Reconstruction Proposal

Embed Size (px)

Citation preview

  • 8/16/2019 Reconstruction Proposal

    1/3

    1 Background

    In the early hours of 25 April, 2015 a magnitude 7.8 earthuake occurred in !epal, the "iggestearthuake in o#er 80 years. $he earthuake %as follo%ed "y se#eral aftershocks, including amagnitude &.7 earthuake on ' (ay 2015 %hich triggered many areas of the !epal %here to%ns and

    #illages ha#e "een cut off "y the se#ere damage. In )irtipur only '* li#es %ere lost %ith *51*residential "uildings completely "roken do%n and '157 "uildings %ere partially damaged.

    $he historically, culturally and archeologically famous )irtipur suffered huge human and economic loss. Almost all temples, patis pau%as and other pu"lic "uildings are at higher degree of risk in terms of itsser#icea"ility and cultural #alues. +eople are %orried a"out etinction of history, architecture andci#ili-ation of )irtipur. ence )irtipur (unicipality as the responsi"le go#ernmental organi-ation it shalltake o#erall management of such assets in )irtipur. $ill date no ma/or study in terms of technicale#aluation and social e#aluation of our near"y pu"lic assets has "een kept in priority "y themunicipality hence early and timely planned maintenance is essential in order to preser#e our architecture and technology and to hando#er the culture, art and technology to the upcomingengineers.

    $he recent earthuake most of the temples are demanding great degree of maintenance and repair acti#ities as these structures are the edge of its eistence. $herefore the municipality should keep itsintention to%ards the reconstruction of the damaged temples through the sustaina"le, resilient andplanned manner.

    2 B3$I4

    $he main o"/ecti#e of this proposal is to assist municipality in pro#iding the technical assistance in thepreparation of a detail study report of the reconstruction plan of historically, culturally andarcheologically important "uildings structures, sites and places damaged due to the de#astatingearthuake %ithin )irtipur (unicipality.

    pecifically, the o"/ecti#es are

    • $o record eisting conditions of temples, dur"ars, gum"as and other pu"lic structures

    systematically

    • $o assess structural integrity of the temples for its safe use

    • $o prepare detail architectural dra%ings of the temples, dur"ars gum"as etc

    • $o pro#ide design and dra%ings of the structural components that need to "e repaired 6 replaced to

    make the structure usa"le

    • $o prepare a detailed cost estimate for maintenance 6 repair 6 reha"ilitation %orks

    3 Scope of Works:

    econnaissance sur#ey, Inspection and ecording

    9e %ill conduct reconnaissance sur#ey of all the damaged cultural heritages, in#entory data and other related data if any.

    :sing the standard Inspection forms, complete the appropriate inspection report forms. $he condition,

    etent and urgency are noted in the form. Also identify the reuired maintenance items and record inappropriate forms 6 sheets.

    )irtipur ngineering ociety. +age 1

  • 8/16/2019 Reconstruction Proposal

    2/3

    3onduct "rief measurement of the damages

    Brief measurement of the damages

    +reparation of ;etail Architectural ;ra%ings

    isting architectural dra%ings of the temples and structures shall "e prepared and all the near"yfeatures such as cho%ks, near"y "uilding patterns, and any other features that has rele#ance inundertaking maintenance 6 safety of the "uilding.

    tructure 3ondition Assessment and #aluation

    $he eisting conditions of the "uilding shall "e assessed in detail to identify any defects 6 damages inthe "uilding. $he "uilding condition shall "e e#aluated to check its ser#icea"ility and safety conditionsfor the eisting and epected use.

    +reparation of econstruction, (aintenance ;esign and ;ra%ings

    Based on the "uilding condition assessment and e#aluation report, all the "uildingelements6components6parts reuiring maintenance6repair6replacement, design and dra%ings %ill "eprepared.

    +reparation of 3ost stimate

     A preliminary cost estimate of the "uilding maintenance %orks %ill "e prepared. $he ;:;B3 normsand specification %ill "e used for the maintenance and repair %orks.

    +reparation of (aintenance +lan

    Based on the a#aila"le "udget the maintenance program6 plan %ill "e prepared.

    +hotographs

    +hotographic recordings of all the damages on the structures are essential for the future record. Assuch photographs of the damages %ill "e taken.

    4 Expected Outputs

    $he study should include "ut not necessarily limited to the follo%ings

    •   Reconnaissance survey

    •  A complete condition of the "uildings

    • epair, maintenance and strengthening design dra%ings

    • uggestions for house pooling plans or programs

    )irtipur ngineering ociety. +age 2

  • 8/16/2019 Reconstruction Proposal

    3/3

    5 Working Team

    $he %orking team for field and office %orks shall necessarily consist of the follo%ing )ey +ersonneltogether %ith adeuate supporting manpo%er.

    S.No Personnel Qualifcation Number

    1 $eam