Reconstruction of A.S.R Stadium

Embed Size (px)

Citation preview

  • 8/12/2019 Reconstruction of A.S.R Stadium

    1/27

    DISTRICT : WEST GODAVARI

    CIRCLE : ELURU

    DIVISION : ELURU

    SUB-DIVISION : ELURU

    MANDAL : ELURU

    GOVERNMENT OF ANDHRA PRADESH

    PANCHAYATRAJ ENGINEERING DEPARTMENT

    Name of the Work : Re-Construction of A.S.R.stadium at El

    Estimate Amount :-Rs.723.00 lakhs

    PROPOSAL ESTIMATE

  • 8/12/2019 Reconstruction of A.S.R Stadium

    2/27

    ru

  • 8/12/2019 Reconstruction of A.S.R Stadium

    3/27

    Name of the work:-Reconstruction of A.S.R.Stadium at Eluru

    Est.Cost.Rs.723.00 lakhs

    The District Collector,West Godavari District,Eluru issued instructions to inspect the A.S.Rstadium at Eluru and to prepare necessary line estimate for demolition and reconstruction,if necessary.

    Accordingly,joint inspection was held by the Engineers of PR&R&B Department on 22.6.2012.

    After inspection,the following conclusions are arrived:-

    1)The seating galleries G1 and G2 and pavillion complex are in reparable condition.

    Hence,there is no need to dismantle them.

    2)The remaining galleries are in dilapidated condition.Hence,they may be

    dismantled.

    3) 8-Lane running track and basket ball court need repairs.

    4) Drainage facilities in the ground must be improved.

    The copy of thejoint inspection reportis enclosed.The opinion of the M/s Siddartha Engg.College,

    Vijayawada is obtained regarding the condition of the existing stadium.They recommended to dismantle

    all the galleries.Copy of the Structural stability reportenclosed.

    Further,as per the instructions of the Dist.Collector,the following infrastructure facilities are

    proposed in the estimate along with reconstruction of galleries and compound wall:-

    1)Dormitories accomodating 30 persons each,both for gents and ladies seperately.

    2)Toilet facilities inside the stadium.

    3)Indoor games complex inside the stadium.

    Accordingly,the proposal estimate is prepared with the following provisions:-

    1)Dismantling of dilapidated galleries and re-construction of galleries and

    compound wall as per the plan enclosed.

    2)Construction of the following infra-structural facilities:-

    a)Two Nos of Dormitories accomodating 30 persons each

    b)Toilet facilities inside the stadium.

    c)Indoor games complex inside the stadium.

    3)Repairs to basket ball court,running track and laying of new court for tennis

    including laying of sports turf/grass

    4)Providing drainage facilities in the ground

    SPECIFICATION REPORT

  • 8/12/2019 Reconstruction of A.S.R Stadium

    4/27

    5)Repairs to the pavillion complex and galleries

    Further lump sum provisions are made in the estimate for the following items:-

    1)Provision for VAT @ 5.00%

    2)Provision for Consultancy charges @ 2.00%3)Provision for Q.C charges @ 0.50%

    4)Provision for Price escalation @ 10%

    The estimate is prepared as per the current SSR,i.e.2011-2012 rates and as per

    the A.P Revised Standard data work will be carried out as per APDSS after administrative sanction

    Asst.Executive Engineer Dy.Executive Engineer

    PRI,Eluru PRI,Eluru

  • 8/12/2019 Reconstruction of A.S.R Stadium

    5/27

    Name of the Work:-Reconstruction of A.S.R.Stadium at Eluru

    Est.Cost. :- Rs.723.00 lakhs

    S.No Description of item Amountin Rs.

    1 2 3

    1 Demolition&Re-Construction of Seating galleries

    & Compound wall

    32089442.00

    2 Construction of infra structure facilities 16322755.00

    3 Providing sports turfs,running track and courts 6835278.00

    4 Providing drainage facilities in the ground 5076385.00

    5 Repairs to Pavillion complex and galleries 1137526.00

    TOTAL 61461386.00

    6 LS Provision towards VAT@ 5% 3073069.00

    7 Provision for [email protected]% 307307.00

    8 Provision for consultancy charges@2% 1229228.00

    9 Provision for price escalation@10% 6146139.00

    10 Rounding--off 82871.00

    PART--A TOTAL 72300000.00

    Asst. Exe.Engineer Deputy Exe.Engineer

    PRI,Eluru Section PRI,Sub division

    Eluru

    GENERAL ABSTRACT

    PART--A

  • 8/12/2019 Reconstruction of A.S.R Stadium

    6/27

    Sl.

    No.

    Description of Item Length

    (m)

    Width (m) Thickness

    (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    I)DEMOLITION OF OLD GALLERIES:-

    1

    For footings of opening columns 5 x 6 2.00 2.00 0.35 42.00

    For footings of gallery columns 16 x 21 2.00 2.00 0.35 470.40

    For plinth beam of Galleries 16 x 1 31.66 0.23 0.30 34.95

    Columns of openings(Type-I) 5 x 2 1.74 0.30 0.45 2.35

    -----do--- Type-II 5 x 2 3.50 0.30 0.45 4.73

    -----do--- Type-III 5 x 2 5.26 0.30 0.45 7.10

    Gallery columns(Type-I) 16 x 7 1.74 0.30 0.45 26.31-----do--- Type-II 16 x 7 3.50 0.30 0.45 52.92

    -----do--- Type-III 16 x 7 5.26 0.30 0.45 79.53

    Gallery main beams 16 x 7 11.14 0.30 0.60 224.58

    Main Beams at openings 5 x 2 11.14 0.30 0.60 20.05

    Secondary Beams at openings 5 x 2 5.00 0.23 0.45 5.18

    Gallery secondary beams 16 x 66 5.00 0.23 0.45 546.48

    Seating slabs of galleries--I 16 x 9 31.66 0.77 0.10 351.05

    -----do----- II 16 x 1 31.66 1.27 0.10 64.33

    Parapet wall 16 x 1 31.66 0.75 0.10 37.99

    1969.95 cum 1342.31

    2

    For footings of opening columns 5 x 6 2.00 2.00 0.30 36.00

    For footings of gallery columns 16 x 21 2.00 2.00 0.30 403.20

    For plinth beam of Galleries 16 x 1 31.66 0.30 0.30 45.59

    484.79 cum 1207.55

    II)RECONSTRUCTION OF NEW GALLERIES:-

    3

    For footings of opening columns 2 x 6 2.00 2.00 3.15 151.20

    For footings of gallery columns 9 x 21 2.00 2.00 3.15 2381.40

    Footings of compound wallcolumns

    1 x 58 1.50 1.50 2.10 274.05

    For plinth beam of compound

    wall

    1 x 1 171.11 0.30 0.30 15.40

    For plinth beam of Galleries 9 x 1 31.66 0.30 0.60 128.22

    Footings of out side compound

    wall columns

    1 x 150 1.50 1.50 2.10 708.75

    3659.02 cum 119.83

    4

    For footings of opening columns 2 x 6 2.00 2.00 0.30 14.40

    Demolition including stacking of serviceable materials and disposal of unserviceable

    materials within 100 metres lead for RCC work

    Demolishing and disposal of unserviceable materials within 100 metres lead

    Unreinforced cement concrete more than 15 cm thickness

    SUB ESTIMATE

    Earth workexcavation and depositing on bank with initial lead of 10m and initial lift of

    2m in Ordinary Soils for Foundation.(APSS No. 308) (RSSR)

    Name of the Sub Work : Demolition&Re-Construction of Seating galleries & Compound wall

    No

    Filling with Sandin trenches, sides of foundations and basement complete for

    finished item of work. (APSS NO. 309 & 310)(CSSR)

  • 8/12/2019 Reconstruction of A.S.R Stadium

    7/27

    Sl.

    No.

    Description of Item Length

    (m)

    Width (m) Thickness

    (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    No

    For footings of gallery columns 9 x 21 2.00 2.00 0.30 226.80

    Footings of compound wall

    columns

    1 x 58 1.50 1.50 0.30 39.15

    Footings of out side compound

    wall columns

    1 x 150 1.50 1.50 0.30 101.25

    For plinth beam of compoundwall 1 x 1 171.11 0.30 0.30 15.40

    For plinth beam of Galleries 9 x 1 31.66 0.30 0.30 25.64

    422.64 cum 1265.09

    5

    For footings of opening columns 2 x 6 2.00 2.00 0.30 14.40

    For footings of gallery columns 9 x 21 2.00 2.00 0.30 226.80

    Footings of compound wall

    columns

    1 x 58 1.50 1.50 0.30 39.15

    Footings of out side compound

    wall columns

    1 x 150 1.50 1.50 0.30 101.25

    For plinth beam of compound

    wall

    1 x 1 171.11 0.30 0.30 15.40

    For plinth beam of Galleries 9 x 1 31.66 0.30 0.30 25.64

    422.64 cum 3435.98

    6

    For footings of opening columns 2 x 6 2.00 2.00 0.35 16.80

    For footings of gallery columns 9 x 21 2.00 2.00 0.35 264.60

    Footings of compound wall

    columns

    1 x 58 1.50 1.50 0.35 45.68

    Footings of out side compound

    wall columns

    1 x 150 1.50 1.50 0.35 118.13

    445.21 cum 6258.86

    7

    For plinth beam of compound

    wall

    1 x 1 171.11 0.23 0.30 11.81

    For plinth beam of out side

    compound wall

    1 x 1 450.00 0.23 0.30 31.05

    For plinth beam of Galleries 9 x 1 31.66 0.23 0.30 19.66

    62.52 cum 7657.86

    8

    Columns of openings(Type-I) 2 x 2 1.74 0.30 0.45 0.94

    -----do--- Type-II 2 x 2 3.50 0.30 0.45 1.89

    -----do--- Type-III 2 x 2 5.26 0.30 0.45 2.84

    Gallery columns(Type-I) 9 x 7 1.74 0.30 0.45 14.80

    -----do--- Type-II 9 x 7 3.50 0.30 0.45 29.77

    -----do--- Type-III 9 x 7 5.26 0.30 0.45 44.74

    Out side compound wall

    columns

    1 x 150 3.60 0.23 0.30 37.26

    Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of

    cement, 20mm size HBG (SS5) metal complete for finished item of work for footing

    (APSS No. 402) (CSSR)

    Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of

    cement, 20mm size HBG (SS5) metal complete for finished item of work for Plinth

    beams (APSS No. 402) (CSSR)

    Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of

    cement, 20mm size HBG (SS5) metal complete for finished item of work for

    Columns (APSS No. 402) (CSSR)

    Plain Cement Concrete (1:4:8)prop using 40mm size HBG (SS5) metal for finished

    item of work for Foundations and Flooring Bed (APSS No. 402)(RSSR)

  • 8/12/2019 Reconstruction of A.S.R Stadium

    8/27

    Sl.

    No.

    Description of Item Length

    (m)

    Width (m) Thickness

    (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    No

    Compound wall columns 1 x 58 6.65 0.23 0.30 26.61

    158.85 cum 6981.10

    9

    Gallery main beams 9 x 7 11.14 0.30 0.60 126.33

    Main Beams at openings 2 x 2 11.14 0.30 0.60 8.02

    Secondary Beams at openings 2 x 2 5.00 0.23 0.45 2.07

    Gallery secondary beams 9 x 66 5.00 0.23 0.45 307.40

    Intermediate beam for

    compound wall

    1 x 1 171.11 0.23 0.30 11.81

    455.63 cum 6773.30

    10

    Seating slabs of galleries--I 9 x 9 31.66 0.77 ----- 1974.63

    -----do----- II 9 x 1 31.66 1.27 ----- 361.87Parapet wall 9 x 1 31.66 0.75 ----- 213.71

    2550.21 sqm 826.79

    11

    Seating slabs of galleries--I 9 x 9 31.66 1.35 ----- 3462.02

    -----do----- II 9 x 1 31.66 1.85 ----- 527.14

    Parapet wall 9 x 1 31.66 0.75 ----- 213.71

    4202.87 sqm 263.04

    12

    206.585

    206.585 MT 60000.00

    13

    Inner Compound wall A/R 1 x 1 171.11 0.23 4.35 171.20

    Deduct columns 1 x 58 0.30 0.23 4.35 -17.41

    Out side Compound wall A/R 1 x 1 450.00 0.23 2.10 217.35

    Deduct columns 1 x 150 0.30 0.23 2.10 -21.74

    349.40 cum 3060.69

    14

    Inner Compound wall both sides 1 x 2 171.11 ---- 4.35 1488.66

    Outer compound wall both sides 1 x 2 450 ---- 2.10 1890.00

    Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per

    IS 1786-1985) of 8mm to 40mm diameters cutting, bending, to required sizes and

    shapes placing in position with cover blocks of approved size and binding wire of

    20SWG, forming grills for reinforcement work as per approved designs and drawings

    including Cost and Conveyance of bars from approved sources to site of work with all

    taxes complete for finished item of work (APSS No.126) in all floors (CSSR)

    Providing impervious coatover RCC seating slab to required slopes with CM (1:3)

    prop. 20mm thick (average) mixed with water proofing compound at 1Kg/bag of

    cement, laid over roof slab when it is green, finished smooth with a floating coat of neat

    cement and thread lining at regular intervals of 45cmx45cm with thread lining, curing,

    lift charges, etc., complete for finished item of work (APSS No. 901 & 903).(CSSR)

    Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of

    cement, 20mm size HBG (SS5) metal complete for finished item of work for Seating

    slab of 100mm thick (APSS No. 402) (CSSR)

    Brick Masonryin superstructure with traditional bricks 23x11x7cms in CM (1:6) prop:

    mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing,etc., complete for finished item of work. (APSS No. 501 & 504).(CSSR) for Compound

    wall

    Vibrated reinforced Cement Concrete M20 grade nominal mix using 400 kg. of

    cement, 20mm size HBG (SS5) metal complete for finished item of work for Beams

    (APSS No. 402) (CSSR)

    Plastering 12mmthick in CM(1:5) including cost and conveyance of all materials and

    all labour charges etc.complete for compound wall

  • 8/12/2019 Reconstruction of A.S.R Stadium

    9/27

    Sl.

    No.

    Description of Item Length

    (m)

    Width (m) Thickness

    (m)

    Quantity Unit Rate

    1 2 3 4 5 6 7 8 9

    No

    3378.66 sqm 90.65

    15

    Stairs bottom 9 x 9 31.66 1.35 ----- 3462.02

    ----do---- 9 x 1 31.66 1.85 ----- 527.14

    Gallery main beams 9 x 7 11.14 ---- 1.50 1052.73

    Main Beams at openings 2 x 2 11.14 ---- 1.50 66.84

    Secondary Beams at openings 2 x 2 5.00 ---- 0.58 11.60

    Gallery secondary beams 9 x 66 5.00 ---- 0.58 1722.60

    6842.93 sqm 106.49

    16

    Galleries top:-

    Seating slabs of galleries--I 9 x 9 31.66 1.35 ----- 3462.02

    -----do----- II 9 x 1 31.66 1.85 ----- 527.14

    Parapet wall 9 x 1 31.66 0.75 ----- 213.71

    Galleries bottom:-

    Stairs bottom 9 x 9 31.66 1.35 ----- 3462.02

    ----do---- 9 x 1 31.66 1.85 ----- 527.14

    Gallery main beams 9 x 7 11.14 ---- 1.50 1052.73

    Main Beams at openings 2 x 2 11.14 ---- 1.50 66.84

    Secondary Beams at openings 2 x 2 5.00 ---- 0.58 11.60

    Gallery secondary beams 9 x 66 5.00 ---- 0.58 1722.60

    Compound walls:-

    Inner Compound wall both sides 1 x 2 171.11 ---- 4.35 1488.66

    Outer compound wall both sides 1 x 2 450 ---- 2.10 1890.00

    14424.46 sqm 87.39

    Total

    Deputy Executive Engineer, Assistant Executive Engin

    PRI Sub-Division, Eluru PRI, Eluru

    Painting to new walls with 2 coats of plastic emulsion paint of approved brand and

    shade over a primary coat white cement paint after thoroughly brushing the surface to

    remove all dirt and remains of loose powdered materials, including cost and

    conveyance of all materials to work site and all operational, incidental, labour charges

    etc. complete for finished item of work as per SS 911 for external walls

    Ornamental Plasteringwith CM (1:3), 12 mm thick including cost and conveyance of

    all materials and all labour charges etc.complete

  • 8/12/2019 Reconstruction of A.S.R Stadium

    10/27

    Amount

    10

    2644284

    585408

    438460

  • 8/12/2019 Reconstruction of A.S.R Stadium

    11/27

    Amount

    10

    534678

    1452183

    2786507

    478769

  • 8/12/2019 Reconstruction of A.S.R Stadium

    12/27

    Amount

    10

    1108948

    3086119

    2108488

    1105523

    12395079

    1069405

  • 8/12/2019 Reconstruction of A.S.R Stadium

    13/27

    Amount

    10

    306276

    728704

    1260611

    32089442

    er,

  • 8/12/2019 Reconstruction of A.S.R Stadium

    14/27

    Sl.

    No.

    Description of Item Length

    (m)

    Width (m) Thickness

    (m)

    Quantity Unit

    1 2 3 4 5 6 7 8

    1

    Construction of Dormitory-I 1 x 1 35.80 10.52 ----- 376.62

    Construction of Dormitory-II 1 x 1 35.80 10.52 ----- 376.62

    Construction of Indoor Games

    complex

    1 x 1 31.66 10.52 ----- 333.06

    Construction of Toilet block-I 1 x 1 15.32 10.52 ----- 161.17

    Construction of Toilet block-II 1 x 1 16.34 10.52 ----- 171.90

    1419.37 sqm

    Deputy Executive Engineer, Assistant Executi

    PRI Sub-Division, Eluru PRI, Eluru

    Construction of the following infra structural facilities for the A.S.R stadium including

    construction of structure,plasterings,paintings,doors,windows,flooring with tiles of

    necessary quality and compound wall etc.complete

    SUB ESTIMATE

    Name of the Sub Work : Construction of infrastructure facilities

    No

  • 8/12/2019 Reconstruction of A.S.R Stadium

    15/27

    Rate Amount

    9 10

    11500 16322755

    Total 16322755

    ve Engineer,

  • 8/12/2019 Reconstruction of A.S.R Stadium

    16/27

    Sl.

    No.

    Description of Item Length

    (m)

    Width (m) Thickness

    (m)

    Quantity Unit

    1 2 3 4 5 6 7 8

    1

    Ditches in ground 1 x 1 80.00 9.50 0.450 342.00

    Ditches in ground 1 x 2 15.00 30.00 0.500 450.00Ditches in ground 1 x 2 25.00 30.00 0.600 900.00

    Ditches in ground 1 x 1 40.00 32.00 0.550 704.00

    2396.00 cum

    2

    For track 1 x 8 430.88 1.22 0.300 1261.62

    For tennis court 1 x 1 23.97 10.97 0.300 78.89

    1340.51 cum

    3

    For track 1 x 8 430.88 1.22 0.200 841.08

    For tennis court 1 x 1 23.97 10.97 0.200 52.59

    893.67 cum

    4

    For basket ball court 1 x 1 28.00 15.00 0.100 42.00 cum

    5

    Foot ball/Hockey ground 1 x 1 91.44 54.86 ----- 5016.40

    Inside running track 1 x 1 156.36 76.36 ----- 11939.65

    16956.05 sqm

    Filling of ditcheswith approved material obtained from borrow pits with all lifts,

    transporting to site, spreading, grading to required slope and compacting to meet

    requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical

    Specification Clause 301.5 MORD / 305 MORTH

    Construction of granular sub baseby providing well graded material / Close graded

    material, spreading in uniform layers with motor grader on prepared surface, mixing by

    mix in place method with rotavator at OMC, and compacting with smooth wheel roller

    80-100 kN / Vibratory Roller to achieve the desired density, complete as per

    Technical Specification Clause 401 MORD / MORTH.

    Construction of sports running trackby providing selected carted earth, spreading in

    uniform layers with motor grader on prepared surface, mixing by mix in place method

    with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN /

    Vibratory Roller to achieve the desired density

    Plain Cement Concrete (1:2:4)prop using 20mm size HBG (SS5) metal for finished

    item of work for Basket ball court waering coat

    SUB ESTIMATE

    Name of the Sub Work : Providing sports tufs,Running track and courts

    No

    Laying of Sports turf/ grassincluding preparartion of ground for

    levelling,transportation of grass to the work spot,labour charges and maintenance for a

    period of one month including application of manures,weeding and mulching

    etc.complete

  • 8/12/2019 Reconstruction of A.S.R Stadium

    17/27

    Deputy Executive Engineer, Assistant Executi

    PRI Sub-Division, Eluru PRI, Eluru

  • 8/12/2019 Reconstruction of A.S.R Stadium

    18/27

    Rate Amount

    9 10

    250.00 599000

    949.10 1272278

    560.00 500455

    5346.00 224532

    250.00 4239013

  • 8/12/2019 Reconstruction of A.S.R Stadium

    19/27

    Total 6835278

    ve Engineer,

  • 8/12/2019 Reconstruction of A.S.R Stadium

    20/27

  • 8/12/2019 Reconstruction of A.S.R Stadium

    21/27

    6

    3.518

    3.518 MT

    7

    Towards North side 1 x 20 80.00 ----- ----- 1600.00 Rmt

    Deputy Executive Engineer, Assistant Executi

    PRI Sub-Division, Eluru PRI, Eluru

    Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per IS

    1786-1985) of 8mm to 40mm diameters cutting, bending, to required sizes and shapes

    placing in position with cover blocks of approved size and binding wire of 20SWG,

    forming grills for reinforcement work as per approved designs and drawings including

    Cost and Conveyance of bars from approved sources to site of work with all taxes

    complete for finished item of work (APSS No.126) in all floors (CSSR)

    Cost,supply and fixing of 450mm dia NP3 class pipes for connecting track drain to

    peripheral drain including transportation and fixing charges

  • 8/12/2019 Reconstruction of A.S.R Stadium

    22/27

    Rate Amount

    9 10

    119.83 72895

    1265.09 153911

    3435.98 418021

    5230.00 1272616

    826.79 387847

  • 8/12/2019 Reconstruction of A.S.R Stadium

    23/27

    60000.00 211095

    1600.00 2560000

    Total 5076385

    ve Engineer,

  • 8/12/2019 Reconstruction of A.S.R Stadium

    24/27

    Sl.

    No.

    Description of Item Length

    (m)

    Width (m) Thickness

    (m)

    Quantity Unit

    1 2 3 4 5 6 7 8

    1

    Over slab 1 x 1 54.00 12.00 0.08 48.60

    48.60 cum

    2

    Pavillion complex

    Ceiling 1 x 5 4.60 1.35 ----- 31.05

    ----do---- 1 x 4 3.80 1.85 ----- 28.12

    Galleries top

    Seating slabs of galleries--I 2 x 9 31.66 1.35 ----- 769.34

    -----do----- II 2 x 1 31.66 1.85 ----- 117.14

    Parapet wall 2 x 1 31.66 0.75 ----- 47.49

    993.14 sqm

    3

    Inner Compound wall both sides 1 x 2 65.00 ---- 4.35 565.50

    565.50 sqm

    4

    Galleries top:-

    Seating slabs of galleries--I 2 x 9 31.66 1.35 ----- 769.34

    -----do----- II 2 x 1 31.66 1.85 ----- 117.14

    Parapet wall 2 x 1 31.66 0.75 ----- 47.49Galleries bottom:-Stairs bottom 2 x 9 31.66 1.35 ----- 769.34

    ----do---- 2 x 1 31.66 1.85 ----- 117.14

    Gallery main beams 2 x 7 11.14 ---- 1.50 233.94

    Gallery secondary beams 2 x 66 5.00 ---- 0.58 382.80

    Compound walls:-

    Inner Compound wall both sides 1 x 2 65.00 ---- 4.35 565.50

    3002.69 sqm

    Patch Plasteringwith CM (1:3), 12 mm thick including cost and conveyance of all

    materials and all labour charges etc.complete

    Painting to new walls with 2 coats of plastic emulsion paint of approved brand and

    shade over a primary coat white cement paint after thoroughly brushing the surface to

    remove all dirt and remains of loose powdered materials, including cost and

    conveyance of all materials to work site and all operational, incidental, labour charges

    etc. complete for finished item of work as per SS 911 for external walls

    Plastering 12mmthick in CM(1:5) including cost and conveyance of all materials and

    all labour charges etc.complete for existing compound wall

    Plain Cement Concrete (1:1.5:3)prop using 6mm size HBG (SS5) metal for finished

    item of work for wearing coat over pavillion complex

    SUB ESTIMATE

    Name of the Sub Work : Repairs to Pavillion complex& Galleries

    No

  • 8/12/2019 Reconstruction of A.S.R Stadium

    25/27

    5 Provision for repairs to electrical

    wiring&Dummy columns

    6 Provision for repairs to

    plumbing&Sanitary lines andfittings and rain water pipes

    Deputy Executive Engineer, Assistant Executi

    PRI Sub-Division, Eluru PRI, Eluru

  • 8/12/2019 Reconstruction of A.S.R Stadium

    26/27

    Rate Amount

    9 10

    6545.00 318087

    106.49 105759

    90.65 51263

    87.39 262417

  • 8/12/2019 Reconstruction of A.S.R Stadium

    27/27

    150000

    250000

    Total 1137526

    ve Engineer,