A NEW ETOBICOKE CENTRE RECONSTRUCTING THE SIX POINTS INTERCHANGE Following more than a decade of planning, consultation, engineering, and design, the City of Toronto has begun construction to reconfigure the Six Points Interchange. The reconfiguration supports the development of Etobicoke Centre as a vibrant mixed-use transit-oriented community featuring: A new road network and at-grade intersection at Dundas, Bloor, and Kipling, with Bloor continuing across Kipling Improved pedestrian and cycling facilities including wide boulevards, bike lanes, trees, street furniture, and access to Kipling Subway Station New land available for potential uses such as parks, public art, development, and other amenities A district energy plan ROADS TO BE DEMOLISHED NEW ROADS /// OVERVIEW //////////////////////////////////////////////////////////////////////////////////////// RENDERING OF THE NEW DUNDAS STREET WEST

RECONSTRUCTING TE SI OINTS INTERHANE A NEW … · RECONSTRUCTING TE SI OINTS INTERHANE ... Reconstruction will remove the existing bridges constructed in 1961, ... S T T H E A S T

  • Upload
    lammien

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

Following more than a decade of planning, consultation, engineering, and design, the City of Toronto has begun construction to reconfigure the Six Points Interchange. The reconfiguration supports the development of

Etobicoke Centre as a vibrant mixed-use transit-oriented community featuring:

A new road network and at-grade intersection at

Dundas, Bloor, and Kipling, with Bloor continuing

across Kipling

Improved pedestrian and cycling facilities

including wide boulevards, bike lanes, trees, street furniture, and access to Kipling Subway Station

New land available for potential uses such as parks,

public art, development, and other amenities

A district energy plan

ROADS TO BE DEMOLISHEDNEW ROADS

/// OVERVIEW ////////////////////////////////////////////////////////////////////////////////////////

RENDERING OF THE NEW DUNDAS STREET WEST

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

The new road network is designed as a complete street to provide safe and accessible movement for all road users including people who walk, cycle, use transit, or drive.

Reconstruction will remove the existing bridges constructed in 1961, and create regular intersections between Kipling Avenue, Bloor Street West and Dundas Street West. It will improve connections to Kipling Subway Station, access to adjacent streets for all users, and maintain operating conditions for vehicular traffic.

Traffic volumes that account for future development and population increases were considered in planning the new traffic flow.

The City anticipates car travel times will increase by about 36.6 seconds in the morning rush hour, and 34.3 seconds in the afternoon rush hour.

EXISTING TRAVEL FLOW RECONFIGURED TRAVEL FLOW

/// TRAFFIC FLOW ////////////////////////////////////////////////////////////////////////////////////

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

Timeline of Milestones in planning and reconstruction of the Six Points Interchange 2003: Start of Environmental

Assessment 2008: Approval of Environmental

Assessment by City Council 2013: Start of Detailed Design 2014: Design Review Panel 2014: Phase 1 Construction 2016: Completion of Detailed Design

2017: Phase 2 Construction Begins 2020: Expected Construction

Completion

The 2007 Environmental Assessment used the following problem statement and objectives to identify appropriate solutions:

/// HOW DID WE GET HERE ///////////////////////////////////////////////////////////////////////

...there are city building / urban design issues, capacity deficiencies, operational, and safety concerns within the Six Points interchange which require a combination of solutions to address these concerns and deficiencies within the interchange. Solutions are required to reconfigure the Six Points Interchange to allow for a well connected Etobicoke Centre, and to meet the objectives in the Etobicoke Centre Secondary Plan and find solutions necessary to:

• Simplify the road network layout, freeing up and making surplus interchange lands available for other uses.

• Maximize ‘typical’ street intersections and potential development frontages.

• Improve the landscape and streetscape of the area.• Provide good pedestrian network access to and from the Kipling

Subway Station, the Westwood Theatre site, Bloor and Dundas Streets, and improve pedestrian connections between the east and west sides of Kipling Avenue.

• Improve cyclist connections through the area to connect to adjacent land uses.

• Maintain acceptable surface transit operations, particularly to and from the Kipling Subway Station, considering existing and future bus operations.

• Have acceptable levels of service for traffic operations on the area arterial road network that are consistent with a highly urbanized pedestrian-oriented environment such as downtown Toronto and North York Centre.

Phase 1 Preliminary Construction took place from 2014 – 2016, and prepared for the new road alignment within the former

Westwood Theatre Lands including site clearing, tree removal, partial grading of

uneven land for roads and sewers, and start of utility relocation

(Enbridge Gas and Bell Canada).

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

Solutions and designs were evaluated through detailed technical analysis, data collection, expert advisors, public feedback, and voted on by Toronto City Council. Throughout the Environmental Assessment and Detailed Design, the public and stakeholders were invited to provide feedback and participate in consultation activities. Feedback was received through public meetings at key study milestones described below. Additionally, feedback was heard through stakeholder meetings, events held by the Ward Councillor, and deputations to Committee.

Environmental AssessmentNovember 2003 - Notice of Study CommencementMarch 2, 2004 - Public Event 1June 20, 2006 - Public Event 22007 - Notice of Study Completion

Detailed DesignJune 2013 - Public Event 1June 2014 - Public Event 2

In advance of all public events, notices were issued through advertisements in local newspapers, and sent to stakeholder groups, project email lists, First Nations, agencies and utilities, affected property owners, and via direct mail to all residents and businesses in the study area. A record of information presented and feedback received is available on the project website: toronto.ca/etobicokecentre

/// PUBLIC CONSULTATION ///////////////////////////////////////////////////////////////////////

The City of Toronto holds public consultations as one way to engage residents in the life of their city. Toronto thrives on your great ideas and actions. We invite you to get involved.

Six Points Interchange Recon�gurationNotice of Public Drop-in EventWe invite you to attend a public drop-in event to learn more about the upcoming recon�guration of the Six Points interchange, at Bloor Street West, Dundas Street West and Kipling Avenue. The existing interchange will be completely reconstructed to support the development of Etobicoke Centre.

Date: Tuesday, June 17, 2013 Time: 6:30 p.m. to 9:00 p.m. (presentation at 7:30 p.m.) Location: St. Andrew's Presbyterian Church 3819 Bloor St. W.BackgroundEtobicoke Centre, running along Dundas Street West from Shorncliffe Road to Islington Avenue, will develop as the urban focal point for the western part of Toronto. The Six Points area will become a vital mixed-use community, including a community hub with recre-ational, cultural and institutional uses.

The City of Toronto completed an Environmental Assessment on the recon�guration of the Six Points Interchange in 2007. This study determined that replacing the existing bridges with an at-grade intersection would best support the development of Etobicoke Centre.

Streetscape and public open space designs throughout the new intersection were �nalized in the Etobicoke Centre Public Space-Streetscape Plan, completed by the City in 2012.

The detailed technical design of the new intersection is now being completed. Construction is expected to start in late 2014.

More information and links to previous and related projects are available on the City's project web page: toronto.ca/involved/projects/6points.

For more informationIf you would like more information about this project, please contact:Mike LoganSenior Public Consultation CoordinatorCity of Toronto Metro Hall, 19th Fl., 55 John St.Toronto, ON M5V 3C6Tel: 416-392-4360 Fax: 416-392-2974TTY: 416-338-0889E-mail: [email protected]: toronto.ca/involved/projects/6points

Issue Date: June 11, 2013

Information will be collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record.

The City of Toronto holds public consultations as one way to engage residents in the life of their city. Toronto thrives on your great

ideas and actions. We invite you to get involved.Six Points Interchange Recon�gurationPublic Drop-in EventWe invite you to attend a public drop-in event to learn more about the upcoming recon�guration of the Six Points interchange, at Bloor

Street West, Dundas Street West and Kipling Avenue. The existing interchange will be completely reconstructed to support the

development of Etobicoke Centre. Date: Wednesday, June 18, 2014 Time: 6:30 p.m. to 8:30 p.m. - Open House 7:00 p.m. - PresentationBackgroundEtobicoke Centre, in the vicinity of Dundas Street West from Shorncliffe Road to Islington Avenue, will develop as the urban focal point

for the western part of Toronto. The Six Points area will become a vital mixed-use community, including a community hub with

recreational, cultural and institutional uses.The City of Toronto completed an Environmental Assessment on the

recon�guration of the Six Points Interchange in 2007. This study

determined that replacing the existing bridges with an at-grade

intersection would best support the development of Etobicoke

Centre. Streetscape and public open space designs throughout the

new intersection were �nalized in the Etobicoke Centre Public Space-Streetscape Plan, completed by the City in 2012.The detailed technical design of the new intersection is now being

completed. Construction is expected to start in Summer 2014.Information shared at this meeting, plus information about previous

and related projects is available on the project web page: toronto.ca/sixpoints.

For more informationIf you would like more information about this project, please contact:

Mike LoganSenior Public Consultation Coordinator City of Toronto Metro Hall, 19th Fl.55 John St.

Toronto, ON M5V 3C6Tel: 416-392-4360 Fax: 416 392-2974 TTY: 416-338-0889E-mail: [email protected]: toronto.ca/sixpointsIssue Date: June 12, 2014Information will be collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the

exception of personal information, all comments will become part of the public record.

Location: Etobicoke Collegiate Institute 86 Montgomery Rd.

/// MAP OF NEW ROAD NETWORK //////////////////////////////////////////////////////////////

STOP

Traffic Signal

Stop Sign

Bike Lane

Pavement Markings

Cross walk

Trees

LEGEND:

STOP

Traffic Signal

Stop Sign

Bike Lane

Pavement Markings

Cross walk

Trees

LEGEND:

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

As part of the City’s 10 Year Cycling Network Plan, separated bicycle lanes will be constructed on Bloor Street West from Carysfort Road to Jopling Ave and on Dundas Street West from Dunbloor Road to Paulart Drive.

A quiet street route on Jopling Avenue and bicycle lanes on Shaver Avenue were also approved as part of the Cycling Network Plan.

CITY OFMISSISSAUGA

CITY OFBRAMPTON

CITY OFVAUGHAN

QUEEN ST E

LEDBUR

YS

T

HEATH ST W

HARBORD ST

BAY

VIE

W AV

E

BARTON AVE

SHUTER ST

CA

RLA

WAVE

LOG

AN AVE

LAIRD

DR

BATH

UR

ST

ST

SPADIN

A AV

E

BREM NERBLVD

DUNDAS ST E

YO

NG

E S

T

DIXON RD

RO

YAL

YOR

KR

D

DUNDAS ST W

OS

SING

TON

AV E

VAUGHAN RD

HIG

HW

AY27

N

AD ELAIDE STE

KE

ELE

ST

GARY DR

DU

FFERIN

ST

RU

NN

YMED

E RD

OSLE

RS

T

ROGERS RD

STEPHEN

DR

VARNA

DR

STEELES AVE W

BLOOR ST W

ISABELLA ST

THE

EAST

MA

LL

KEELE ST

KENN

ETH AVE

FAIRLAWN AVE

CH

UR

CH

ST

EI REAN

N

QU

AY

MA

RLEE AV

E

SCARLETTR

D

OVE

RLEA

BLVD

CARLTON ST

WELLINGTON ST W

ST CLAIR AVE W

SHAW

ST

GILTS PUR

DR

AVEN

UE

RD

EGLINTON AVE W

FINCH AVE W

ALBION RD

WEN

DELL

AVE

LES

LIE S

T

CH

RISTIE ST

KIPLIN

GAVE

EMPRESS AVE

DO

RIS AVE

LAKE SHORE BLVD W

MILLWOOD RD

KING ST W

RO

SEMOUNTAVE

SENLAC

RD

LAKE SHORE BLVD W

JAN

E S

T

MA

RTIN G

RO

VE RD

CHAPLIN CRES

LAKE SHORE BLVD W

KIPLING

AVE

LAWRENCE AVE W

WELLINGTON ST W

GLENGROVE AVE W

ISLING

TON

AVE

BELFIELD RD

DO

VERC

OU

RT

RD

HU

MBER

COL LEGE BLVD

MAPLE LEAF DR

GLENLAKE AVE

PAR

KSIDE D

R

DANFORTH AVE

ALNESS

ST

EVANS AVE

SOU

THKINGSW

AY

DUPONT ST

HEATH ST

E

BLOOR ST W

QU

EE

N S PLATE DR

STR

AC

HA

NAV

E

YORK MILLS RD

HIG

HW

AY 27 S

ANNETTE ST

SE

NTI N

EL

RD

COLBECK

ST

THE QUEENSWAY

THE WESTWAY

WESTON RD

ADELAIDE ST W

QUEENS QUAY E

RO

CKC

LIFFE BLVD

WELLESLEY

ST W

OAK

WO

OD

AVE

SHEPPARD AVE W

THE QUEENSWAY

THE POND RD

DAVENPORT RD

WILSON AVE

RATHBURN RD

QUEEN ST W

RANEE AVE

ELLISAVE

REXDALE BLVD

BROOKE AVE

OLD

WE

STON

RD

DUNDAS ST W

LEXFIELD

AVE

DU

FFER

INS

T

MILL

RD

COLLEGE ST

JAMESO

N AVE

WALLACE AVE

GLEN CAIRN AVE

MORTIMER AVE

RUSTIC RD

LAWRENCE AVE E

DAVISVILLE AVE

BURNHAMTHORPE RD

DO

NM

ILLS

RD

UN

IVER

SITY

AVE

SHER

BOU

RN

EST

TRANSITR

D

EGLI

NTON

AVE

W

MOORE AVE

DRIFTWOODAVE

EGLINTON AVE E

CRES CENT RD

WILM

ING

TON

AVE

GR

ACE ST

RICHMOND ST W

SILVERTH

OR

NA

VE

PARKLAW

NRD

LAWRENCE AVE E

LAKE SHORE

BLVD E

BRO

CK AVE

JARVIS ST

TRETHEWEY DR

LAKE SHORE BLVD E

WESTHUMBER

BLVD

JOH

N GARLAN D

BLVD

DUNCAN

W

O ODS DR

ST CLAIR AVE E

DU

PLEX

AVE

BEVERLE

Y S

T

THISTLE

DOWN

BLVD

CHARLES

ST W

BLYTHWOOD RD

HOWARD PARK

AVE

VICTO

RIA

ST

FASKEN DR

BETHRIDGE RD

MIMICO

AVE

LAN

SDO

WN

EAV

E

ROSELAWN AVE

MORNING

STAR DR

KILBARRY RD

CHURCH ST

SHEPPARD AVE E

DAV EN PORT RD

KEELE ST

CA

LED

ON

IAR

D

WELLESLEY ST E

O CONNOR DR

AU

GU

STA

AVE

DISCO RD

BR

OW

NS

LINE

TAM

WO

RTH

RD

DU

NN

AVE

CU

LFOR

DR

D

EARL ST

MILL ST

HOPEST

GO

SFO

RD

BLVD

MANOR RD E

BANNATYNE

DR

DUNC ANMILL RD

ELM R

D

MC

C

AUL

ST

NEW TORONTO ST

WALSHAVE

OLD

PAR

KR

D

NAIR

N

AVE

PR

OV

OS

T

DR

ELM ST

THIR

TIETH ST

LAPPIN

AVE

SH

AVE

RAV

ES

SUN

NYSID

E

AVE

MO

U NT

OLIVE DR

FRONT ST E

FRONT ST W

LAN

YARD RD

SHOR EHAM

DR

AVONDALE AVE

BRENTCLIFFE

RD

SYMIN

GTO

N AVE

HALLAM ST

PRETORIAAVE

FAYW

OO

DBLV

D

SPADIN

A R

D

BE

ECR

OFT

RD

STANLEY

RD

BERRY RD

YONGEBLVD

WIN

COTT

DR

VAN

SCO

RD

INGRAM

DR

FLORENCE AVE

BLACK

CRE

EK

DR

CLEN

DEN

AN

AVE

CLIN

TON

ST

ST JOHNS

RD

KIDRONVALLEY

DR

ROSEDALE VALLEY RD

BICKN

ELL AVE

NORSEMAN ST

EDITH

DR

ARM

OUR

BLV

D

CAR

LING

VIEW D

R

VARSITYRD

PORTLAND

ST

FENNAVE

WILSO

NH

EIG

HTS

BLVD

GERRARD

ST W

MERTON ST

FENMAR DR

SUMMERHILL

AVE

P RIN

CESS

MARGARETBLV

D

PRIN

CE

EDW

AR

D D

R S

ROSELAWN

AVE

HARBOUR

ST

CHA

LKFA

R

M D R

BERING

AVE

GLEN

ECHORD

THE ESPLANADE

BROADWAY AVE

SUMMITCREST DR

ADVANCE RD

DEWSON

ST

DENLO W BLVD

THE KINGSWAY

ST GEO

RG

E ST

GRANDRAVINE DR

HU

MB

ER

LINE

DR

CHERRY

ST

ATTWE

LLD

R

PINE ST

JUDSON ST

BA

RTO

R R

D

SHOR

NC

LIFFER

D

BEFFORT

RD

FLINT

RD

LIBERTY

ST

WIN

DE

RM

ERE

AVE

LA ROSE AVE

YORKDALE

RD

MONTGOMERYRD

ELMH URST DR

HA

RR

I SONR

D

ANGLESEY BLVD

BIRMINGHAM ST

FOXWELL

ST

G

UN

NS

RD

OVERBROOK PL

WILLO

WD

ALE AVE

ELMAVE

WOODSWORTH

R

D

ELM

RIDGE

DR

DU

VAL

DR

GLE

NC

EDAR

RD

SOUDAN AVE

NE

ILSO

NDR

MO

UN

T

PLEA

SAN

T

RD

EXBURYRD

BURTONRD

LLOYD

MA

NO

RR

D

F IFE

SHI

RE

RD BAN

BU

RY

RD

CASTLEFIELD AVE

SHER

MO

UN

T

AVE

FALSTAFF AVE

GLE

NM

OU

NT

AVE

VALERMO DR

KNOBHILLD

R

AMEER

AVE

CLYD

E AVE

GEARY

AVE

RED

PATH AVE

ORMON T DR

SPENVALLEY DR

WE

LLAN

D

AVE

SOUTHVALE

DR

UPJO

HN

RD

CAN

MO

TOR

AVE

IND

IAN

RD

HA

WK

SB

UR

Y DR

BE

RKINDALE

DR

SIGN

ET

DR

CENTENNIAL

PAR

K

B LVD

EDE

NBR

ID

GE

DR

WICKST EED AVE

LONSDALE

RD

GORDON

MACKAY RD

ELM

RIDGEDR

PALM

ERSTO

N

BLVD

RE

SOURCES

RD

ORFUS RD

TORORD

NEP

TUNE D R

INDUSTRY ST

BRIDGELANDAVE

GIBBS RD

FOUR WINDS

DR

PO

TTERY

RD

EG

LINTONAVE W

CH

ESSWO

OD

DR

GU LLI VERR D

STEEPROCK DR

WIN

ON

A

DR

PARK HOME AVE

VALHALLA

INN RD

BARM

AC

DR

TOBERMORYDR

QUEE

NS

PLATED

R

DU

FFLAW

RDTA

BER RD

GARYRAY DRELLERSLIE AVE

PLEWES RD

ERSKINE

AVE

GO

LDFINCHCRT

POST RD

EAST DR

TAN

GIE

RS

RD

RACINE RD

HIG

HPAR

KAV

E

WIL

LIA

MC

ARS

ON

CRE

S

CLAYSO

N

RD

JUTLAND RD

TYCOS DR

MONOGRAM

PL

LESMILL

R

D

ATOM

IC

AVE

WINGOLD

AVE

TORYORK DR

RIVA

LDA

RD

TITAN RD

PARK

LANE CRCL

EDDYSTONE

AVE

MO

UN

TPLE

ASAN

TR

D

SOR

AUR

EN AVE

PAR

LIAMEN

T S

T

BRO

ADVIEW

AVE

BAY

S

T

RE

NFO

RTHD

R

SPADIN

A R

D

CA

RR

IERD

R

RO

NC

ESVALLES AVE

CH

ER

RY

ST

NORTH QUEEN ST

OR

IOLE

PKW

Y

M A RIN

EPA

RAD

ED

R

PAPE AV

E

HUM

BERW

OOD

BLVD

DW

IGH

T AVE

BLOOR

RAM

P

THE

WES

TM

ALL

WE

LLESW

ORTH

DR

SIL

VE

RST

ON

E

DR

CA

BERNET CR

C L

PARK

RDAV

ENU

E RD

THE KINGSWAY

GLEN

RUS

HBLV

D

EMME T T

AVE

HU

MBE

RBL

VD

NO

RFIN

CH

DR

ARROWRD

AR

RO

W R

D

WES

TMO

RE D

R

HU

LLMAR

DR

TH

ED

ONW

AY

W

CALVINGTON DR

BANBURYRD

BROO

KH

AVE

ND

R

HORNER AVE

GLE

N R

D

GR

AND

AVE

UPPER

HIG

HLAN

D

CR

ES

SH

EFFIELD

ST

FIELD

WAY

RD

UPPER

CANADA

DRMILLWICKDR

BERG

AMOT AVE

WILLIA

MR

ALLEN RD

OAK

DA

LER

D

MILVAN DR

TOR

BAR

RIE

RD

SKYWAY

AVE

RONSO

NDR

NO

RE

LCO

DR

LAKE ONTARIO

±

Data source: City of Toronto / IBI Group, 2016Projection: NAD 1927 MTM 3

Date: April 2016Cartography: Vélo Québec

0 2 4 km

!

Toronto

U.S.A

LAKE ONTARIO

Cycling Network PlanEtobicoke York

District

LegendCycling Network and Trails Plan

Existing Cycling Network

FreewaysMajor RoadsArterial Road Network

Green Spaces

Rail Lines

Major Corridor Studies

Trails | Boulevard Trails

Trails | Boulevard Trails

Quiet Street Routes

Bike Lane | Cycle Tracks

Quiet Street Routes

Bike Lane | Cycle Tracks

Tunnels and Bridges!(

CITY OFMISSISSAUGA

CITY OFBRAMPTON

CITY OFVAUGHAN

QUEEN ST E

LEDBUR

YS

T

HEATH ST W

HARBORD ST

BAY

VIE

W AV

E

BARTON AVE

SHUTER ST

CA

RLA

WAVE

LOG

AN AVE

LAIRD

DR

BATH

UR

ST

ST

SPADIN

A AV

E

BREM NERBLVD

DUNDAS ST E

YO

NG

E S

T

DIXON RD

RO

YAL

YOR

KR

D

DUNDAS ST W

OS

SING

TON

AV E

VAUGHAN RD

HIG

HW

AY27

N

AD ELAIDE STE

KE

ELE

ST

GARY DR

DU

FFERIN

ST

RU

NN

YMED

E RD

OSLE

RS

T

ROGERS RD

STEPHEN

DR

VARNA

DR

STEELES AVE W

BLOOR ST W

ISABELLA ST

THE

EAST

MA

LL

KEELE ST

KENN

ETH AVE

FAIRLAWN AVE

CH

UR

CH

ST

EI REAN

N

QU

AY

MA

RLEE AV

E

SCARLETTR

D

OVE

RLEA

BLVD

CARLTON ST

WELLINGTON ST W

ST CLAIR AVE W

SHAW

ST

GILTS PUR

DR

AVEN

UE

RD

EGLINTON AVE W

FINCH AVE W

ALBION RD

WEN

DELL

AVE

LES

LIE S

T

CH

RISTIE ST

KIPLIN

GAVE

EMPRESS AVED

OR

IS AVE

LAKE SHORE BLVD W

MILLWOOD RD

KING ST W

RO

SEMOUNTAVE

SENLAC

RD

LAKE SHORE BLVD W

JAN

E S

T

MA

RTIN G

RO

VE RD

CHAPLIN CRES

LAKE SHORE BLVD W

KIPLING

AVE

LAWRENCE AVE W

WELLINGTON ST W

GLENGROVE AVE W

ISLING

TON

AVE

BELFIELD RD

DO

VERC

OU

RT

RD

HU

MBER

COL LEGE BLVD

MAPLE LEAF DR

GLENLAKE AVE

PAR

KSIDE D

R

DANFORTH AVE

ALNESS

ST

EVANS AVE

SOU

THKINGSW

AY

DUPONT ST

HEATH ST

E

BLOOR ST W

QU

EE

N S PLATE DR

STR

AC

HA

NAV

E

YORK MILLS RD

HIG

HW

AY 27 S

ANNETTE ST

SE

NTI N

EL

RD

COLBECK

ST

THE QUEENSWAY

THE WESTWAY

WESTON RD

ADELAIDE ST W

QUEENS QUAY E

RO

CKC

LIFFE BLVD

WELLESLEY

ST W

OAK

WO

OD

AVE

SHEPPARD AVE W

THE QUEENSWAY

THE POND RD

DAVENPORT RD

WILSON AVE

RATHBURN RD

QUEEN ST W

RANEE AVE

ELLISAVE

REXDALE BLVD

BROOKE AVE

OLD

WE

STON

RD

DUNDAS ST W

LEXFIELD

AVE

DU

FFER

INS

T

MILL

RD

COLLEGE ST

JAMESO

N AVE

WALLACE AVE

GLEN CAIRN AVE

MORTIMER AVE

RUSTIC RD

LAWRENCE AVE E

DAVISVILLE AVE

BURNHAMTHORPE RD

DO

NM

ILLS

RD

UN

IVER

SITY

AVE

SHER

BOU

RN

EST

TRANSITR

D

EGLI

NTON

AVE

W

MOORE AVE

DRIFTWOODAVE

EGLINTON AVE E

CRES CENT RD

WILM

ING

TON

AVE

GR

ACE ST

RICHMOND ST W

SILVERTH

OR

NA

VE

PARKLAW

NRD

LAWRENCE AVE E

LAKE SHORE

BLVD E

BRO

CK AVE

JARVIS ST

TRETHEWEY DR

LAKE SHORE BLVD E

WESTHUMBER

BLVD

JOH

N GARLAN D

BLVD

DUNCAN

W

O ODS DR

ST CLAIR AVE E

DU

PLEX

AVE

BEVERLE

Y S

T

THISTLE

DOWN

BLVD

CHARLES

ST W

BLYTHWOOD RD

HOWARD PARK

AVE

VICTO

RIA

ST

FASKEN DR

BETHRIDGE RD

MIMICO

AVE

LAN

SDO

WN

EAV

E

ROSELAWN AVE

MORNING

STAR DR

KILBARRY RD

CHURCH ST

SHEPPARD AVE E

DAV EN PORT RD

KEELE ST

CA

LED

ON

IAR

D

WELLESLEY ST E

O CONNOR DR

AU

GU

STA

AVE

DISCO RD

BR

OW

NS

LINE

TAM

WO

RTH

RD

DU

NN

AVE

CU

LFOR

DR

D

EARL ST

MILL ST

HOPEST

GO

SFO

RD

BLVD

MANOR RD E

BANNATYNE

DR

DUNC ANMILL RD

ELM R

D

MC

C

AUL

ST

NEW TORONTO ST

WALSHAVE

OLD

PAR

KR

D

NAIR

N

AVE

PR

OV

OS

T

DR

ELM ST

THIR

TIETH ST

LAPPIN

AVE

SH

AVE

RAV

ES

SUN

NYSID

E

AVE

MO

U NT

OLIVE DR

FRONT ST E

FRONT ST W

LAN

YARD RD

SHOR EHAM

DR

AVONDALE AVE

BRENTCLIFFE

RD

SYMIN

GTO

N AVE

HALLAM ST

PRETORIAAVE

FAYW

OO

DBLV

D

SPADIN

A R

D

BE

ECR

OFT

RD

STANLEY

RD

BERRY RD

YONGEBLVD

WIN

COTT

DR

VAN

SCO

RD

INGRAM

DR

FLORENCE AVE

BLACK

CRE

EK

DR

CLEN

DEN

AN

AVE

CLIN

TON

ST

ST JOHNS

RD

KIDRONVALLEY

DR

ROSEDALE VALLEY RD

BICKN

ELL AVE

NORSEMAN ST

EDITH

DR

ARM

OUR

BLV

D

CAR

LING

VIEW D

R

VARSITYRD

PORTLAND

ST

FENNAVE

WILSO

NH

EIG

HTS

BLVD

GERRARD

ST W

MERTON ST

FENMAR DR

SUMMERHILL

AVE

P RIN

CESS

MARGARETBLV

D

PRIN

CE

EDW

AR

D D

R S

ROSELAWN

AVE

HARBOUR

ST

CHA

LKFA

R

M D R

BERING

AVE

GLEN

ECHORD

THE ESPLANADE

BROADWAY AVE

SUMMITCREST DR

ADVANCE RD

DEWSON

ST

DENLO W BLVD

THE KINGSWAY

ST GEO

RG

E ST

GRANDRAVINE DR

HU

MB

ER

LINE

DR

CHERRY

ST

ATTWE

LLD

R

PINE ST

JUDSON ST

BA

RTO

R R

D

SHOR

NC

LIFFER

D

BEFFORT

RD

FLINT

RD

LIBERTY

ST

WIN

DE

RM

ERE

AVE

LA ROSE AVE

YORKDALE

RD

MONTGOMERYRD

ELMH URST DR

HA

RR

I SONR

D

ANGLESEY BLVD

BIRMINGHAM ST

FOXWELL

ST

G

UN

NS

RD

OVERBROOK PL

WILLO

WD

ALE AVE

ELMAVE

WOODSWORTH

R

D

ELM

RIDGE

DR

DU

VAL

DR

GLE

NC

EDAR

RD

SOUDAN AVE

NE

ILSO

NDR

MO

UN

T

PLEA

SAN

T

RD

EXBURYRD

BURTONRD

LLOYD

MA

NO

RR

D

F IFE

SHI

RE

RD BAN

BU

RY

RD

CASTLEFIELD AVE

SHER

MO

UN

T

AVE

FALSTAFF AVE

GLE

NM

OU

NT

AVE

VALERMO DR

KNOBHILLD

R

AMEER

AVE

CLYD

E AVE

GEARY

AVE

RED

PATH AVE

ORMON T DR

SPENVALLEY DR

WE

LLAN

D

AVE

SOUTHVALE

DR

UPJO

HN

RD

CAN

MO

TOR

AVE

IND

IAN

RD

HA

WK

SB

UR

Y DR

BE

RKINDALE

DR

SIGN

ET

DR

CENTENNIAL

PAR

KB LVD

EDE

NBR

ID

GE

DR

WICKST EED AVE

LONSDALE

RD

GORDON

MACKAY RD

ELM

RIDGEDR

PALM

ERSTO

N

BLVD

RE

SOURCES

RD

ORFUS RD

TORORD

NEP

TUNE D R

INDUSTRY ST

BRIDGELANDAVE

GIBBS RD

FOUR WINDS

DR

PO

TTERY

RD

EG

LINTONAVE W

CH

ESSWO

OD

DR

GU LLI VERR D

STEEPROCK DRW

INO

NA

DR

PARK HOME AVE

VALHALLA

INN RD

BARM

AC

DR

TOBERMORYDR

QUEE

NS

PLATED

R

DU

FFLAW

RDTA

BER RD

GARYRAY DRELLERSLIE AVE

PLEWES RD

ERSKINE

AVE

GO

LDFINCHCRT

POST RD

EAST DR

TAN

GIE

RS

RD

RACINE RD

HIG

HPAR

KAV

E

WIL

LIA

MC

ARS

ON

CRE

S

CLAYSO

N

RD

JUTLAND RD

TYCOS DR

MONOGRAM

PL

LESMILL

R

D

ATOM

IC

AVE

WINGOLD

AVE

TORYORK DR

RIVA

LDA

RD

TITAN RD

PARK

LANE CRCL

EDDYSTONE

AVE

MO

UN

TPLE

ASAN

TR

D

SOR

AUR

EN AVE

PAR

LIAMEN

T S

T

BRO

ADVIEW

AVE

BAY

S

TR

EN

FORTH

DR

SPADIN

A R

D

CA

RR

IERD

R

RO

NC

ESVALLES AVE

CH

ER

RY

ST

NORTH QUEEN ST

OR

IOLE

PKW

Y

M A RIN

EPA

RAD

ED

R

PAPE AV

E

HUM

BERW

OOD

BLVD

DW

IGH

T AVE

BLOOR

RAM

P

THE

WES

TM

ALL

WE

LLESW

ORTH

DR

SIL

VE

RST

ON

E

DR

CA

BERNET CR

C L

PARK

RD

AVEN

UE R

D

THE KINGSWAY

GLEN

RUS

HBLV

D

EMME T T

AVE

HU

MBE

RBL

VD

NO

RFIN

CH

DR

ARROWRD

AR

RO

W R

D

WES

TMO

RE D

R

HU

LLMAR

DR

TH

ED

ONW

AY

W

CALVINGTON DR

BANBURYRD

BROO

KH

AVE

ND

R

HORNER AVE

GLE

N R

D

GR

AND

AVE

UPPER

HIG

HLAN

D

CR

ES

SH

EFFIELD

ST

FIELD

WAY

RD

UPPER

CANADA

DRMILLWICKDR

BERG

AMOT AVE

WILLIA

MR

ALLEN RD

OAK

DA

LER

D

MILVAN DR

TOR

BAR

RIE

RD

SKYWAY

AVE

RONSO

NDR

NO

RE

LCO

DR

LAKE ONTARIO

±

Data source: City of Toronto / IBI Group, 2016Projection: NAD 1927 MTM 3

Date: April 2016Cartography: Vélo Québec

0 2 4 km

!

Toronto

U.S.A

LAKE ONTARIO

Cycling Network PlanEtobicoke York

District

LegendCycling Network and Trails Plan

Existing Cycling Network

FreewaysMajor RoadsArterial Road Network

Green Spaces

Rail Lines

Major Corridor Studies

Trails | Boulevard Trails

Trails | Boulevard Trails

Quiet Street Routes

Bike Lane | Cycle Tracks

Quiet Street Routes

Bike Lane | Cycle Tracks

Tunnels and Bridges!(

/// CYCLING FACILITIES ////////////////////////////////////////////////////////////////////////////

Dundas Street West will be reconfigured from Summerland Terrace to Aukland Drive.

The new roadway will include separated bicycle lanes, widened sidewalks, street furniture, lighting, trees, and planters.

/// RENDERINGS OF THE NEW DUNDAS STREET WEST ////////////////////////////////////

ROADS TO BE DEMOLISHEDNEW ROADS

Bloor Street West will be reconfigured from Resurrection Road to Beamish Drive.

The new roadway will include separated bicycle lanes, widened sidewalks, street furniture, lighting, trees, and planters.

/// RENDERINGS OF THE NEW BLOOR STREET WEST ///////////////////////////////////////

ROADS TO BE DEMOLISHEDNEW ROADS

Kipling Avenue will be reconfigured from one block north of Bloor Street to south of Bloor Street and St. Albans Road.

The new roadway will include widened sidewalks, street furniture, lighting, trees, planters. A bike lane will be constructed between Bloor Street and Dundas Street West.

/// RENDERINGS OF THE NEW KIPLING AVENUE ///////////////////////////////////////////

ROADS TO BE DEMOLISHEDNEW ROADS

Dunbloor Road will include widened sidewalks, street trees and furniture, and separated bicycle lanes.

/// RENDERINGS OF THE NEW DUNBLOOR ROAD ///////////////////////////////////////////

ROADS TO BE DEMOLISHEDNEW ROADS

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

/// WESTWOOD THEATRE LANDS: A NET ZERO COMMUNITY/////////////////////////////

What is Net Zero?Net zero means significantly reducing energy use and meeting remaining energy needs with local, low-carbon energy sources, over time.

Net zero communities are important to meeting our city-wide energy and emissions targets.

Master planning of the Westwood Theatre Lands (WTL) presents an opportunity to plan for a net zero community. Efficient buildings and low-carbon thermal energy networks are key to achieving net zero.

Low-Carbon Thermal Energy NetworkBlock/district-scale energy sharing networks that leverage large-scale renewable energy sources (e.g. geo-exchange systems) can cost-effectively provide the majority of low-carbon energy needed.

Installation of the pipes in the WTL has recently been tendered by Engineering & Construction Services and will progress with road phasing.

Efficient BuildingsPassive design and high performance mechanical systems reduce energy use significantly. The WTL will meet the new Toronto Green Standard V3.

For more information:toronto.ca/communityenergy

WESTWOOD THEATRE LANDS: A NET ZERO COMMUNITY

Efficient Buildings

Low-Carbon Thermal Energy Network

Master planning of the Westwood Theatre Lands (WTL) presents an opportunity to plan for a net zerocommunity. Efficient buildings and low-carbon thermal energy networks are key to achieving net zero.

What is Net Zero?

Net zero means significantlyreducing energy use andmeeting remaining energyneeds with local, low-carbonenergy sources, over time.

Net zero communities areimportant to meeting our city-wide energy and emissionstargets.

Westwood Theatre Lands Master Plan

Geo-exchange system

Block/district-scale energy sharing networksthat leverage large-scale renewable energysources (e.g. geo-exchange systems) cancost-effectively provide the majority of low-carbon energy needed.

Installation of the pipes in the WTL has recentlybeen tendered by Engineering & ConstructionServices and will progress with road phasing.

Passive design and highperformance mechanicalsystems reduce energyuse significantly. The WTLwill meet the new TorontoGreen Standard V3.

For more information:toronto.ca/communityenergy

HEADER

WESTWOOD THEATRE LANDS: A NET ZERO COMMUNITY

Efficient Buildings

Low-Carbon Thermal Energy Network

Master planning of the Westwood Theatre Lands (WTL) presents an opportunity to plan for a net zerocommunity. Efficient buildings and low-carbon thermal energy networks are key to achieving net zero.

What is Net Zero?

Net zero means significantlyreducing energy use andmeeting remaining energyneeds with local, low-carbonenergy sources, over time.

Net zero communities areimportant to meeting our city-wide energy and emissionstargets.

Westwood Theatre Lands Master Plan

Geo-exchange system

Block/district-scale energy sharing networksthat leverage large-scale renewable energysources (e.g. geo-exchange systems) cancost-effectively provide the majority of low-carbon energy needed.

Installation of the pipes in the WTL has recentlybeen tendered by Engineering & ConstructionServices and will progress with road phasing.

Passive design and highperformance mechanicalsystems reduce energyuse significantly. The WTLwill meet the new TorontoGreen Standard V3.

For more information:toronto.ca/communityenergy

HEADER

WESTWOOD THEATRE LANDS: A NET ZERO COMMUNITY

Efficient Buildings

Low-Carbon Thermal Energy Network

Master planning of the Westwood Theatre Lands (WTL) presents an opportunity to plan for a net zerocommunity. Efficient buildings and low-carbon thermal energy networks are key to achieving net zero.

What is Net Zero?

Net zero means significantlyreducing energy use andmeeting remaining energyneeds with local, low-carbonenergy sources, over time.

Net zero communities areimportant to meeting our city-wide energy and emissionstargets.

Westwood Theatre Lands Master Plan

Geo-exchange system

Block/district-scale energy sharing networksthat leverage large-scale renewable energysources (e.g. geo-exchange systems) cancost-effectively provide the majority of low-carbon energy needed.

Installation of the pipes in the WTL has recentlybeen tendered by Engineering & ConstructionServices and will progress with road phasing.

Passive design and highperformance mechanicalsystems reduce energyuse significantly. The WTLwill meet the new TorontoGreen Standard V3.

For more information:toronto.ca/communityenergy

HEADER WESTWOOD THEATRE LANDS: A NET ZERO COMMUNITY

Efficient Buildings

Low-Carbon Thermal Energy Network

Master planning of the Westwood Theatre Lands (WTL) presents an opportunity to plan for a net zerocommunity. Efficient buildings and low-carbon thermal energy networks are key to achieving net zero.

What is Net Zero?

Net zero means significantlyreducing energy use andmeeting remaining energyneeds with local, low-carbonenergy sources, over time.

Net zero communities areimportant to meeting our city-wide energy and emissionstargets.

Westwood Theatre Lands Master Plan

Geo-exchange system

Block/district-scale energy sharing networksthat leverage large-scale renewable energysources (e.g. geo-exchange systems) cancost-effectively provide the majority of low-carbon energy needed.

Installation of the pipes in the WTL has recentlybeen tendered by Engineering & ConstructionServices and will progress with road phasing.

Passive design and highperformance mechanicalsystems reduce energyuse significantly. The WTLwill meet the new TorontoGreen Standard V3.

For more information:toronto.ca/communityenergy

HEADER WESTWOOD THEATRE LANDS: A NET ZERO COMMUNITY

Efficient Buildings

Low-Carbon Thermal Energy Network

Master planning of the Westwood Theatre Lands (WTL) presents an opportunity to plan for a net zerocommunity. Efficient buildings and low-carbon thermal energy networks are key to achieving net zero.

What is Net Zero?

Net zero means significantlyreducing energy use andmeeting remaining energyneeds with local, low-carbonenergy sources, over time.

Net zero communities areimportant to meeting our city-wide energy and emissionstargets.

Westwood Theatre Lands Master Plan

Geo-exchange system

Block/district-scale energy sharing networksthat leverage large-scale renewable energysources (e.g. geo-exchange systems) cancost-effectively provide the majority of low-carbon energy needed.

Installation of the pipes in the WTL has recentlybeen tendered by Engineering & ConstructionServices and will progress with road phasing.

Passive design and highperformance mechanicalsystems reduce energyuse significantly. The WTLwill meet the new TorontoGreen Standard V3.

For more information:toronto.ca/communityenergy

HEADER

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

STAGE 1 Winter 2017 - Winter 2018

STAGE 1A• Construct new Dundas Street West alignment

between Kipling Avenue and Bloor Street West• Construct Road A and Road B• Construct an underground Hydro duct bank

on Dundas from Aukland Road to Jopling Avenue

STAGE 1B• 72 hour closure of Dundas/Bloor intersection

to remove asphalt and place temporary ramps to Bloor Street West

• Construction along Dundas Street West, Road A, and Road B

• Close the bus ramp (Kipling to Street A) and open temporary connections (Dundas, Road A, Road B)

STAGE 1C• Reconstruct Bloor Street West, westbound

lanes from Dunbloor Road to the projects eastern limit

• Construct the east-side of Kipling Avenue and bus ramp, south of Bloor Street West

STAGE 1D• Construct Bloor Street West, westbound lanes• Construct the Kipling/Dundas intersection

/// PHASE 2 CONSTRUCTION SCHEDULE - STAGE 1 //////////////////////////////////////////

Generally, construction includes:• removing the existing roads and facilities as required• installing underground infrastructure (watermain, storm sewers, sanitary sewers, and utilities)• streetscaping (including landscaping, street lighting, and furniture)• road surfacing, intersection improvements, and curb installation

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

STAGE 2Spring 2018 - Summer 2019

STAGE 2A• Reconstruct the Bloor Street West, eastbound

lanes• Reconstruct Dunbloor Road• Construct the remainder of Dundas Street

West, south side and the Kipling/Dundas intersection

• Construct new Viking Lane

STAGE 2B• Bloor Street West, realignment from Dundas

Street West to Kipling Avenue• Construct Road C• Reconstruct the existing Dundas Street West,

east of Kipling, and Kipling/Dundas ramp• Construct Dundas Street West from Jopling

Avenue to Kipling Avenue

/// PHASE 2 CONSTRUCTION SCHEDULE - STAGE 2 //////////////////////////////////////////

Generally, construction includes:• removing the existing roads and facilities as required• installing underground infrastructure (watermain, storm sewers, sanitary sewers, and utilities)• streetscaping (including landscaping, street lighting, and furniture)• road surfacing, intersection improvements, and curb installation

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

/// PHASE 2 CONSTRUCTION SCHEDULE - STAGE 3 /////////////////////////////////////////

STAGE 3Summer 2019 - Spring 2020

STAGE 3A• Widen Kipling Avenue northbound lanes• Remove the existing Dundas/Bloor bridge

structures over Kipling Avenue

STAGE 3B

• Widen and reconstruct Kipling Avenue southbound lanes

• Construct Bloor Street West from Kipling Avenue to Prennan Avenue

Generally, construction includes:• removing the existing roads and facilities as required• installing underground infrastructure (watermain, storm sewers, sanitary sewers, and utilities)• streetscaping (including landscaping, street lighting, and furniture)• road surfacing, intersection improvements, and curb installation

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

ROAD AND SIDEWALK ACCESS In order to complete the work in a safe manner, there will be road and sidewalk restrictions within the construction work zone. Access for emergency vehicles will be maintained at all times.

DRIVEWAY ACCESSThe contractor will notify residents of any temporary driveway access restrictions. If your property has two entrances, one entrance will be kept open at all times.

TRAFFIC MANAGEMENTEfforts have been made to manage traffic in the area for the safety of workers, road users and residents. Road users should expect delays and increased traffic on nearby main and side streets.

PARKING Parking in the active work zone is not permitted due to space require-ments for construction equipment and materials. If your parked vehicle

affects the construction work, it will be re-located with no charge to the owner. If your vehicle is moved, please contact park-ing control for its location at 416-808-2222.

GARBAGE & RECYCLINGPlease follow your normal routine. If required, the contractor will move bins to an appropriate location and return them. Please ensure that you label your bins with your address.

RESTORATIONThe construction work area will be restored with sod and/or asphalt where required in future stages of the work. Updates will be provided.

TRANSIT SERVICEThis project will affect travel times of ALL TTC and MiWay Routes to and from Kipling Subway Station that travel along Dundas Street West.

Visit ttc.ca  or miway.ca for accurate schedule information.

You may experience dust, noise and other inconveniences. The City will make efforts to reduce the impacts. We appreciate your patience.

Work will take place from 7:00 am to 7:00 pm., Monday to Friday, with work after hours and on weekends as required.

Notification about construction impacts will be sent to affected property owners, residents, and businesses, in advance of any construction disruptions via direct mail.

Questions and comments can be directed to:Meghan Bratt, Field Ambassador416-338-7755 | [email protected]

/// WHAT TO EXPECT DURING CONSTRUCTION //////////////////////////////////////////////

A NEW ETOBICOKE CENTRERECONSTRUCTING THE SIX POINTS INTERCHANGE

Building a great city takes time. During construction we will keep you informed about

what’s happening, what’s next, and progress made.www.toronto.ca/etobicokecentre

CONTACT YOUR FIELD AMBASSADOR

Your Field Ambassador is your main point of contact for questions and concerns about reconstruction of the Six Points Interchange. 

Meghan Bratt, Field [email protected]

416-338-7755

SIGN UP FOR EMAIL UPDATES

Stay up to date on construction milestones and opportunities to get involved by signing up to receive updates on the project website.

Your contact information will be kept private, and will only be used to share information about the Six Points Interchange Reconfiguration.

NOTIFICATION + NEWSLETTERS

Notification about construction impacts will be sent to property owners 2 weeks in advance of construction via Canada Post delivery.

Newsletters will be sent at key project milestones to share information on construction progress and what’s next.

@

/// STAY INFORMED ///////////////////////////////////////////////////////////////////////////////

1947 1961

These aerial maps and images from the Toronto Archives show how the cityscape has changed over time. You can explore these maps in detail at www.toronto.ca/archives.

1971 1981

1991 2017

These images from the Toronto Archives show construction of the Six Points Interchange in 1960.

Six Points area,1960 - 1975

Six Points intersection, 1959, looking west Six Points intersection, 1960, looking north-west

Site of Kipling Subway Station, 1978

Crossover area, east of Kipling Station, 1978

Looking east, along CPR at Kipling Station, 1982

SIX POINTS INTERCHANGE RECONFIGURATION

SIX POINTS OVER THE YEARS

PLANNING IN ETOBICOKE CENTRE

KIPLING MOBILITY HUB

COMMUNITY ART WORK