Department of Training andWorkforce Development

Western Australia

RPL Assessment Tool Kit

BCG31003Certificate III in Solid Plastering

Page 2: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

First published 2010

ISBN 978-1-74205-627-2

© Department of Training and Workforce Development

All rights reserved.

Western Australian Department of Training and Workforce Development materials, regardless of format, are protected by copyright law.

Permission, however, is granted to Trainers, Assessors and Registered Training Organisations to use, reproduce and adapt the material (third party material excluded) for their Recognition of Prior Learning (RPL) assessment activities.

This permission is subject to the inclusion of an acknowledgement of the source. Permission does not extend to the making of copies for hire or sale to third parties, and provided it is not used for commercial use or sale. Reproduction for purposes other than those indicated above requires the prior written permission of the Western Australian Department of Training and Workforce Development.

Published by and available from

WestOne Services

1 Prospect PlaceWEST PERTH WA 6005Tel: (08) 9229 5200    Fax: (08) 9227 8393Email: [email protected]

Website:  www.westone.wa.gov.au

AcknowledgementsThis work has been produced with the assistance of funding provided by the Council of Australian Governments (COAG) National Reform Initiative (NRI).

This resource contains units of competencies, performance criteria, elements, range statements, employability skills and qualification summaries from the BCG03 General Construction Training Package – BCG31003 Certificate III in Solid Plastering © Commonwealth of Australia, used under the AEShareNet-FfE licence

DisclaimerWhilst every effort has been made to ensure the accuracy of the information contained in this RPL Assessment Tool Kit, no guarantee can be given that all errors and omissions have been excluded. No responsibility for loss occasioned to any person acting or refraining from action as a result of the material in this RPL Assessment Tool Kit can be accepted by the Western Australian Department of Training and Workforce Development.

Page 3: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringRPL Assessment Tool Kit

ContentsRecognition of Prior Learning (RPL) Assessment Tool Kit 5

Overview of the Recognition Process 7

PART 1Section 1 – Assessor’s Information 9

Introduction 11

Explanation of RPL documents 12

Section 2 – List of competencies in this RPL Assessment Tool Kit 13Qualification Rules 15

List of competencies in this RPL Assessment Tool Kit 17

Units of competency covered in this RPL Assessment Tool Kit 17

Section 3 – Interview Question Bank and Recording Sheets 19Skill Set 1 – Rendering a flat section of wall 21

Skill Set 2 – Installing an angle bead and paper-faced cornice at height 29

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coatingthe attached pier 35

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installingdecorative mouldings 43

Section 4 – Practical Tasks and Observation Recording Sheets 47Practical tasks 49

Skill Set 1 – Rendering a flat section of wall 51

Task 1 51

Instructions for the candidate 51

Demonstration/Observation Checklist 53

Instructions for the Assessor 53

Candidate’s work plan for Skill Set 1 55

Skill Set 2 – Installing an angle bead and paper-faced cornice at height 61

Task 2 61

Instructions for the candidate 61

Demonstration/Observation Checklist 63

Instructions for the Assessor 63

Candidate’s work plan for Skill Set 2 65

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier 71

Task 3 71

Instructions for the candidate 71

Demonstration/Observation Checklist 73

Instructions for the Assessor 73

Page 3 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 4: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringRPL Assessment Tool Kit

Candidate’s work plan for Skill Set 3 75

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings 81

Task 4 81

Instructions for the candidate 81

Demonstration/Observation Checklist 83

Instructions for the Assessor 83

Candidate’s work plan for Skill Set 4 85

PART 2 91Section 5 – Candidate’s Information and Self-Evaluation Forms 91

What is Recognition of Prior Learning (RPL)? 93

How to prepare for your RPL assessment 94

The four steps in the RPL assessment process 96

Candidate’s Information Form 99

Candidate’s Employment History Form 101

Candidate’s Self-Evaluation Form 103

Candidate’s Self-Evaluation for Skill Set 1 – Rendering a flat section of wall 105

Candidate’s Self-Evaluation for Skill Set 2 – Installing an angle bead andpaper-faced cornice at height 111

Candidate’s Self-Evaluation for Skill Set 3 – Floating and setting a curved walland attached pier; texture coating the attached pier 113

Candidate’s Self-Evaluation for Skill Set 4 – Forming an in situ mould,setting a pier, forming an arch and installing decorative mouldings 115

Section 6 – Third Party Report and Supporting Documentation 117Third Party Report 119

Supporting Documentation 121

Assessor’s Evidence Summary Sheet 125

Section 7 – Mapping of Assessment Tools 127Mapping document for Skill Set 1 129

Evidence Matrix 131

Mapping document for Skill Set 2 173

Evidence Matrix 175

Mapping document for Skill Set 3 193

Evidence Matrix 195

Mapping document for Skill Set 4 209

Evidence Matrix 211

© Department of Training and Workforce Development 2010 Page 4 of 222Version 1, May 2010

Page 5: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringRPL Assessment Tool Kit

Recognition of Prior Learning (RPL) Assessment Tool KitBCG31003 Certificate III in Solid Plastering

This RPL Assessment Tool Kit has been developed by the Western Australian Department of Training and Workforce Development, in consultation with industry, as a resource to assist RPL Assessors by providing a set of quality assessment tools, which can be used to conduct whole-of-qualification RPL. This kit also contains information which can be provided to the candidate.

This kit should be customised to suit the needs of the candidate, employer/industry or Assessor and should reflect the purpose for which it is being used.

It is recommended that prior to using this kit for the first time, and after any modifications or contextualisation, this RPL Assessment Tool Kit be validated by the user to ensure it meets the required Australian Qualification Training Framework Standards (AQTF), relevant Training Package requirements and Registered Training Organisation (RTO) policies.

A task-based model for RPLA process for RPL has been developed that promotes holistic, task-based assessment, and which focuses on relating assessment activities to actual job tasks. The intention of this model is to streamline and simplify recognition processes for prospective candidates. This RPL Assessment Tool Kit has been developed to support this task-based model.

The focus of the new streamlined holistic assessment process is to focus on demonstrated skills and knowledge and is not reliant on documentary evidence as the main source of evidence.

Page 5 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 6: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringRPL Assessment Tool Kit

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 6 of 222Version 1, May 2010

Page 7: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringRPL Assessment Tool Kit

Overview of the Recognition Process

Page 7 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Gap Training (if required)

If not ready for RPL, the candidate is to

be provided with training options.

Supporting Evidence/Third Party

Report(if required)

Issue Qualification –Statement of Attainment

By RTO

Candidate Self-Evaluation

Interview and Questioning

Demonstration/Observation of Practical Tasks

Candidate EnquiryCandidate’s Information

Form

STEP 4

STEP 3

STEP 2

STEP 1

Page 8: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringRPL Assessment Tool Kit

© Department of Training and Workforce Development 2010 Page 8 of 222Version 1, May 2010

Page 9: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringRPL Assessment Tool Kit

Page intentionally blank

Page 9 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 10: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 1 – Assessor’s Information

PART 1

Section 1

Assessor’s Information

It is important that you complete both Steps 2 (Interview/Questioning) and 3 (Practical Tasks) when completing RPL Assessment using this kit.

The RPL process is a streamlined process which does not rely solely on documentary evidence. It uses a combination of questioning, practical assessment and supporting evidence to provide evidence of the candidate’s competence.

© Department of Training and Workforce Development 2010 Page 10 of 222Version 1, May 2010

Page 11: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 1 – Assessor’s Information

Page intentionally blank

Page 11 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 12: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 1 – Assessor’s Information

IntroductionWelcome to the BCG31003 Certificate III in Solid Plastering.

This RPL Assessment Tool Kit contains supporting assessment materials for nineteen (19) units of competency – fifteen (15) core units required for the qualification and four (4) elective units.

It is simply set out, with a covering comprehensive list of instructions at the front of each document, as well as covering instructions for each step of the process, as found in the notes for the Assessor, and notes for the candidate.

Included in this kit are the following documents:

Assessor’s Information

Explanation of RPL documents

Qualification Rules and list of units of competency contained in this kit

Units of competency separated into skill sets for assessment

Tool Kits for each skill set:

► Interview Question Bank and Recording Sheets

► Practical Tasks and Observation Recording Sheets

Candidate’s Information

► Candidate’s Self-Evaluation Form (incorporating Third Party Verification)

Mapping documents for all the units of competency included in this kit.

© Department of Training and Workforce Development 2010 Page 12 of 222Version 1, May 2010

Page 13: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 1 – Assessor’s Information

Explanation of RPL documentsa) Interview Question Bank and Recording Sheets (Section 3): The interview question

bank is the second stage of the process, in which the Assessor and the candidate confirm the knowledge by discussing a series of questions. Each of these questions includes a series of Key Points, which may assist the Assessor in guiding the discussions.

b) Practical Tasks and Observation Recording Sheets (Section 4): These tools are designed to guide the Assessor and candidate through a workplace observation, proving the candidate’s ability to conduct the specific tasks and skills required for recognition of competence in the particular area.

c) Candidate’s Information and Self-Evaluation Forms (Section 5): This document is for the candidate to assess their suitability for RPL process, by asking them to consider each of the points and assessing their ability against the task. It has been broken into smaller skill groups, clustering like activities together to enable ease of completion. It is then reinforced by the candidate’s supervisor’s comments, both against tasks and as a summary for each group. This serves as third party validation of the candidate’s claims.

d) Third Party Report and Supporting Documentation (if applicable) (Section 6): The third party verification report is provided for referees, for example the supervisor, to confirm the candidate’s skills and experience in the qualification/occupation. This is particularly useful in addressing employability skill requirements. It is important to note that third party reports are not always available and it is recommended that Assessors use their professional judgement to determine if this is a requirement.

List of suggested supporting documentation (if applicable): A list of suggested industry specific evidence or supporting documentation (in addition to the generic documentation) is provided to assist the candidate in collecting evidence to support their application.

e) Mapping Document (Section 7): This tool demonstrates how each of the documents reflects the units of competency in the particular skill set.

Page 13 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 14: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 2 – List of competencies in this RPL Assessment Tool Kit

Section 2

List of competenciesin this

RPL Assessment Tool Kit

© Department of Training and Workforce Development 2010 Page 14 of 222Version 1, May 2010

Page 15: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 2 – List of competencies in this RPL Assessment Tool Kit

Page intentionally blank

Page 15 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 16: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 2 – List of competencies in this RPL Assessment Tool Kit

Qualification Rules

BCG31003 Certificate III in Solid PlasteringThe following information has been extracted from BCG03 General Construction Training Package (version 4).

RequirementsSuccessful completion of a total of nineteen (19) units of competency made up of:

fifteen (15) core units of competency

four (4) units of competency where:

o three (3) or more units are from electives

o and between zero (0) and one (1) unit is from:

- relevant units from BCG03 General Construction Training Package

- relevant units from another endorsed Training Package.

The BCG General Construction Training Package (version 4) should be consulted for information on choosing electives.

© Department of Training and Workforce Development 2010 Page 16 of 222Version 1, May 2010

Page 17: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 2 – List of competencies in this RPL Assessment Tool Kit

Page intentionally blank

Page 17 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 18: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 2 – List of competencies in this RPL Assessment Tool Kit

List of competencies in this RPL Assessment Tool KitThis section identifies the units contained in this kit.

Units of competency covered in this RPL Assessment Tool Kit

Skill Set 1 – Rendering a flat section of wall

Unit Code Unit Title Core/Elective

BCGCM1001B Follow OHS policies and procedures Core

BCGCM1002B Work effectively in the general construction industry Core

BCGCM1003B Plan and organise work Core

BCGCM1004B Conduct workplace communication Core

BCGCM1005B Carry out measurements and calculations Core

BCGCM2001B Read and interpret plans and specifications Core

BCGSP2001B Handle solid plastering materials Core

BCGSP2002B Use solid plastering tools and equipment Core

BCGSP2003B Prepare surfaces for plastering Core

BCGCM2006B Apply basic levelling procedures Core

Skill Set 2 – Installing an angle bead and paper-faced cornice at height

Unit Code Unit Title Core/Elective

BCGCM2007B Use explosive power tools (EPT) Elective

BCGWC3004B Install cast plaster and paper-faced cornices Core

BCGCO2003B Carry out concreting to simple forms Elective

BCGCM2008B Erect and dismantle restricted height scaffolding Core

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Unit Code Unit Title Core/Elective

BCGSP3001B Apply float and render to straight and curved surfaces

Core

BCGSP3003B Apply trowelled texture coat finishes Elective

© Department of Training and Workforce Development 2010 Page 18 of 222Version 1, May 2010

Page 19: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 2 – List of competencies in this RPL Assessment Tool Kit

BCGSP3002B Apply set coats Core

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Unit Code Unit Title Core/Elective

BCGSP3005B Install pre-cast decorative mouldings Elective

BCGSP3004B Restore and renovate solid plasterwork Core

Page 19 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 20: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Section 3

Interview Question Bank and

Recording SheetsThis section contains questions the Assessor may ask the candidate while documenting their conversation during the RPL interview.

Assessor’s InstructionsIt is not intended that every question for each competency be asked or discussed during the conversation. Only questions related to those competencies that the initial documentary review has failed to fully address are required.

Each question provides key points to look for in the candidate’s responses. You may wish to use these key points to formulate questions of your own, contextualise, or rephrase the suggested questions to suit the candidate’s particular work situation.

On the Recording Sheets, place a tick next to each key point as it is addressed by the candidate during the conversation. By doing this, you are recording what you have heard the candidate say during the interview.

Use the Assessor’s Comments section next to each question to provide further details about the context of the discussion or other key points and examples the candidate has discussed that may be relevant in confirming competence.

It is important to remember that the notes taken during the questioning interview are important evidence and should be retained as part of the candidate’s assessment records.

© Department of Training and Workforce Development 2010 Page 20 of 222Version 1, May 2010

Page 21: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Page intentionally blank

Page 21 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 22: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Interview Question Bank and Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Assessor’s Instructions

The interview should allow the candidate to confirm their knowledge as identified by their Self-Evaluation against relevant units of competency. The Assessor may use these questions to guide the interview ensuring that the candidate addresses the key points identified for each question.

These key points exist as a guide only, and the Assessor is encouraged to expand on them where necessary to satisfy depth of underpinning knowledge and skills.

It is recommended that the interview be conducted in the workplace, allowing the candidate access to documents, equipment etc to support their statements.

Record of interview

Candidate’s name

Assessor’s name

How/where was the interview conducted?

Interview only qAt an RTO’s premises q Name:

In the workplace q Name:

© Department of Training and Workforce Development 2010 Page 22 of 222Version 1, May 2010

Page 23: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Candidate’s name

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competencyBCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Question 1 – Discuss OHS procedures, evacuation and accident report procedures for gaining entry to work on site.

Key points to be addressed by the candidate

q Blue Card.

q PPE.

q Observe safety signs.

q Adhere to electrical safety.

q Company policy and procedures.

q Apply first aid in the event of an accident and respond according to level of severity. Ensure worker safety – and others in the area – are the priority.

Assessor’s notes

Question 2 – Talk through the whole process of inspecting working platforms, setting up your tools and equipment for a simple rendering job.

Key points to be addressed by the candidate

q Assess risks.

q JSA.

q MSDSs.

Assessor’s notes

Page 23 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 24: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Candidate’s name

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competencyBCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

q Material quantities.

q Correctly stored material (dry area, off ground.)

q Material identification.

q Signage, barricades.

q Preparation tasks – unload/set up equipment/stack materials.

q Check electrical leads, RCDs.

q Check frames are clean, flat and sound.

q Select mixer.

q Prepare surfaces.

q Use levelling techniques.

q Keep clean/clear while working.

q Dispose of waste responsibly.

q Clean tools and equipment.

q Check for damage or corrosion.

© Department of Training and Workforce Development 2010 Page 24 of 222Version 1, May 2010

Page 25: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Candidate’s name

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competencyBCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Question 3 – How would you prepare a concrete background before rendering?

Key points to be addressed by the candidate

q Bondall BondCrete.

q Cement slurry.

q Chip (sparrow peck).

q Spatter dash.

Assessor’s notes

Question 4 – Discuss your role as a plasterer. Talk about communication and working effectively in a team.

Key points to be addressed by the candidate

q Roles and responsibilities.

q Basic teamwork/cooperation/work dependence.

q Various techniques in plastering.

q Planning and organising skills – work deadlines.

q Decision-making (on site meetings).

q Verbal/written instructions, visual signs,

Assessor’s notes

Page 25 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 26: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Candidate’s name

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competencyBCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

terminology.

Question 5 – What is the purpose of lime in a mix?

Key points to be addressed by the candidate

q Workability.

q Water retention.

q Weakens coats.

Assessor’s notes

Question 6 – Where can you find information on correct mixing ratios?

Key points to be addressed by the candidate

q Specification.

q Product bags.

q Manufacturers.

Assessor’s notes

Question 7 – What PPE is required when mixing cement?

Key points to be addressed by the candidate Assessor’s notes

© Department of Training and Workforce Development 2010 Page 26 of 222Version 1, May 2010

Page 27: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Candidate’s name

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competencyBCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

q Dust mask gloves/safety boots.

q Eye protection (AS 1337).

Question 8 – From a given plan and specification, list all the tools and equipment you need to render the front elevation of a house.

Key points to be addressed by the candidate

q Trowel/hawk/rule/float.

q Grass brush.

q Water/cement/cement mixer/wheelbarrow.

Assessor’s notes

Question 9 – Calculate the volume of material you would need to render that front elevation with a 10 mm coat.

Key points to be addressed by the candidate

q Length height depth.

Assessor’s notesApproximate volumes are acceptable.

Page 27 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 28: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Candidate’s name

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competencyBCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Additional notes from conversation

Assessor’s signature Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)

Assessor’s name Date

© Department of Training and Workforce Development 2010 Page 28 of 222Version 1, May 2010

Page 29: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Interview Question Bank and Recording Sheets

Skill Set 2 – Installing an angle bead and paper-faced cornice at height

Assessor’s Instructions

The interview should allow the candidate to confirm their knowledge as identified by their Self-Evaluation against relevant units of competency. The Assessor may use these questions to guide the interview ensuring that the candidate addresses the key points identified for each question.

These key points exist as a guide only, and the Assessor is encouraged to expand on them where necessary to satisfy depth of underpinning knowledge and skills.

It is recommended that the interview be conducted in the workplace, allowing the candidate access to documents, equipment etc to support their statements.

Record of interview

Candidate’s name

Assessor’s name

How/where was the interview conducted?

Interview only qAt an RTO’s premises q Name:

In the workplace q Name:

Page 29 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 30: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 2 – Installing an angle bead and paper-faced cornice at height

Candidate’s nameUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

NoteMany solid plasterers have had limited exposure to the application of cornice, as this area is often left to wall and ceiling lining tradespeople in industry.

Question 10 – What method can be used to ensure that window reveals are 90 degrees to the frame?

Key points to be addressed by the candidateq Plasterers’ square.

q Trowel.

q Spirit level.

Assessor’s notes

Question 11 – What methods have you used to fix metal beading with the aid of a levelling device?

Key points to be addressed by the candidateq EPT.

q Bedding on.

q Straight edge.

Assessor’s notes

Question 12 – When given instructions to use an EPT, can you describe the stripping and assembly, logging of serviceability, misfire procedures, storage and security regulations, the suitable types of materials that can be fastened and the cleaning-up procedures?

Key points to be addressed by the candidateq PPE (safety glasses, safety boots,

clothing).

q JSA.

q Safety signs located appropriately.

q Barricade to prevent access to work area.

q Only point to what is being fastened.

Assessor’s notes

© Department of Training and Workforce Development 2010 Page 30 of 222Version 1, May 2010

Page 31: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 2 – Installing an angle bead and paper-faced cornice at height

Candidate’s nameUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

NoteMany solid plasterers have had limited exposure to the application of cornice, as this area is often left to wall and ceiling lining tradespeople in industry.

q Keep EPT and fasteners in a secure carry case.

q Warn passers-by before firing.

q Ensure surface to fix to is sound.

q Ensure work area is clear of trip hazards.

Question 13 – Explain how to measure, cut, install, butt join paper-faced cornice step-by-step, and how to erect a suitable working platform to complete the task safely and cleanly.

Key points to be addressed by the candidateq Ensure correct handling of sheet material.

q JSA.

q Erect a suitable working platform.

q Check wall/ceiling surface is sound.

q Projection lines (below ceiling line).

q Measure lengths.

q Cut mitres correctly.

q Butter up sides and install.

q Clear away surplus adhesive and check work.

q Fill and sand back mitres (joints).

q Clean up area and put away tools and equipment.

Assessor’s notes

Page 31 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 32: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

© Department of Training and Workforce Development 2010 Page 32 of 222Version 1, May 2010

Page 33: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 2 – Installing cornices and pre-cast mouldings

Candidate’s name

Units of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Additional notes from conversation

Assessor’s signature Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)

Assessor’s name Date

Page 33 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 34: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 34 of 222Version 1, May 2010

Page 35: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Interview Question Bank and Recording Sheets

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Assessor’s Instructions

The interview should allow the candidate to confirm their knowledge as identified by their Self-Evaluation against relevant units of competency. The Assessor may use these questions to guide the interview ensuring that the candidate addresses the key points identified for each question.

These key points exist as a guide only, and the Assessor is encouraged to expand on them where necessary to satisfy depth of underpinning knowledge and skills.

It is recommended that the interview be conducted in the workplace, allowing the candidate access to documents, equipment etc to support their statements.

Record of interview

Candidate’s name

Assessor’s name

How/where was the interview conducted?

Interview only qAt an RTO’s premises q Name:

In the workplace q Name:

Page 35 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 36: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Candidate’s name

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Question 14 – What is the purpose of using screeds, setting-out dots and squares?

Key points to be addressed by the candidateq Provides accurate guides to rule to.

q Dots ensure accuracy over a long distance.

q Dots provide a true plumb surface.

q Dots are easy to rule back to.

q Squares ensure surfaces are 90 degrees to each other.

Assessor’s notes

Question 15 – Explain how to find the radius of a curved surface and make the template for screeding?

Key points to be addressed by the candidateq Timbers.

q Square.

q Rule.

q Trammel.

q Jig saw.

Assessor’s notes

Question 16 – Give two (2) reasons why shrinkage can occur.

Key points to be addressed by the candidateq High-suction background.

q Dry background.

Assessor’s notes

© Department of Training and Workforce Development 2010 Page 36 of 222Version 1, May 2010

Page 37: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Candidate’s name

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

q Heat.

Question 17 – When finishing render coats, what equipment have you used? What environmental protection procedures have you followed?

Key points to be addressed by the candidateq T-bar.

q Spray gun/grass brush.

q Poly/wooden float.

q Sponge float.

q Use waste skip.

q Cover drain openings.

q Clean up.

Assessor’s notes

Question 18 – What is the purpose of rubbing up the wall surface?

Key points to be addressed by the candidateq Consolidate surface.

q Close surface.

q Finish surface.

Assessor’s notes

Question 19 – Explain how block work can be set out.

Key points to be addressed by the candidateq Measure height-divide equally.

Assessor’s notes

Page 37 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 38: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Candidate’s name

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

q Measure width-divide equally.

q Scribe with jointer and rule.

q Transfer levels.

Question 20 – What methods can be used to achieve a limestone effect using mortar?

Key points to be addressed by the candidateq Apply unevenly.

q Float horizontally.

Assessor’s notes

Question 21 – Explain how you would plan, prepare, apply and finish an acrylic texture coat product.

Key points to be addressed by the candidateq Follow work instructions, plan,

specifications.

q Set up signage/barricades.

q Calculate quantity.

q Prime surface.

q Trowel, roll on or spray texture coat.

q Finish with plastic float to specification.

q Clean up.

Assessor’s notes

Question 22 – Explain how to prepare for and apply a minimum of two (2) different types of texture coat finishes.

© Department of Training and Workforce Development 2010 Page 38 of 222Version 1, May 2010

Page 39: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Candidate’s name

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Key points to be addressed by the candidateq Follow work instructions, plan,

specifications.

q Set up signage/barricades.

q Calculate quantity.

q Prime surface.

q Trowel, roll on or spray texture coat.

q Primer.

q Spray/trowel.

q Plastic float finish.

q Poly/wooden float finish.

q Sponge finish.

q Clean up.

Assessor’s notesApproximate volumes are acceptable.

Question 23 – Explain how to prepare various backgrounds for setting, select correct tools and equipment, and how to mix a plaster and lime set. Give details of the cleaning procedures and the problems that can arise when setting.

Key points to be addressed by the candidateq Soak and spray with a hose.

q Bondall BondCrete surface and let it go tacky before application.

q Mix in clean bucket and clean water.

q Mix lime putty well, before adding plaster

Assessor’s notes

Page 39 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 40: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Candidate’s name

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

and water.

q Fire cracking, blisters, Gauls, watermarks.

© Department of Training and Workforce Development 2010 Page 40 of 222Version 1, May 2010

Page 41: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 3 – Floating and setting a carved wall and attached pier; texture coating the attached pier

Candidate’s name

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Additional notes from conversation

Assessor’s signature Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)

Assessor’s name Date

Page 41 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 42: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

© Department of Training and Workforce Development 2010 Page 42 of 222Version 1, May 2010

Page 43: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Page intentionally blank

Page 43 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 44: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Interview Question Bank and Recording Sheets

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Assessor’s Instructions

The interview should allow the candidate to confirm their knowledge as identified by their Self-Evaluation against relevant units of competency. The Assessor may use these questions to guide the interview ensuring that the candidate addresses the key points identified for each question.

These key points exist as a guide only, and the Assessor is encouraged to expand on them where necessary to satisfy depth of underpinning knowledge and skills.

It is recommended that the interview be conducted in the workplace, allowing the candidate access to documents, equipment etc to support their statements.

Record of interview

Candidate’s name

Assessor’s name

How/where was the interview conducted?

Interview only qAt an RTO’s premises q Name:

In the workplace q Name:

© Department of Training and Workforce Development 2010 Page 44 of 222Version 1, May 2010

Page 45: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Candidate’s name

Units of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Question 24 – If an original ceiling plaster panel mould was damaged and needed to be replaced, what procedure is required to restore the panel? What housekeeping rules must be followed?

Key points to be addressed by the candidateq Copy profile.

q Cut out template.

q Construct frame.

q Run mould.

q Erect scaffold.

q Install.

q Clean up.

Assessor’s notes

Question 25 – Talk through the installation of a large ceiling rose weighing in excess of 10 kilograms when installed.

Key points to be addressed by the candidateq Access ceiling support.

q Install noggins.

q Bondall BondCrete base.

q Countersink screws.

q Remove excess adhesive.

q Support with props until set.

q Wear suitable PPE, eg hard hat and safety boots.

Assessor’s notes

Page 45 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 46: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Candidate’s name

Units of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Question 26 – How would you renovate a section of wall (a passageway) which has water damage due to a leaky wet area on the opposite wall (shower)?

Key points to be addressed by the candidateq Fix leakage.

q Allow wall to dry out.

q Remove damaged plasterwork.

q Prepare surface (brush down surface and suppress dust).

q Float out background.

q Set and finish to standard.

q Clean up.

Assessor’s notes

© Department of Training and Workforce Development 2010 Page 46 of 222Version 1, May 2010

Page 47: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 3 – Interview Question Bank and Recording Sheets

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Candidate’s name

Units of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Additional notes from conversation

Assessor’s signature Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)

Assessor’s name Date

Page 47 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 48: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Section 4

Practical Tasks and

Observation Recording Sheets

This section contains practical assessment tasks that the candidate will complete to assist you in determining their skills and knowledge.

Assessor’s InstructionsUse the Observation Recording Sheets for each of the practical tasks to document the skills and knowledge demonstrated by the candidate in completing each of the required tasks.

These practical tasks may be modified to suit the context of the candidate’s workplace, job role or their work environment.

Not all tasks need to be completed. You should select only those tasks that will provide the required evidence to prove competence by the candidate.

For a whole qualification it may be necessary to perform all tasks, if you believe that there is insufficient supporting evidence from other sources.

© Department of Training and Workforce Development 2010 Page 48 of 222Version 1, May 2010

Page 49: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

It is important to remember that the notes you make during the observation of the practical demonstration are important evidence and should be retained as part of the candidate’s assessment records.

You should make sure that the candidate obtains permission for any audio or video recording devices you intend to use, as this is both a legal requirement and a policy requirement for all RTOs.

Page 49 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 50: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Practical tasksWhile performing the various practical tasks, it is important that the principles of Occupational Health and Safety, and workplace safety requirements be met at all times.

Assessors need to ensure that the specifications for materials/resources used in the practical tasks are consistent with those in the critical aspects of evidence. (Refer to the Mapping of Assessment Tools document for more information.)

Skill Set 1 – Rendering a flat section of wallTask 1The candidate is to prepare, set out and render a simple (flat) section of wall.

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightTask 2The candidate is to:

prepare a section of wall surface

erect a work platform

attach a reinforced metal bead to an external angle on a wall using an explosive power tool

fix a section of decorative cornice

construct formwork 1 m2, mix and pour a slab, and finish with trowel and broom.

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierTask 3The candidate is to prepare, set out and restore solid plasterwork to specification on a minimum of three tasks including:

one curved surface

one ceiling

one archway or column.

Note: Setting (the type of finish) is not assessed in this skill set. It is only included to give the external mould a quality finish.

© Department of Training and Workforce Development 2010 Page 50 of 222Version 1, May 2010

Page 51: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsTask 4The candidate is to prepare, set out and restore solid plasterwork to specification on a minimum of three tasks including:

one curved surface

one ceiling

one archway or column.

Note: Setting (the type of finish) is not assessed in this skill set. It is only included to give the external mould a quality finish.

Page 51 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 52: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Skill Set 1 – Rendering a flat section of wall

Task 1

Instructions for the candidate

Outline of taskFor this task you are to prepare, set out and render a simple (flat) section of wall.

You will be required to:

follow all OHS procedures

prepare the wall surfaces before rendering a section of wall 2400 mm high (floor to ceiling) and 1200 mm wide

ensure the finish is level +/– 2 mm

ensure surfaces are rubbed up and sponge float finished to industry standards

assemble all equipment and tools, prepare the surface then apply the render to the wall, and finish to the required standard

follow established practices for OHS.

You will be provided with a simple candidate’s work plan to help you manage this task. You are to complete this plan before you begin the task. It will help you to plan how to approach this task in a methodical manner.

You will be assessed on your ability to:

locate, interpret and apply relevant information, standards and specifications

comply with OHS regulations and site safety plan/JSA applicable to project/workplace

comply with company policy, procedure and quality guidelines

demonstrate safe and effective operational use of all required tools, plant and equipment, including optical and laser levelling devices

communicate and work safely and effectively with others/workmates

select, use and maintain tools and equipment

handle and store solid plastering materials and components

prepare surfaces for plastering

render the section of wall specified.

Your Assessor:

will observe you performing specific tasks relevant to the generic units of competency in the skill set, but with a practical focus on the following units:

© Department of Training and Workforce Development 2010 Page 52 of 222Version 1, May 2010

Page 53: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

oBCGSP2001B Handle solid plastering materials

oBCGSP2002B Use solid plastering tools and equipment

oBCGSP2003B Prepare surfaces for plastering.

may verbally question you while you are performing the range of activities specified to address the task.

Page 53 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 54: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 1 – Rendering a flat section of wall

Task 1Candidate’s name

Assessor’s name

Supervisor’s name(if applicable)

Work activity The candidate is to prepare, set out and render a simple (flat) section of wall.

Skill Set 1 – Core units of competency

BCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Assessment location

Date of demonstration Time

Instructions for the Assessor

The candidate is to: follow all OHS procedures prepare the wall surfaces before rendering a section of wall 2400 mm high (floor to

ceiling) and 1200 mm wide ensure the finish is level +/– 2 mm and surfaces rubbed up and sponge float finished to

industry standards assemble all equipment and tools, prepare the surface then apply the render to the wall,

and finish to the required standard follow established practices for OHS complete the work plan before starting the activity.Questions may be asked of the Assessor for clarification purposes only.The duration of the assessment is at the discretion of the Assessor who may stop the assessment at any stage if he/she determines that he/she has enough evidence to support a satisfactory or unsatisfactory outcome.The candidate must have access to all materials, tools and equipment, and eye and ear protection, and must wear safety boots.OHS regulations and codes of practice must be followed at all times.

© Department of Training and Workforce Development 2010 Page 54 of 222Version 1, May 2010

Page 55: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 1 – Rendering a flat section of wall

Task 1The activity will require the candidate to: locate, interpret and apply relevant information, standards and specifications comply with OHS regulations and site safety plan/JSA applicable to project/workplace comply with company policy, procedure and quality guidelines demonstrate safe and effective operational use, and maintenance of all required tools,

plant and equipment, including optical and laser levelling devices communicate and work safely and effectively with others/workmates handle and store the solid plastering materials and components prepare surfaces for plastering render the section of wall specified.

Resources required for this task

flat section of brick wall 2400 mm high and 1200 mm wide, preferably in a sheltered area where inclement weather is unlikely to adversely affect the candidate’s task

cement mixer poly or wooden floats plasterer’s trowel hawk T-bar spray gun or grass brush hop up buckets sand cement lime spirit level stand and spot board.

Page 55 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 56: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Candidate’s work plan for Skill Set 1The candidate is to complete this checklist before starting any practical tasks. This is for the Assessor to use as an aid for planning and assessment.

1 OHS requirements

Satisfactory q

Unsatisfactory q

2 Plans and specifications

Satisfactory q

Unsatisfactory q

3 Set up materials and fixings for the task.

Satisfactory q

Unsatisfactory q

4 Set up hand and power tools for the task.

Satisfactory q

Unsatisfactory q

© Department of Training and Workforce Development 2010 Page 56 of 222Version 1, May 2010

Page 57: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

5 Set up construction tools and equipment for the task.

Satisfactory q

Unsatisfactory q

6 Outline below the approach you plan to use (ie the steps you take to complete the task).

Satisfactory q

Unsatisfactory q

7 On job completion, check the finished task against the stated criteria.

Satisfactory q

Unsatisfactory q

8 Clean up/put tools and equipment away.

Satisfactory q

Unsatisfactory q

Page 57 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 58: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 1 – Rendering a flat section of wall

Task 1Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

OHS requirements OSH Act 1984

Select and use correct personal protective equipment (PPE). q qCheck required safety signs are in place. q qSelect and use safety equipment for job or task. q qCheck electrical leads and power tools. q qPlans and specifications

Read plans and specifications, and check site before starting. q qInterpret information on plans and transfer to set-out and materials. q qConfer with team members (Assessor) to verify all points. q qMaterials and fixings

Select required materials from store and use them appropriately. q qIdentify all fixings correctly and use them appropriately and economically. q qStack materials safely on worksite before, during and after use. q qHand tools, portable power tools and static machinery Electrical safety

© Department of Training and Workforce Development 2010 Page 58 of 222Version 1, May 2010

Page 59: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 1 – Rendering a flat section of wall

Task 1Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

Select hand tools and use them safely to recognised trade practices. q qSelect portable power tools and use them safely to recognised trade practices. q qCheck mixing machinery for faults before and after start-up. q qCheck hand tools for good condition before use. q qCheck portable power tools for good condition before use. q qConstruction tools and equipment Working at height

legislation 2009Use trestles and planks safely and appropriately for work at heights. q qSelect scaffolding and erect safely for use during project. q qSet up levelling devices for correct use in appropriate places on site. q qPlace or stack trestles, planks, ladders and levelling devices in a safe, but easily accessible manner when not in use on site. q q

Work methodology

Follow identified job processes and procedures as closely as possible. q q

Job completion

Check all work against plans, specifications and instructions and q q

Page 59 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 60: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 1 – Rendering a flat section of wall

Task 1Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

confirm for completion with the team.

Clean up Builders’ Registration Act and BCADispose of all identified unusable material and waste safely, and in

an environmentally friendly manner. q qReturn and stack usable materials correctly in the store. q qClean/sweep site or work area, pick up unused fixings and return to store. q q

© Department of Training and Workforce Development 2010 Page 60 of 222Version 1, May 2010

Page 61: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Assessor’s general comments/observations

Assessor’s name Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)Assessor’s signature

Candidate’s signature Date

Page 61 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 62: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Skill Set 2 – Installing an angle bead and paper-faced cornice at height

Task 2

Instructions for the candidate

Outline of taskFor this task you are to prepare a section of wall surface, erect a work platform, attach a reinforced metal bead to an external angle on a wall, using an explosive power tool, then fix a section of paper-faced cornice, construct formwork, and mix and pour concrete to a trowel and brush finish.

You will be required to:

follow established OHS practices and procedures

prepare the wall surface before erecting a one-lift scaffold/work platform and fix a reinforced bead to an external angle of a wall using an explosive power tool

render a window wall and attached pier ensuring walls, external angles and reveals are plumb, sills and soffits are level

ensure the finish is level +/– 2 mm and surfaces are rubbed up and sponge float finished to industry standards

measure, mark and scribe limestone block effect onto the attached pier, ensuring all blocks are the same size and have variable texture

measure, cut, place and finish paper-faced cornices, including external/internal mitre and use butt joints – all mitres to be filled and neatly finished (sanded)

construct formwork, and mix and pour concrete to a trowel and brush finish.

You will be provided with a simple candidate’s work plan to help you manage this task. You are to complete this plan before you begin the task. It will help you to plan how to approach this task in a methodical manner.

You will be assessed on your ability to:

locate, interpret and apply relevant information, standards and specifications

comply with OHS regulations and site safety plan/JSA applicable to project/workplace

comply with company policy, procedure and quality guidelines

demonstrate safe and effective operational use of all required tools, plant and equipment, including optical and laser levelling devices

communicate and work safely and effectively with others/workmates

select, use and maintain tools and equipment

© Department of Training and Workforce Development 2010 Page 62 of 222Version 1, May 2010

Page 63: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

handle and store the solid plastering materials and components

prepare surfaces for plastering

render the section of wall specified

erect the scaffolding to the standard required, and ensure the footings are safe and the structure stable

measure, cut, place and finish paper-faced cornices, including external/internal mitre and use butt joints

dismantle the work platform safely, clean up the work area and put all tools away

construct formwork 1 m2, mix and pour concrete to a trowel and brush finish.

Your Assessor:

will observe you performing specific tasks relevant to the two units of competency in the skill set

may verbally question you while you are performing the range of activities specified to address the task.

Page 63 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 64: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 2 – Installing an angle bead and paper-faced cornice at

heightTask 2

Candidate’s name

Assessor’s name

Supervisor’s name(if applicable)

Work activity The candidate is to install and angle bead and paper-faced cornice at height, construct formwork, and mix and pour concrete to a trowel and brush finish.

Skill Set 2 – Units of competency

BCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornices

BCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Assessment location

Date of demonstration Time

Instructions for the Assessor

The candidate is to: prepare a section of wall surface, erect a work platform, attach a reinforced metal bead

to an external angle on a wall using an explosive power tool then fix a section of decorative cornice

follow all OHS procedures, prepare the wall surface before erecting a one-lift scaffold/work platform and fix a reinforced bead to an external angle of a wall using an explosive power tool

render a window wall and attached pier ensuring walls, external angles and reveals are plumb, sills and soffits are level

ensure the finish is level +/– 2 mm and surfaces are rubbed up and sponge float finished to industry standards

measure, mark and scribe limestone block effect onto the attached pier, ensuring all blocks are the same size and have variable texture

measure, cut, place and finish paper-faced cornices, including external/internal mitre and use butt joints – all mitres to be filled and neatly finished (sanded)

construct formwork 1 m2 ensuring top edge is level measure, cut reinforcement grid and suspend on chairs mix concrete and pour, tamp surface and rule level, ensuring edges are bull-nosed and

surface finished with trowel and brush.The candidate must have access to all materials, tools and equipment, and eye and ear protection, and must wear safety boots.OHS regulations and codes of practice must be followed at all times.If the Assessor deems that the candidate has demonstrated insufficient evidence for the unit of competency BCGCO2003B Carry out concreting to simple forms, a small concreting practical task may be added at the end of the assessment.

© Department of Training and Workforce Development 2010 Page 64 of 222Version 1, May 2010

Page 65: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 2 – Installing an angle bead and paper-faced cornice at

heightTask 2

The activity will require the candidate to: locate, interpret and apply relevant information, standards and specifications comply with OHS regulations and site safety plan/JSA applicable to project/workplace comply with company policy, procedure and quality guidelines demonstrate safe and effective operational use, and maintenance of all required tools,

plant and equipment, including optical and laser levelling devices communicate and work safely and effectively with others/workmates handle and store solid plastering materials and components prepare surfaces for plastering render the section of wall specified install the paper-faced cornice and finish to the standard required set up scaffolding and work at height safely clean up the work area, replacing all tools, equipment and waste materials set up formwork, cut reinforcement and pour concrete finish surface with trowel and broom.

Resources required for this task

flat section of brick wall 2400 mm high and 1200 mm wide, preferably in a sheltered area where inclement weather is unlikely to adversely affect the candidate’s task

external corner of a brick wall suitable for the application of a beading with an explosive power tool

brick pier (3 x 3 or 2 x 3 full brick width) to ceiling height (2400 mm) suitable for the installation of paper-faced cornice around the perimeter of the pier

cement mixer, wheelbarrow, shovel poly or wooden floats plasterer’s trowel bull-nose tool hawk T-bar spray gun or grass brush hop up buckets sand cement stone lime spirit level stand and spot board.

Page 65 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 66: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Candidate’s work plan for Skill Set 2The candidate is to complete this checklist before starting any practical tasks. This is for the Assessor to use as an aid for planning and assessment.

1 OHS requirements

Satisfactory q

Unsatisfactory q

2 Plans and specifications

Satisfactory q

Unsatisfactory q

3 Set up materials and fixings for the task.

Satisfactory q

Unsatisfactory q

4 Set up hand and power tools for the task.

Satisfactory q

Unsatisfactory q

© Department of Training and Workforce Development 2010 Page 66 of 222Version 1, May 2010

Page 67: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

5 Set up construction tools and equipment for the task.

Satisfactory q

Unsatisfactory q

6 Outline below the approach you plan to use (ie the steps you take to complete the task).

Satisfactory q

Unsatisfactory q

7 On job completion, check the finished task against the stated criteria.

Satisfactory q

Unsatisfactory q

8 Clean up/put tools and equipment away.

Satisfactory q

Unsatisfactory q

Page 67 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 68: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 2 – Installing an angle bead and paper-faced cornice at height

Task 2Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

OHS requirements OSH Act 1984

Select and use correct personal protective equipment (PPE). q qCheck required safety signs are in place. q qSelect and use safety equipment for job or task. q qCheck electrical leads and power tools. q qPlans and specifications

Read plans and specifications, and check site before starting. q qInterpret information on plans and transfers to set-out and materials. q qConfer with team members (Assessor) to verify all points. q qMaterials and fixings

Select required materials from store and use them appropriately. q qIdentify all fixings correctly and use them appropriately and economically. q qStack materials safely on worksite before, during and after use. q qHand tools, portable power tools and static machinery Electrical safety

© Department of Training and Workforce Development 2010 Page 68 of 222Version 1, May 2010

Page 69: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 2 – Installing an angle bead and paper-faced cornice at height

Task 2Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

Use selected hand tools safely to recognised trade practices. q qUse selected portable power tools safely to recognised trade practices. q qCheck mixing machinery for faults before and after start-up. q qCheck hand tools for good condition before use. q qInspect and use correctly EPT, including orientation, PPE, and safety barriers and signs. q q

Construction tools and equipment Working at height legislation 2009

Use trestles and planks safely and appropriately for work at heights. q qSelect scaffolding and erect safely for use during project. q qUse levelling devices correctly and in appropriate places on site. q qPlace or stack trestles, planks, ladders and levelling devices in a safe, but easily accessible manner when not in use on site. q q

Work methodology

Follow identified job processes and procedures as closely as possible. q qJob completion

Page 69 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 70: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 2 – Installing an angle bead and paper-faced cornice at height

Task 2Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

Check all work against plans, specifications and instructions and confirm for completion with the team. q q

Clean up Builders’ Registration Act and BCADispose of all identified unusable material and waste safely, and in

an environmentally friendly manner. q qReturn and stack usable materials correctly in the store. q qClean/sweep site or work area and pick up unused fixings and return to store. q q

© Department of Training and Workforce Development 2010 Page 70 of 222Version 1, May 2010

Page 71: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Assessor’s general comments/observations

Assessor’s name Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)Assessor’s signature

Candidate’s signature Date

Page 71 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 72: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Task 3

Instructions for the candidate

Outline of taskFor this task you are to prepare, set out and render a curved wall and attached pier, including capping, set the curved wall and apply texture coat to the attached pier.

You will be required to:

follow all OHS procedures

prepare the curved wall surfaces before rendering

float, render and finish the wall to the required specification

ensure the finish is level +/– 2 mm and finish is to industry standards

assemble all equipment and tools, and prepare the surface then apply the render to the wall and finish to the required standard

assemble all equipment and tools, and prepare the surface then apply set to a curved surface to the required standard

follow established practices for OHS

apply a texture coat finish to the bottom section of the curved wall.

You will be provided with a simple candidate’s work plan to help you manage this task. You are to complete this plan before you begin the task. It will help you to plan how to approach this task in a methodical manner.

You will be assessed on your ability to:

locate, interpret and apply relevant information, standards and specifications

comply with OHS regulations and site safety plan/JSA applicable to project/workplace

comply with company policy, procedure and quality guidelines

demonstrate safe and effective operational use of all required tools, plant and equipment, including optical and laser levelling devices

communicate and work safely and effectively with others/workmates

select, use and maintain tools and equipment

handle and store solid plastering materials and components

prepare surfaces for plastering

© Department of Training and Workforce Development 2010 Page 72 of 222Version 1, May 2010

Page 73: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

finish the section of wall specified

complete a simple texture coating task on the attached pier.

Your Assessor:

will observe you performing specific tasks relevant to the generic units of competency in the skill set, but with a practical focus on the following units:

oBCGSP3001B Apply float and render to straight and curved surfaces

oBCGSP3003B Apply trowelled texture coat finishes.

may verbally question you while you are performing the range of activities specified to address the task.

Page 73 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 74: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 3 – Floating and setting a curved wall and attached pier;

texture coating the attached pierTask 3

Candidate’s name

Assessor’s name

Supervisor’s name(if applicable)

Work activity The candidate is to float and set a curved wall and attached pier then texture coat the attached pier.

Skill Set 3 – Units of competency

BCGSP3001B Apply float and render to straight and curved surfaces

BCGSP3003B Apply trowelled texture coat finishes

BCGSP3002B Apply set coats

Assessment location

Date of demonstration Time

Instructions for the Assessor

The candidate is to: prepare, set out and render a curved wall and attached pier, including capping, and set

curved wall and apply texture coat to the attached pier prepare the curved wall surfaces before rendering, and then float, render and finish the

curved section of wall to the required specification follow all OHS regulations and codes of practice ensure the finish is level +/– 2 mm and finish is to industry standards assemble all tools and equipment, and prepare the surface then apply the render to the

wall and finish to the required standard assemble all equipment and tools, and prepare the surface then apply set to a curved

surface to the required standard follow established practices for OHS apply a texture coat finish to the attached pier.Questions may be asked of the Assessor for clarification purposes only.The duration of the assessment is at the discretion of the Assessor who may stop the assessment at any stage if he/she determines that he/she has enough evidence to support a satisfactory or unsatisfactory outcome.The candidate must have access to all materials, tools and equipment, and eye and ear protection, and must wear safety boots.

© Department of Training and Workforce Development 2010 Page 74 of 222Version 1, May 2010

Page 75: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 3 – Floating and setting a curved wall and attached pier;

texture coating the attached pierTask 3

The activity will require the candidate to: locate, interpret and apply relevant information, standards and specifications comply with OHS regulations and site safety plan/JSA applicable to project/workplace comply with company policy, procedure and quality guidelines demonstrate safe and effective operational use, and maintenance of all required tools,

plant and equipment, including optical and laser levelling devices communicate and work safely and effectively with others/workmates handle and store the solid plastering materials and components prepare surfaces for plastering render and float the section of curved wall to standard apply set coats to a specification on a minimum of three (3) surfaces including

horizontal, vertical and curved apply a trowelled texture coat finish to industry standard render the section of wall specified.

Resources required for this task

curved section of brick wall 2400 mm high and 1200 mm wide, preferably in a sheltered area where inclement weather is unlikely to adversely affect the candidate’s task

cement mixer, wheelbarrow, shovel poly or wooden floats plasterer’s trowel hawk T-bar spray gun or grass brush hop up buckets sand cement set lime putty texture coat product and relevant MSDS for that product spirit level stand and spot board.

Page 75 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 76: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Candidate’s work plan for Skill Set 3The candidate is to complete this checklist before starting any practical tasks. This is for the Assessor to use as an aid for planning and assessment.

1 OHS requirements

Satisfactory q

Unsatisfactory q

2 Plans and specifications

Satisfactory q

Unsatisfactory q

3 Set up materials and fixings for the task.

Satisfactory q

Unsatisfactory q

4 Set up hand and power tools for the task.

Satisfactory q

Unsatisfactory q

© Department of Training and Workforce Development 2010 Page 76 of 222Version 1, May 2010

Page 77: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

5 Set up construction tools and equipment for the task.

Satisfactory q

Unsatisfactory q

6 Outline below the approach you plan to use (ie the steps you take to complete the task).

Satisfactory q

Unsatisfactory q

7 On job completion, check the finished task against the stated criteria.

Satisfactory q

Unsatisfactory q

8 Clean up/put tools and equipment away.

Satisfactory q

Unsatisfactory q

Page 77 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 78: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Task 3Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

OHS requirements OSH Act 1984

Select and use correct personal protective equipment (PPE). q qCheck required safety signs are in place. q qSelect and use safety equipment for job or task. q qCheck electrical leads and power tools. q qPlans and specifications

Read plans and specifications, and check site before starting. q qInterpret information on plans and transfers to set-out and materials. q qConfer with team members (Assessor) to verify all points. q qMaterials and fixings

Select required materials from store and use them appropriately. q qIdentify all fixings correctly and use them appropriately and economically. q qStack materials safely on worksite before, during and after use. q qHand tools, portable power tools and static machinery Electrical safety

© Department of Training and Workforce Development 2010 Page 78 of 222Version 1, May 2010

Page 79: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Task 3Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

Use selected hand tools safely to recognised trade practices. q qUse selected portable power tools safely to recognised trade practices. q qCheck mixing machinery for faults before and after start-up. q qCheck hand tools for good condition before use. q qCheck portable power tools for good condition before use. q qConstruction tools and equipment Working at height

legislation 2009Use trestles and planks safely and appropriately for work at heights. q qSelect scaffolding and erect safely for use during project. q qSet up levelling devices correctly and in appropriate places on site. q qPlace or stack trestles, planks, ladders and levelling devices in a safe, but easily accessible manner when not in use on site. q q

Work methodology

Follow identified job processes and procedures as closely as possible. q q

Job completion

Check all work against plans, specifications and instructions and q q

Page 79 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 80: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pier

Task 3Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

confirm for completion with the team.

Clean up Builders’ Registration Act and BCADispose of all identified unusable material and waste safely, and in

an environmentally friendly manner. q qReturn and stack safely and correctly usable materials in the store. q qClean/sweep site or work area and pick up unused fixings and return to store. q q

© Department of Training and Workforce Development 2010 Page 80 of 222Version 1, May 2010

Page 81: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Assessor’s general comments/observations

Assessor’s name Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)Assessor’s signature

Candidate’s signature Date

Page 81 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 82: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Task 4

Instructions for the candidate

Outline of taskFor this task you are to prepare, set out and restore solid plasterwork to specification on a minimum of three (3) tasks, including one (1) curved surface, one (1) ceiling and one (1) archway or column.

You will be required to:

follow all OHS procedures

prepare the wall surfaces before rendering

float an attached pier to a tolerance of +/– 2 mm and form a backing coat to accommodate an ovolo on an external angle, and plasterboard an arch/soffit and fit arch beads, ensuring accuracy of radius and soffit level +/– 2 mm

run the finish coat of the ovolo with a splayed top and bottom and set the attached pier with 5 mm bull-nose external angles

plant a pre-cast arch mould from the spring line +/– 1 mm from the circumference, and plant and fix a ceiling rose in the centre of the ceiling, ensuring circumference is filled and brushed clean

ensure the finish is plumb +/– 2 mm – surfaces to be ruled flat to industry standards

assemble all equipment and tools, and prepare the surface then apply the float/set coats to the wall and finish to the required standard.

You will be provided with a simple candidate’s work plan to help you manage this task. You are to complete this plan before you begin the task. It will help you to plan how to approach this task in a methodical manner.

You will be assessed on your ability to:

locate, interpret and apply relevant information, standards and specifications

comply with OHS regulations and site safety plan/JSA applicable to project/workplace

comply with company policy, procedure and quality guidelines

demonstrate safe and effective operational use of all required tools, plant and equipment, including optical and laser levelling devices

communicate and work safely and effectively with others/workmates

select, use and maintain tools and equipment

© Department of Training and Workforce Development 2010 Page 82 of 222Version 1, May 2010

Page 83: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

handle and store solid plastering materials and components

prepare surfaces for plastering

render the section of wall specified

plasterboard a timber frame to form an arch

run a decorative in situ mould

install a ceiling rose.

Your Assessor:

will observe you performing specific tasks relevant to the generic units of competency in the skill set, but with a practical focus on the following units:

oBCGSP3005B Install pre-cast decorative mouldings

oBCGSP3004B Restore and renovate solid plasterwork

oBCGSP3002B Apply set coats

may verbally question you while you are performing the range of activities specified to address the task.

Page 83 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 84: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 4 – Forming an in situ mould, setting a pier, forming an

arch and installing decorative mouldingsTask 4

Candidate’s name

Assessor’s name

Supervisor’s name(if applicable)

Work activity The candidate is to form an in situ mould, form an arch and install decorative mouldings.

Skill Set 4 – Units of competency

BCGSP3005B Install pre-cast decorative mouldings

BCGSP3004B Restore and renovate solid plasterwork

Assessment location

Date of demonstration Time

Instructions for the Assessor

The candidate is to: prepare, set out and restore solid plasterwork to specification on a minimum of three

tasks including one curved surface, one ceiling and one archway or column float an attached pier to a tolerance of +/– 2 mm and form a backing coat to

accommodate an ovolo on an external angle, and plasterboard an arch/soffit and fit arch beads, ensuring accuracy of radius and soffit level +/– 2 mm

run the finish coat of the ovolo with a splayed top and bottom and set the attached pier with 5 mm bull-nose external angles

plant a pre-cast arch mould from the spring line +/– 1 mm from the circumference, and plant and fix a ceiling rose in the centre of the ceiling, ensuring circumference is brushed clean

prepare the wall surfaces before floating ensure the finish is plumb +/– 2 mm – surfaces to be ruled flat and finished to industry

standards assemble all equipment and tools, and prepare the surface then apply the float/set

coats to the wall and finish to the required standard follow established practices for OHS.Questions may be asked of the Assessor for clarification purposes only.The duration of the assessment is at the discretion of the Assessor who may stop the assessment at any stage if he/she determines that he/she has enough evidence to support a satisfactory or unsatisfactory outcome.The candidate must have access to all materials, tools and equipment, and eye and ear protection, and must wear safety boots.Note: Setting (the type of finish) is not assessed in this skill set. It is only include to give the external mould a quality finish.

© Department of Training and Workforce Development 2010 Page 84 of 222Version 1, May 2010

Page 85: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 4 – Forming an in situ mould, setting a pier, forming an

arch and installing decorative mouldingsTask 4

The activity will require the candidate to: locate, interpret and apply relevant information, standards and specifications comply with OHS regulations and site safety plan/JSA applicable to project/workplace comply with company policy, procedure and quality guidelines demonstrate safe and effective operational use, and maintenance of all required tools,

plant and equipment, including optical and laser levelling devices communicate and work safely and effectively with others/workmates select, use and maintain tools and equipment handle and store the solid plastering materials and components prepare surfaces for plastering render the section of wall specified

Resources required for this task

timber and plasterboard sufficient to construct a small arch cement mixer, wheelbarrow, shovel poly or wooden floats plasterer’s trowel hawk T-bar hop up buckets sand cement casting plaster box rule ovolo template splay template tape measure lime spirit level stand and spot board.

Page 85 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 86: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Candidate’s work plan for Skill Set 4The candidate is to complete this checklist before starting any practical tasks. This is for the Assessor to use as an aid for planning and assessment.

1 OHS requirements

Satisfactory q

Unsatisfactory q

2 Plans and specifications

Satisfactory q

Unsatisfactory q

3 Set up materials and fixings for the task.

Satisfactory q

Unsatisfactory q

4 Set up hand and power tools for the task.

Satisfactory q

Unsatisfactory q

© Department of Training and Workforce Development 2010 Page 86 of 222Version 1, May 2010

Page 87: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

5 Set up construction tools and equipment for the task.

Satisfactory q

Unsatisfactory q

6 Outline below the approach you plan to use (ie the steps you take to complete the task).

Satisfactory q

Unsatisfactory q

7 On job completion, check the finished task against the stated criteria.

Satisfactory q

Unsatisfactory q

8 Clean up/put tools and equipment away.

Satisfactory q

Unsatisfactory q

Page 87 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 88: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Task 4Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

OHS requirements OSH Act 1984

Select and use correct personal protective equipment (PPE). q qCheck required safety signs are in place. q qSelect and use safety equipment for job or task. q qCheck electrical leads and power tools. q qPlans and specifications

Read plans and specifications, and check site before starting. q qInterpret information on plans and transfers to set-out and materials. q qConfer with team members (Assessor) to verify all points. q qMaterials and fixings

Select required materials from store and use them appropriately. q qIdentify all fixings correctly and use them appropriately and economically. q qStack materials safely on worksite before, during and after use. q qHand tools, portable power tools and static machinery Electrical safety

© Department of Training and Workforce Development 2010 Page 88 of 222Version 1, May 2010

Page 89: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Task 4Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

Use selected hand tools safely to recognised trade practices. q qUse selected portable power tools safely to recognised trade practices. q qCheck mixing machinery for faults before and after start-up. q qCheck hand tools for good condition before use. q qCheck portable power tools for good condition before use. q qConstruction tools and equipment Working at height

legislation 2009Use trestles and planks safely and appropriately for work at heights. q qSelect scaffolding and erect safely for identified use during project. q qSet up levelling devices correctly and in appropriate places on site. q qPlace and stack trestles, planks, ladders and levelling devices in a safe, but easily accessible manner when not in use on site. q q

Work methodology

Follow identified job processes and procedures as closely as possible. q q

Job completion

Check all work against plans, specifications and instructions and q q

Page 89 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 90: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Demonstration/Observation ChecklistSkill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldings

Task 4Candidate’s name

During the demonstration or observation of skills, did the candidate do the following?

Regulations Standards and industry requirements

Is behaviour observed? Assessor’s Notes

Yes No

confirm for completion with the team.

Clean up Builders’ Registration Act and BCADispose of all identified unusable material and waste safely, and in

an environmentally friendly manner. q qReturn and stack safely and correctly usable materials in the store. q qClean/sweep site or work area and pick up unused fixings and return to store. q q

© Department of Training and Workforce Development 2010 Page 90 of 222Version 1, May 2010

Page 91: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 4 – Practical Tasks and Observation Recording Sheets

Assessor’s general comments/observations

Assessor’s name Outcome(Please circle)

S(Satisfactory)

NYS(Not Yet Satisfactory)Assessor’s signature

Candidate’s signature Date

Page 91 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 92: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

PART 2

Section 5

Candidate’s Informationand

Self-Evaluation Forms

It is recommended that candidates be provided with this information before applying for RPL.

Page 93 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 93: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 94 of 222Version 1, May 2010

Page 94: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

What is Recognition of Prior Learning (RPL)?RPL is the acknowledgment of skills and knowledge obtained through learning achieved outside the formal education and training system and includes work and life experience including paid and volunteer work and skills attained through leisure pursuits such as musical, mechanical or linguistic abilities.

RPL recognises any prior knowledge and experience and measures it against the qualification in which students are enrolled. The individual may not need to complete all of a training program if he or she already possesses some of the competencies taught in the program.

Why you should apply for RPLIf you apply for RPL and your application is successful you could:

reduce or eliminate the need for any training in skills and knowledge you already have

save time by not needing to attend any or a reduced number of classes and completing unnecessary work

save money because you will not have to buy textbooks and other learning material

complete your qualification in a shorter time

advance to a higher level qualification in a shorter time if desired.

Some terms you need to understandIt is important that you understand the following term to assist you with your RPL application.

Competence

Competence is the demonstration of skills and knowledge that you have gained through life and work experiences as well as any training that you have successfully completed that can be matched against a set of industry performance standards referred to as units of competency. These units are grouped together to form a specific industry qualification, within the Australian Quality Training Framework (AQTF).

Each unit of competency is divided into elements (a set of activities that lead to an overall achievement or demonstration of competence). Each of these elements is further broken down into a set of performance criteria which give a more detailed description of the skills and knowledge you need to be able to demonstrate.

Matching your evidence against each of the elements/performance criteria will help you to reach your qualification more quickly.

Page 95 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 95: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

How to prepare for your RPL assessmentIn order for your skills to be formally recognised as part of a national qualification, Assessors must make sure that you (the candidate) have the required skills and knowledge to meet the industry standard as specified in the relevant Training Package.

You must be involved in the RPL process so that all the experience, skills and knowledge you have gained over time can be correctly identified and suitably demonstrated. This evidence is gathered and used in recognition of all or some of the units for the qualification you wish to gain.

All assessment requirements will be discussed with you in advance and you will be given the opportunity to ask questions and clarify requirements. Being prepared for the assessment process and knowing what you need to provide can save you valuable time and ensure that the RPL assessment is as simple and stress-free as possible.

Here are some tips to make the application process and interview easier for you.

1. Your Assessor will ask you to talk about your work roles and your employment history.

Bring a copy of your résumé. You might like to write down any work you have done in the past (paid or unpaid) and where this took place.

2. If you have certificates from any training courses you have completed, bring along either certified copies or the originals to the interview with the Assessor and they can make a copy of them.

3. Bring along any other documentation that you think would support your claim that you have done this work over time.

The following is a list of some of the documents you can provide as examples of your work history:

brief CV

certificates/results of assessment

any licences

tickets held, eg forklift, crane

photographs of work undertaken

diaries/task sheets/job sheets/logbooks

site training records

site competencies held record

membership of relevant professional associations

hobbies/interests/special skills outside work

references/letters from previous employers/supervisors

industry awards

any other documentation that may demonstrate your trade or industry experience or support your claim.

© Department of Training and Workforce Development 2010 Page 96 of 222Version 1, May 2010

Page 96: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Depending on where you have worked and what the work may have included, you may or may not have documentary evidence. Do not be put off if you do not have documentary evidence, as the Assessor will work with you during the assessment process.

4. Think about whom you would consider to be your workplace contact or referee.

Is your employer happy to support your aim to become qualified?

Would you feel comfortable if the Assessor contacted your current workplace or previous workplace/s to validate your skills and spoke to your supervisor/s or employer/s?

5. You will need to supply the contact details of work referees who can confirm your skills in the industry.

Think about whom the best person to confirm your skill level would be.

Think about current or recent supervisors or employers who have observed your work and who would be able to confirm your previous work skills and experience. The Assessor will need to contact them.

6. You can speak with your Assessor about other ways you can show your skills for the trade or industry in which you are seeking recognition.

These could include letters from employers, records of any training courses or professional development sessions attended, employers or clients in related industries or government agencies, acknowledgements, workplace forms (as long as there are no confidentiality issues – see below) or any other relevant documents.

Confidentiality issuesIt is important that sensitive information is not included as part of your Supporting Documentation (as identified in Section 6 and any other documentation you wish to use as evidence). You may need authorisation from your supervisor to use some of your evidence, so it is always best to check the privacy and confidentiality policies of the organisation. Client names should be deleted and financial figures or other personal details should be blacked out and made unidentifiable.

Page 97 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 97: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

The four steps in the RPL assessment processOnce your training organisation has provided you with the information you need to apply for RPL, you need to follow these four steps in order to complete the process.

Step 1 – Self-Evaluation

Before you decide to apply for RPL you need to assess your current competence for one or several units of competency.

Complete the candidate information and self-evaluation forms provided with as much information of your previous work experience as you can.

This will allow for an initial assessment of your experience and a check to see whether you can demonstrate the required skills and knowledge. You can discuss this with an RPL Assessor if you want.

You must be able to provide evidence against the elements/performance criteria for the relevant unit/s of competency.

It is not enough to simply state that you possess the skills and knowledge required. You must be able to demonstrate competence.

This is your opportunity to provide as much proof as you can of the variety of experience you have had. You should supply examples of your work history if you have any. (See Tip 3 above.)

Depending on the trade or industry you have worked in, you may or may not have documentary evidence available. This should not deter you from seeking RPL, as your Assessor will work with you throughout the RPL process.

You will also need to supply the contact details of work referees who can confirm your skills in the industry.

By asking your supervisor to complete their part of your self-evaluation, they will be providing valuable evidence confirming the work experience, skills and knowledge you have demonstrated in the performance of your work duties.

You will also be provided with a list of suggested evidence that you could use to demonstrate that you are competent in a particular unit or units of competency. This list is a guide only. If you have other suitable evidence to support your claim for RPL then you are encouraged to share this with your Assessor.

If you do not believe that you have any suitable evidence, then you should discuss your options with your Assessor.

Once you have completed the self-evaluation and made the decision that you would like to continue with the RPL process, make an appointment for an interview and enrol for RPL.

© Department of Training and Workforce Development 2010 Page 98 of 222Version 1, May 2010

Page 98: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Note: It is possible to gain RPL for an entire qualification.

Step 2 – Enrolment and interview with the Assessor

An interview with an Assessor who understands your industry will be organised for you. They will review – usually with you – the information and supporting documentation you have provided and match up your skills to the units/subjects in the qualification.

During your RPL interview, your Assessor will discuss with you your self-evaluation and any evidence you have provided.

It is at this point that you will be able to identify any previous work experience and discuss this with your Assessor.

During this conversation, you will be required to answer questions relating to your work experience. This questioning forms part of the assessment, as it will identify your current knowledge and skills regarding the area of industry in which you are applying for recognition.

If you are currently enrolled in a training course relating to this qualification, it is important that you let your Trainer know that you intend to apply for RPL, then nominate the units you have selected for RPL so that the required documentation can be processed and your application can go ahead.

It is at this stage that a decision will be made whether you are able to proceed to the next step or whether you need to undergo gap training.

Step 3 – Practical demonstration of your skills

Your Assessor will organise with you and your employer to conduct a practical skills test at your workplace (if appropriate) or other suitable location.

This is your opportunity to demonstrate your level of competence on a practical level. The assessment will focus on the skills required in the work activities which relate to the qualification in which you are applying for recognition.

Your Assessor will identify the skills they want you to demonstrate by asking you to complete certain tasks.

Step 4 – Provision of further supporting evidence

Your Assessor will need to confirm your previous work experience with someone (such as your supervisor or employer) who can vouch for your skills over a period of time.

They will contact the referees you have provided as part of the candidate information.

Your Assessor may ask you to give your selected workplace contacts or previous employers the Third Party report to complete. Authentication of these reports by the Assessor would then be required.

Page 99 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 99: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

After the assessmentAfter the assessment, your Assessor will advise you of the units of competency you have successfully completed. You will also be advised whether you have gained the full qualification or if gaps have been identified during the recognition process. If you do have skill gaps, these may be addressed through additional training.

If you have any questions during the RPL process, you should contact your Assessor.

.

© Department of Training and Workforce Development 2010 Page 100 of 222Version 1, May 2010

Page 100: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Candidate’s Information Form(You may find it easier to provide the information for the following by attaching a résumé.)

Qualification/Industry in which you are seeking recognitionBCG31003 Certificate III in Solid Plastering

Personal details

Surname

First name/s

Any other name/s used

Home address

Postal address (if different from above)

Telephone numbers Home: Work:

Mobile: Fax:

Email address

Are you a permanent resident of Australia?

Yes q No q

Do you need an interpreter to help you with an interview? Yes  q No  qDo you have a disability which we should be aware of? Yes  q No  qWill you need special aids if you are required to undertake a practical assessment?

Yes  q No  q

Please provide details of special needs so that we can assist you if required.

Current employment

Are you currently employed? Yes  q No  qIf ‘yes’, in which occupation are you currently employed?

What is your current job title?

Who is your current employer?

How long have you worked in this job approximately? year/s month/s

Is this occupation in the same industry as the industry in which you are applying for recognition?

Yes  q No  q If ‘no’, go to the next page.

Page 101 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 101: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

If ‘yes’, list some of the main tasks you perform as part of your work that you think are relevant to your RPL application.

If you have further recent industry experience relevant to your application, please attach another sheet or your current résumé.

Rate your knowledge and skills against the qualification/industry relevant to your RPL application.

Industry area: Plastering Yes No Possibly

I think my experience is of a high level. q q qI think I am skilled to do this job. q q qI know how to do the work tasks really well. q q qI can explain my experience and provide documentary evidence. q q q

I have undertaken much of this work without supervision. q q qFurther training

I have attended training courses in this area of work. q qIf ‘yes’, what training did you undertake? Include date training completed (month, year).

Is there any further information you wish to give in support of your application?

Professional referees (relevant to work situation if not already listed on your résumé)

Name

Position

Organisation

Address of organisation

Phone number

Mobile number

Email address

© Department of Training and Workforce Development 2010 Page 102 of 222Version 1, May 2010

Page 102: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Professional referees (relevant to work situation if not already listed on your résumé)

Name

Position

Organisation

Address of organisation

Phone number

Mobile number

Email address

Candidate’s Employment History Form(You may attach a current résumé in place of completing this section.)

Name, address and phone number

of employers

Period of employment(DD/MM/YYYY) Position/s

heldFull-timePart-timeCasual

Description of major duties

From To

1.

2.

3.

4.

5.

Attach additional sheet if required.

DeclarationI declare that the information contained in this application is true and correct and that all documents are genuine.

Candidate’s signature Date

Page 103 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 103: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

© Department of Training and Workforce Development 2010 Page 104 of 222Version 1, May 2010

Page 104: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Page intentionally blank

Page 105 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 105: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Candidate’s Self-Evaluation FormCompletion instructionsThe purpose of completing the Self-Evaluation Form is to enable candidates who believe that they already possess the competencies, to assess their skills and knowledge against the qualification.

Complete the following pages and identify your capacity to perform the tasks described. Be honest in your appraisal. By completing this self-evaluation you will be identifying the areas where you may be able to apply for recognition.

NB: If this self-evaluation is being used as evidence, your supervisor must evaluate your ability to perform the work tasks. Your supervisor is also asked to comment on your ability to perform these work tasks and verify this by signing each section.

If this self-evaluation is being used only so that you and your assessor can decide if you should proceed, then it doesn’t have to be verified.

Identify your level of experience in performing each competency/task by using the following:

not well – I do the task but not well.

well – I do the task well.

very well – I do the task really well.

See example below.

Competency/TaskI have performed these tasks Supervisor

Evaluation

Evidence to support claim

Frequently Never Sometimes Doc No.

Documentation provided (Number and name the document you are providing for easy reference)

Using a computer to enter or change work information or data. q

Not Well Not Well

Using personal protective equipment as appropriate to conduct my work safely and in accordance with site and legal requirements.

Wellq

Well 1 Copy of Company Personal Protective Equipment Requirements for my job role.

© Department of Training and Workforce Development 2010 Page 106 of 222Version 1, May 2010

Page 106: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Page intentionally blank

Page 107 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 107: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Candidate’s Self-Evaluation

Skill Set 1 – Rendering a flat section of wall

Candidate’s name Date completed

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Skill Set 1Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometimes

Doc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

1. Being aware of and complying with all site safety plans, OHS regulations and legislation to your trade area when on site.

2. Selecting and using fire-fighting equipment to extinguish a fire.

3. Explaining all the processes and practices in place for working safely on the job at your workplace.

4. Explaining the size, and the economic and employment importance of the construction industry in WA, with reference to your trade.

5. Finding and identifying construction workers’ employment conditions.

6. Identifying en employee’s career development needs or goals.

7. Identifying and dealing with personal conflict situations at work.

8. Providing evidence to demonstrate the selection of necessary tools, equipment,

© Department of Training and Workforce Development 2010 Page 108 of 222Version 1, May 2010

Page 108: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 1 – Rendering a flat section of wall

Candidate’s name Date completed

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Skill Set 1Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometimes

Doc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

materials, fixings, PPE and task sequences for various trade tasks.

9. Knowing what company organisational policies/procedures and quality control requirements are.

10. Identifying and demonstrating the use of communication equipment commonly used in the construction industry for your trade.

11. Identifying and interpreting most of the building of construction site signage.

12. Working as part of a team and communicating/working effectively with other members.

13. Participating in informal and formal site meetings.

14. Using a calculator to do basic mathematics required for any work quotations relevant to your trade.

15. Calculating rough estimates of material (sand, concrete, lime, adhesives, base coat, lengths of time etc) required for your specific trade.

Page 109 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 109: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 1 – Rendering a flat section of wall

Candidate’s name Date completed

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Skill Set 1Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometimes

Doc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

16. Using simple tools like a square, string line and measuring tape to make sure a structure is set out square.

17. Accurately measuring and cutting materials in order to install them.

18. Identifying and interpreting builder’s drawings and calculating rough estimates of material required for plastering tasks.

19. Correctly identifying and interpreting the areas on a builder’s drawings relevant to your specific trade.

20. Handling and working safely with building materials in the workplace.

21. Safely identifying and using all the common tools required for your trade, including levels, tapes, and hand and power tools.

22. Safely using portable mixing plant such as spraying and texture coat application tools, a wheelbarrow and other basic manual handling equipment.

© Department of Training and Workforce Development 2010 Page 110 of 222Version 1, May 2010

Page 110: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 1 – Rendering a flat section of wall

Candidate’s name Date completed

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Skill Set 1Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometimes

Doc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

23. Demonstrating safe handling techniques such as correct lifting in the workplace.

24. Maintaining/servicing/sharpening your tools of the trade to keep them in good condition.

25. Preparing surfaces – sanding/cleaning/scoring – to make them ready for the application of render/set/paint/plasterboard/timber as applicable to your trade.

26. Using a simple levelling device such as a plumb bob, level, stringline or automatic level or laser level.

27. Transferring level readings, recording differences in height from one wall to another, in order to make sure both walls are plumb, level and parallel once plasterboard has been applied to the walls.

Supervisor’s comments (Please provide a comment on the candidate’s ability to perform the above work task/s.)

Page 111 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 111: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 1 – Rendering a flat section of wall

Candidate’s name Date completed

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Skill Set 1Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometimes

Doc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

Supervisor’s name Position

Supervisor’s signature Date

© Department of Training and Workforce Development 2010 Page 112 of 222Version 1, May 2010

Page 112: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Page intentionally blank

Page 113 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 113: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Candidate’s Self-EvaluationSkill Set 2 – Installing an angle bead and paper-faced cornice at heightCandidate’s name Date completed

Units of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornices

Units of competencyBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Skill Set 2Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometime

sDoc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

28. Safely installing basic concreting formwork and placing and finishing concrete for the construction of minor slabs, pathways, repairs to walls and other minor applications.

29. Mixing concrete from the specifications listed in the manufacturer’s guide on the packaging.

30. Measuring, cutting, buttering and fixing cornice.

31. Mitring cornice correctly and explaining how a mitre box is to be used.

32. Filling the joints correctly between two correctly mitred pieces of cornice and sanding to the required finish.

33. Using an explosive power tool (EPT).

34. Being aware of the safety requirements when using an EPT.

35. Fixing beading to a solid background using an EPT and explaining the reason for doing this.

© Department of Training and Workforce Development 2010 Page 114 of 222Version 1, May 2010

Page 114: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightCandidate’s name Date completed

Units of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornices

Units of competencyBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Skill Set 2Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometime

sDoc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

36. Correctly placing, constructing and using building scaffolding, ensuring that the footings are level and firm, and that the structure is stable and safe to use.

37. Understanding the legal aspects of holding a restricted height scaffolding competency, and the maximum height to which you can assemble the scaffolding, and who can work from the platform.

Supervisor’s comments (Please provide a comment on the candidate’s ability to perform the above work task/s.)

Page 115 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 115: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightCandidate’s name Date completed

Units of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornices

Units of competencyBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Skill Set 2Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometime

sDoc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

Supervisor’s name PositionSupervisor’s signature Date

© Department of Training and Workforce Development 2010 Page 116 of 222Version 1, May 2010

Page 116: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Candidate’s Self-EvaluationSkill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierCandidate’s name Date completed

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Skill Set 3Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometime

sDoc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

38. Explaining suction and why this is a major issue in the application of render.

39. Rendering curved surfaces.

40. Explaining how to ensure a curved render surface is achieved and how to ensure the finish is level vertically and the curve maintained over distance.

41. Explaining the curing process and its importance for the finish.

42. Finding the radius on a curved wall.

43. Using texture coat products to achieve a finish.

44. Listing a number of techniques you can use for applying texture coatings.

45. Using any other tools, apart from a trowel to give different textures with sand and cement.

Page 117 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 117: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierCandidate’s name Date completed

Units of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Skill Set 3Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometime

sDoc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

Supervisor’s comments (Please provide a comment on the candidate’s ability to perform the above work task/s.)

Supervisor’s name PositionSupervisor’s signature Date

© Department of Training and Workforce Development 2010 Page 118 of 222Version 1, May 2010

Page 118: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Candidate’s Self-EvaluationSkill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsCandidate’s name Date completed

Units of competency BCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Skill Set 4Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometime

sDoc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

46. Knowing what is considered the minimum number of applications for a good set coat finish and knowing how to overcome the lack of adhesion between coats.

47. Applying a smooth and high-quality finish to a set coat to a wall.

48. Setting over a concrete surface.

49. Preparing a ceiling in order to be able to install a heavy pre-cast moulding such as a decorative ceiling rose.

50. Positioning and fixing a solid plaster picture railing along a section of wall.

51. Running a decorative in situ moulding.

52. Renovating render finished walls.

53. Preparing and repairing a wall which has significant cracks in the set to an acceptable standard.

Page 119 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 119: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 5 – Candidate’s Information and Self-Evaluation Forms

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsCandidate’s name Date completed

Units of competency BCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Skill Set 4Competency/Task

I have performed these tasksSupervisor’s Evaluation

Evidence to support claim

Frequently Never Sometime

sDoc No.

Documentation provided (Number and name the document you are providing for easy

reference.)

Supervisor’s comments (Please provide a comment on the candidate’s ability to perform the above work task/s.)

Supervisor’s name PositionSupervisor’s signature Date

© Department of Training and Workforce Development 2010 Page 120 of 222Version 1, May 2010

Page 120: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Section 6

Third Party Report and

Supporting Documentation

It is recommended that the Assessor verify the third party report with the person who completes the form to confirm the candidate’s skills in different contexts over time.

This information may be provided at, and form part of, the interview.

Page 121 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 121: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 122 of 222Version 1, May 2010

Page 122: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Third Party Report(Referee testimonial)

All people who verify your work are to complete the details below to ensure validity. (You may need multiple copies of this form.)

BCG31003 Certificate III in Solid Plastering

Candidate’s nameReferee’s name(Name of person providing this evidence)Position/titleWorkplaceWorkplace address

Telephone numbersEmail addressThis report was completed via interview by Assessor q independently by referee q

Interview conducted by(if applicable)Date of interviewInstructions As part of the assessment for the Certificate III in Solid Plastering, the

candidate requires evidence from a third party (employer, supervisor or equivalent). This evidence will be used to validate the candidate’s skills and experience.A letter of support from the organisation validating a range of tasks performed by the candidate over a period of time is useful in identifying competence.

To whom it may concern

Re: ________________________ who is a ________________________. (insert candidate’s name) (insert industry/job title)

I certify that the above-named person has:worked at ________________________ for a period of ________________________ (insert name of workplace) (insert length of time).

He/she has regularly completed the following activities to an acceptable workplace/industry standard within this organisation.

Yes No

1. Preparing a wall for solid plaster applications. q q

2. Rendering a window wall with an attached pier. q q

3. Floating a straight wall. q q

4. Installing paper-faced cornice. q q

5. Using an EPT to fix an external beading. q q

Page 123 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 123: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Yes No

6. Floating and setting a curved wall, including capping. q q

7. Running a moulded projection. q q

8. Applying texture coat to an attached pier. q q

9. Floating out a pier. q q

10. Running an ovolo, ie running a decorative in situ mould. q q

11. Setting a curved wall/pier. q q

12. Forming an arch with plasterboard and beads. q q

13. Running and installing a mould on the radius of an arch. q q

I understand the evidence/tasks the candidate has performed on which I am required to comment.

q q

I am willing to be contacted if further verification of my statements is required. q q

If you would like further information or would like to discuss any of the above, I can be contacted on ____________________________________ (insert phone number).

Yours sincerely

Signature: ________________________________ Date: ________________________

© Department of Training and Workforce Development 2010 Page 124 of 222Version 1, May 2010

Page 124: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Supporting DocumentationThe following tables provide guides of additional evidence sources to support your claim for Recognition of Prior Learning. If you have other evidence, you are encouraged to provide this to your Assessor.

If you do not have all this evidence, you are not excluded from applying for recognition and you should discuss options with your Assessor.

If you are providing documents as evidence then it is a good idea to number each document for easy identification. Place the number of the relevant document against the evidence listed below.

Candidate’s name:Date:

BCG31003 required documentary evidence Document number

1. A copy of a current Industry Safety Induction Course you have completed.

2. Letters from a current or previous employer.

3. Checklist or other documentation showing work planning, which involves work tasks or a schedule of building work.

4. A completed JSA.

5. Example of work improvement documentation, referring to environmental, safety or quality issues, with respect to a worksite.

6. Minutes and subsequent action documentation from involvement in meetings with a building supervisor or inspector or builder, or owner-builder.

7. Documentation showing compliance with worksite requirements for a building site.

8. Documentation showing estimation of materials for a specific project (to include drawings and reference to all materials – plasterboard, adhesives, plaster and consumables).

9. Evidence of knowledge and compliance with electrical safety, with respect to portable power tools and basic electrical safety.

10. Forklift, crane driving, or materials handling certificates.

11. Other vehicle licences.

12. Qualifications for dangerous goods handling.

13. Plans, drawings, quotations and related site documentation for building jobs you have been involved with.

Page 125 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 125: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Candidate’s name:Date:

BCG31003 required documentary evidence Document number

14. Shire-approved plans for works you have completed, or been directly involved with.

15. Photographs of construction work you have completed.

16. References from your clients/customers – related to work you have completed.

17. An example of a safety report you have compiled in accordance with building site procedures (or builder site-specific policy).

18. Academic records from any accredited training provider, or university, which may in fact also include training/studies in an unrelated area.

© Department of Training and Workforce Development 2010 Page 126 of 222Version 1, May 2010

Page 126: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Candidate’s name:Date:

Skill Set 1 – Practical unitsPhotographs and other supporting evidence to substantiate that you can:

Document number

19. Use solid plastering tools, equipment and materials proficiently.

20. Prepare surfaces for plastering.

21. Level walls and other surfaces.

Candidate’s name:Date:

Skill Set 2Photographs and other supporting evidence to substantiate that you can:

Document number

22. Use an EPT to fix an external beading.

23. Install cast plaster and paper-faced cornice.

24. Erect and dismantle scaffolding in the workplace.

25. Complete simple concreting tasks.

Candidate’s name:Date:

Skill Set 3Photographs and other supporting evidence to substantiate that you can:

Document number

26. Floating and rendering a straight wall and a curved wall.

27. Applying trowelled texture coat finishes.

28. Applying set coats.

Page 127 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 127: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Candidate’s name:Date:

Skill Set 4Photographs and other supporting evidence to substantiate that you can:

Document number

29. Running an ovolo (a decorative in situ mould).

30. Forming an arch with plasterboard and beads.

31. Running and installing a mould on the radius of an arch.

© Department of Training and Workforce Development 2010 Page 128 of 222Version 1, May 2010

Page 128: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Candidate’s name:Date:

Additional information

Is there anything else that you have done that has not been identified here?

If so, provide details below.

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

________________________________________________________________________

Candidate’s signature

Date

Page 129 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 129: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Assessor’s Evidence Summary SheetThe Assessor completes this table during the assessment to record the evidence collected.

It is expected that this evidence summary sheet (or similar) is attached to the evidence.

Candidate’s name

Date

Unit Code Unit Title

Evidence collected

Com

pete

ncy

dem

onst

rate

d

Que

stio

ns

Prac

tical

Third

Par

ty

Rep

ort

Oth

er

evid

ence

Units for Skill Set 1

BCGCM1001B Follow OHS policies and proceduresq Yes

q No

BCGCM1002B Work effectively in the general construction industry

q Yes

q No

BCGCM1003B Plan and organise workq Yes

q No

BCGCM1004B Conduct workplace communicationq Yes

q No

BCGCM1005B Carry out measurements and calculationsq Yes

q No

BCGCM2001B Read and interpret plans and specificationsq Yes

q No

BCGSP2001B Handle solid plastering materialsq Yes

q No

BCGSP2002B Use solid plastering tools and equipmentq Yes

q No

BCGSP2003B Prepare surfaces for plasteringq Yes

q No

BCGCM2006B Apply basic levelling proceduresq Yes

q No

Units for Skill Set 2

BCGCM2007B Use explosive power tools (EPT)q Yes

q No

BCGWC3004B Install cast plaster and paper-faced cornicesq Yes

q No

BCGCO2003B Carry out concreting to simple formsq Yes

q No

© Department of Training and Workforce Development 2010 Page 130 of 222Version 1, May 2010

Page 130: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 6 – Third Party Report and Supporting Documentation

Unit Code Unit Title

Evidence collected

Com

pete

ncy

dem

onst

rate

d

Que

stio

ns

Prac

tical

Third

Par

ty

Rep

ort

Oth

er

evid

ence

BCGCM2008B Erect and dismantle restricted height scaffoldingq Yes

q No

Units for Skill Set 3

BCGSP3001B Apply float and render to straight and curved surfaces

q Yes

q No

BCGSP3003B Apply trowelled texture coat finishesq Yes

q No

BCGSP3002B Apply set coatsq Yes

q No

Units for Skill Set 4

BCGSP3005B Install pre-cast decorative mouldingsq Yes

q No

BCGSP3004B Restore and renovate solid plasterworkq Yes

q No

Alternative electives (Assessor to specify which Training Package – four in total required; check packaging requirements first.)

q Yes

q No

q Yes

q No

q Yes

q No

q Yes

q No

Assessor’s signature

Assessor’s name

Date

Page 131 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 131: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Section 7

Mapping ofAssessment Tools

This section contains tables with mapping of each of the Assessment Tools provided, against the requirements of the units of competency for the qualification that makes up this RPL Assessment Tool Kit.

It is important to note that this section is used for validation purposes only.

Whilst all effort is made to ensure that all the unit requirements for each unit are covered, the developers do not give any warranty nor accept any liability in relation to the mapping provided.

Note: It is recommended that these Assessment Tools be validated prior to using them for the first time or after any customisation has been made, to ensure they meet the requirements of the organisation and meet AQTF Standards.

© Department of Training and Workforce Development 2010 Page 132 of 222Version 1, May 2010

Page 132: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Page intentionally blank

Page 133 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 133: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Mapping document for Skill Set 1

Using this documentThis document is mapped to the direct sources of evidence required to satisfy competence in this particular skill set.

Each of the columns reflects the particular tool in use, and the numbers relate to the question numbers in that tool which support the relevant performance criteria, critical aspects of evidence or required knowledge and skills in this skill set.

Note: The final column, ‘Supplementary evidence’, refers to any suggested sources of documentary evidence that the candidate may use to support their application for RPL. This includes information from the supplementary documentation checklist (identified as SD in the mapping document) and third party evidence checklist (identified as TP in the mapping document) from Section 6.

Interview questions that appear in brackets are from other skill sets. If the candidate has not been assessed in these other skill sets, the Assessor will need to decide whether sufficient evidence has already been gathered or whether the candidate will need to respond to the bracketed questions.

© Department of Training and Workforce Development 2010 Page 134 of 222Version 1, May 2010

Page 134: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Page intentionally blank

Page 135 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 135: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Evidence MatrixThe evidence matrix below identifies how each of the questions in the Interview Question Bank (Section 3), the Practical Tasks (Section 4) and the supplementary documentation checklist and third party evidence checklist (Section 5) demonstrate competence against the elements, performance criteria and critical aspects of evidence, underpinning skills and knowledge.

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1001B Follow OHS policies and procedures

Element 1 – Follow safe work practices

1.1 Tasks are performed in a safe manner and in accordance with legislative requirements, enterprise policies and procedures.

Q1, 2, 6, 7, (12) Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

1.2 Organisation of duties, tools, equipment and materials are performed in accordance with enterprise procedures.

Q1, 2, 8 Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

1.3 Personal protective equipment and clothing is worn, used and stored according to enterprise procedures.

Q1, 2, 7 (12) Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

1.4 Plant and equipment guards are used in accordance with manufacturers’ specifications and regulations, where applicable.

Q1, 2 (12) Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

1.5 Safety signs and symbols are identified and followed. Q1, 4, 7 (12) Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

Element 2 – Assess risks 2.1 Hazards in the work area are identified, assessed and reported to designated personnel.

Q1, 2, 6, 7, (12, 24) Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

2.2 OHS issues and risks in the work area are identified, assessed and reported to designated personnel.

Q1, 2, 4, 6, 7, (12, 24)

Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

2.3 Safe workplace procedures and safe work instructions Q1, 2, 4, 6, 7, (12, Task 1 SD1, 4, 7, 9, 10, 11, © Department of Training and Workforce Development 2010 Page 136 of 222Version 1, May 2010

Page 136: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1001B Follow OHS policies and procedures

are followed for controlling risks. 24) 12, 17, 18

2.4 OHS, hazard, accident or incident reports are contributed to according to workplace procedures and state/territory legislation.

Q1, 2, 7 (12, 24) Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

Element 3 – Follow emergency procedures

3.1 Appropriate personnel are identified in the event of an emergency.

Q1, 2, 4 Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

3.2 Safe workplace procedures for dealing with accidents, fires and emergencies are followed within scope of responsibilities.

Q1, 2, 4 Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

3.3 Emergency and evacuation procedures are practised and carried out when required.

Q1, 2, 4 Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q1, 2, 4, 6, 7, 8 (12, 24)

Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

Compliance with site safety plan, OHS regulations and state/territory legislation applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Communication and working effectively and safely with others.

Selection and use of fire-fighting equipment to extinguish a

Page 137 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 137: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1001B Follow OHS policies and procedures

simulated mechanical fire.

Evacuation of a site through simulated response to an emergency complying with workplace procedures.

Required knowledge Site and equipment safety requirements. Q1, 2, 4, 6, 7, 8 (12, 24)

Task 1 SD1, 4, 7, 9, 10, 11, 12, 17, 18

Personal protective equipment and clothing.

Signage.

Basic fire-fighting equipment.

Fires.

Basic first aid procedures.

Accidents and injuries.

Company procedures.

Regulations.

OHS policies and procedures.

Induction procedures.

Emergency response and evacuation procedures.

Material safety data sheets and material handling methods.

Project quality requirements.

© Department of Training and Workforce Development 2010 Page 138 of 222Version 1, May 2010

Page 138: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1001B Follow OHS policies and procedures

Communication devices.

General construction terminology.

JSAs/Safe work method statements.

Page 139 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 139: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1002B Work effectively in the general construction industry

Element 1 – Identify the industry work context and setting

1.1 The scope and nature of the general construction industry functions and activities are identified.

Q2, 4 Task 1 SD2, 16TP1–16

1.2 The profile of the general construction industry in terms of direct and indirect employment and national economic importance is identified.

Q2, 4 Task 1 SD2, 16TP1–16

1.3 Trends in technology and processes which are likely to impact on the general construction industry are identified and comprehended.

Q2, 4 Task 1 SD2, 16TP1–16

1.4 General construction employment conditions, responsibilities and obligations are identified and clarified.

Q2, 4 Task 1 SD2, 16TP1–16

Element 2 – Organise and accept responsibility for own workload

2.1 Priorities and deadlines are established in consultation with others and recorded.

Q2, 4 Task 1 SD2, 16TP1–16

2.2 Work activities are planned and progress of work is communicated to others whose personal work plans and timelines may be affected.

Q2, 4 Task 1 SD2, 16TP1–16

2.3 Work is completed to the standard expected in the workplace and in accordance with any guidelines, directions and specifications.

Q2, 4 Task 1 SD2, 16TP1–16

2.4 Variations and difficulties affecting work requirement are identified through regular reviews and action is taken to report these issues to appropriate personnel.

Q2, 4 Task 1 SD2, 16TP1–16

© Department of Training and Workforce Development 2010 Page 140 of 222Version 1, May 2010

Page 140: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1002B Work effectively in the general construction industry

2.5 Additional support to improve work outcomes is communicated clearly to the appropriate personnel.

Q2, 4 Task 1 SD2, 16TP1–16

Element 3 – Work in a team

3.1 Site goals and the contributions to be made by teams are identified and understood.

Q2, 4 Task 1 SD2, 16TP1–16

3.2 Individual contributions to team activities are identified, agreed and reviewed periodically with the team.

Q2, 4 Task 1 SD2, 16TP1–16

3.3 Defined roles and strengths of other team members are identified and acknowledged.

Q2, 4 Task 1 SD2, 16TP1–16

3.4 Assistance and encouragement is provided to other team members wishing to enhance their role and the role of the team.

Q2, 4 Task 1 SD2, 16TP1–16

3.5 Ground rules for team operations are reviewed and changes are made through team consultative processes.

Q2, 4 Task 1 SD2, 16TP1–16

3.6 Team improvements are initiated and/or encouraged from team members.

Q2, 4 Task 1 SD2, 16TP1–16

3.7 Causes of disharmony and other barriers to achievement are promptly resolved or referred to the appropriate party for resolution.

Q2, 4 Task 1 SD2, 16TP1–16

Page 141 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 141: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1002B Work effectively in the general construction industry

Element 4 – Participate in identifying and pursuing own development needs

4.1 The competencies for the workplace are identified. Q2, 4 Task 1 SD2, 16TP1–16

4.2 Steps are taken, in consultation with appropriate personnel, to identify own learning needs for future work requirements.

Q2, 4 Task 1 SD2, 16TP1–16

4.3 Appropriate opportunities to learn and develop required competencies are identified and pursued with the appropriate people.

Q2, 4 Task 1 SD2, 16TP1–16

Element 5 – Participate in site meetings

5.1 Meeting procedures and objectives are identified, understood, and observed.

Q2, 4 Task 1 SD2, 16TP1–16

5.2 Points of view and comments, including agreement and dissent are presented in a logical, persuasive and orderly manner.

Q2, 4 Task 1 SD2, 16TP1–16

5.3 Points of view of other members are given a fair hearing. Q2, 4 Task 1 SD2, 16TP1–16

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q1, 2, 4 Task 1 SD2, 16TP1–16

Compliance with site safety plan and OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures

© Department of Training and Workforce Development 2010 Page 142 of 222Version 1, May 2010

Page 142: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1002B Work effectively in the general construction industry

including quality requirements.

Communication and working effectively and safely with others.

Explanation to others of the scope, employment and economic importance of the general construction industry.

Location and identification of site employment conditions and the source of these conditions.

Setting personal and team work goals.

Responding to personal conflict situations.

Identifying personal development needs.

Participating in site meetings.

Required knowledge The general construction industry size, scope of work and national economic importance.

Q1, 2, 4 Task 1 SD2, 16TP1–16

Relevant industrial awards and enterprise agreements.

Relevant legislative provisions covering discrimination and equal employment opportunity.

Typical site/team work structure and methods.

Typical site communication procedures.

Interpersonal communication skills.

Page 143 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 143: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1002B Work effectively in the general construction industry

Typical site training/development systems.

Basic job/skill analysis techniques.

Basic conflict management.

Site meeting procedures.

Quality requirements.

General construction terminology.

JSAs/Safe work method statements.

© Department of Training and Workforce Development 2010 Page 144 of 222Version 1, May 2010

Page 144: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1003B Plan and organise work

Element 1 – Plan and prepare

1.1 Work instructions and operational details are obtained, confirmed and applied.

Q2, 4, 6, 8 (24) Task 1 SD3, 5

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q1, 2, 7 (12, 24) Task 1 SD3, 5

1.3 Signage/barricade requirements are identified and implemented.

Q1, 2, 12 Task 1 SD3, 5

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q2, 4, 8 (10, 13, 20, 21, 22, 23)

Task 1 SD3, 5

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q6, 9 (19) Task 1 SD3, 5

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q2, 5, 6 (22, 23) Task 1 SD3, 5

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q1, 2, 4 (17) Task 1 SD3, 5

Element 2 – Sequence work safely

2.1 Work plan is determined, modified and performed in a logical and efficient sequence.

Q1, 2, 8 (13, 23) Task 1 SD3, 5

2.2 Tasks are completed to meet work instructions. Q1, 2, 8 (12, 13, 23) Task 1 SD3, 5

Page 145 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 145: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1003B Plan and organise work

Element 3 – Clean up 3.1 Work area is cleared and materials disposed of or recycled in accordance with project environmental management plan.

Q1, 2 (13, 17, 23, 25) Task 1 SD3, 5

3.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q1, 2 (13, 17, 23, 25) Task 1 SD3, 5

Critical aspects of evidence

Location, interpretation and application of relevant information. Q1, 2, 4, 5, 6, 7, 8, (12, 13, 17, 20, 21, 22, 24, 25)

SD3, 5

Compliance with site safety plan, OHS regulations and state/territory legislation applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Communication and working effectively and safely with others.

Selection of necessary tools, materials, personal protective equipment and work sequence for a minimum of three separate tasks.

Required knowledge Site and equipment safety requirements. Q1, 2, 4, 5, 6, 7, 8, (12, 13, 17, 20, 21, 22, 24, 25)

Task 1 SD3, 5

Operational and maintenance procedures.

Processes for the calculation of material requirements.

Material safety data sheets and material handling methods.

Project quality requirements.

© Department of Training and Workforce Development 2010 Page 146 of 222Version 1, May 2010

Page 146: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1003B Plan and organise work

General construction terminology.

JSAs/Safe work method statements.

Page 147 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 147: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1004B Conduct workplace communication

Element 1 – Gather, convey and receive information

1.1 Verbal and written instructions are gathered, received and responded to with correct actions.

Q1, 4, 6 Task 1 SD5, 6

1.2 Instructions conveyed accurately. Q1, 4, 6 Task 1 SD5, 6

1.3 Work signage is responded to with correct action. Q1, 4, 6 Task 1 SD5, 6

1.4 Information is conveyed in simple English and message is confirmed.

Q1, 2, 4, 6, 8 (13, 25) Task 1 SD5, 6

1.5 Questions are used to gain additional information and to clarify understanding.

Q1, 2, 4, 6, 8 (13, 25) Task 1 SD5, 6

Element 2 – Carry out face-to-face routine communication

2.1 Routine instructions and messages are received and followed.

Q1, 4, 8 Task 1 SD5, 6

2.2 Workplace procedures are carried out to company requirements.

Q1 Task 1 SD5, 6

2.3 Information from a range of sources is accessed and interpreted.

Q1, 6, 8 Task 1 SD5, 6

2.4 Information is selected and sequenced correctly. Q6, 8 Task 1 SD5, 6

2.5 Verbal and written reporting is completed where required. Q1, 4 Task 1 SD5, 6

Element 3 – Apply visual communications

3.1 The visual communications used follow accepted industry practice or social convention.

Q1, 4 Task 1 SD5, 6

3.2 The attention of the communicating parties is obtained, Q1, 4 Task 1 SD5, 6

© Department of Training and Workforce Development 2010 Page 148 of 222Version 1, May 2010

Page 148: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1004B Conduct workplace communication

confirmed and/or acknowledged.

3.3 The intention of the visual communication is clarified and confirmed at each step.

Q1, 4 Task 1 SD5, 6

3.4 Visual communications which are unclear or ambiguous are questioned or visually cancelled.

Q1, 4 Task 1 SD5, 6

3.5 Instances of unclear visual communications are followed up to avoid repeated problems.

Q1, 4 Task 1 SD5, 6

Element 4 – Participate in simple on-site meeting processes

4.1 Correct process for on-site meetings are identified and followed to pre-determined or agreed procedures.

Q4 Task 1 SD5, 6

4.2 Responses are sought and provided to others in the group.

Q4 Task 1 SD5, 6

4.3 Constructive contributions are made. Q4 Task 1 SD5, 6

4.4 Goals or outcomes are identified and/or recorded. Q4 Task 1 SD5, 6

Critical aspects of evidence

Location, interpretation and application of relevant information. Q1, 2, 4, 6, 8 (13, 25) Task 1 SD5, 6

Compliance with site safety plan, OHS regulations and state/territory legislation applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of communication equipment.

Page 149 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 149: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1004B Conduct workplace communication

Communication and working effectively and safely with others.

Interpretation of all signage accurately – complete five tasks successfully following instruction; convey at least five pieces of information to other workers; fill out at least three workplace documents appropriately; ask one question at an on-site meeting.

Required knowledge Site and equipment safety requirements. Q1, 2, 4, 6, 8 (13, 25) Task 1 SD5, 6

Signage.

Company procedures.

OHS requirements.

Checklists.

Work instructions.

Delivery dockets.

JSAs/Safe work method statements.

Workplace policies.

Bulletins.

Memos.

Maps and sketches.

© Department of Training and Workforce Development 2010 Page 150 of 222Version 1, May 2010

Page 150: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1004B Conduct workplace communication

Emergency procedures.

Material safety data sheets and material handling methods.

Project quality requirements.

Communication devices.

General construction terminology.

Page 151 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 151: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1005B Carry out measurements and calculations

Element 1 – Plan and prepare

1.1 Work instructions are confirmed and applied. Q9 Task 1 SD8

1.2 Safety requirements are obtained from the site safety plan, other regulatory specifications or legal obligations and applied.

Q1 Task 1 SD8

1.3 Measuring and calculating equipment selected to carry out tasks is consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported.

Q9 (13) Task 1 SD8

Element 2 – Obtain measurements

2.1 Method of obtaining the measurement is selected and applied.

Q9 (13, 19) Task 1 SD8

2.2 Measurements are obtained using a rule or tape, accurate to 1 mm.

Q9 (13, 19) Task 1 SD8

2.3 Measurements are confirmed and recorded. Q9 (13, 19) Task 1 SD8

Element 3 – Perform calculations

3.1 Appropriate calculation method is selected for achieving the required result.

Q9 (13, 19) Task 1 SD8

3.2 Material quantities for the project are correctly calculated using the appropriate factors.

Q9 (13, 19) Task 1 SD8

3.3 Results are confirmed and recorded. Q9 (13, 19) Task 1 SD8

Element 4 – Estimate approximate quantities

4.1 Calculations for determining material requirements are taken.

Q9 (13, 19) Task 1 SD8

4.2 Appropriate formulas for calculating quantities are Q9 (13, 19) Task 1 SD8

© Department of Training and Workforce Development 2010 Page 152 of 222Version 1, May 2010

Page 152: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1005B Carry out measurements and calculations

selected.

4.3 Quantities are estimated from the calculations taken. Q9 (13, 19) Task 1 SD8

4.4 Material quantities for the project are calculated, confirmed and recorded within enterprise tolerances.

Q9 (13, 19) Task 1 SD8

Critical aspects of evidence

Location, interpretation and application of relevant information. Q1, 2, 4, 9 (13, 19) Task 1 SD8

Compliance with site safety plan, OHS regulations and state/territory legislation applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

Completion of measurements, calculations and determination of quantities for at least three different projects of varying complexity.

Required knowledge Site and equipment safety requirements. Q1, 2, 4, 9 (13, 19) Task 1 SD8

Measuring, calculating, geometry and determination of quantities.

Tolerances.

Calculators.

Page 153 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 153: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM1005B Carry out measurements and calculations

Company procedures.

Project quality requirements.

Communication devices.

Processes for care of measuring equipment.

General construction terminology.

JSAs/Safe work method statements.

© Department of Training and Workforce Development 2010 Page 154 of 222Version 1, May 2010

Page 154: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2001B Read and interpret plans and specifications

Element 1 – Identify types of drawings and their functions

1.1 Main types of plans and drawings used in the civil construction sector of the industry are identified.

Q8, 9 Task 1 SD8, 13, 14

1.2 Key functions of each type of drawing are identified. Q8, 9 Task 1 SD8, 13, 14

1.3 Quality requirements of company operations are recognised and adhered to.

Q1 Task 1 SD8, 13, 14

1.4 Environmental controls are identified from the job plans, specifications and environmental plan.

Q1 Task 1 SD8, 13, 14

Element 2 – Recognise amendments

2.1 Title panel is checked to verify latest amendments to drawing.

Q8 Task 1 SD8, 13, 14

2.2 Amendments to specifications are checked to ensure currency of information.

Q8 Task 1 SD8, 13, 14

Element 3 – Recognise commonly used symbols and abbreviations

3.1 General construction symbols and abbreviations are recognised.

Q8 Task 1 SD8, 13, 14

3.2 Legend is located on project drawings, symbols and abbreviations are correctly interpreted.

Q8 Task 1 SD8, 13, 14

Element 4 – Locate and identify key features on a site plan

4.1 Orientation of the plan with the site is achieved. Q8 Task 1 SD8, 13, 14

4.2 Key features of the site are identified and located. Q8 Task 1 SD8, 13, 14

4.3 Access to site is gained and services, main features, contours and datum are identified.

Q8 Task 1 SD8, 13, 14

Element 5 – Identify project 5.1 Dimensions for project and nominated locations are Q8 Task 1 SD8, 13, 14

Page 155 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 155: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2001B Read and interpret plans and specifications

requirements identified.

5.2 Construction types and dimensions for nominated locations are identified.

Q8 Task 1 SD8, 13, 14

5.3 Environmental controls and locations are identified. Q8 Task 1 SD8, 13, 14

5.4 Location, dimensions and tolerances for ancillary works are identified.

Q8 Task 1 SD8, 13, 14

Element 6 – Read and interpret job specifications

6.1 Job specifications are identified from drawings, notes and descriptions.

Q8 Task 1 SD8, 13, 14

6.2 Standards of work, finishes and tolerances are identified from the project specifications.

Q8 Task 1 SD8, 13, 14

6.3 Material attributes are identified from specifications. Q8 Task 1 SD8, 13, 14

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q1, 2, 4, 8, 9 Task 1 SD8, 13, 14

Compliance with site safety plan, OHS regulations and state/territory legislation applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Communication and working effectively and safely with others.

For a minimum of two different projects, the reading and interpretation of the project plans, including:

© Department of Training and Workforce Development 2010 Page 156 of 222Version 1, May 2010

Page 156: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2001B Read and interpret plans and specifications

confirmation of amendment status and drawings confirmed ‘for construction’

orientation of plans to the ground six key features on both the plan and the site confirmation of six items of information from the title block

of project plans six construction dimensions, levels and locations from the

project plans six ancillary works dimensions, levels and locations from

the project plans.

For a minimum of two formal specifications, identify the dimensions, material requirements and processes to be followed.

Required knowledge Features of plans and elevations, including direction, scale, key, contours, symbols and abbreviations.

Q1, 2, 4, 8, 9

Commonly used general construction symbols and abbreviations.

The processes for application of scales in plan preparation/interpretation.

Techniques for orienting/confirming the orientation of a plan.

Key features of formal job specifications.

Page 157 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 157: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2001B Read and interpret plans and specifications

Site and equipment safety requirements.

Project quality requirements.

General construction terminology.

Basic calculations of heights, areas, volumes and grades.

Drawing conventions.

JSAs/Safe work method statements.

© Department of Training and Workforce Development 2010 Page 158 of 222Version 1, May 2010

Page 158: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2001B Handle solid plastering materials

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q2, 8 Task 1 SD2, 16TP1–13

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q1 Task 1 SD2, 16TP1–13

1.3 Signage/barricade requirements are identified and implemented.

Q2 (12) Task 1 SD2, 16TP1–13

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q2, 8, 9, (19) Task 1 SD2, 16TP1–13

1.5 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q2, 8, 9, (19) Task 1 SD2, 16TP1–13

Element 2 – Handle, sort and store solid plaster material and components

2.1 Solid plastering material and components are identified on delivery to site and checked for conformity to material schedule, plans and specifications.

Q2 Task 1 SD2, 16TP1–13

2.2 Handling characteristics of solid plastering material and components are identified and safe handling techniques are selected and applied in accordance with workplace requirements.

Q2 (13) Task 1 SD2, 16TP1–13

2.3 Solid plastering material and components are sorted to Q2 (13) Task 1 SD2, 16

Page 159 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 159: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2001B Handle solid plastering materials

suit material type and size, stacked for ease of identification, retrieval for task sequence, and job location in accordance with work specifications.

TP1–13

2.4 Solid plastering material and components are protected against physical and water damage and stored clear of traffic ways.

Q2 Task 1 SD2, 16TP1–13

2.5 Signage and/or barricades are erected to isolate stored materials from workplace traffic or unauthorised access.

Q2 Task 1 SD2, 16TP1–13

Element 3 – Handle and position solid plastering materials and components in preparation for installation

3.1 Solid plastering material and components are identified from stack and safely handled and distributed to required job location.

Q2 Task 1 SD2, 16TP1–13

3.2 Solid plastering materials and components are positioned ready for fixing in accordance with manufacturers' recommendations and job requirements.

Q(13, 24, 25) Task 1 SD2, 16TP1–13

Element 4 – Handle and remove solid plastering material and components on completion

4.1 Materials are handled safely and effectively according to MSDS and requirements of regulatory authorities.

Q2 Task 1 SD2, 16TP1–13

4.2 Hazardous material is identified for separate handling by authorised personnel.

Q4 Task 1 SD2, 16TP1–13

4.3 Dust suppression procedures are used to minimise health risk to self and others.

Q(24) Task 1 SD2, 16TP1–13

4.4 Protection of materials is provided in accordance with specific material needs.

Q2 Task 1 SD2, 16

© Department of Training and Workforce Development 2010 Page 160 of 222Version 1, May 2010

Page 160: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2001B Handle solid plastering materials

TP1–13

4.5 Materials are stored safely and effectively according to material safety data sheets and requirements of regulatory authorities.

Q2 Task 1 SD2, 16TP1–13

Element 5 – Clean up 5.1 Unused materials are sealed and stored/stacked in accordance with standard material handling practices and techniques and company requirements.

Q2 Task 1 SD2, 16TP1–13

5.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q2 Task 1 SD2, 16TP1–13

5.3 Stormwater system is protected during clean up process in accordance with sound work practices compliant with EPA.

Q(17) Task 1 SD2, 16TP1–13

5.4 Waste and unwanted materials are removed and placed into job waste bins or rubbish stockpile in a safe and effective manner in accordance with sound work practices compliant with EPA.

Q(17) Task 1 SD2, 16TP1–13

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q1, 2, 8, 9 (10, 12, 13, 14, 17, 19, 24, 25)

Task 1 SD2, 16TP1–13

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Page 161 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 161: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2001B Handle solid plastering materials

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

Handling and storing the mandatory solid plastering materials and components listed in the range statement.

Disposing of waste/excess materials.

Required knowledge Workplace and equipment safety requirements, including common manual handling injuries and handling techniques.

Q1, 2, 8, 9 (10, 12, 13, 14, 17, 19, 24, 25)

Task 1 SD2, 16TP1–13

Quality requirements.

Plastering terminology.

Plastering tools and equipment types, characteristics, uses and limitations.

The types, characteristics, uses and limitations of solid plastering materials and components.

Systems and techniques for safe handling of materials.

Processes for the calculation of material requirements.

Material safety data sheets.

© Department of Training and Workforce Development 2010 Page 162 of 222Version 1, May 2010

Page 162: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2001B Handle solid plastering materials

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statements.

Page 163 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 163: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2002B Use solid plastering tools and equipment

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q2, 8 Task 1 SD19

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q1 Task 1 SD19

1.3 Signage/barricade requirements are identified and implemented.

Q2 (12) Task 1 SD19

1.4 Material quantity requirements are calculated in accordance with plans and/or specifications

Q2, 8 Task 1 SD19

1.5 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q2 (13) Task 1 SD19

1.6 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q2 (17) Task 1 SD19

Element 2 – Identify hand and power tools

2.1 Hand and power tools, their functions, operations and limitations are identified.

Q2 (12, 21) Task 1 SD19

2.2 OHS requirements for using hand tools are recognised and adhered to.

Q1, 2 Task 1 SD19

2.3 OHS requirements for using power tools are recognised and adhered to.

Q1 (12) Task 1 SD19

© Department of Training and Workforce Development 2010 Page 164 of 222Version 1, May 2010

Page 164: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2002B Use solid plastering tools and equipment

Element 3 – Select tools for project

3.1 Tools are selected consistent with job requirements. Q2 (13, 18, 21) Task 1 SD19

3.2 Tools, including leads and hoses, are checked for tags, serviceability and safety, and any faults rectified or reported.

Q2 (12) Task 1 SD19

3.3 Power tools guards, retaining bolts, couplings, gauges and controls are checked and maintained in accordance with manufacturers' recommendations.

Q2 (12) Task 1 SD19

3.4 Equipment to hold or support material during operation is selected.

Q(12, 25) Task 1 SD19

3.5 Pre-operational checks including lubricants, hydraulic fluid and water are completed according to manufacturers' recommendations.

Q2 (12) Task 1 SD19

Element 4 – Use tools 4.1 Power and/or compressed air supply is connected to work area.

Q2 (12) Task 1 SD19

4.2 Start-up and shutdown procedures are followed Q2 (12) Task 1 SD19

4.3 Tools are safely and effectively used according to manufacturers' recommendations and OHS requirements.

Q2 (12) Task 1 SD19

4.4 Tools are safely located when not in immediate use. Q2 (12) Task 1 SD19

Page 165 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 165: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2002B Use solid plastering tools and equipment

Element 5 – Select plant and equipment

5.1 Function and limitations of plant/equipment used in solid plastering are identified.

Q2 (12) Task 1 SD19

5.2 Plant and equipment are selected consistent with hazard minimisation and needs of job.

Q2 (12) Task 1 SD19

5.3 Method of operation of plant/equipment is identified. Q2 (12) Task 1 SD19

5.4 OHS requirements for operating and using plant and equipment are recognised and adhered to.

Q2 (12, 13) Task 1 SD19

5.5 Plant and equipment are checked for safety and faults are rectified or reported.

Q2 (12, 13) Task 1 SD19

Element 6 – Use plant and equipment

6.1 Plant and equipment are safely and effectively used. Q2 (12, 13) Task 1 SD19

6.2 Plant and equipment are safely located when not in immediate use.

Q2 (12, 13) Task 1 SD19

6.3 Plant and equipment are cleaned, maintained and stored after use.

Q2 (12, 13) Task 1 SD19

Element 7 – Clean up 7.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Task 1 SD19

7.2 Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q2 (12, 13) Task 1 SD19

© Department of Training and Workforce Development 2010 Page 166 of 222Version 1, May 2010

Page 166: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2002B Use solid plastering tools and equipment

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q1, 2, 8 (12, 13, 17, 18, 21)

Task 1 SD19

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Communication and working effectively and safely with others.

Selection, use and maintenance of the tools and equipment listed in the range statement.

Selection, use and maintenance of the plant listed in the range statement.

Required knowledge Workplace and equipment safety requirements. Q1, 2, 8 (12, 13, 17, 18, 21)

Task 1 SD19

Quality requirements.

Plastering terminology.

The types, characteristics, uses and limitations of solid plastering hand tools.

The types, characteristics, uses and limitations of solid plastering power tools.

The types, characteristics, uses and limitations of solid

Page 167 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 167: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2002B Use solid plastering tools and equipment

plastering plant items.

Systems and techniques for safe handling of materials.

The types, characteristics, uses and limitations of solid plastering materials.

Processes for the calculation of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statements.

© Department of Training and Workforce Development 2010 Page 168 of 222Version 1, May 2010

Page 168: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2003B Prepare surfaces for plastering

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q2, 8 Task 1 SD20

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q1 Task 1 SD20

1.3 Signage/barricade requirements are identified and implemented.

Q2 (12) Task 1 SD20

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q2 (12, 13) Task 1 SD20

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q2, 8 Task 1 SD20

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q2, 8 Task 1 SD20

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q2 (17) Task 1 SD20

Element 2 – Prepare surfaces

2.1 Preparation requirements are identified from site inspection and plans/specifications.

Q2, 8 (12) Task 1 SD20

2.2 Hazards, obstructions and attachments are removed, or Q2 (12, 13) Task 1 SD20

Page 169 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 169: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2003B Prepare surfaces for plastering

arrangements made for their removal.

2.3 Surface preparation tools are selected and set up in accordance with surface condition and job requirements.

Q2, 3 (22) Task 1 SD20

2.4 Tools are used to prepare surface in accordance with manufacturers' specifications and job requirements.

Q2, 3 Task 1 SD20

2.5 All loose or protruding material is removed by sander/grinder and brush so that surface is prepared to specification.

Q2 (26) Task 1 SD20

Element 3 – Patch and fill holes and depressions

3.1 Patching method of hole is determined from type of material surface, size of hole, compatibility of materials and planned finish.

Q2 (26) Task 1 SD20

3.2 Patching materials are selected to suit material surface and mixed to manufacturers' specifications.

Q13 (26) Task 1 SD20

3.3 Material is applied to manufacturers' specifications using appropriate application method.

Q(22, 25) Task 1 SD20

3.4 Surface is brushed/washed/scraped clean of surplus material in accordance with type of patching material and material surface.

Q(13, 25) Task 1 SD20

3.5 Patched areas are sealed by application of prime or sealing coat, to suit requirements of specified finishes.

Q(22) Task 1 SD20

Element 4 – Clean up 4.1 Work area is cleared and materials disposed of, reused or recycled in accordance with

Q2 (13, 17, 24) Task 1 SD20

© Department of Training and Workforce Development 2010 Page 170 of 222Version 1, May 2010

Page 170: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2003B Prepare surfaces for plastering

legislation/regulations/codes of practice and job specification.

4.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q2 (13, 17, 24) Task 1 SD20

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q1, 2, 8 (12, 13, 17, 22, 24, 25, 26)

Task 1 SD20

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

The preparation of surfaces for plastering, either solid plastering (masonry or concrete) or sheet plastering (timber, steel or masonry) including: both wall and ceiling surfaces to a level and plumb

surface finishthe patching or filling of holes and depressions.

Required knowledge Workplace and equipment safety requirements. Q1, 2, 8 (12, 13, 17, Task 1 SD20

Page 171 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 171: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP2003B Prepare surfaces for plastering

22, 24, 25, 26)Quality requirements.

Plastering, and wall and ceiling terminology.

Surface preparation tools and equipment types, characteristics, uses and limitations.

Surface preparation techniques including sanding, planing, levelling, packing, patching and filling.

The types, uses and limitations of surface preparation materials.

Processes for the calculation of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statements.

© Department of Training and Workforce Development 2010 Page 172 of 222Version 1, May 2010

Page 172: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2006B Apply basic levelling procedures

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q8 Task 1 SD21

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q1 Task 1 SD21

1.3 Signage/barricade requirements are identified and implemented.

Q2 Task 1 SD21

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q2 Task 1 SD21

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q2, 8, 9 (19) Task 1 SD21

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q2, 8 Task 1 SD21

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q2 (17) Task 1 SD21

Element 2 – Set up and use levelling device

2.1 Heights or levels to be transferred/established are identified from project plans or instructions.

Q(13, 19) Task 1 SD21

2.2 Levelling devices are set up and tested in accordance Q(13, 19) Task 1 SD21

Page 173 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 173: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2006B Apply basic levelling procedures

with manufacturers' instructions.

2.3 Levelling devices are set up and correctly used in accordance with standard operating procedures and manufacturers' guidelines.

Q(13, 19) Task 1 SD21

2.4 Levelling staffs are accurately applied. Q(19) Task 1 SD21

2.5 Levels are shot and heights transferred to required location and marked and/or recorded to job requirements.

Q(19) Task 1 SD21

2.6 Results of levelling procedure are documented to organisational requirements.

Q2 Task 1 SD21

Element 3 – Clean up 3.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q2 (13) Task 1 SD21

3.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q2 (13) Task 1 SD21

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q1, 2, 4, 8 (13, 17, 19)

Task 1 SD21

Compliance with site safety plan, OHS regulations and state/territory legislation applicable to workplace operations.

Compliance with organisational policies and procedures

© Department of Training and Workforce Development 2010 Page 174 of 222Version 1, May 2010

Page 174: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2006B Apply basic levelling procedures

including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

Transfer of levels and the recording of differences in height using: a spirit level and straight edge on one project to job

specifications the levelling with water technique on one project to job

specifications laser levelling devices on one project to job specifications optical levelling devices on one project to job

specifications.

Confirmation of the accuracy of the readings taken for all of the above including set-up and movement of device in two locations.

Conduct of a two-peg test with an automatic level to confirm instrument meets manufacturers’ tolerances.

The accurate recording of the results of each levelling procedure to organisational requirements.

Required knowledge Basic general construction processes. Q1, 2, 4, 8 (13, 17, 19)

Task 1 SD21

General construction plan, symbols and construction

Page 175 of 222 © Department of Training and Workforce Development 2010Version 1, May 2023

Page 175: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 1 – Rendering a flat section of wall

Units of competencyBCGCM1001B Follow OHS policies and proceduresBCGCM1002B Work effectively in the general construction industryBCGCM1003B Plan and organise workBCGCM1004B Conduct workplace communicationBCGCM1005B Carry out measurements and calculations

Units of competency BCGCM2001B Read and interpret plans and specificationsBCGSP2001B Handle solid plastering materialsBCGSP2002B Use solid plastering tools and equipmentBCGSP2003B Prepare surfaces for plasteringBCGCM2006B Apply basic levelling procedures

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2006B Apply basic levelling procedures

terminology.

Levelling device types, characteristics, technical capabilities and limitations.

Levelling techniques related to essential tasks.

Basic mathematical techniques associated with levelling.

Site and equipment safety requirements.

Processes for interpreting engineering drawings and sketches.

Site isolation and traffic control responsibilities and authorities.

Project quality requirements.

General construction terminology.

Processes for setting out.

Line, level and plumb.

JSAs/Safe work method statement.

© Department of Training and Workforce Development 2010 Page 176 of 222Version 1, May 2010

Page 176: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Mapping document for Skill Set 2

Using this documentThis document is mapped to the direct sources of evidence required to satisfy competence in this particular skill set.

Each of the columns reflects the particular tool in use, and the numbers relate to the question numbers in that tool which support the relevant performance criteria, critical aspects of evidence or required knowledge and skills in this skill set.

Note: The final column, ‘Supplementary evidence’, refers to any suggested sources of documentary evidence that the candidate may use to support their application for RPL. This includes information from the supplementary documentation checklist (identified as SD in the mapping document) and third party evidence checklist (identified as TP in the mapping document) from Section 6.

Interview questions that appear in brackets are from other skill sets. If the candidate has not been assessed in these other skill sets, the Assessor will need to decide whether sufficient evidence has already been gathered or whether the candidate will need to respond to the bracketed questions.

Page 177 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 177: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 178 of 222Version 1, May 2010

Page 178: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Evidence MatrixThe evidence matrix below identifies how each of the questions in the Interview Question Bank (Section 3), the Practical Tasks (Section 4) and the supplementary documentation checklist and third party evidence checklist (Section 5) demonstrate competence against the elements, performance criteria and critical aspects of evidence, underpinning skills and knowledge.

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2007B Use explosive power tools (EPT)

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q12 Task 2 SD23

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q12 Task 2 SD23

1.3 Signage/barricade requirements are identified and implemented.

Q12 Task 2 SD23

1.4 Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q12 Task 2 SD23

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q12 Task 2 SD23

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q12 Task 2 SD23

1.7 Environmental protection requirements are identified for Q12 Task 2 SD23

Page 179 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 179: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2007B Use explosive power tools (EPT)

the project in accordance with environmental plans and regulatory obligations and applied.

Element 2 – Set out fasteners

2.1 Minimum distances from edge of substrate material are adhered to in accordance with legislation/regulations/codes of practice.

Q12 Task 2 SD23

2.2 Material is located and temporarily held or fixed into designed position according to detailed drawings.

Q12 Task 2 SD23

Element 3 – Use explosive power tools

3.1 Explosive power tool is checked for operation to manufacturers' specifications and safety requirements.

Q12 Task 2 SD23

3.2 Fastener is selected to requirements of job. Q12 Task 2 SD23

3.3 Charge is selected to assessed requirements for material, base and penetration.

Q12 Task 2 SD23

3.4 Attachments and/or accessories are installed to explosive power tool in accordance with manufacturers' specifications and safety requirements.

Q12 Task 2 SD23

3.5 Fastener and charge in explosive power tool are located to manufacturers' specification.

Q12 Task 2 SD23

3.6 Explosive power tool operation is carried out and fastener fixed into place in accordance with manufacturers' recommendations, legislation/regulations/codes of practice.

Q12 Task 2 SD23

© Department of Training and Workforce Development 2010 Page 180 of 222Version 1, May 2010

Page 180: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2007B Use explosive power tools (EPT)

3.7 Fastening penetration is checked and appropriate depth into material applied.

Q12 Task 2 SD23

3.8 Power regulating device is adjusted for conditions. Q12 Task 2 SD23

3.9 Misfire procedures is carried out to manufacturers' recommendations and legislation/regulations/codes of practice.

Q12 Task 2 SD23

3.10 Temporary holding/fixings are removed without damage to material.

Q12 Task 2 SD23

Element 4 – Secure and store equipment and charges

4.1 Charges are stored in designated container in accordance with legislation/regulations/codes of practice and used charges recorded.

Q12 Task 2 SD23

4.2 Unused fasteners, the EPT and attachments are stored in a carry case to manufacturers’ recommendations.

Q12 Task 2 SD23

4.3 Logbook is checked and maintenance recorded to manufacturers recommendations.

Q12 Task 2 SD23

Element 5 – Maintain EPT and kit

5.1 Safety features of the tool are checked for serviceability in accordance with manufacturer’s operating manual.

Q12 Task 2 SD23

5.2 Tool is cleaned and lubricated to manufacturer’s recommendations.

Q12 Task 2 SD23

5.3 Periodic maintenance service is carried out to manufacturer’s specifications.

Q12 Task 2 SD23

Page 181 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 181: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2007B Use explosive power tools (EPT)

5.4 Diminished stocks of charges and fasteners are replenished to designed effectiveness of power tool kit.

Q12 Task 2 SD23

Element 6 – Clean up 6.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q12 Task 2 SD23

6.2 Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q12 Task 2 SD23

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q12 Task 2 SD23

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

The fixing of metal or timber to a steel, concrete or masonry based on one project of each to job specifications, including completion of all activities listed in the fourth dot point of the unit scope.

© Department of Training and Workforce Development 2010 Page 182 of 222Version 1, May 2010

Page 182: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2007B Use explosive power tools (EPT)

Required knowledge Workplace and equipment safety requirements. Q12 Task 2 SD23

Quality requirements.

General construction terminology.

Plant, tools and equipment types, characteristics, uses and limitations.

Explosive power tools, charges and fasteners.

EPT materials.

Processes for the calculations of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

Relevant Acts, regulations and codes of practice.

Equipment safety manuals and instructions.

Security and storage procedures for equipment and charges.

JSAs/Safe work method statement.

Page 183 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 183: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGWC3004B Install cast plaster and paper-faced cornices

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q13 Task 2 SD24

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q13 Task 2 SD24

1.3 Signage/barricade requirements are identified and implemented.

Q13 Task 2 SD24

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q13 Task 2 SD24

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q13 Task 2 SD24

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q13 Task 2 SD24

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q13 Task 2 SD24

Element 2 – Prepare work area for application process

2.1 Work area and substrate are prepared for installation of cornices to plans/specifications.

Q13 Task 2 SD24

2.2 Substrate is checked for conformance in accordance with the relevant Australian Standard®.

Q13 Task 2 SD24

© Department of Training and Workforce Development 2010 Page 184 of 222Version 1, May 2010

Page 184: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGWC3004B Install cast plaster and paper-faced cornices

Element 3 – Fix cornices to wall and ceiling junctions

3.1 Wall length and centre position are measured making allowance for tolerance, enrichment centres and internal and external mitres.

Q13 Task 2 SD24

3.2 Cornice depth and projections are established and the wall is marked in accordance with manufacturers' recommendations.

Q13 Task 2 SD24

3.3 Internal and external cornice mitres are measured and cut.

Q13 Task 2 SD24

3.4 Cornice adhesives are applied to the cornice ceiling/wall. Q13 Task 2 SD24

3.5 Cornice is positioned or placed to required area ready for straight stopping.

Q13 Task 2 SD24

3.6 Straight stopping, mitres and joins are finished for painting.

Q13 Task 2 SD24

Element 4 – Clean up 4.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q13 Task 2 SD24

4.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q13 Task 2 SD24

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q13 Task 2 SD24

Compliance with site safety plan, OHS Page 185 of 222 © Department of Education and Training 2010

Version 1, May 2010

Page 185: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGWC3004B Install cast plaster and paper-faced cornices

legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

Measuring, cutting, placing, straight stopping and finishing paper-faced cornices, including internal mitre, external mitre and butt join.

Measuring, cutting, placing, straight stopping and finishing cast plaster decorative cornices, including internal mitre, external mitre and butt join.

Required knowledge Workplace and equipment safety requirements. Q13 Task 2 SD24

Quality requirements.

Plastering, and wall and ceiling terminology.

Cornice installation tools and equipment types, characteristics, uses and limitations.

The type, characteristics, uses and limitation of cornices and cornice installation materials.

Cornice measuring, cutting, placement, stopping and finishing techniques.

© Department of Training and Workforce Development 2010 Page 186 of 222Version 1, May 2010

Page 186: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGWC3004B Install cast plaster and paper-faced cornices

Processes for the calculations of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statement.

Page 187 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 187: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCO2003B Carry out concreting to simple forms

Element 1 – Plan and prepare

1.1 Work instructions and operational details are obtained, confirmed and applied.

Q(2) Task 2 SD22

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q(2) Task 2 SD22

1.3 Signage/barricade requirements are identified and implemented.

Q(2) Task 2 SD22

1.4 Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q(2) Task 2 SD22

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q(2) Task 2 SD22

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q(2) Task 2 SD22

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q(2) Task 2 SD22

Element 2 – Erect and strip simple formwork

2.1 Subgrade is prepared. Q(2) Task 2 SD22

2.2 Formwork design is identified from drawings. Q(2) Task 2 SD22

2.3 Formwork is erected safely on commencement. Q(2) Task 2 SD22

2.4 Form release agent is applied to erected formwork where Q(2) Task 2 SD22

© Department of Training and Workforce Development 2010 Page 188 of 222Version 1, May 2010

Page 188: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCO2003B Carry out concreting to simple forms

specified.

2.5 Timber components are de-nailed following stripping of formwork.

Q(2) Task 2 SD22

2.6 Components are cleaned, stacked and stored for reuse or bundled for removal.

Q(2) Task 2 SD22

2.7 Formwork components are removed from site. Q(2) SD22

Element 3 – Place and tie reinforcement

3.1 Reinforcing components are handled and positioned safely.

Q(2) Task 2 SD22

3.2 Reinforcing bars and mesh are positioned. Q(2) Task 2 SD22

3.3 Bar chairs and spacers are positioned, with minimum edge cover.

Q(2) Task 2 SD22

Element 4 – Place concrete

4.1 Formwork or excavation is cleaned of excess material and debris prior to concrete placement.

Q(2) Task 2 SD22

4.2 Concrete is safely transported by wheelbarrow. Q(2) Task 2 SD22

4.3 Pump line/chute is controlled and concrete placed. Q(2) Task 2 SD22

4.4 Concrete is placed in formwork to specified depth. Q(2) Task 2 SD22

4.5 Concrete is screeded to the alignment of formwork and project specified datums.

Q(2) Task 2 SD22

4.6 Surface of concrete is finished in accordance with specifications.

Q(2) Task 2 SD22

Page 189 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 189: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCO2003B Carry out concreting to simple forms

Element 5 – Clean up 5.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q(2) Task 2 SD22

5.2 Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q(2) Task 2 SD22

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q(2) Task 2 SD22

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

Preparation of subgrade, erection of formwork, cut, place and tie reinforcement, place and hand screed concrete for a slab of at least 4 m2 and a minimum depth of 100 mm to the required finished level and job specification.

Required knowledge Workplace and equipment safety requirements. Q(2) Task 2 SD22

Quality requirements.

© Department of Training and Workforce Development 2010 Page 190 of 222Version 1, May 2010

Page 190: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCO2003B Carry out concreting to simple forms

General construction terminology.

Plant, tools and equipment types, characteristics, uses and limitations.

Concreting techniques.

Concrete materials.

Processes for the calculations of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

Levelling techniques.

Simple formwork and reinforcing componentry.

JSAs/Safe work method statement.

Page 191 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 191: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2008B Erect and dismantle restricted height scaffolding

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q(2, 8) (Task 1) SD25

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q(1) (Task 1) SD25

1.3 Signage/barricade requirements are identified and implemented.

Q(2), 12 (Task 1) SD25

1.4 Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q(2), 12, 13 (Task 1) SD25

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q(2, 8) (Task 1) SD25

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q(2, 8) (Task 1) SD25

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q(2), 17 (Task 1) SD25

Element 2 – Erect scaffolding

2.1 Purpose for scaffolding is confirmed and associated work tasks identified.

Q(2), 13 (24) Task 2 SD25

2.2 Expected loading on scaffold and supporting structure is Q(1) Task 2 SD25

© Department of Training and Workforce Development 2010 Page 192 of 222Version 1, May 2010

Page 192: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2008B Erect and dismantle restricted height scaffolding

determined using load tables.

2.3 Site access and egress routes are identified. Q(4) Task 2 SD25

2.4 Scaffolding and components are selected and inspected with damaged components labelled and rejected or repaired.

Q13 (24) Task 2 SD25

2.5 Adequate footing is established in accordance with AS for scaffolding.

Q13 (24) Task 2 SD25

2.6 Scaffolding is erected in accordance with regulations and planned hazard prevention and control measures, acceptable safe work practices and manufacturers' requirements.

Q13 (24) Task 2 SD25

Element 3 – Inspect, repair and alter scaffolding

3.1 Critical structural and safety areas of scaffolding are inspected for damage, corrosion and wear.

Q(1), 13 (24) Task 2 SD25

3.2 Current use of scaffolding is checked for accordance with the type of scaffolding equipment.

Q(2) Task 2 SD25

3.3 Inspection log and handover are completed. Q(2) Task 2 SD25

3.4 Scaffolding is reviewed to determine if changes or modifications were scheduled as per original planning.

Q(2) Task 2 SD25

3.5 Alteration or repair carried out where specified. Q(2) Task 2 SD25

Page 193 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 193: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2008B Erect and dismantle restricted height scaffolding

Element 4 – Dismantle scaffolding

4.1 Scaffolding is dismantled using reverse procedure as for erection.

Q13 (24) Task 2 SD25

Element 5 – Clean up 5.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q13 (24) Task 2 SD25

5.2 Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q13 (24) Task 2 SD25

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q(1, 2, 4, 8) 13 (17, 24)

Task 2 SD25

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools, plant and equipment.

Communication and working effectively and safely with others.

© Department of Training and Workforce Development 2010 Page 194 of 222Version 1, May 2010

Page 194: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2008B Erect and dismantle restricted height scaffolding

Completion of planning, erection and dismantling of a modular scaffolding system, in accordance with JSAs/Safe work method statements and regulations, including a minimum of: bays (one with a return) lift with ladder fall/edge protection.

Required knowledge Workplace and equipment safety requirements. Q(1, 2, 4, 8) 13 (17, 24)

Task 2 SD25

Quality requirements.

General construction terminology.

Plant, tools and equipment types, characteristics, uses and limitations.

Scaffolding techniques.

Scaffolding equipment.

Processes for the calculations of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statement.

Page 195 of 222 © Department of Education and Training 2010Version 1, May 2010

Page 195: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 2 – Installing an angle bead and paper-faced cornice at heightUnits of competencyBCGCM2007B Use explosive power tools (EPT)BCGWC3004B Install cast plaster and paper-faced cornicesBCGCO2003B Carry out concreting to simple formsBCGCM2008B Erect and dismantle restricted height scaffolding

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGCM2008B Erect and dismantle restricted height scaffolding

Relevant Acts, regulations and codes of practice.

Lifting devices.

© Department of Training and Workforce Development 2010 Page 196 of 222Version 1, May 2010

Page 196: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Mapping document for Skill Set 3

Using this documentThis document is mapped to the direct sources of evidence required to satisfy competence in this particular skill set.

Each of the columns reflects the particular tool in use, and the numbers relate to the question numbers in that tool which support the relevant performance criteria, critical aspects of evidence or required knowledge and skills in this skill set.

Note: The final column, ‘Supplementary evidence’, refers to any suggested sources of documentary evidence that the candidate may use to support their application for RPL. This includes information from the supplementary documentation checklist (identified as SD in the mapping document) and third party evidence checklist (identified as TP in the mapping document) from Section 6.

Interview questions that appear in brackets are from other skill sets. If the candidate has not been assessed in these other skill sets, the Assessor will need to decide whether sufficient evidence has already been gathered or whether the candidate will need to respond to the bracketed questions.

Page 197 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 197: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 198 of 222Version 1, May 2010

Page 198: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Evidence MatrixThe evidence matrix below identifies how each of the questions in the Interview Question Bank (Section 3), the Practical Tasks (Section 4) and the supplementary documentation checklist and third party evidence checklist (Section 5) demonstrate competence against the elements, performance criteria and critical aspects of evidence, underpinning skills and knowledge.

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3001B Apply float and render to straight and curved surfaces

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q(2) Task 3 SD26

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q(1) Task 3 SD26

1.3 Signage/barricade requirements are identified and implemented.

Q(2) Task 3 SD26

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q(2) Task 3 SD26

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q(2) Task 3 SD26

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q(2) Task 3 SD26

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and

Q(2) Task 3 SD26

Page 199 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 199: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3001B Apply float and render to straight and curved surfaces

regulatory obligations and applied.

Element 2 – Prepare templates for curved work or circular columns

2.1 Material is selected to manufacture templates. Q15 Task 3 SD26

2.2 Radiuses and shapes are established for curves and columns to plans/specifications.

Q15 Task 3 SD26

2.3 Templates are manufactured and formed to suit job requirements.

Q15 Task 3 SD26

Element 3 – Prepare background surface

3.1 Background surface is identified and wire-brushed if required.

Q(2) Task 3 SD26

3.2 Dash coat is mixed and applied liberally to wetted surface.

Q(2) Task 3 SD26

3.3 Bonding coats, using patent products, are applied to specifications.

Q(2) Task 3 SD26

3.4 Metal beads are selected for external or squint arises. Q(11) Task 3 SD26

3.5 Metal beads are fixed to arises and checked for accuracy. Q(10) Task 3 SD26

Element 4 – Apply floating and rendering to flat and curved surfaces

4.1 Screeding lines or guides are established to specified tolerances.

Q14 Task 3 SD26

4.2 Float is used and applied to Australian Standards® and plans/specifications.

Q(2) Task 3 SD26

4.3 Floating coat is applied and ruled off to screed. Q14 Task 3 SD26

© Department of Training and Workforce Development 2010 Page 200 of 222Version 1, May 2010

Page 200: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3001B Apply float and render to straight and curved surfaces

4.4 Surface is finished plumbed and levelled to specified alignment tolerance.

Q14 Task 3 SD26

4.5 Heads, reveals and sills are finished square off to wall ace and back into opening.

Q14 Task 3 SD26

4.6 All internal angles, ceiling and floor lines are accurately cut.

Q14 Task 3 SD26

Element 5 – Apply floating and rendering coats to piers

5.1 Floating coat is applied using floating profiles/rules, Dutch pins or hooks so that face of pier is plumb and ruled off.

Q14 Task 3 SD26

5.2 Face is squared off to form returns and reveals, rules removed and arises left square or ‘radiussed’ as required.

Q14 Task 3 SD26

Element 6 – Apply floating coat within metal beading

6.1 Metal beading is fixed to base surface to form a panel with expansion joint so that panel is plumb and square to specified position.

Q(10) Task 3 SD26

6.2 Panels are finished to true, flat surfaces, suitable for applying plaster and lime setting.

Q(10) Task 3 SD26

Element 7 – Finish rendering coats on flat walls and piers and curved work

7.1 Walls are hand floated to fill slacks and voids. Q(2) Task 3 SD26

7.2 Walls are scoured and fined using water and hand float systems

Q(2) Task 3 SD26

Page 201 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 201: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3001B Apply float and render to straight and curved surfaces

Element 8 – Clean up 8.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q(2) Task 3 SD26

8.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q(2) Task 3 SD26

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q(1, 2, 10, 11) 14, 15 Task 3 SD26

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

The floating, rendering and finishing to specification of a minimum of three surfaces including: a curved wall a ceiling a column.

© Department of Training and Workforce Development 2010 Page 202 of 222Version 1, May 2010

Page 202: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3001B Apply float and render to straight and curved surfaces

Required knowledge Workplace and equipment safety requirements. Q(1, 2, 10, 11) 14, 15 Task 3 SD26

Quality requirements.

Solid plastering terminology.

Plastering tools and equipment types, characteristics, uses and limitations.

Flat and curved surface plastering floating, rendering and finishing techniques.

The types, characteristics, uses and limitations of solid plastering materials and components.

Systems and techniques for safe handling of materials.

Processes for the calculation of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statement.

Lifting devices.

Page 203 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 203: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3003B Apply trowelled texture coat finishes

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q21 Task 3 SD27

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q21 Task 3 SD27

1.3 Signage/barricade requirements are identified and implemented.

Q21 Task 3 SD27

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q21 Task 3 SD27

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q21 Task 3 SD27

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q21 Task 3 SD27

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q21 Task 3 SD27

Element 2 – Prepare surface area

2.1 Materials and substrate surfaces are prepared for the specified trowelled texture coat finish in accordance with manufacturers' recommendations.

Q21 Task 3 SD27

2.2 Dash coat is mixed and applied liberally to wetted surface in accordance with manufacturers' recommendations and

Q21 Task 3 SD27

© Department of Training and Workforce Development 2010 Page 204 of 222Version 1, May 2010

Page 204: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3003B Apply trowelled texture coat finishes

specifications.

Element 3 – Mix and apply material

3.1 Texture coating materials are mixed to designed proportion and consistency in accordance with manufacturers' recommendations and job specifications.

Q21 Task 3 SD27

3.2 Texture coat is applied to specified surfaces with trowel and to correct thickness.

Q21 Task 3 SD27

3.3 Texture coat is applied in accordance with manufacturers' recommendations and job specifications.

Q21 Task 3 SD27

Element 4 – Finish and cure the texture coat

4.1 Screeding lines or guides are established to specified tolerances.

Q21 Task 3 SD27

4.2 Float is used and applied to Australian Standards® and plans/specifications.

Q21 Task 3 SD27

Element 5 – Clean up 5.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q21 Task 3 SD27

5.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q21 Task 3 SD27

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q21 Task 3 SD27

Compliance with site safety plan, OHS

Page 205 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 205: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3003B Apply trowelled texture coat finishes

legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

The preparation for and application to specification of a minimum of two different types of texture coat finishes.

Required knowledge Workplace and equipment safety requirements. Q21 Task 3 SD27

Quality requirements.

Solid plastering terminology.

Plastering tools and equipment types, characteristics, uses and limitations.

Trowelled texture coat finish application techniques.

The types, characteristics, uses and limitations of solid plastering materials and components.

Systems and techniques for safe handling of materials.

Processes for the calculation of material requirements.

Material safety data sheets.

© Department of Training and Workforce Development 2010 Page 206 of 222Version 1, May 2010

Page 206: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3003B Apply trowelled texture coat finishes

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statement.

Page 207 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 207: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3002B Apply set coats

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q23 Task 3 SD28

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q23 Task 3 SD28

1.3 Signage/barricade requirements are identified and implemented.

Q23 Task 3 SD28

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q23 Task 3 SD28

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q23 Task 3 SD28

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q23 Task 3 SD28

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q23 Task 3 SD28

Element 2 – Prepare backgrounds for set coat application

2.1 Background surface is identified and surface preparation process is selected in accordance with requirements of the setting coat to be applied.

Q23 Task 3 SD28

2.2 Surface is cleaned in preparation for application. Q23 Task 3 SD28

© Department of Training and Workforce Development 2010 Page 208 of 222Version 1, May 2010

Page 208: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3002B Apply set coats

2.3 Surface is wet down to provide an even suction appropriate to the setting rate for the setting coat being applied.

Q23 Task 3 SD28

2.4 Surface is checked for appropriate level of suction appropriate to the setting rate of the setting coat being applied.

Q23 Task 3 SD28

Element 3 – Mix plaster and lime setting

3.1 Mix ratios of plaster and lime are selected for appropriate backgrounds, or to architect's specifications.

Q23 Task 3 SD28

3.2 Products are mixed to standard requirements and manufacturers' specifications.

Q23 Task 3 SD28

Element 4 – Apply plaster and lime set coat

4.1 Application of set coats are in accordance with relevant standards and architect's requirements.

Q23 Task 3 SD28

4.2 Surface is trowelled until a hard, smooth finish is achieved to specified tolerances or levels of finish.

Q23 Task 3 SD28

Element 5 – Clean up 5.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q23 Task 3 SD28

5.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q23 Task 3 SD28

Critical aspects of Location, interpretation and application of relevant information, standards and specifications.

Q23 Task 3 SD28

Page 209 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 209: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3002B Apply set coats

evidence Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

The application of set coats to specification on a minimum of three surfaces which are to include: one vertical one horizontal one curved.

Required knowledge Workplace and equipment safety requirements. Q23 Task 3 SD28

Quality requirements.

Solid plastering terminology.

Plastering tools and equipment types, characteristics, uses and limitations.

Set coat mixing and application techniques.

The types, characteristics, uses and limitations of solid plastering materials and components.

© Department of Training and Workforce Development 2010 Page 210 of 222Version 1, May 2010

Page 210: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 3 – Floating and setting a curved wall and attached pier; texture coating the attached pierUnits of competencyBCGSP3001B Apply float and render to straight and curved surfacesBCGSP3003B Apply trowelled texture coat finishesBCGSP3002B Apply set coats

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3002B Apply set coats

Systems and techniques for safe handling of materials.

Processes for the calculation of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statement.

Page 211 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 211: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 212 of 222Version 1, May 2010

Page 212: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Mapping document for Skill Set 4

Using this documentThis document is mapped to the direct sources of evidence required to satisfy competence in this particular skill set.

Each of the columns reflects the particular tool in use, and the numbers relate to the question numbers in that tool which support the relevant performance criteria, critical aspects of evidence or required knowledge and skills in this skill set.

Note: The final column, ‘Supplementary evidence’, refers to any suggested sources of documentary evidence that the candidate may use to support their application for RPL. This includes information from the supplementary documentation checklist (identified as SD in the mapping document) and third party evidence checklist (identified as TP in the mapping document) from Section 6.

Interview questions that appear in brackets are from other skill sets. If the candidate has not been assessed in these other skill sets, the Assessor will need to decide whether sufficient evidence has already been gathered or whether the candidate will need to respond to the bracketed questions.

Page 213 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 213: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Page intentionally blank

© Department of Training and Workforce Development 2010 Page 214 of 222Version 1, May 2010

Page 214: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Evidence MatrixThe evidence matrix below identifies how each of the questions in the Interview Question Bank (Section 3), the Practical Tasks (Section 4) and the supplementary documentation checklist and third party evidence checklist (Section 5) demonstrate competence against the elements, performance criteria and critical aspects of evidence, underpinning skills and knowledge.

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3005B Install pre-cast decorative mouldings

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q24, 25, 26 Task 4 (TMS, JRE) SD31

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q24, 25, 26 Task 4 SD31

1.3 Signage/barricade requirements are identified and implemented.

Q24, 25, 26 Task 4 SD31

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q24, 25, 26 Task 4 SD31

1.5 Material quantity requirements are calculated in accordance with plans and/or specifications.

Q24, 25, 26 Task 4 SD31

1.6 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.

Q24, 25, 26 Task 4 SD31

1.7 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q24, 25, 26 Task 4 SD31

Page 215 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 215: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3005B Install pre-cast decorative mouldings

Element 2 – Prepare work area for application processes

2.1 Work area and substrate are prepared for installation of pre-cast mouldings to plans/specifications.

Q24, 25, 26 Task 4 SD31

2.2 Substrate is checked for conformance in accordance with the relevant Australian Standard®.

Q24, 25, 26 Task 4 SD31

Element 3 – Fix and stop pre-cast moulded archways

3.1 Plasterboard wall sheets are confirmed to be in accordance with plans/specifications.

Q24, 25, 26 Task 4 SD31

3.2 Archway profile is set out and cut to architect's drawings and specifications.

Q24, 25, 26 Task 4 SD31

3.3 Timber arch soffit templates are cut and fixed to position. Q24, 25, 26 Task 4 SD31

3.4 Infill moulding is fixed to arch soffit and reveals of opening.

Q24, 25, 26 Task 4 SD31

3.5 Arch is stopped in accordance with job specifications and required level of finish.

Q24, 25, 26 Task 4 SD31

Element 4 – Fix and stop plaster panelled ceiling

4.1 Ceiling battens are positioned and spaced for cornice margins and flush mounted panels.

Q24, 25, 26 Task 4 SD31

4.2 Panels are located on ceiling, levelled, lined up and fastened into position in accordance with the approved specification.

Q24, 25, 26 Task 4 SD31

4.3 Jointing is finished to specification. Q24, 25, 26 Task 4 SD31

Element 5 – Fix ornamental mouldings

5.1 Ornamental mouldings are measured and cut to specification.

Q24, 25, 26 Task 4 SD31

5.2 Ornamental mouldings are fixed by fastening or bonding with adhesive, straight and level to architect's

Q24, 25, 26 Task 4 SD31

© Department of Training and Workforce Development 2010 Page 216 of 222Version 1, May 2010

Page 216: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3005B Install pre-cast decorative mouldings

specifications.

5.3 Mouldings are finished including straight stoppings and finishing mitres to specification.

Q24, 25, 26 Task 4 SD31

Element 6 – Clean up 6.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q24, 25, 26 Task 4 SD31

6.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q24, 25, 26 Task 4 SD31

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q24, 25, 26 Task 4 SD31

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

Completion of the installation and finishing of three different pre-cast decorative mouldings with at least one being installed on a ceiling.

Required knowledge Workplace and equipment safety requirements. Q24, 25, 26 Task 4 SD31

Page 217 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 217: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3005B Install pre-cast decorative mouldings

Quality requirements.

Plastering, and wall and ceiling terminology.

The type, characteristics, uses and limitations of pre-cast decorative moulding installation materials.

Pre-cast decorative moulding installation tools and equipment types, characteristics, uses and limitations.

Pre-case decorative moulding measuring, cutting, placement, stopping and finishing techniques.

Processes for the calculation of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statement.

© Department of Training and Workforce Development 2010 Page 218 of 222Version 1, May 2010

Page 218: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3004B Restore and renovate solid plasterwork

Element 1 – Plan and prepare

1.1 Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied.

Q24, 26 Task 4 SD29, 30, 31

1.2 Safety requirements are followed in accordance with safety plans and policies.

Q24, 26 Task 4 SD29, 30, 31

1.3 Signage/barricade requirements are identified and implemented.

Q24, 26 Task 4 SD29, 30, 31

1.4 Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.

Q24, 26 Task 4 SD29, 30, 31

1.5 Run-off devices are installed and maintenance processes applied if appropriate to the task.

Q24, 26 Task 4 SD29, 30, 31

1.6 Environmental protection requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.

Q24, 26 Task 4 SD29, 30, 31

Element 2 – Select restoration or renovation method

2.1 Extent and type of restoration or renovation required are identified by site examination and from plans and specifications.

Q24, 26 Task 4 SD29, 30, 31

2.2 Drawing and/or template of damaged area are prepared to profile/moulding shape of existing work.

Q24, 26 Task 4 SD29, 30, 31

Element 3 – Restore plasterwork

3.1 Materials are mixed and prepared for use. Q24, 26 Task 4 SD29, 30, 31

3.2 Damaged plasterwork is restored to original condition or specifications in accordance with plans and

Q24, 26 Task 4 SD29, 30, 31

Page 219 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 219: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BSB41407 Certificate IV in Occupational Health and SafetySection 7 – Mapping of Assessment Tools

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3004B Restore and renovate solid plasterwork

specifications.

3.3 Damaged cement or plaster mould work is restored to original condition in accordance with plans and specifications.

Q24, 26 Task 4 SD29, 30, 31

3.4 Textured finishes are applied to match original surfaces, details and alignment.

Q24, 26 Task 4 SD29, 30, 31

Element 4 – Renovate lettering and monograms

4.1 Surface for renovation is prepared to architect's specifications.

Q24, 26 Task 4 SD29, 30, 31

4.2 Monograms and lettering panels are constructed in sand and cement mortar to match detail for restorations.

Q24, 26 Task 4 SD29, 30, 31

4.3 Materials are applied to fine finish, with sharp arises, square returns and plumb/level to requirements or job drawings.

Q24, 26 Task 4 SD29, 30, 31

Element 6 – Clean up 5.1 Work area is cleared and materials disposed of, reused or recycled in accordance with legislation/regulations/codes of practice and job specification.

Q24, 26 Task 4 SD29, 30, 31

5.2 Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturers' recommendations and standard work practices.

Q24, 26 Task 4 SD29, 30, 31

Critical aspects of evidence

Location, interpretation and application of relevant information, standards and specifications.

Q24, 26 Task 4 SD29, 30, 31

Compliance with site safety plan, OHS legislation/regulations/codes of practice applicable to

© Department of Training and Workforce Development 2010 Page 220 of 222Version 1, August 2010

Page 220: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BCG31003 Certificate III in Solid PlasteringSection 7 – Mapping of Assessment Tools

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3004B Restore and renovate solid plasterwork

workplace operations.

Compliance with organisational policies and procedures including quality requirements.

Safe and effective operational use of tools and equipment.

Communication and working effectively and safely with others.

Restore solid plasterwork to specification on a minimum of three tasks including: one curved surface one ceiling one archway or column.

Renovate lettering to specification where the task requires the preparation and use of significant moulds.

Required knowledge Workplace and equipment safety requirements. Q24, 26 Task 4 SD29, 30, 31

Quality requirements.

Solid plastering terminology.

Plastering tools and equipment types, characteristics, uses and limitations.

Solid plastering, restoration and renovation techniques.

The types, characteristics, uses and limitations of solid

Page 221 of 222 © Department of Training and Workforce Development 2010Version 1, May 2010

Page 221: Recognition of Prior Learning (RPL) Assessment Tool Kittle.westone.wa.gov.au/content/file/67e71c13-29cc-4558... · Web viewPreparation tasks – unload/set up equipment/stack materials

BSB41407 Certificate IV in Occupational Health and SafetySection 7 – Mapping of Assessment Tools

Skill Set 4 – Forming an in situ mould, setting a pier, forming an arch and installing decorative mouldingsUnits of competencyBCGSP3005B Install pre-cast decorative mouldingsBCGSP3004B Restore and renovate solid plasterwork

Element Performance Criteria Question Practical Tasks SupplementaryEvidence

BCGSP3004B Restore and renovate solid plasterwork

plastering materials and components.

Systems and techniques for safe handling of materials.

Processes for the calculation of material requirements.

Material safety data sheets.

Plans, drawings and specifications.

Materials handling, storage and environmentally friendly waste management.

JSAs/Safe work method statement.

© Department of Training and Workforce Development 2010 Page 222 of 222Version 1, August 2010