates a buffer that reduces the impact and need of the required physical barrier separating them.

4. Trail alignment is modified at intersections, with trail crossings shifted further north from the 2016 location adjacent to the NE 76th Street travel lanes.

5. 164th Avenue NE intersection becomes a signalized crossing.

2012 - first stEPs1. The trail is “claimed” in the location around which the 2016 vision will take shape. 2. Some ties are integrated in and abutting the trail, possibly with interim treatments, to create

desired “friction” of an urban trail, particularly at areas near intersections.3. The future landing space is claimed with earth forms and limited temporary paving/edge

elements.4. Intersection treatments are completed to provide safe crossing, including limited use of

specialty paving to intuitively increase awareness of traffic “mixing zones.”5. Planting of trees in both interim and long-term locations is encouraged.6. With the timing of design and construction of 164th Avenue NE unclear at this time, the 2012

trail may weave an interim treatment in this area awaiting the eventual completion of the new street.

20

25

20

16

Page 82: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

72

oPen sPaCe

2025 highlightsThe elimination of surface parking and redevelopment of the adjacent “triangle site” and new buildings to the north of Cleveland Street further reinforces the unique qualities of the open space block.

2025

2012

164th ave ne

164th ave ne

166th ave ne

166th ave ne

ne 76th st.

ne 76th st.

cLeveLand st.

cLeveLand st.

sound tRansit Light RaiL

1

1

2

2

3

3

4

4

5

6

Page 83: Redmond Central Connector

the

des

Ign

73

2025 highlights1. Surface parking lot has been reclaimed as open space for the Connector providing significantly increased

width along the Connector.2. Linear art walls continue to provide seating and screening, but are shifted to the south edge of the

Connector where they become a barrier separating the Connector from the adjacent transit way without taking on an undesirable barrier quality.

3. The adjacent triangular property is redeveloped as a stunning architectural icon worthy of the most visible site in all of downtown Redmond.

4. A highly interactive building façade provides commercial activity that spills onto, utilizes and energizes the adjacent Connector.

5. New development along the north edge of Cleveland Street becomes the visual backdrop of the open space area providing a variety of building heights and design quality that breaks up one of Redmond’s largest single blocks into Redmond’s small-town scale.

6. A new shared street provides a mid-block connection between Cleveland Street and Redmond Way, connecting directly to the Connector’s open space (per DEWCS).

2012 - first stEPs1. The trail is “claimed” with materials and finishes to convey the eventual “urban friction” it will

possess.2. The future landing space is claimed with a hardscape and crushed rock plaza and interim art

element. 3. Intersection treatments are completed to provide safe crossing, including limited use of

specialty paving to intuitively increase awareness of traffic “mixing zones.”4. With the timing of design and construction of 164th Avenue NE unclear at this time, the 2012

trail may weave an interim treatment in this area awaiting the eventual completion of the new street.

Page 84: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

74

neIghboRhood stRoll

2025 highlightsWith the surface parking lots replaced with open space and new landings, the neighborhood stroll evolves from being the most trail-like segment of the Connector to the most park-like, with secondary circulation, art and extensive passive green space.

2025

2012

ne 76th st.

ne 76th st.

cLeveLand Way

cLeveLand Way

166th ave ne

166th ave ne

170th ave n

e

170th ave n

e

avon

daLe

Way

sound tRansit Light RaiL

1 1

1

2 2

3

2

2

2 2 2

3 3

4 4

4

5

5

6

6 7 7

8

8 8

8

1314 14

9

9

11

10

Page 85: Redmond Central Connector

the

des

Ign

75

2025 highlights1. All leased surface parking lots to the north have been reclaimed as park space to replace green space used by Sound

Transit to the south.2. New developments, predominately residential fronts on the Connector, provide energy and activity.3. Significant lawn areas reinforce the neighborhood stroll as park blocks, providing passive unprogrammed space that

becomes the front lawn for the increasing number of people making downtown Redmond home.4. The trail generally remains in its 2016 alignment, reconfigured at intersections, but with new or enhanced furnishings,

paving and elements that continue to enrich the Connector quality and experience.5. Secondary circulation routes along the northern side of the Connector provide access to adjacent residences and also

enrich the experience for those moving through the Connector.6. Low impact development features, particularly stormwater elements, provide environmental value while also enhancing

the Connector’s aesthetic and providing a buffer between residences and the Connector.7. Landings are developed as permanent installations, becoming mid-block destinations for gatherings.8. New mid-block connections and street ends are shared streets where cars and pedestrians safely co-mingle,

connecting Cleveland Street to the Connector, while also meeting service/parking needs of new developments. 9. Private open space of new developments is visually and physically connected to the Connector. 10. Art/screen elements are relocated from the north side of the trail (as they are no longer needed to screen parking) to

the south side of the trail as a barrier separating the Connector users from the adjacent transit way without taking on an undesirable barrier quality.

11. The Avondale Way extension, now complete, is a slow speed shared street where cars and non-motorized users coexist.

12. The Avondale Way crossing has a different character than all other crossings, with a reduced width and speed for vehicles and wider, signalized crossings for those on the trail corridor.

13. The 170th Avenue NE intersection is reconfigured as light rail transitions from its bridge crossing of Bear Creek to the typical transit way alignment.

14. Planting, possibly a rain garden linking from 166th Avenue NE to 170th Avenue NE creates a buffer between trail paving and transit way, reducing impact of the required physical separation barrier.

2012 - first stEPs1. The trail is “claimed” in the location it will ultimately be realized, placing it adjacent to surface

parking and building service areas.2. Fencing and screening buffer unattractive views to the north and focus users’ views up and

down the Connector. 3. The future landing space is claimed with a hardscape and crushed rock plaza and interim art

element. 4. Future intersection treatments are completed to provide safe crossing, including limited use

of specialty paving to intuitively increase awareness of traffic “mixing zones.”

Page 86: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon

76

CReeksIde

2025 highlightsThe creekside alignment and character will be significantly altered with the construction of Sound Transit’s light rail that will include a bridge over Bear Creek. The details of this alignment cannot be determined at this time; however, there are several identified factors about how this section of the trail will ultimately take form.

2025

2012

170th ave n

e

ne 76th st.

sound tRansit Light RaiL

1

1 3

2

2 2 2

4

Page 87: Redmond Central Connector

the

des

Ign

77

2025 highlights1. An on-grade connector will be maintained connecting the Redmond Connector Trail from 170th to the

Bear Creek Trail.

2. The Sound Transit Bridge could potentially incorporate a parallel trail as part of the crossing of Bear Creek and SR 520, connecting to the East Lake Sammamish Trail beyond.

2012 - first stEPsThe initial trail connection is made from the new 161st Street to the Sammamish River including the following elements:

1. Wayfinding signage is incorporated at the Redmond Connector “trailhead.”

2. Trail elements to provide desired “friction” for the mixed-use trail are provided, including ties, and specialty paving, but may be completed using interim materials that allow future evolution and development of the trail.

3. The future landing space is claimed with a hardscape and crushed rock plaza and interim art element.

Page 88: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

78

sammamIsh valley

The Sammamish Valley Study Area starts at the northern City limits of NE 124th Street and

extends south to the east bank of the Sammamish River. The character of the corridor is

predominantly rural, in spite of its location along a high volume road between three major

metropolitan centers (Kirkland, Woodinville and Redmond). The trail that will ultimately be

developed will be a more typical regional, multi-use trail, similar to the existing Sammamish

River Trail, and much less urban than the Downtown Study Area. However, the language of

“fluctuations” still shapes this portion of the Connector, particularly with landings, islands and

eddies, and ties shaping the corridor.

lAndings

While considerably less frequent than in the Downtown area, landings exist at major events

along the trail in the Sammamish Valley.

• Sammamish Valley Park: The existing master plan for the park, and particularly the

overlook feature, are embraced by the trail corridor and become a landing on the trail, as

well as becoming a major destination for trail users from Downtown Redmond.

• NE 90th Street Siding: Much as railroad sidings once gave trains in the corridor a place

to pause off the side of the main rail line, the expanded width of the Connector at this

point for a landing as a significant linear park, provides a place for pause and rest as well

as a destination on the trail. The location at NE 90th Street allows the park to become a

gateway to the City from Willows Road, and provides bikers and pedestrians a loop route

to depart the trail and return to the City.

• “The Switch”: A unique spot along the rail corridor, bound on the west by a green

embankment, and to the east perched above West Park, the landing at this bend in the

corridor highlights a distinct “switch” form the rural Sammamish Valley to the Sammamish

River and Downtown beyond.

islAnds And EddiEs

While also less frequent than in the Downtown area, islands and eddies are created to give places for pause

and discovery along the trail, occurring at natural features or key intersections with other roads and trails,

making them gateways to the Redmond Central Connector.

sammamish valley landing

Page 89: Redmond Central Connector

the

des

Ign

79

sammamish valley Park lookout serves as a natural place for a landing along the Connector sammamish valley Plan

Page 90: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

80

trAil AlignmEnt oPtions

The precise layout for where the trail will be located in the corridor is yet to be determined, and is subject to

a number of different variables. The master plan has identified three prototypical trail alignment scenarios to

illustrate possible alignments and help guide design as the project moves forward. Central to these options

is the decision to keep or remove the existing trackway. In addition to trail layout options, the prototypical

exhibits show how the trail alignments fit with the full corridor width, as well as at reduced width “pinch

points” (such as at Willows Golf Course).

trollEy study

One of the variables determining how the Sammamish Valley will be realized is the decision of whether or

not the existing trackway will remain. In consideration of one option for retaining the trackway, the City of

Redmond commissioned a Trolley Feasibility Study (Appendix D). This study was intended to evaluate the

feasibility and requirements to operate a trolley on the existing tracks between Downtown Redmond and

the Woodinville Winery District. The primary type of service would be tourist based; however, there is some

interest in evaluating local commuter service along the same route due to peak hour traffic congestion on

the City’s north-south arterials, Willows Road, and Red-Wood Road (SR 202).

Existing tracks on abutment

trail without tracks on abutment

Existing tracks with trail on abutment

Page 91: Redmond Central Connector

the

des

Ign

81

trail w/o railroad tracksCenter alignment12’ paved trail over existing rail bed

trail with railroad tracksEastside alignment 12’ paved trail Westside soft trailVegetation buffer

trail with railroad tracksWestside Alignment 12’ Paved Trail Vegetation buffer

Bus Shelter Bus Shelter Bus Shelter

Willow

s Road

Willow

s Road

Willow

s Road

NE 116th St. NE 116th St. NE 116th St.

12’ Paved Trail

Ties (Paving Banding) Ties (Paving Banding) Ties (Paving Banding)

12’ Paved Trail 12’ Paved Trail

Existing Rails Remain Existing Rails Remain

Soft Trail

* As future trail planning and deisgn takes place in the Sammamish Valley, Public Works should be engaged to coordinate the potential widening of Willows Road.

Page 92: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

82

Building on the City’s vision for the corridor, one of the design principles shaping the master plan is that it’s not just a place with art, but a place that is art. The Connector presents the opportunity to

feature art, be art, and be a catalyst to shape an ever more artistically engaged community. The master plan process was designed to push the integration of art at every opportunity. The master plan team

included artist Perri Lynch who was integral to the development of the design from the earliest stages of the project. The resulting framework is based on the concept of Fluctuations (Section 2.3) and

makes the presence of art integral to the corridor. The master plan also recognizes that the high aspiration of arts integration throughout the Redmond Connector will be achieved with several layers of

opportunity shaping implementation and long-term maintenance and operation of the corridor. The purpose of this Art Integration Plan is to identify opportunities for creative expression already integrated

into the corridor design, as well as identify arts opportunities that can be developed in the future as the Redmond Connector is further realized. This plan identifies the role of art; where art happens; how

art is incorporated; and how art is implemented.

aRt IntegRatIon

Art goAls: whAt is thE rolE of Art on thE ConnECtor?

The goals established for arts integration reflect the design principles for the project as a whole (Section 1.2) yet expand on them with arts-specific planning detail.

mAkE it distinCtly rEdmond mAkE it grEAt on All dAys, in All wEAthEr insPirE A Community through ArtistiC ACtivity

Page 93: Redmond Central Connector

the

des

Ign

83

This collection of photos and textures inspired the concept of “fluctuations” and help convey the “mood” of the Connector. These images are derived from places along the corridor, precedent site visits and other sources

that influenced the collaborative planning process. Associated with these images are a variety of words that inspired the plan which include: FLOW, CONNECTIVITY, CADENCE, RHYTHM, CONNECTION, LUMINOUS,

CURIOUS, HI-TECH, ACCESSIBLE, VAST, LINKAGE, NARRATIVE, WAYPOINTS, LANDMARKS, PERCHES, PORCHES, PROMENADES, SWITCH, ANCHOR, VENTURE, SENSE.

Page 94: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

84

Woodinville

• Main stage performances

• Picnics, wine tasting

• Garden art

Kirkland

• Kirkland Art Center – classes for all ages

• Exhibitions in gallery settings Downtown

• Representational sculptures studio tour

Bellevue

• Bellevue Art Museum – focus on crafts, textiles, glass,

pottery

• Arts festival of saleable works

Issaquah

• Free film series

• Art walk – gallery based

• artEAST craft workshops

mAkE it distinCtly rEdmond

Program the Connector with events uniquely redmond

The first opportunity to make the Connector uniquely Redmond is to make it different from other cities. Build on what Redmond has that makes it

different instead of trying to do what other cities are already doing. Build on the strengths and character of the community in Redmond, and ideally

expand on events that already “belong” to Redmond. So what are others doing?

Seattle

• Olympic Sculpture Park

• First Thursdays and various “firsts” art walks in neighborhoods

• Commercial gallery scene, “high” art – SAM, opera, symphony, ballet

• Live theatre

• Mercer Island

• I-90 outdoor sculpture gallery (rotating exhibition) saleable works

• Music in the park

Page 95: Redmond Central Connector

the

des

Ign

85

digital Arts festival

Redmond already hosts a Digital Arts Festival, building on

its position of cutting-edge knowledge shaping the world.

Capitalize on this event by:

• Refocusing it to be multi-sited along the Connector, or at

least make the Connector “home base” to the event.

• Let the festival blend indoor/outdoor—Think Sundance Film

Festival or a Jazz Fest, multiple venues that link together as

a progressive party along the trail.

• Curate digital works for the long term to assure that the trail

serves as a year-round reminder of the festival.

so whAt might rEdmond do?

redmond lights

Everyone in the City talks about and loves Redmond lights, yet

it only occurs once a year. Consider building on the event’s

great success by:

• Bringing it into the Connector (and Downtown and its

commerce) connecting to the Sammamish River.

• Integrating creative lighting into the design framework that

supports Redmond lights.

• Celebrating Redmond lights more than once a year,

imagine it monthly. Whereas numerous cities have First

Friday art walks or some version of it, imagine Redmond

lights as a monthly event that no other City has, yet can

integrate and celebrate the arts!

Celebrate redmond’s unique history

Redmond is unique in its character, physically represented

by its smaller scale Downtown, presence of historic (and

older, if not historic) buildings, and great natural setting. All

of these can be a wealth of inspiration for arts in the corridor,

including…

• Celebrating the rail corridor that shaped the City.

• Tell the natural history of the river valley.

• Convey Redmond’s evolution from natural resources such

as lumber, to agrarian, to one of the technology capitols of

the world!

Page 96: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

86

mAkE it grEAt on All dAys, in All wEAthEr

Most public spaces are used and loved in the warmer dryer summer months; as Northwesterners, we do not waste the opportunity to

enjoy being outside. The Redmond Connector strives to build on that love of being outside, making the Connector a place Redmond

residents and visitors will make a destination year-round.

• Use art as a tool to make it engaging year-round

• Think of enduring or episodic art opportunities to attract people morning, afternoon, and night

• Rain or shine, there’s something to experience

Opportunities:

• Celebrate the weather through sun, rain, and wind expressive art.

• Emphasize events like the Digital Arts Festival for non-summer months.

• Capitalize on darkness in the dead of winter.

• Electronic art and sculptural lighting.

Page 97: Redmond Central Connector

the

des

Ign

87

EngAgE A Community of ArtistiC ACtivity (EngAgE, don’t Just disPlAy)

The Connector presents the opportunity not only to house art, but to be art and be a catalyst to shape an ever more artistically

engaged community.

• Support artists, not just the arts

• Keep local artists local

• Decentralize the arts – not just sculpture parks and art centers

• More than placing art in the corridor

• Focus on direct connections between the public and artists

• Opportunities for public engagement and expression—art can come from anyone

Opportunities:

• The Connector is a studio space and gallery

• Events and installations that are spread out over time and space along the Connector

• Make it interactive – trail and park users participate in the creation and manipulation of art

• Define new “Rules of Engagement” where ordinary elements and infrastructure is something special

• Provide space and time for artists – live/work, outdoor studio zone, performance areas

• Art extends indoor/outdoor

Page 98: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

88

Building on thE frAmEwork: whErE doEs Art hAPPEn Along thE Corridor?

The master plan’s arts-integrated concept of Fluctuations builds a framework for arts to occur through the corridor as experiential

elements shaping the corridor and defining a hierarchy of spatial elements where art occurs along the corridor. These elements are

landings, islands and eddies, and ties (Section 2.3), which form the framework of the Connector and the integration of art.

landings

Landings provide the single largest, most iconic art

opportunities along the corridor as sites for permanent site-

specific art elements. These spaces are “claimed” in the near

term with simple cost-effective means that create a series of

different yet complimentary spaces along the corridor. In time,

likely in conjunction with development of adjacent properties

and/or the transit light rail line, these landings will become

more permanently developed as opportunities for large and

dramatic art installations.

islands and Eddies

Islands and eddies, as secondary experiences along the trail,

provide opportunities for art, though likely less iconic art than

the landings. These art elements afford the opportunity to

be less interconnected from one area to another, unlike the

interrelated landings, and open the door to a great diversity

of art including permanent and non-permanent art, potentially

curated. These spaces, being places of pause and rest, might

also be great opportunities for performance art and artists.

ties

Ties are permanent features of the corridor, inspired by the

Fluctuations concept. These elements have a strongly defined

rhythm and character and are very architectural in nature,

often acting as site furnishings along the corridor. Ties again

offer the opportunities for art, yet do so as permanent features,

incorporating art to add richness to the tie elements, without

obscuring the immediately identifiable architectural character

of the tie.

Page 99: Redmond Central Connector

the

des

Ign

89

variety of opportunities: how Art is integrated into the Connector

Permanent Site Specific:

• Artist takes location into account when designing the artwork.

• “Permanent” is generally defined as residing in one place and

constructed out of durable materials, lasting for 30-50 years

or more. Stone, steel, wood, glass, and concrete are typical

materials for permanent, site-specific artworks.

• Though this work is designed to endure the test of time, it

does not have to be static. Sometimes work in this genre has

kinetic elements, activated by the wind, sun, rain, etc.

• Generally this work is large scale, resides outdoors in a

prominent location, and designed for the public setting, not

gallery exhibition.

• Site-specific permanent works are likely to involve natural

elements or be otherwise situated in the landscape, rather

than on a plinth or riser.

• Sometimes referred to as Environmental Art, Earth Art, Social

Sculpture, and Land Art.

Integrated:

• Integrated artworks are so tied to landscape and

surroundings that one could not exist without the other.

Often experiential in nature, encouraging audiences to

move over, under, or through the sculptural elements.

• Integrated artwork is generally designed for a local rather

than global audience.

• This work may incorporate oral histories, indigenous

language, historical photographs, or interpretive

information on natural surroundings.

• This work is generally multi-sited, inviting one to move

along a path, along which the story of the artwork unfolds.

• Another example of integrated artwork is when off-the-shelf

or stock-issue urban amenities (railings, tree wells, refuse

bins, etc.) are replaced with artist-made building parts.

Curated:

• Curated artworks are primarily selected for exhibition.

• These works may be sited indoors or outside.

• Curated art is generally not intended to be permanently

sited.

• The curator defines an overarching theme for an

exhibition or festival and then selects work that fits that

theme.

• Because curated art is generally invitation-only, the

curator will often interpret or define the artwork relative to

their theme, which may differentiate from the artists own

intentions.

• The Venice Biennale, Documenta, and Art Basel are

examples of large-scale curated exhibitions.

Page 100: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

90

Ephemeral:

• Ephemeral artworks are not made of durable materials.

Generally, ephemeral art is designed to fall apart, degrade

over time, or last for only a short duration. This decay is

often the conceptual basis for the work, with permanence

and impermanence being a common theme.

• Artworks that change due to storm events, wind direction,

or tidal rhythms are also ephemeral.

• This term also refers to event-based works such as

performance art, outdoor puppet shows, projections, or

busking.

how Arts may be implemented into the Connector

The Art Commission’s 2009 Strategic Plan identifies three key strategies which include: Make art Accessible, Create

a Place for the Arts, and Nurture the Arts in Our Community. In addition to the integration of art in the basic design

framework of the plan, visual and performing arts also play a significant role in the corridor and put the strategies of

the Art Commission into action. This section builds on the strategies of the Art Commission as well as the goals and

policies included in the Redmond PARCC Plan by identifying a number of opportunities for arts within the corridor, and

recommendations for ensuring that art contributes to the character and story of the Connector.

Process for implementation

Phasing:

• Near-Term Opportunities

o Curated Outdoor exhibition (1-12

months)

o Community artworks

o Festivals, Biennials

• Long-Term Considerations

o Permanently sited works that

share linkage

o Designated “kid art” zone

o Artist-made building parts instead

of off-the-shelf (see matrix below)

o Call for Artists

Protocol:

• Send Request for Qualifications (see matrix

below).

• Assemble review panel from community, Arts

Commission, parks and trails.

Procurement:

• Establish selection criteria to foster “tried and true” artists as

well as emerging talent.

o Consider art from “non-artists” within the

community.

o Capitalize on the talent bank of designers and

engineers in the surrounding Tech industry.

o Community Engagement

Utilize the corridor as a catalyst that fosters art in Redmond.

As with biking, how can Redmond embrace art, not by displaying

art and saying it is embraced, but by becoming a more artistically

active community?

• Community-based art workshops and projects

• Housing artists

• Opportunities for impromptu “making of art”

• Celebrate creativity

o Art Budget Considerations

• Prioritize great art in a small space rather than light touches

over a large expanse

• Cost share with trail work whenever possible (footings,

grading, installation, etc.)

Page 101: Redmond Central Connector

the

des

Ign

91

Bollards Sandblasted,

Wrapped, Twisted,

Hammered

Historical Waypoint Markers

Poetry on Poles

Giant Refrigerator Magnets

Sculptors, Writers,

Photographers

Benches Carved, Sandblasted,

Molded

Unexpected Objects

Repurposed Material

Alice-In-Wonderland Moments

Sculptors, Painters,

Printmakers, Writers

Utility Boxes Wrapped, Muraled,

Texted

Illustrated Trail Maps

Photographic Imagery

Oral Histories

Sound/Light Art

Writers, Painters, Printmakers,

Community Members,

Call for Art from non-artists

Tree Wells Sand blasted, Laser

cut

Agricultural Motifs

Techno-Memorabilia

Historical Signs and Symbols

Sculptors, Illustrators,

Historians,

Community Members

Guard Rails Hand-forged,

Hammered, Pelted

Felt Sense of Place

Poetry

Symbols

Sculptors, Writers

Bike Racks Twisted, Knotted,

Bent

Redmond Icons

Historical Symbols

Illustrators, Sculptors

Flat Surfaces Textured, Colored,

Inlaid,

Interactive

Opportunities,

Temporary Works

Chalk Art (Temporary/Interactive)

Community Mosaics

Murals

Post-its

Pin on the Map

Writers, Painters, Printmakers,

Community Members

Kid-centric

Rules of Engagement Matrix

In making a place that is art, every opportunity should be taken to realize art, in big moves and

small.

Why?

• Make the ordinary special and create opportunities for artists

• Design mechanisms for order and safety that don’t feel like barriers

How?

• By meeting specific needs in unexpected ways

• By choosing artist-made over off-the-shelf

• By encouraging collaboration between artists and the community

• By melding creative expression with functional and efficient means of engagement

Permanent

Site-Specific

Large Steel Sculpture

Interactive Stone Labyrinth

Major Landmarks

Craftsman Benches

Artist-made Birdbaths

Funky Bike Racks

Embedded Steel Sections

Bike-Activated Sound Art Elements

Trail Distance Indicators

Integrated Big Recycled Train Track Art

Climbing Berms

Natural Echo Chamber

Recycled Railroad Rest Spots

Interactive Landforms

Interesting Waypoints

History of Redmond Storyline

Indigenous Poetics

Creative Navigational Aids

Curated Outdoor Sculpturefest

Lunchtime Concert Series

Community Artworks

Creative Game Night Series

Outdoor Open Mike Night

Map Art Exhibition

Artist-made Geological Timeline

Ephemeral Digital Arts Festival

Outdoor Film Festival

Kids Art Corner

Scavenger Hunt

Local Holiday Madness

Trail Chalk Art Competition

Parades

Summer Music Festival

Landings TiesIslands/ Eddies

Art Integration Matrix

Why?

• To turn the whole place into art

• To resolve the site without killing the buzz

• To encourage participation and creative expression without dictating or requiring

How?

• Make passive observation pleasurable

• Create a more vibrant and less scripted trail experience

• To delight and bewilder, but not confuse

• Focus on what people will experience, and echo that in the necessities.

Page 102: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

92

Page 103: Redmond Central Connector

5

desIgn ConsIdeRatIons

Page 104: Redmond Central Connector
Page 105: Redmond Central Connector

the

des

Ign

95

5.1 PlAnning guidElinEs

This master plan addresses design related issues within the corridor, adjacent to the corridor and connecting to the corridor. This

section discusses how these public and private developments can realize the vision for the Redmond Central Connector and work

together to implement it. (Additional detail provided in Appendix B.)

Adjacent development

The master plan and the current policies of the City envision a lively and active corridor along the Redmond Central Connector. For the

Downtown segment of the Connector, this vibrancy needs to be supported by lively and active edges of the corridor including City-

owned properties and private adjacent buildings.

Page 106: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

96

Adjacent developments should provide significant public benefit such as:

• Encourage retail, commercial and residential frontage on the corridor

The realities of site planning for the properties along the corridor present challenges to

activated frontages on both Cleveland Street and the Connector. Because parking can

only be built one level below grade, projects along the corridor have been using the

surface level and above-grade parking in addition to the below-grade level to meet the

necessary parking requirements for the mixed-use projects. It will take creative problem

solving between developers and the City to activate the ground level on both Cleveland

Street and the Connector.

• Connect private open space to public open space of the Connector

New residential and mixed-use buildings need to provide usable private open space for

residents. This open space is often located in required setbacks (including the 14-foot

setback along the Corridor) or on top of the parking podium on the second or third

floor. Such private open spaces should have a visual and physical connection to the

Connector. The physical connection can limit access to residents only. The visual and

physical integration of the open spaces will magnify their impact for both residents and

the public by contributing to the park-like character of the corridor.

• Enhance and preserve existing historic structures

The nearby historic architecture gives Redmond character that is irreplaceable. The

City should continue efforts and seek guidance for preservation of historic buildings

and guidelines for new infill development. New architecture should not mimic historic

buildings, but offer excellent design appropriate to current materials and construction

methodologies that will become a valued part of Redmond’s architectural fabric.

• Be constructed of high-quality materials and well-detailed

City policies call for new buildings to be of quality materials. Because jurisdictions

typically find this provision difficult to actually enforce, there may need to be clarifications

in City guidelines about the intent of design elements and quality of materials and design

along the Connector.

Page 107: Redmond Central Connector

the

des

Ign

97

development incentives

To encourage the desired results from adjacent building developments the following incentives may be possible:

Allow use of the setback for public benefit

The 14-foot setback requirement for developments along the Redmond Connector right-of-way could be modified if using

the setback creates an appropriately balanced public benefit that results in a better edge condition along the Connector. City

policy would need to be specific in terms of the public benefits that would allow the use of the setback.

Allow adjacent properties the option of building parking below City-owned land

Because parking constraints impact the ability to activate the Connector, the option of allowing private parking below grade

may be helpful to achieving City objectives. This would only be possible where utilities and other easements are not impacted

or couldn’t otherwise be mitigated, and the City would need to work with property owners regarding timing of the project, the

replacement of at-grade amenities, and legal issues.

Consider flexibility in parking requirements

The City has a Fee-in-Lieu of parking program, but it may need to be made more attractive to developers if it is intended to

result in active uses along the Connector. The City should work with developers to see if there are acceptable methods to

project lenders for providing parking in ways that reduce impacts on the Connector.

Consider reductions in open space requirements

The City may consider reducing the required open space requirement for residential uses along the Connector, provided that

the proposed project design provides significant public benefits.

Allow use of public property for project stormwater requirements

Use stormwater as an incentive, specifically allowing stormwater (from non-polluting surfaces such as roofs) to be detained

and infiltrated on the Connector site.

Page 108: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

98

life/safety, utilities and other services

While beyond the scope of this master plan effort, this design process, especially with regard to adjacent developments and an

evolving Downtown Redmond, identified many operational questions and challenges for the City to consider.

Fire lanes and access

Life safety services are critical, and the Connector master plan recognizes their importance to both the Connector and

adjacent developments. It is accepted that these services require a 20-foot clear lane, though there is interest in providing

different, yet equally effective means of delineating and preserving fire lane corridors in an urban setting. Fire lanes might

be delineated with specialty paving and 20-foot clearances could be provided by “planting voids” or other non-structural

elements providing visual interest and “softening” to urban fire lanes while maintaining their critical functions.

Garbage and recycle

As Redmond continues to densify and new efforts are put into creating a pedestrian-friendly Downtown, waste management

providers and building operators will likely need to adapt and change their typical services similar to those in other high

density neighborhoods in the region. Location of trash and recycle enclosures should be encouraged to be within buildings

and not along valued pedestrian connections adjacent to new retail spaces or abutting new residential units. These new

practices may include physical storage of trash and recycle enclosures within buildings to be temporarily placed in pick up

areas by building management or waste management companies.

Electrical:

The location of transformers often increases in complexity with high density developments as contrasted with low density

development where transformers can often be placed in landscaping. This often means transformers are located in sunken

vaults under garage entry ramps or other spaces, freeing up valuable urban façades to become retail or other uses that

enliven the streetscape. Careful consideration should be given to the location of electrical meters in relation to buildings

edges, façades and desired pedestrian routes.

Gas:

Careful consideration should be given to the location of gas meters in relation to building edges, façades and desired

pedestrian routes.

Next Steps:

These development recommendations and incentives have been supported through the master plan process and are

critical to realizing vision for the corridor. A logical next step is to refine these recommendations and incorporate them into

adopted City policy, possibly the development/modification of design guidelines for the Connector and potentially broader

Downtown area.

Page 109: Redmond Central Connector

the

des

Ign

99

5.2 trAnsPortAtion

The Redmond Central Connector will be an integral part of the movement of people through Downtown. Beyond the multi-use trail

that is integrated into the Connector itself, there are numerous street crossings of the corridor, numerous streets and pedestrian

connections ending at the corridor, and a future light rail transit way paralleling the corridor. These transportation considerations

have been integral in the development of this master plan and will be integral to its implementation in both short-term and long-term

projects.

A multi-use regional trail

The Redmond Central Connector includes a multi-use regional trail running its full distance; make it an integral part of Redmond’s

Downtown transportation planning, but also an integral part of the region’s regional trail network. In particular, the Downtown Study

Area forms a secondary link between the existing Bear Creek Trail, East Lake Sammamish Trail, and Sammamish River Trail. The

development of the master plan included preliminary engineering layout of the trail to meet AASHTO and King County regional trail

standards between the Sammamish River and Bear Creek. In addition to the preliminary engineering, the master plan has identified

phases and strategies for trail development that will realize the trail as an urban trail that will welcome pedestrians, bicyclists,

and other users of all abilities. In addition, the master plan identifies strategies for how parallel routes and trails can be used to

complement the Redmond Central Connector.

A hierarchy of Crossings and Access Points

With a total of six existing or planned road crossings over the Connector, and many street ends (public ROWs), service roads (private

access roads), and pedestrian connections (sidewalks, trails, and midblock connections), potentially tying into the corridor, it is

important to recognize the differing and potential qualities of the streets and access points.

Page 110: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

100

Primary Street Crossings (161st Avenue NE, Leary Way, 166th Avenue NE, 170th Avenue NE)

These streets are high traffic crossings. The character of these crossings is that the trail is crossing the road, and trail users

are expected to stop and wait for the appropriate time to cross, likely as part of a signalized crossing. While three of these four

streets exist, when the Connector crossing is completed there should be intuitive cues to provide safe crossings, including

signals, signage, lighting, and crosswalk markings and materials.

Secondary Street Crossings (164th Avenue NE, Avondale Way)

These are new through streets planned as part of DEWCS and can have a different character and lower traffic volume and

speeds from primary street crossings. The character of these crossings is to create a “slow zone” where the trail crosses

the road, yet the road also feels it crosses the trail. The approach for this street is to make it a “shared street” where spatial

treatments result in cars intuitively slowing, and pedestrians are mixing and crossings are welcomed. Trail crossings of these

streets may or may not require signalization in the near term, although signalization will likely be required upon construction of

the Sound Transit Light Rail.

cRossing

ne 7th st.

Light RaiL

tRaiL

secondaRy

stReet

Page 111: Redmond Central Connector

the

des

Ign

101

Street Ends and Mid-Block Access (Brown Street, Gilman Street and more)

Existing and future street ends provide the opportunity to access the Connector

from Cleveland Street while also proving critical access for building function.

Because these streets are not through streets, but vehicular dead ends, their

character is more a plaza with vehicles, not a street.

Design elements to encourage this character include:

• Specialty paving (not just asphalt)

• Cast in place concrete with small-scale

saw cut

• Stone or precast concrete pavers

• Flush or reduced curb height

• Planting buffers along blank façades

• Barriers can take the form of seating

and furnishings to direct/block vehicular

traffic (while providing pedestrian

amenities)

• Pedestrian lighting can be mounted

on or hang from buildings to minimize

poles in the right-of-way

• Vehicular access via curb cut (not a

road intersection)

• Provide canopies and/or arcades for

pedestrians

• Rain Garden curb bulbs with planting

extend Connector to Cleveland Street

Pedestrian Mid-Blocks

Existing or proposed pedestrian mid-block connections from Cleveland

Street provide access to the Connector and allow access to large blocks of

development. Pedestrian mid-blocks may be open to the sky or could become

partially covered arcades.

gaRage access

the connectoR

stReet end

cLev

eLan

d s

tRee

t

gaRage access

the connectoR

mid-bLock access

cLev

eLan

d s

tRee

t

gaRage access

Page 112: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

102

Page 113: Redmond Central Connector

the

des

Ign

103

intersection design:

With the six existing or planned road crossings, thoughtful treatment of intersections along the Connector is critical. While engineering

of intersections has not been completed as part of the master plan, it has been considered in great detail and will be designed in the

Phase 1 trail engineering. It is assumed that in the near term (prior to light rail), Connector crossings will be incorporated into street

intersections at NE 76th Street, as there is inadequate space between Cleveland Street and NE 76th Street for a mid-block crossing

to be safely implemented, and Cleveland Street is more distant from the Connector and trail alignment. Future light rail design

and construction conditions are not finalized. However, the master plan has considered how trail crossings would be modified to

accommodate side running alignment, the preferred alignment described in the Infrastructure Alignment Plan (Appendix A). Based

on these assumptions, the Connector/trail crossing would be shifted to the north; it would likely continue to be operated as part of

signalized intersections at NE 76th Street and the light rail transit way.

redmond Central Connector and sound transit East link

Sound Transit East Link Light Rail is an essential element of the long-term Redmond Central Connector Master Plan vision. The

master plan identifies locations for the Downtown East Link Light Rail Station and track alignment as well as many major City capital

projects including a regional stormwater trunk line, a regional trail and linear park, and a number of street and mid-block connections

across the corridor. The City reviewed many different station and track alignment options with Sound Transit in addition to Sound

Transit’s preferred alignment during development of the master plan to identify an alignment that could meet the needs of both

organizations in the corridor.

The master plan does not accommodate Sound Transit’s preferred alignment as it is being evaluated in the Final Environmental

Impact Statement described as the Segment E Preferred Marymoor Alternative (E2). However, the master plan does provide

opportunities to accommodate Sound Transit alignment and terminal station facilities subject to additional design and potential

changes to design criteria.

The City and Sound Transit collaborated on various alternatives to the Sound Transit E2 preferred alignment along the former BNSF

rail corridor that better take into account the property limitations or pinch points along the corridor as well as the City’s planned capital

projects within the corridor, and achieve Redmond’s long-term goals of creating an active urban destination in the Downtown. The

Infrastructure Alignment Plan identifies a preferred option where Sound Transit uses the southern portion of the former BNSF corridor

and northern part of NE 76th Street for track alignment. It also shows Sound Transit using a side platform station instead of a center

platform station, which minimizes the amount of property needed for the tracks at the station and provides more room for pedestrian

circulation. Sound Transit stated that the master plan’s preferred option for East Link would require changes to its design criteria for

permanent terminal stations. In comments made on the Supplemental Draft EIS for East Link, the City requested that Sound Transit

Light RaiL

tRaiL

ne 76th st.

stReetcRossing

stReetcRossing

Page 114: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

104

locate support facilities in Southeast Redmond rather than in the Downtown and minimize the size of the tail track section in Downtown

in order to maintain the urban character of Downtown. Due to the lack of funding in Sound Transit’s ST2 Mass Transit Ballot measure,

Sound Transit is unable to conduct the design work necessary to evaluate the options proposed in Redmond’s comments on the SDEIS.

The Redmond Central Connector Master Plan is a visioning document for the City of Redmond. It portrays how current City policies

and goals can be realized. The master plan also shows the City’s preferences for East Link alignment and facilities within the Redmond

Central Connector. The City will continue to work closely with Sound Transit as it moves forward with all development projects in the

Redmond Central Connector, including the ultimate design of East Link.

Next Steps:

These transportation concepts have been supported through the master plan process and are critical to realizing the vision for the

corridor. With the development of Phase 1 design, some of these considerations will be developed, honed and implemented. Other

elements, such as the development of street typologies and urban design guidelines may be addressed by other processes or projects.

Light RaiL tRansitWay

station pLatFoRm

station pLatFoRm

ne 76th st.

pLaZa & tRaiL

kiss & Ride

Page 115: Redmond Central Connector

the

des

Ign

105

5.3 PlAnting ConsidErAtions

While specific planting plans are beyond the level of detail of a master plan, planting has been considered through the master plan

process. The transition between the natural areas of Bear Creek and the Sammamish River Crossing with the much more urban

sections of the trail between give rise to one of the fluctuations that define the corridor, that of planted/wild. The more natural areas of

the corridor are the “wild” and are intended to be predominately native plantings. As the Connector moves through Downtown and

becomes more urban, its plantings become more structured for the desired and controlled experience, and may include more non-

natives. The Phase 1 design project will identify plants in the Downtown Study Area.

trees in the corridor

The master plan is conscious of not overplanting the corridor, therefore trees are intended to be used strategically where needed,

but not used unnecessarily. As an open space in the City, one of the opportunities embraced by the master plan is the use of a few

larger scale “legacy trees” that can become a living icon of the Connector and a nice compliment to the more vertical trees typically

used along streetscapes. Another consideration for trees in the corridor is to bring conifers into the heart of the City since they’re so

present in the “green ring” that surrounds Redmond. The evergreen presence of the conifers also brings the advantage of forming

effective year-round buffers where desired.

irrigation

It is assumed there will be irrigation for plants and grass areas along the corridor. While irrigation will likely be needed, exactly how

extensive irrigation is and how long it will be used will be determined in future development of the design. At the most minimal,

irrigation can be used for plant establishment for the first 2-3 years after planting, decreasing volumes each year until eventually it

is discontinued. More urban and intensively used areas of the corridor may warrant permanent irrigation to provide a more refined

or ornamental landscape, and to assure plants and grass can withstand the increased intensity of an urban space. It is assumed

Redmond municipal water would be used; however, in the future it might be possible to use clean stormwater sources, such as roof

water from adjacent developments.

Electricity

There is a need for electricity within the Redmond Central Connector for lighting the trail, for key art elements and potentially for

vendors. The Phase 1 design for Downtown will include wiring the trail area for electricity. However, the design will also evaluate

alternative energy sources as appropriate such as the use of solar energy.

Page 116: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

106

5.4 mAtEriAls And furnishings

The selection and identification of materials has been considered in the development of this master plan, though definitive selections

have not been made. However, strategies for how materials and furnishings are made in the future have been developed.

A hierarchy of paving materials

While specific materials have not been selected, a variety of materials have been considered. The City’s preference is to use higher

quality materials than asphalt for most of the Downtown Study Area. The trail and associated plazas are envisioned to be constructed of

a family of paving materials that are repeatedly used in similar or common situations. The City is interested in using sustainable materials

and construction techniques to build this project, which will be a key factor in selecting materials for the corridor. Some materials

considerations are:

• Asphalt – Asphalt is a common material used in multi-use trails, for example the Bear Creek and Sammamish River Trails, providing

a smooth, seamless finish and allowing/ encouraging higher speeds. Asphalt may be used for portions of the Redmond Connector,

particularly the Sammamish Valley. However, in the Downtown portion of the trail, in response to the more urban condition, the use of

asphalt should be limited to emphasize that the Downtown section is a different, slower, urban trail.

• Concrete – Concrete can be finished in countless ways, providing a wide variety of textures and colors, making it an effective material

to intuitively inform how the Connector is used. Concrete can be used as an accent material or as the primary paving material for a

larger area.

• Pavers – Pavers, both precast concrete and stone, can be used as an accent at strategic points along the Connector, such as

landings, nearing landings, or in active “building zones” where activity from adjacent buildings spills onto the corridor. These pavers

can have a tactile quality to intuitively warn bikes and pedestrians they are approaching or in a space that requires attention and slow

speeds. However, consideration should be given to the site conditions in which pavers are used as they may potentially require more

maintenance for replacement and weeding.

• Crushed rock paving can be used on secondary trails to define small paved areas. Crushed rock may be a particularly cost-effective

way to claim some of the spaces in early phases of corridor development without expending great cost or investment in temporary

elements that might require change later.

• Other materials may also be considered including porous asphalt, concrete, or pavers, and reinforced grass paving.

Page 117: Redmond Central Connector

the

des

Ign

107

5.5 stormwAtEr And low imPACt dEvEloPmEnt (lid) oPPortunitiEs

Claiming the weather is one of the design principles for the Connector, with the intention to create a corridor that comes to life in wet

weather. To realize that, we have identified several aesthetic and functional strategies to utilize stormwater.

Celebrate the stormwater

Our goal is that new and possibly existing development will route clean stormwater runoff down the south side of the buildings

or along north/south streets or mid-block connectors in a way that is visible and interesting, and potentially interactive rainwater

features. This water can be conveyed through hardscape runnels or rain gardens and eventually be tied into the appropriate

stormwater management system.

Collect stormwater

Rain gardens along the corridor can collect runoff and infiltrate it in visual elements where it can be of aesthetic value, providing

green relief in the corridor. Rain gardens can also play an important role in shaping use of the corridor, providing a buffer when

desired, and in particular, creating a buffer between the corridor and the adjacent light rail, reducing the need for more imposing

barriers separating the two. Stormwater elements can also be unseen as buried infiltration chambers that allow programmed uses to

take place on the surface.

Convey as appropriate:

Stormwater might be conveyed to rain gardens as described above, which could infiltrate water in an important aquifer recharge

area. These rain gardens might be isolated or combined into a larger system. If isolated, the rain gardens might need extra capacity

in peak events and could be designed to flow into the underlying stormwater trunk line as necessary. Isolated rain gardens would still

provide the benefit of infiltrating some water, and reducing or slowing peak flows.

Page 118: Redmond Central Connector

Redmond CentRal ConneCtoR masteR Plan | the desIgn - 2016

108

APPEndiCEs:

A. Infrastructure Alignment Plan

• Plan

• Appendix

• Goals and Policies

• MOU –Port, ST, City, County, CWA, PSE

• Memos – Process Memos 1 & 2

• Environmental Assessment: Downtown Study Area

• Critical Area Evaluation: Downtown Study Area

• Critical Area Evaluation: Sammamish Valley Study Area

• Sound Transit Letter of Support

B. Planning Review & Recommendations

C. Art Review & Recommendations

D. Public Involvement summary

E. Trolley Study

F. History

G. Master Plan Cost Considerations

H. SEPA

5.6 sitE grAding

The Redmond Central Connector’s existing topography is shaped largely by the railroad that once ran along this route. The regional

trail will typically use the existing topography with little change. The railroad grade provided a small ridge through the Downtown area

that has become a defining characteristic separating Redmond Town Center from the City’s historic center. This grading feature is

maintained in the Connector master plan to both honor the history of the railroad and intuitively warn crossing vehicles to the presence of

the Connector and its many users. To maximize useful grade in the corridor, the relatively narrow track way has been widened, merging

into existing grade to the north, and maximizing the Connector width to the south, before dropping back down to meet existing grades

near NE 76th Street. A preliminary grading plan has been completed as part of the master plan. Future grading is difficult to predict

with Sound Transit occupying the southern edge of the Connector; however, it is clear that there will need to be grading transitions

between NE 76th Street and the grade of the Connector. This grading transition could be provided on either side of the future transit way;

however, this master plan recommends it be provided between NE 76th Street and the transit way, allowing Sound Transit to run at a

consistent slope close to matching the elevation of the Connector.

Page 119: Redmond Central Connector
Page 120: Redmond Central Connector
Page 121: Redmond Central Connector
Page 122: Redmond Central Connector
Page 123: Redmond Central Connector