18
Ohio Department of Natural Resources Division of Oil & Gas Resources Management 2045 Morse Rd, Building F2 Casing Ticket Columbus, Ohio 43229 Form 55: Revised 12/97 AP! Well Number: 34-111-2-4568-00-00 Record of Casing, Cementing and Mudding Well Ov.mer: 84-11 CNX GAS CO.\IPANY LLC Lease Name: ILONA BABER ET AL S\VITZ16BHSU Well No. S\VITZ County: i\IONROE To\vnship: S\VITZERLAND Driller. Refer Top EXPRESS ENERGY SERVICES Ground Level 1303 Lat: 39.825590 Tool Rotary Long: 80.924190 Date Spudded: 06/01/2015 Date Cotnpleted: Inspector \VILLIAi\I STOLARIK AD Meets Requirements '../ AD on Permit Comments: The said well by Express Energy's top hole rig with a 100' x 36" conductor borehole being drilled and 100' of 30" conductor being set. Express Energy cement service cemented the casing using 275 sacks of class A -2o/o calcium .50 pound per sack loss circulation material 50°/o open hole excess cement with good cement returns witnessed to surface and the cement mix water tested for chlorides and PH. 09/17/2016 -On site inspection to witness the 18.625"surface-mine string combination with Patterson Drilling rig# 801 on location and a 24" borehole drilled to 770' with the mine seam encountered at 690' to 697', a 18.625" 87.5 lb/ft J-55 Buttress thread casing string was ran to a depth of 742' with a hydraulic operated inflatable packer set at 456' and a DV tool set above the packer at 447'. Allied Cement service was on location to cement the casing with the bottom section between the casing shoe and mine void cemented by first pumping 50 barrels of 6°/o gel followed by 260 sacks of class A-2% calcium cement that was displaced with 226 barrels of fresh water; the swell packer was the inflated by increasing the internal casing pressure to 1,047 psi and then the DV tool was then opened with circulation established to surface before beginning the upper section cement stage by first pumping 50 barrels of 6% gel spacer followed by 1079 sacks or 230 barrels of class A-2% calcium cement with the cement displaced with 196 barrels of fresh water and casing integrity verified by pressure during the landing of both cement plugs on both cement sections with cement returns to surface on the last stage. FLO Ll*_H_o_Ie_l _F_ie_Id_E_nt_r_y __________ ICONDITION LIN_e_w_---; Bot Diam [=---161 Top 01 LENGTH =Set Dt [ 6/3/20151 String Comments Casing Condition, Weight and Cement Basket conductor borehole-drilled dry, no fresh water present. BOC 01 TOC 0 DT_CM I I DURATION I I CMT_coN I I INSPECTOR lw1LLIAM STOLARIK CLASS_CMT: I I SACKS I I YIELD CJ WEIGHT I Cement 1 I Cement 2 I Printed by Inspector: stolarik@ 11/9/2016 9:52:24 AM Page 1of3

Record of Casing, Cementing and Mudding

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Record of Casing, Cementing and Mudding

Ohio Department of Natural Resources

Division of Oil & Gas Resources Management

2045 Morse Rd, Building F2

Casing Ticket Columbus, Ohio 43229

Form 55: Revised 12/97

AP! Well Number:

34-111-2-4568-00-00

Record of Casing, Cementing and Mudding

Well Ov.mer: 84-11 CNX GAS CO.\IPANY LLC

Lease Name: ILONA BABER ET AL S\VITZ16BHSU Well No. S\VITZ

County: i\IONROE To\vnship: S\VITZERLAND

Driller.

Refer Top

EXPRESS ENERGY SERVICES

Ground Level 1303 Lat: 39.825590

Tool Rotary

Long: 80.924190

Date Spudded: 06/01/2015

Date Cotnpleted:

Inspector \VILLIAi\I STOLARIK

-~ AD Meets Requirements

'../ AD on Permit

Comments: The said well by Express Energy's top hole rig with a 100' x 36" conductor borehole being drilled and 100' of 30" conductor being set. Express Energy cement service cemented the casing using 275 sacks of class A -2o/o calcium .50 pound per sack loss circulation material 50°/o open hole excess cement with good cement returns witnessed to surface and the cement mix water tested for chlorides and PH. 09/17/2016 -On site inspection to witness the 18.625"surface-mine string combination with Patterson Drilling rig# 801 on location and a 24" borehole drilled to 770' with the mine seam encountered at 690' to 697', a 18.625" 87.5 lb/ft J-55 Buttress thread casing string was ran to a depth of 742' with a hydraulic operated inflatable packer set at 456' and a DV tool set above the packer at 447'. Allied Cement service was on location to cement the casing with the bottom section between the casing shoe and mine void cemented by first pumping 50 barrels of 6°/o gel followed by 260 sacks of class A-2% calcium cement that was displaced with 226 barrels of fresh water; the swell packer was the inflated by increasing the internal casing pressure to 1,047 psi and then the DV tool was then opened with circulation established to surface before beginning the upper section cement stage by first pumping 50 barrels of 6% gel spacer followed by 1079 sacks or 230 barrels of class A-2% calcium cement with the cement displaced with 196 barrels of fresh water and casing integrity verified by pressure during the landing of both cement plugs on both cement sections with cement returns to surface on the last stage.

FLO Ll*_H_o_Ie_l _F_ie_Id_E_nt_r_y __________ ICONDITION LIN_e_w_---;

Bot ~ Diam [=---161 Top 01 LENGTH =Set Dt [ 6/3/20151 ~-~

String Comments Casing Condition, Weight and Cement Basket

conductor borehole-drilled dry, no fresh water present.

BOC 01 TOC 0 DT_CM I I DURATION I I ~.WITNESSED ~-;:=.~---====--~---========-~

CMT_coN I I INSPECTOR lw1LLIAM STOLARIK ~=====================;----~

CLASS_CMT: I I SACKS I I YIELD CJ WEIGHT I

Cement 1 I

CLASS_CMT~2-:~I ---------~1-s_A_C_K_S2~1----Y-IE_L_D~CJ-~w-E-IG_H_T--~----l

Cement 2 I ~----------------------------------------

Printed by Inspector: stolarik@ 11/9/2016 9:52:24 AM Page 1of3

Page 2: Record of Casing, Cementing and Mudding

FLO ;'-•c_on_d_u_ct_o_r _P_cip_e_F_ie_ld_E_nt--'ry'---------~lcoNDITION :~-]

Bot ~ Diam [ ____ lQJ Top L___~ol LENGTH =Set Dt ! 6/31201 sl

Condition, Weight and Cement Basket

String Comments Casing 1.375 wall pipe; weld connections.

---------------------~

BOC 1001 TOC D DT_CM L_I ___ __J DURATION '----~21 ~ WITNESSED

CMT_CON !EXPRESS ENERGY SERVICES I INSPECTOR IWILLIAM STOLARIK

CLASS_CMT: !Class A Cement I SACKS 2751 YIELD [1}fil WEIGHT I 15.61

Cement 1 I Class A -2% Calcium, .50 pound per sack loss circulation material.

CLASS_CMT2: I I SACKS2 I I YIELD I I WEIGHT I

Cement 2 I L_ ______________________________ ~

FLO l*Hole 2 Field Entry -~!CONDITION ~jN_e_w_~

Bot ~Diam L____2___,41 Topi'-__ ol LENGTH c=J Set Dt I 9/17/20161

String Comments Casing Condition, Weight and Cement Basket

Mine -surface combination, Mine seam @ 690' to 697' approximate.

BOC ol TOC LJ DT_CM DURATION 21 ~·WITNESSED

CMT_CON INSPECTOR !WILLIAM STOLARIK '--=====================---___J

CLASS_CMT: SACKS YIELD =WEIGHT ---'=====================-------======--------'====-----__b--~

Cement1 LI _______________________________ __j

CLASS_CMT2: I I SACKS2 I YIELD =WEIGHT -'=====================-----'=====c_ __ ---====----_b--=

Cement 2

Printed by Inspector: stolarik@ 11/9/2016 9:52:24 AM Page 2 of 3

Page 3: Record of Casing, Cementing and Mudding

FLO l~M_i_ne_St_ri_n_g_F_ie_ld_E1_1t_ry _______ ~ICONDITION ~IN_e_w_~

Bot ~Diam [II6251 Top [==°J LENGTH c:=J Set Dt I 9/17/20161

String Comments Casing Condition, Weight and Cement Basket

87.5 lb/ft buttress thread casing,Formation swell packer@ 456' - basket@ 504'.

BOC 7421 TOC 0 DT_CM I

CMT_CON !ALLIED OIL & GAS SERVICES

CLASS_CMT: !class A Cement

=1 DURATION I I ~ WITNESSED

I INSPECTOR lwILLIAM STOLARIK I

SACKS 260[ YIELD CTI WEIGHT I 15.61

Cement 1 I Bottom balance job between the 18.625" casing shoe and mine void.

CLASS_CMT2: IC!ass A Cement I SACKS2 I 10791 YIELD I 1.21 WEIGHT I 15.6

Cement 2 !Top section cement job above the Mine section, swwell packer and DV tool ran, packer at 456'.

Printed by Inspector: stolarik@ 11/9/2016 9:52:24 AM Page 3 of 3

Page 4: Record of Casing, Cementing and Mudding

September 14, 2016

Consol Energy

SWITZ-168

Cementing Proposal 13.375" Intermediate 1

Prepared For: Ryan Coffman

Business Phone: (724) 485-4044

Mobile Phone: (724) 984-2193 Email: [email protected]

Service Point: Bridgeport, WV

District Manager: Randy Mackinnon Business Phone: 304-626-3078

Mobile Phone: 740-801-0709

email: [email protected]

Sales Manager: Vince McKibben Business Phone: 304-677-8801

Mobile Phone: 304-677-8801 email: [email protected]

THdNtf you fOff roun fJUSf N~5S!

Page 1

Page 5: Record of Casing, Cementing and Mudding

Operator Name:

Wei/Name:

September 14, 2016

Job Information

Previous Casing

Outer Diamet er

Inner Diameter

Linear W eight

Casing Grade

Open Hole

Inner Diamet er

Consol Energy

SWITZ-168

30% Excess from 2543 ft to 780 ft

Casing

Outer Diameter Inner Diamet er

Casing Weight

Casing Grade

Operator Name:

Wei/Name:

September 14, 2016

Pump Schedule

Consol Energy

SWITZ-168

13.375" Intermediate 1

0 to 780 ft. MD

18 5/8 In. 17.755 in.

87.50 lbs/ft

l ·55

780 t o 2543 ft. MD

17 1/2 In.

1592.0 ft3

0 to 2543 ft. M D

13 3/8 in.

12.615 In.

54.50 lbs/ft

J-55

13.375" Intermediate 1

Surface Density Estimat ed Avg. Fluid# Fluid Type · Name

(lb/gal) Rate (bbl/min)

Soacer 1 Fresh Water

Soacer 2 Gel Spacer

Lead 1 Class A

Tail 1 Class A

Displacement 1 Fresh Water

8.34 6

8.60 6

15.60 6

15.60 6 8.34 8

TOTALS

Estimat ed pump time @ 4 bpm

Estimated pump time @ 8 bpm

Page 2

Down hole

Volume (bbl)

5.0

50.0

377.9

22.6 391.0

846.S 3.53 1.76

Water

Required (bbl.)

hrs

hrs

5.0

50.0

223.5

13.2 391.0

682.7

Top of

Fluid (ft)

0

0

0

2043

0

Page 6: Record of Casing, Cementing and Mudding

Operator Name:

Wei/ Name:

September 14, 2016

Fluids Design

Consol Energy

SWITZ-168

Spacer 1 Fresh Water

Spacer 2 Gel Spacer

Lead 1 Class A

Base Slurry Class A Cement

13.375" Intermediate 1 Fluid Density: Fluid Volume:

Fluid Density: Fluid Volume:

0.25 lb/sk Flo-Seal (Polyflake LCM) Slurry Density:

Tail 1 Class A

Base Slurry Class A Cement 2% BWOC Calcium Chloride

Displacement 1 Fresh Water

Page 3

Slurry Yield: Mixing Water Total sacks Total barrels

Slurry Density: Slurry Yield: Mixing Water Total sacks Total barrels

Fluid Density: Fluid Volume:

8.34 lb/gal 5.0 bbls

8.60 lb/gal 50.0 bbls

15.60 lb/gal 1.18 ft'/sk 5.23 gal/sk 1796 sks

377.9 bbls

15.60 lb/gal 1.20 ft'/sk 5.25 gal/sk 106 sks

22.6 bbls

8.34 lb/gal 391.0 bbls

Page 7: Record of Casing, Cementing and Mudding

Operator Name:

Wei/ Name:

September 14, 2016

Consol Energy r:~LLIED SWITZ-168

• OFS,LLC

Cost Estimate 13.375" Intermediate 1

Services Qty UoM Unit Price Total Price

Casing Pump Charge 2001' to 3000' 1.00 Min. 4 hr $891.38 $891.38

Data Acquisition 1.00 per job ' $423.50 $423.50

Cementing Head Rental with Manifold - High Pressure 1.00 per day $218.75 $218.75

Field Bin Rental, per five day period or fraction 2.00 per day $225.00 $450.00

Bulk Materials Service Charge 1923.91 per cu. ft. $0.69 $1,322.69

Ton Mileage (per ton per mile basis, from nearest operating location) 2691.54 ton-mile $0.69 $1,850.44

light Vehicle Mileage, round trip from nearest operating location 60.00 per mile $1.31 $78.45

Heavy Vehicle Mileage, round trip from nearest operating location 120.00 per mile $1.93 $231.00

Subtotal: $5,466.20

Materials Qtv UoM Unit Price Total Price

Gel Spacer 50.00 oer bbl $7.50 $375.00 Class A 1796.00 per sack $6.38 $11,449.50

CLC-CPF 449.00 per lb $1.31 $589.31

Class A 106.00 oer sack $6.38 $675.75

CA-100 200.00 per lb $0.39 $77.50

CDF-lOOL 1.00 per gal $22.21 $22.21

CR-1000 200.00 per lb $1.13 $225.00

Subtotal: $13,414.27

TOTAL EXCLUDING AoomoNAL ITEMS: I $11,sso.41

The data contained In this proposal Is based on the best Information available at the time of writing and Is subject to further analysis and testing. The prices contained In this proposal are estimates and may vary depending on the work actually performed. Pricing does not Include federal, state and local taxes or royalties. This quotation Is based on being awarded the work on a first call basis and may be subject to change for second or third call. This quotation Is valid for thirty (30) days after listed proposal date, and may be subject to change If the work Is performed more than thirty (30) days after the listed proposal date.

Page 4

Page 8: Record of Casing, Cementing and Mudding

TERMS and CONDITIONS

Allied OFS, LLC performance of services and sale of materials Is expressly conditioned upon the applicability of the Terms and Conditions listed on the service ticket provided at the job site. The Terms and Conditions Include, among other things, an Indemnity In favor of Allied OFS, LLC from Customer for damage to the well bore, reservoir damage, loss of the hole, blowouts and loss of control of the well, even If caused by the negligence or other fault of Allied OFS, LLC. The Terms and Conditions also limit the warranties provided by Allied OFS, LLC and the remedies to which Customer may be entitled In the event of a breach of warranty by Allied OFS, LLC. For these reasons, we strongly recommend that you carefully review a copy of the Terms and Conditions.

By requesting that Allied OFS, LLC perform the services described herein, Customer acknowledges that such Terms and Conditions are applicable to the services. Further, by requesting the services, Customer warrants that Its representative on the well location or other service site will be fully authorized to acknowledge such Terms and Conditions by executing a service ticket or other document presented by Allied OFS, LLC containing such Terms and Conditions.

In the event that Customer and Allied OFS, LLC have executed a Master Services Agreement covering the work to be performed, such Master Services Agreement shall govern In place of the Terms and Conditions.

Page 5

Page 9: Record of Casing, Cementing and Mudding

JP 7'i .J

CASING SIZE ~ WT 23.00 WELL 5vv1 'fL lt.B I DRIFT GRADE P-125 TORQUE- MIN=5000#, MAX-5000#, 0

COLLAPSE- 2570 BURST 3950

CAP- 0.0758 DISPL- 0.0146 31 C.R nf tYi t u/"3~

MUDWf

BUOYANCY FACTOR

Drilled depth: 770 KB Jts on loca tion 70

Casing shoe depth: 2529.1 8 2&.60 Jts run 60

Float collar depth: 2518. l l Jts out 10

Casin2 settin2 Depth ITEM JOINT LENGTH DEPTH TOTAL CAP. STRING REMARKS

NO (FT) (Fl) (Fl) 0.0758 WT.

SHOE A 1.80 1.80 2529.18 PUPI 9.27 11.07 2527.38 I c FLT COL 1.40 12.47 2518.11 Casini.? I 43.38 55.85 2516.71 c Casing 2 43.08 98.93 2473.33 I

Casing 3 41 .23 140.16 2430.25 I c Casing 4 41.91 182.07 2389.02

I

Casing 5 41.22 223.29 2347.11 c Casing 6 41.47 264.76 2305.89 Casing 7 36.82 301.68 2264.42 c Casing 8 42.56 344.14 2227.60 Casing 9 43.30 387.44 2185.04 c Casing JO 39.75 427.19 2141.74 Casing 11 42.87 470.06 2101.99 c Casing 12 35.34 505.40 2059.12 Casing 13 40.90 546.30 2023.78 c Casing 14 43.20 589.60 1982.88 Casing 15 42.96 632.46 1939.68

I c Casing 16 41 .20 673.66 1896.72 Casing 17 39.47 713.13 1855.52 c Casing 18 40.74 753.87 1816.0S I

Casing 19 42.37 796.24 1775.31 c Casing 20 42.58 838.82 1732.94 I

Casing 21 41.58 880.40 1690.36 I c Casing 22 40.56 920.96 1648.78 I

Casing 23 40.52 961.48 1608.22 c Casing 24 41.61 1003.09 1567.70 Casing 25 41.98 1045.07 1526.09 I c Casing 26 41.97 1087.04 1484.11 I Casing 27 40.46 1127.50 1442.14 c Casing 28 40.31 1167.81 1401.68 Casing 29 42.25 1210.06 1361.37 c Casing 3 0 42.77 1252.83 1319.12 I Casing 31 41 .66 1294.49 1276.35 I c Casing 32 37.68 1332.17 1234.69 Casing 33 42.20 1374.37 1197.01 ' c Casing 34 37.96 1412.33 1154.81

Casing 35 40.15 1452.48 1116.85 c

Page 10: Record of Casing, Cementing and Mudding

Casing 36 35.60 1488.08 1076.70 Casing 37 46.86 1534.94 1041.10 c Casing 38 37.94 1572.88 994.24 Casing 39 42.32 1615.20 956.30 c Casing 40 42.00 1657.20 913.98 Casing 41 41 .85 1699.05 871.98 c Casing 42 41.88 1740.93 830.13 Casing 43 37.51 1778.44 788.25 c Casing 44 42.05 1820.49 750.74 Casing 45 41.96 1862.45 708.69 c Casing 46 39.18 1901.63 666.73 Casing 47 42.85 1944.48 627.55 c Casing 48 42.48 1986.96 584.70 Casing 49 42.38 2029.34 542.22 c Casing so 41 .44 2070.78 499.84 Casing 51 43.49 2114.27 458.40 c Casing 52 45.05 2159.32 414.91 Casing 53 39.65 2198.97 369.86 c Casir11? 54 43.95 2242.92 330.21 Casing 55 41.32 2284.24 286.26 c Casing 56 44.84 2329.08 244.94 Casing 57 41.97 2371.05 200.10 c Casing 58 43.19 2414.24 158.13 Casing 59 40.09 2454.33 114.94 c Casing 60 39.55 2493.88 74.85 PUP 2.00 2495.88 35.30 WHEAD 3.30 2499.18 33.30 LJ 30.00 Casing 61 42.63 2636.41 Casing 62 41.96 2578.37 Casing 63 40.96 2619.33 Casing 64 42.15 2661.48 Casing 65 41 .71 2703.19 Casing 66 42.67 2745.86 Casing 67 42.52 2788.38 Casing 68 42.39 2830.77 Casing 69 40.22 2870.99 Casing 70 42.65 2913.64 Casing 71 Casing 72 Casing 73

Casing 74 Casing 75 Casing 76 Casing 77 Casing 78 Casing 79 Casing 80 0.00 Casing 81 0.00 Casing 82 o.oo Casing 83 0.00 Casini! 84 0.00

Casing 85 0.00

Page 11: Record of Casing, Cementing and Mudding

September 14, 2016

Consol Energy

SWITZ-168

Cementing Proposal 18.625" Surface

Prepared For: Ryan Coffman

Business Phone: (724)485-4044

Mobile Phone: (724) 984-2193

Email: [email protected]

Service Point: Bridgeport, WV

District Manager: Randy Mackinnon

Business Phone: 304-626-3078

Mobile Phone: 740-801-0709

ema i I: Randy. M ackinnon@al I iedservices .com

Sales Manager: Vince McKibben

Business Phone: 304-677-8801

Mobile Phone: 304-677-8801

email: [email protected]

'/HANK YOU FOR YOUR BUSINl;'SSI

Page 1

Page 12: Record of Casing, Cementing and Mudding

Operator Name:

Wei/Name:

September 14, 2016

Consol Energy r:~LLIED SWITZ-168

!iii'i OFS,LLC

Job Information

Previous Casing

Outer Diameter

Inner Diameter

Open Hole

Inner Diameter

18.625" Surface

Oto 100 ft. MD

30 in.

29.438 in.

30% Excess from 780 ft to 100 ft

100 to 780 ft. MD

24 in.

1104.6 ft3

Casing

Outer Diameter

Inner Diameter

Linear Weight

Casing Grade

Stage Tool Depth

Operator Name:

Wei/Name:

September 14, 2016

Pump Schedule

Fluid#

Stap;e 1 Spacer 1

Stage 1 Spacer 2

Sta.e:e 1lead1

Sta11:e 1Diso1

Circulate

Sta11:e 2 Soacer 1

Sta2e 2 Soacer 2

Stage 2 lead 1

Sta2e 2 Diso 1

Consol Energy

SWJTZ-168

0 to 780 ft. MD

18 5/8 in.

17.755 in.

87 .50 lbs/ft

J-55

680 ft. MD

18.625" Surface

Fluid Type- Name

Fresh Water

Gel Spacer

Class A

Fresh Water

Drop Opening Too~ Circulate

Fresh Water

Gel Spacer

Class A

Fresh Water

Surface Density Estimated Avg.

(lb/gal) Rate {bbl/min)

8.34 6

8.60 6

15.60 6

8.34 8

8.34 5

8.60 5

15.60 5

8.34 5

TOTALS

Estimated pump time@ 4 bpm

Estimated pump time@ 8 bpm

Page 2

Downhole

Volume (bbl)

5.0

50.0

55.4

230.0

5.0

50.0

230.0

196.0 821.S

3.42

1.71

Water

Required (bbl,)

hrs hrs

5.0

50.0

32.5

230.0

5.0

50.0

134.8

196.0

703.3

Top of

Fluid

(ft)

465

480

630

0 680

0

0

0

0

Page 13: Record of Casing, Cementing and Mudding

Operator Name:

Wei/Name:

September 14, 2016

Fluids Design

Consol Energy

SWITZ-168

Stage 1Spacer1 Fresh Water

Stage 1 Spacer 2 Gel Spacer

Stage 1 Lead 1 Class A

Base Slurry Class A Cement

2% BWOC Calcium Chloride

Stage 1 Olsp 1 Fresh Water

18.625" Surface

Drop Opening Tool, Open Stage Tool Per Manufacturer's Recommended Procedures

Circulate Well~ Begin Second Stage

Stage 2 Spacer 1 Fresh Water

Stage 2 Spacer 2 Gel Spacer

Stage 2 Lead 1 Class A

Base Slurry Class A Cement

2% BWOC Calcium Chloride

Stage 2 Disp 1 Fresh Water

Page 3

Fluid Density:

Fluid Volume:

Fluid Density:

Fluid Volume:

Slurry Density:

Slurry Yield:

Mixing Water

Total sacks

Total barrels

Fluid Density:

Fluid Volume:

Fluid Density:

Fluid Volume:

Fluid Density:

Fluid Volume:

Slurry Density

Slurry Yield:

Mixing Water

Total sacks

Total barrels

Fluid Density:

Fluid Volume:

8.34 lb/gal

5.0 bbls

8.60 lb/gal

50.0 bbls

15.60 lb/gal

1.20 ft1/sk

5.25 ga1/sk

260 sks

55.4 bbls

8.34 lb/gal

230.0 bbls

8.34 lb/gal

5.0 bbls

8.60 lb/gal

50.0 bbls

15.60 lb/gal

1.20 ft1/sk

5.25 gal/sk

1079 sks

230.0 bbls

8.34 lb/gal

196.0 bbls

Page 14: Record of Casing, Cementing and Mudding

WellView .. Tally(SWITZ16BHSU) Casing Description: Coal/Mine SetDepth:741.1 Run Date:

Run? Run# Ref# Len (ft)

- - . - . " -- ·---·--··---p p 2

p 3

p 4 2

p 5 3

p 6 4

p 7 5

p 8

p 9 6

p 10

p 11

p 12

p 13

p 14 7

p 15 8

p 16 9

p 17 10

p 18 11

p 19 12

p 20 13

p 21 14

p 22 15

p 23

p 24

r 16

r 17

r 18

r 19

r 20

r 21

Date printed: 911712016 2:48:43 PM

Item Des

- -- -----.. ··· '"" ............. -.. 1.80 Float Shoe

0.00 Baffle Plate

43.03 Casing Joints

42.45 Casing Joints

42.99 Casing Joints

42.77 Casing Joints

42.97 Casing Joints

20.97 Casing Pup Joint

42.96 Casing Joints

4.30 Casing Pup Joint

9.13 Packer

3.20 Stage Tool

3.78 Casing Pup Joint

42.93 Casing Joints

42.99 Casing Joints

42.98 Casing Joints

42.97 Casing Joints

42.98 Casing Joints

43.00 Casing Joints

42.99 Casing Joints

43.01 Casing Joints

43.02 Casing Joints

20.98 Casing Pup Joint

36.45 Landing Joint

42.99 Casing Joints

42.98 Casing Joints

42.93 Casing Joints

42.98 Casing Joints

43.00 Casing Joints

42.98 Casing Joints

OD (in) -- ____________ ,_, ... --· Wt (lb/ft) - "" - - --- ---- _____ ,. -

'•·····~---"~"·· .. '. 87:5iiK-55 87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

87.50 K-55

Grade ID (in) Top Thread ·-----··---

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Buttress Thread

Page: 1 of 3

Page 15: Record of Casing, Cementing and Mudding

WellView -' Tally(SWITZ16BHSU) Casing Description: Coal/Mine SetDepth:741.1 Run Date:

Centralized?

r r p r p r p r p r r r r p r p r p r p r p r r r r r r r r

Date printed: 9/17/2016 2:48:43 PM

# Centralizers Cent Note Ext Jwlry Ref ID Cum Len (ft) Top (ftKB)

.. -·-··---·-·-··-739.3

1.80 739_3

44.83 696.3

87.28 653.8

13027 610.8

173.04 568.1

216.01 525.1

236.98 504.1

279.94 461.2

28424 456.9

293.37 447.7

296c57 444.5

300.35 440.8

343.28 397.8

38627 354.8

42925 311.9

47222 268.9

515.20 225.9

558 .. 20 182.9

601.19 139.9

64420 96.9

687.22 53.9

70820 32.9

744.65 -3.5

Page: 2 of 3

Page 16: Record of Casing, Cementing and Mudding

WellView. Tally(SWITZ16BHSU) Casing Description: Coal/Mine Set Depth: 741.1 Run Date:

Btm (ftKB) Vol Disp Cum (bbl)

-· " ___ ,,,, __ , -- ----··741:1·- --- -----·------·-·---- .. -- -

739.3

739.3

696.3

653.8

610.8

568.1

525.1

504.1

4612

456.9

447.7

444.5

440.8

397..8

354.8

311.9

268.9

225.9

182.9

139.9

96.9

53.9

32.9

Date printed: 9/17/2016 2:48:43 PM

Cum Wt (1000lb~ -"·-· .... -"-"'-"" " ~ ..... ---···-· ""' -·--

0.1

1.4

2.7

4.0

5.4

6.7

7.3

8.7

8.8

9.1

9.2

9.3

10.6

11.9

13.3

14.6

15.9

17.3

18.6

19.9

21.2

21.9

23.0

0

0

4

8

11

15

1.9

21

25

25

26

26

26

30

34

38

41

45

49

53

56

60

62

65

Page: 3 of3

Page 17: Record of Casing, Cementing and Mudding

STATE OF OHIO

DEPARTMENT OF NATURAL RESOURCES

OWNER NAME, ADDRESS

CNX GAS COMPANY LLC 200 EVERGREENE DRIVE

W AYNESBURG

Division of Oil and Gas Resources Management

WELL PERMIT

PA 15370

DATE ISSUED

2/9/2015

API W ELL NUMBER

34-111-2-4568-00-00

PERMIT EXPIRES

2/8/2017

TELEPHONE NUMBER (724) 627-1246

IS HEREBY GRANTED PERMISSION TO: Drill New Well , horizontally AND ABANDON W ELL IF UNPRODUCTIVE

PURPOSE OF WELL: Oil & Gas

COMPLETION DATE IF PERMIT TO PLUG:

DESIG NATION AND LOCATI ON:

LEASE NAME WELL NUMBER COUNTY CIVIL TOWNSHIP

ILONA BABER ET AL SWITZ16BHSU MONROE SWITZERLAND

CORRECTION TRACT OR ALLOTMENT SURFACE FOOTAGE LOCATION TARGET FOOTAGE LOCATION

261'SL & 486'WL OF SEC 5 412'NL & 375'EL OF SEC 18 (W)

TYPE OF TOOLS: Air Rotary/Fluid Rotary

PROPOSED TOTAL DEPTH 21465 FEET

GROUND LEVEL ELEVATION 1302 FEET

SPECIAL PERMIT CONDITIONS: Perm it is subject to the attached terms and/or conditions

Horizontal Drilling Well Permit Conditions

Horizontal Well/Pre-Permitting Site Condit ions

SURFACE NAD27

X: 2442530 Y: 668734

LAT: 39.825496666932

LONG: -80.9243654544736

TARGET NAD27

2436867

678841

39.8535089284295

-80.943904548741 5

GEOLOGICAL FORMATIO N($) :

POINT PLEASANT

Water Well Sampl ing Results must be Submitted Prior to Drilling

CASING PROGRAM (CASING MUST BE C ENTRALIZED AND IS SUBJECT TO APPROVAL OF THE OIL AND GAS INSPECTOR):

30" CONDUCTOR A PPROX. 100' CEMENTED TO SURFACE

18 5/8" SURFAC E CA SING M INIMUM OF 780' CEMENTED TO SURFACE

13 3/8" INTERMEDIATE APPROX.2469' AND CEMENTED

9 5/8 " INTERM EDIATE A PPROX.9189' AND CEMENTED

5 112" PRODUCTION CASING TO T.D. CEMENTED IF PRODUCTIVE

"BLOW OUT PR EVENTOR REQUIRED" HAZA RDOUS CON DITIONS MAY BE ENCOUNTERED

This permit is NOT TRANSFERABLE. This permit, or an exact copy thereof, must be displayed in a conspicuous and easily accessible place at the well site before permitted activity commences and remain until the well is completed. Ample notification to inspector is necessary.

OIL A ND GAS WELL INSPECTOR:

WILLIAM STOLARIK (740) 507-6592 BRENT BEAR - Supervisor (740) 412-2945 DISTRICT#: (740) 588-0631

INSPECTOR NOTIFICATION

The oil and gas inspector must be notified at least 24 hours prior to: 1. Commencement of site construction 2. Pit excavation and c losure 3. Commencement or dri lling, reopening, converting or plugback operations 4. Installation and cementing or all casing strings 5. BOP testing 6. Well stimulation 7. Plugging operations 8. Well pad construction

The oil and gas inspector must be notified immediately upon: 1. Discovery of defective well construction 2. Detection of any natural gas or H2S gas during drilling in urban areas 3. Discovery or defective well construction during well stimulation 4. Determination that a well is a lost hole 5. Determination that a well is a dry hole

FLARING NOTIFICATION The oil and gas inspector and local fire authority must be notified prior to flaring.

DNR 5606 (Rev. 6110)

FlREANDEM ERGENCYNUMBERS

FIRE : - 911

MEDICAL SERVICE - 911

CORRECT ION TO CASING PROGRAM (06/03/2015)

Richard J. Simmers CHIEF, Division or Oil and Gas Resources Management

Page 18: Record of Casing, Cementing and Mudding

• 9800 Richmond Avenue Suite 700 Houston, TX 77042 (713) 625-7400

Your sense of WELL-Being

Date District ,.

F \( Ticket No. ,, '}(,.

Company I Rig No

Lease Well No. 0 County , ,. State

Location I ' Field { I ' '

CASING DATA: Conductor 9 PTA D Squeeze D Misc D

Surface D Intermediate D Production D Liner D

Size _ _ _ _ __ Type Weight Collar _ _ _

Drill Pipe: Size ____ Weight _ _____ Collars. _____ _

Open Hole: Size T.D. ft. P.B. to. _____ ft.

CAPACITY FACTORS:

Casing: --'----'--- Lin. ft./Bbl.. ____ _ Bbls/Lin ft. , /(

Open Holes: Bbls/Lin ft. --- - - -Lin. ft./Bbl. _ _ __ _

Drill Pipe: Bbls/Lin ft. ------Lin. ft./Bbl. ___ _ _

Annulus: Bbls/Lin ft. ------Lin. ft./Bbl. ____ _

Bbls/Lin ft. ------Lin. ft./Bbl. _ ___ _

CEMENTING LOG Stage No.

CEMENT DATA:

SpacerType: _ __.'--""---L..:..1.-------------- -Amt. 11 o t Sks Yield. _____ ft3/sk Density ____ __ PPG

LEAD: Pump Time _ _ 1'-'--:SL......I.'- -=---- hrs Type { f '>$ 1 ) /.

~r--'--~~"'---.....i...-=-(-~r~~/ _ _ Excess _ _ __,.1~1-=-Y.:..t.-___ _ _

Amt. 1 ?'5 1Sks Yield--'-1-'-t ""£ ___ ft3/sk Density_~''"""'''"'-' '""I~ ___ PPG

TAIL: Pump Time ________ hrs Type _________ _ ___ _______ ____ Excess _________ _

Amt. Sks Yield _ ____ ft3/sk Density PPG

WATER: Lead ) . )f, gals/sk Tail. _ _____ gals/sk Total _ _ Bbls.

7, I</

Pump Trucks Used.__, _ _,_· -' - - - -------------­

Bulk Equip._ ' _ _,)'-f'------ ----------- ----

Float Equip Manufacturer _ ___ ___ _ _________ _

Shoe: Type _________ _ _ __ Depth _______ _

Float: Type Depth _______ _

Centralizers: Quantity _ ____ Plugs Top _____ Btm. ____ _

Stage Collars - ----------- - - - - ------Special Equip. _ _________ _________ _ _ _

Disp. Fluid Type ______ ,_Amt. ____ Bbls. Weight ____ ,PPG

· ,,, ~ A uo/Type Weight PPG ~ . Perforations· ft to ft Amt From I.

COMPANY REPRESENTATIVE ~, 'd t/1711 N'l'tll-A J 4 -"////'/ CEMENTER ") < .·,S. I

TIME PRESSURES PSI FLUID P6~PED bATA

AM/PM DRILL PIPE ANNULUS TOTAL FLUID Pumped Per RATE REMARKS

CASING T1tne Period Bbls Min

xc) On Location

r1s Pre job Safety Meeting

< J JO Rig Up

,. rs )( I '> (r t,., / c. ' ' .JO Preflush with H20 ...

c7 ')() I

I ' r'> f>\.1 '1 J 711 r.i I )~ ' 1 . <.. I Cement Mudscaled at µ Mudscaled Throughout Job

- ?< •111 I ·r, I Mix Water Used

I() I <: '-( () f)( ) ~ •'h I 1< . ' ) . <=; <; Displaced with H,O

I ( -S ~ Shut Down

/()r;{> Pre Rig Down Meeling

I It Jf'i Rig Down/Clean Up

1 t'r Leave Location

J 1/ Water PH

/ ,90 Water Temp.

y~. ')• Cement Temp.

5 Bbl. Cement to Surface