RED Limited5
RED 5 LimitedRED 5 LimitedSianaSiana Gold Project Gold Project -- PhilippinesPhilippines
Sydney Mining Club4 June 2009
Lance Govey – Executive Director Technical
For
per
sona
l use
onl
y
RED Limited5
Red 5 - at a glance….
RED – ASX (01 June): 8.8 cents
Market Cap (01 June): $58.0m
Issued Shares: 659.2m
Cash at 31 Mar 09: A$23.9m
Enterprise value A$34 (per Resource oz)
Largest Shareholders:Mathews Capital 19.5%AngloGold Ashanti 10.2%R Stanley 8.0%
For
per
sona
l use
onl
y
RED Limited5
Highly prospective location
100 million oz equivalentpotential in Surigao del Norte
Excellent local infrastructure
Strong Community support(history of mining)
Strategic land position
Secure form of mining title(Mineral Production SharingAgreement)
Red 5 in Philippines since Dec 2002
A$22 M invested at Siana
For
per
sona
l use
onl
y
RED Limited5
Momentum increaseMomentum increase……
Last 3 months:
Reserves doubled with underground resource upgrade
Positive feasibility study complete, Board review in progress
Environmental Compliance Certificate issued
Mapawa MPSA granted – satellite Resource potential
… business de-risked
For
per
sona
l use
onl
y
RED Limited5
Probable Ore Reserves
Stockpile Open Pit Underground Total*
Tonnes 0.08 3.1 1.94 5.1Au g/t 1.33 3.42 5.82 4.3Ag g/t 10.67 8.71 9.08 8.9Ounces Au 3,549 341,000 363,000 708,000Ounces Ag 28,000 870,000 566,000 1,465,000*contains minor rounding errors
88 diamond drillholes for 37,480 metres14,600 specific gravity measurements>15,000 geotechnical measurements28,500 samples assayed (seven elements)
For
per
sona
l use
onl
y
RED Limited5
Long term mine planLong term mine plan
Stockpile Open Pit Underground (Long term mine plan)
Total
3.365.839.12
630,000986,000
6.554.68.9
975,000
Tonnes 0.08 3.10Au g/t 1.33 3.42Ag g/t 10.67 8.71Ounces Au 3,549 341,000
1,885,000Ounces Ag 28,000 870,000
For
per
sona
l use
onl
y
RED Limited5
Resource still open…F
or p
erso
nal u
se o
nly
RED Limited5
Feasibility study updateFeasibility study update……
Plant and infrastructure costs updated
Open pit design and costs updated
In country contractors/suppliers used where possible
Modified waste dump design
Tailings dam detailed design
Underground mine design completed - drill and blast and road header optionsFor
per
sona
l use
onl
y
RED Limited5
Consultants to the study…
Resource estimation - Hellman & Schofield, Cube Consulting, PerthGeotechnical - Mining One, Melb, Peter O’Bryan & Associates, PerthHydrology - Meyer Water & Environmental Solutions, Perth
Open Pit mine design - RSG Global (Coffey Mining), Perth
Underground mine design - Red Rock Engineering, Perth
Process design & metallurgy - Intermet Engineering, Amdel, PerthTailings Storage design GHD - Manila, Perth; Golder - Melbourne
Underground mine equipment and operations - Sandvik Mining and Construction, Perth; Fox Mining and Engineering, Sydney
Underground paste fill - Revell Resources Pty Ltd
Underground electrical engineering - Rossi Associates, Perth
Environment & Community, EIS - BMP Environment & Community Care, Manila
For
per
sona
l use
onl
y
RED Limited5
Site layoutSite layoutF
or p
erso
nal u
se o
nly
RED Limited5
Project financials (preProject financials (pre--tax)tax)
Base case:
750,000 tpa
Gold US$800/oz Silver US$10/oz
NPV > US$ 100 million
IRR > 30%For
per
sona
l use
onl
y
RED Limited5
CostsCosts
CAPEX
Cost to first gold reduced from September 2008 estimate (US$73 million) with decreased steel prices, fuel and EPCM costs
March 2009 estimate similar but now includes working capital (US$10 million)
OPEX
Life of mine US$350 per ounce cash cost
For
per
sona
l use
onl
y
RED Limited5
Gold recovery
Gravity and CIL leach:
• open pit - 85 %, 1.2 kg/t CN
• underground LZN - 88 %, 2.2 kg/t CN
• underground HZN - 84 %, 2.4 kg/t CN
Gravity, Zn flotation, cons and tail leach:
• underground HZN – 83.4 %, 2.45 kg/t CNFor
per
sona
l use
onl
y
RED Limited5
Underground miningUnderground mining
Underhand cut and fill (top down)
Road header in ore (more productive in soft ground than conventional drill and blast, with additional benefit of less explosive on site)
Drill and blast for hard material
Paste fill ground supportFor
per
sona
l use
onl
y
RED Limited5
Why underhand cut and fill?Why underhand cut and fill?
Safe workplace for entry style mining
High mining recoveries
Low dilution
Independent of rock break technique
For
per
sona
l use
onl
y
RED Limited5
Underhand cut and fillUnderhand cut and fillF
or p
erso
nal u
se o
nly
RED Limited5
Underground design parametersUnderground design parameters
Access via a 5m by 5m, 1:7 decline in porphyry
and basalt units
Portal located 90 metres above final pit floor
50 tonne trucks
Level spacing 40m (ramps 20m up 20m down)
For
per
sona
l use
onl
y
RED Limited5
Underground designUnderground designF
or p
erso
nal u
se o
nly
RED Limited5
Requirements to operate…
Environmental Compliance Certificate granted
Feasibility study under review by MGB
In preparation:
SDMP – Social Development Management Plan
EPEP – Environmental Protection and Enhancement Programme
FMRDP – Final rehab and decommissioning plan
For
per
sona
l use
onl
y
RED Limited5
Strong community support…
Clean water project
For
per
sona
l use
onl
y
RED Limited5
...through health assistanceF
or p
erso
nal u
se o
nly
RED Limited5
… welfareF
or p
erso
nal u
se o
nly
RED Limited5
… education programmesF
or p
erso
nal u
se o
nly
RED Limited5
…and agricultural assistanceF
or p
erso
nal u
se o
nly
RED Limited5
ImplementationImplementation
Permitting and finance 3rd Qtr 2009
Plant construction commences 4th Qtr 2009
Open pit commences 1st Qtr 2010
First gold production Dec 2010
Underground portal commences 1st Qtr 2013
Underground ore production 3rd Qtr 2013
For
per
sona
l use
onl
y
RED Limited5
OpportunitiesOpportunities
Further underground extensions
- 3m at 31.6 g/t, 5m at 25.4 g/t Au
Mapawa satellite ore
- 3-4 Mt potential
Zinc concentrate production
- bi-product credit potentialFor
per
sona
l use
onl
y
RED Limited5
MAPAWA Gold Project
Exciting milestone achieved with approval and registration of MPSA 280-2009-XIII
Located 30 km north of Siana
1,482 hectares, highly prospective for gold and potentially, base metals
Strengthened regional gold exploration portfolio
Gold intersected in historic drilling at the ‘LSY’ prospect, with indications of target mineralisation of approximately three to four million tonnes, commencing at surface
Groundwork commenced
For
per
sona
l use
onl
y
RED Limited5
LSY prospectF
or p
erso
nal u
se o
nly
RED Limited5
Summary
Technically and economically viable project10 year operating life delivering 850,000 recovered ounces of low cost productionUpside with Mapawa licence grantCommunity acceptance and environmentally benign Knowledgeable supportive shareholder baseFinancing discussions in progress
Nearly there…
For
per
sona
l use
onl
y
RED Limited5
Market comparison
Source: BGF Equities
For
per
sona
l use
onl
y
RED Limited5
Contact details
Level 2, 35 Ventnor AvenueWest Perth, Western Australia 6005PO Box 1911 West Perth, WA 6872 Ph: + 61 8 9322 4455 Fax: + 61 8 9481 5950
Web Site: www.red5limited.comEmail: [email protected]
or p
erso
nal u
se o
nly
RED Limited5
Competent persons
The information in this Public Report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on, and accurately reflects, information compiled by Mr G C Edwards, Mr A L Govey and Mr W Darcey who are full-time employees of Red 5 Limited and who are Members of The Australasian Institute of Mining and Metallurgy. Mr Edwards, Mr Govey and Mr Darcey have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr Edwards, Mr Govey and Mr Darcey consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.