24
CEDSERRCH COR5U 52N82SE9889 2 .7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2 kk Earngey Township, Ontario (To Accompany maps 84-120-A,B,C) RECEIVED DEC 101984 MINING LANDS SECTION November 20, 1984

RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

CEDSERRCH COR5U 52N82SE9889 2 .7541 EARNGEY010

Magnetic Survey for

DOME EXPLORATION (CANADA) LIMITED

on

PROJECT 2kk

Earngey Township, Ontario

(To Accompany maps 84-120-A,B,C)

RECEIVEDDEC 101984

MINING LANDS SECTION

November 20, 1984

Page 2: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

INTRODUCTION

A magnetic survey was carried out for Dome

Exploration (Canada) Limited on Project 244 in March,

1984 with additional work completed on September 14, 1984.

The property consists of 44 unpatented

mining claims numbered as follows: KRL 775423 to KRL

775433 inclusive; KRL 775453 to KRL 775484 inclusive;

and KRL 775504 0 The claims are located on both sides

of Leg Lake in the southeast corner of Earngey Township.

They are in N. T. S. 52-N-2. Access to the claim group

was by fixed-wing aircraft approximately 9Okms east of

Red Lake, Ontario* The purpose of the survey was to

identify magnetic environments that appear to be

conducive for gold mineralization.

INSTRUMENTATION AND METHOD

The magnetic survey was carried out with two

Scintrex MP-2 proton magnetometers and one Geometrics

G 826. Diurnal corrections were accomplished using a

GMG MR 10 with a Barringer magnetometer as base-

station recording equipment.

A technical data sheet accompanies this report.

RESULTS

A number of magnetically high zones were

Page 3: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

- 2 -

located by the magnetic survey. In general, these

features are long and linear, trend roughly northeast

and are as a rule narrow. This trend parallels the trend

of the volcanics and reflects the varying magnetite

content of the various geologic units*

Magnetic relief averages approximately 7*000

gammas above a background of approximately 60,000 gamma.

There are isolated peaks up to 21 t OOO gammas above

background.

The location of some of the more significant

zones is as follows:

(1) Line 18 S, ^EOO to line 3 S, 7E50. A possible

extension of this zone lies along the ends of the lines

from line 1 N, 9EOp to line 16 N, 10EOO.

(2) Line 19 S, 1E50 to line 5 S, OW50. This feature

f continues with a significant change in strike to E-W

from line 3 S, ONOO to line 1 N, 3E25. This geological

feature may warrant further investigation,

l (3) Line 17 S, 3W75 to line 1 S, 3W50 to line

7 N, 4WOO.

J (4) Line 5 N, 1EOO to line 16 N, 1E50.

l•M Further investigation of these magnetic

l

l

l

REG OMMENDATIONS

Page 4: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

- 3 -

features should be carried out after evaluating their

geological setting. The portion of the zone that strikes

E-l/ warrants special consideration.

GEOSEAUCH CONSULTANTS LIMITED

^ V V, lit Thompson P. Eng.

Page 5: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

GEOPHYSICAL TECHNICAL DATA

MAGNETIC SURVEY

Instrument: Scintrex MP 2 Proton

Magnetic field measured: Total

Accuracy- scale constant: 1 gamma

Diurnal correction method: Recording base-station

with readings at 30 second intervals.

Base station location: 17S25 on base line* 60170 gamma.

Number of readings at 25m stations; 2628

Total number of readings: 3911

Line spacing: 100 m

Contour interval: 100 gamma.

Page 6: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

...n.stryof Report of WorkNatural , ~. . - .Resources (Geophysical, Geological,

jntano Geochemical and Expenditures)

M i r 52N82SE9889 2.7541 EARNGEY 900Type of S

Claim Holderls)

Magnetic j IDarngey Township[Prospector's Licence No.

IDoinc i^xploration (Canacla] Ltd.ddress

Box 270 1 1 First Canadian Place, Toronto, OntarioSurvey Company

n 14- * T 4-^ Consultants Ltd.Name and Address of Author {of Geo-Techmcal report)

Date of Survey (from fi to) JTotai Miles o* line Cut

01, 03 84! 20 1 1 84! 66 km.V Mo. ! Yr. l

3 84| 2n Yr - i o

. H. Thompson. Ste. 700. 88 University Avo, Toronto. OntarioCredits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days, (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days - ;-~ - ,'

Complete reverse side " ' ^ and eijtet totarts) here -

Airborne Credits

Note: Special provisions credits do not apply to Airbofc* C rC*YsJ^

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

' Gao^nysical

- Eftclfcor agnetic

. r. r , -^vlagneto neter

- RadftiMetric

'^Geological

Geochemical

Electromagnetic

Radiometric

Days perClaim

4o

Days per Claim

Days perClaim

ExpendituresType of Work Performed

Performed on•ww

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

S

InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per c aim selected in columns at right.

Date

December 7, 1984Recorded Holder qr Agent (Signature)

Certification Verifying Report of Worky

Mining Claims Traversed (List in numerical sequence)M

Prefix

KRL

ining ClaimNumber

775^2377^4?^

775^25775^26775^27775^28775^29775^30775^31775^32775^33775^t53

—27^5^ .-77.545577545^577^ii^777^/1^1877 c;u^q775460

-7.7-5^1. .-77 rJt62

^35kQ^77i-,ii^/!

Expend.Days Cr.

— ———

MPrefix

KRL

ming ClaimNumber

775465775^66775467

. 775468775-469--

-775-47.0..—775471775472775473775474775475775476775477775478775479775480

^775481J75M2 _

77548377J484

..7.755P4.....

Expend,Day-; O.

Total number of mining claims covered by this report of work.

1 hereby certify that l have a personal and intimate knowledge of the^Si*^et forth in the Report o f Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true. i\ G \ "J **7

Name and Postal Address of Person Certifying * ^ T r ̂ j f

- U,H.Thompson, Ste. -700, 88 University Ave. .Toronto. Ontariovyn t . 401 l Date dvrtifi

l Nov.

ed

2CL.

(Signature)

1362 (81/9)

Page 7: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

KM.l I*"L

'•4*71* 1*4*71

~ \ KIVL~

|*4*7t7 I*4t7t

l ML l ML rf tem "ML

i l l *T*4*t 177*4*1

4t7*4 I 64*7**

sr 1 35' 33' 32'

E G-/884

Page 8: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

1984 12 17 Your File: Our File: 2.7541

Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO

Dear Sir:

We received reports tnd maps on December 10, 1984 for a Geophysical (Magnetometer) Survey submitted under Special Provisions (credit for Performance and Coverage) on Mining Claims KRL 775423 et al 1n the Township of Earngey.This material will be examined and assessed and a statement of assessment work credits will be Issued.

We do not have a copy of the report of work which Is normally filed with you prior to the submission of this technical data. Please forward a copy as soon as possible.

Yours sincerely,

S.E. YundtDirectorLand Management Branch

Whitney Block, Room 6643Queen's ParkToronto, OntarioM7A 1W3Phone: (416)965-4888

A. Barr:sc

cc: Dome Exploration (Canada) Limited P.O. Box 270 l First Canadian Place Toronto, Ontario M5X 1H1 Attn: Ed Plgulskl

Page 9: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

z; O

Ontario

Ministry of Natural Resources

GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

FUc.

Type of Survey(s Township or Are,

Claim Holder(s)

Survey Company Author of Repor

Address of Authc Covering Dates o

Total Miles of Lil

SPECIAL PROCREDITS REC

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

) Mamie tici Earngey Twp.

Dome Exploration (Canada) Ltd.Box 270, 1 First Canadian PI., Tor.Geosearch Consultants Limited

f W. H. Thompson,,Suite 700 - 88 University Ave.F Survey March

ic Cut

VISIONS )UESTED

ENTER 40 days (includes line cutting) for first survey.

ENTER 20 days for each additional survey using same grid.

1 to Nov. 20, 1984.(linecutting to office)66 Kins*

DAYS— , . , per claim Geophysical

M anPinJLrr ^0

Barl ! rtm^rir

-OtherCmlnpiral

AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)

Magnetometer, t,F.Wrrnmaanptir Radinmrtrir(enter days per claim)

DATF- Nov 20/84 sir.NATHRF.-f> /AN* l It&s^fj&Zsr?-

Res. Geol.Previous Surveys

"" 'AurJior of Report dr Agent

Qualifications t ^-.--J l^-J — *

File No. Type Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

KRL 775423(prefix)775424

775425

775426

775427

775428

775^29

775430

775431

775432

775433

KRL 775464(number)

775466

775467

775468

775469

775470

775471

775472

77,547?

...............7.25.1*7.*....775453 72-5^757754:54 77J5476

775455775456

775457775458

..............7.7J&52775460

775^6.1.

...............7.75.4, 6,.?.

TOTAL CLAIM

...............7.ZJ5.H7.7......r? r*y t; li f** Q...............7.7J5.H7.S.....

72^48072^481

.....77^!*82.....................775.4..8.1....

775504Q 44

837 (5/79)

Page 10: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

GEOPHYSICAL TECHNICAL DATA

GROUND SURVEYS If more than one survey, specify data for each type of survey

Number of Stations__________262R____________Number of Readings 391 1

Station interval ____?5 m_____________________Line spacing_____1 00 m

Profile scale ^^——^^.^—^———^—^^^——^-^—-——————————.——-—————.—^.—..——.

Contour interval _____100 gammas^___________^^_______________

Instrument —————S c in t r ex MP-2 Proton Precession Magnetometer———^—— Accuracy — Scale constant 1 gamma_____^^_______^_^_______^_____^

Diurnal correction method Recording base station with 30 second readings

Base Station check-in interval (hours)________________________________________

O

Base Station location and value 17+25 S on base line O+OO ; 601 ?0 gammas

ECTROMAGNETIC

Instrument

Coil configuration

Coil separation

AccuracyMethod: CD Fixed transmitter CD Shoot back CD In line

Frenuencv

CD Parallel line

(specify V.L.F. station)

Parameters measured__________________

Instrument

Scale constant.

Corrections made.

Base station value and location

Elevation accuracy.

InstrumentMethod CD Time Domain CD Frequency Domain

OKH

<Nt— 1

Pt*~-i0OH

QWua*— H

^H " — (j — j(-H

in53^

Parsm^tprs - On time Frequency

- Off time Ranpe

— Delay time

— Integration time

Power

Electrode array ... -- -

Electrode spacing . .

Tvoe of electrode

Page 11: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

SELF POTENTIALInstrument^——-———-———^—-.—————-——...—-——^—^———..—— .,. Range.Survey Method ———-—^-^———————^^^———————-——————^———..—-.

Corrections made.

RADIOMETRIC Instrument -^-——.

Values measured .

Energy windows (levels)________________'..————-—.——'.——^^———.———— Height of instrument.————-.—-——.—-——.,____________Background Count.

Size of detector—————^—---———^———-—-————-.——————.^^—....—.———.

Overburden .———-^—.^———.^—-———^-^^^^—...—^----^^^^^——.—^———-———(type, depth - include outcrop map)

S (SEISMIC, DRILL WELL LOCKING ETC.)Type of survey Instrument .—— Accuracy .-—-^Parameters measured.

Additional information (for understanding results).

A1EM)RNK S Type of survey(s)

Instrument(s)(specify for each type of survey)

Accuracy—————....———^^—^^^(specify for each type of survey)

Aircraft used————^———-—-^—^—.——-.—^-——...—--.—————Sensor altitude-Navigation and flight path recovery method.

Aircraft altitude_________________________________Line Sparing Miles flown over total area__________________________Over claims only.

Page 12: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

GEOCHEMICAL SURVEY - PROCEDURE RECORD

Numbers of claims from which samples taken.

Total Number of Samples. Type of Sample.

(Nature of Material)

Average Sample Weight——————— Method of Collection_________

Soil Horizon Sampled. Horizon Development. Sample Depth———— Terrain-———————

Drainage Development.————-———-—— Estimated Range of Overburden Thickness.

ANALYTICAL METHODS

Values expressed in: per cent p. p. m. p. p. b.

n nD

Cu, Pb,

Others—

Zn, Ni, Co, Ag, Mo, As.-(circle)

Field Analysis (.Extraction Method. Analytical Method- Reagents Used——

Field Laboratory AnalysisNo. ^.—.-.—-———

SAMPLE FKKrARATlON(Includes drying, screening, crushing, ashing)

Mesh size of fraction used for analysis ————.

Extraction Method. Analytical Method. Reagents Used.——

Commercial Laboratory (- Name of Laboratory —— Extraction

Analytical Reagents Used

.tests)

.tests)

-tests)

GeneraL General.

Page 13: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

Mining Lands Section

Control Sheet

File No J). 75 V/

TYPE OF SURVEY GEOPHYSICAL

GEOLOGICAL

GEOCHEMICAL

EXPENDITURE

MINING LANDS COMMENTS:

Signature of Assessor

Date

Page 14: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

January 25, 1985 Your File: 81-84 Our File; 2.7541

Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO

Dear Sir:RE: Notice of Intent dated January 4, 1985

Geophysical (Magnetometer) Survey on Mining Claims KRL 775423, et al. In Earngey Township

The assessment work credits, as listed with the above-mentioned Notice of Intent, have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours sincerely,

S. E. YundtDirectorLand Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1M3 Phone:(416)965-4888D. Isherwood:mccc: Dome Exploration (Canada) Limited

P.O. Box 270 1 First Canadian Place Toronto, Ontario M5X l HI Attention: Ed Plgulskl

Encl.

cc: Mr. G.H. FergusonMining ft Lands Commissioner Toronto, Ontario

cc: Resident GeologistRed Lake, Ontario

Page 15: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

/JI~N Ministry OT Technical Assess)(Vyl Natural . .. . ^ . ..lyj R^urces Work CreditsOntario ^P

nent *2.7541

Date Mining Recorder's Report of1985 01 04 Workk- ^-8?

Recorded Holder DOME EXPLORATION (CANADA) LTD

Township or Area ^^ ̂ ^

Type ol survey and number of Assessment days credit per claim

Geophysical

Rariinmatric days

nthur days

Section 77 (19) S** "Mining Claim* AuetMd" column

Geological days

fienrhemiral days

Man days d Airborne O

Special provision S] Ground H

Q Credits have been reduced because of partial coverage of claims.

ED Credits have been reduced because of corrections to work dates and figures of applicant.

Mining Claims Assessed

KRL 775423 to 429 inclusive 775432 - 433 775453 to 480 inclusive 775482 to 484 inclusive 775504

Special credits under section 77 (16) for the following mining claims

20 DAYS 10 DAYS

KRL 775431 KRL 775430 775481

No credits have been allowed for the following mining claims

LJ not sufficiently covered by the survey 1 1 Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical 60; Geological 40; Geochemical 40; Section 77(19) GO:

SSB I83JB)

Page 16: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

ano

Ministry ofNaturalResources

1985 01 04

Mining RecorderMinistry of Natural ResourcesOntario Government BuildingBox 5003Red Lake, OntarioPOV 2MO

Dear Sir:

Your File: 81-84 Our File: 2.7541

Enclosed are two copies of a Notice of Intent with statements listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record

sheets.For further information, if required, please contact Mr. R.J. Pichette at 416/965-4888.

Yoars sincerely,

Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3

,D. Isherwood:mc

Ends.

cc: Dome Exploration (Canada) Limited P.O. Box 270 l First Canadian Place Toronto, Ontario M5X l HI Attention: Ed Pigulski

cc: Mr. G.H. FergusonMining b Lands Commissioner Toronto, Ontario

845

Page 17: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

Ministry ofNaturalResources

Ontario

Notice of Intent

for Technical Reports

1985 01 04

2.7541/81-84

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Land Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

846 (82/5)

Page 18: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

Dome Exploration (Canada) Limited

Fxecutive Office

DELIVER

December 10, 1984

P.O. Box 2701 First Canadian PlaceToronto, OntarioM5X1H1(416) 364-3453Telex 065 24590Telecopier 366-1775

Lands Administration Branch Ministry of Natural Resources Room 6450, Whitney Block Queen's Park Toronto, Ontario M7A 1X1

Our Project No. 244

Attention; Mr. Ray Pichette

Re: Mining Claims KRL.775423 et al- Earngy Township, Uchi Lake Area

_____(M. 2157)________________

Dear Sir;

We enclose herewith, in duplicate, a report and plans by Geosearch Consultants Ltd. (W. R. Thompson), covering a magnetic survey performed on the above-noted 44 claims located in the Red Lake Mining Division.

This submission is made under the Special Provisions Regulations as to 40 days per claim.

Enclosed is a copy of the Report of Work which we forwarded to the Mining Recorder in Red Lake, Ontario.

Please date-stamp the enclosed copy of this letter and return it to me.

Yours very truly,

DOME EXPLORATION (CANADA) LIMITED

EAP:tc Enclosures

/ - s t^r^

Edward A. Pigulski Assistant Secretary

Page 19: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

Copy For: Mr. Ray Pichette

Dome Exploration (Canada)

Executive Off.ce7 ioa/ 7, 1984

P0 BOX 2701 ^'rst Canadian Place Toronto. Ontario M5X 1 H 1 (416)364-3453 Telex 065-24590 Telecopier 366-1775

Mr. Scott RivettMining RecorderMinistry of Natural ResourcesP.O. Box 5003Red Lake, OntarioPOV 2MO

Our Project No. 244

Re: Mining Claims KRL.775423 et al- Earngy Township, Uchi Lake Area

_____(M. 2157),^^—————————————

Dear Mr. Rivett:

Enclosed is a Report of Work covering a Magnetic Survey (40 days for each claim) performed by Geosearch Consultants Ltd. (W. H. Thompson), on 44 mining claims as shown on the Report.

We will be delivering the survey report and plans, in duplicate, to the Land Management Branch of the Ministry for evaluation within the next week.

This assessment work is being filed under the Special Provisions Regulations.

Yours very truly,

DOME EXPLORATION (.CANADA) LIMITED

EAPstc Enclosures

Edward A. Pigulski Assistant Secretary

c. c. Mr, Ray Pichette (w. /ends.)

Page 20: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

Ministry ofNaturalResources

OntariJ

Report of Work(Geophysical, Geological, Geochemical and Expenditures) PROJECT 244

Mining Act

Instructions: Please type or print. If number of mining claims traversed

exceeds space on this form, attach a list.Note: Only days credits calculated m the

"Expenditures" section may be enteredin the "Expend. Days Cr." columns.

- Do not use shaded areas below.Type of Survey(s)

MagneticClaim Holder(s)

Dome Exploration (Canada)Address

Box 270. 1 First CanadianSurvey Company

Geosearch Consultants Ltd.Name and Address of Author (of Geo-Technical report)

tt. H. Thompson. Ste. 700. 88

Ltd.

Township or Area

Earngey TownshipProspector's Licence No.

A21304

Place, Toronto, Ontario[Date of Survey (from Si to) Total Miles of line Cut-pt 03 84! 20 , 11 84 66 km.

1 Day j Mo.H y '- i Day | Mo. ] Yr.

University Ave. Toronto. OntarioCredits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter^AO days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Days perClaim

Man Days

Complete reverse side and enter total(s) here

Geophysical

- Electromagnetic

- Magnetometer ' i

l- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Airborne Credits

Note: S pecial provisions Electromagnetic credits do not apply

Days per Claim

Days per Claim

to Airborne Surveys. Magnetometer

Radiometric

Expenditures (excludes power stripping)Type of Work Performed

Performed on Claim(s)

Calculation of Expenditure Days Credits

Total ExpendituresTotal

Days Credits

InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

Date

December 7, 1984Recorded Holder ar Agent (Signature) '

Certification Verifying Report of

Mining Claims Traversed (List in numerical sequence)Mining Claim

Prefix

KRL

Number

77542T

77=1424

775425775426775^27

775^*28

775429

775430

775431

775432

775^33

775453

775W

., .275455-

775^5677^7

7754g877*54*5Q

77*i46O

775461

77546?

77546377 z.hf*li

Expend. Days Cr.

-

Mining ClaimPrefix Number

KRL 775465" T H

-.--.^"r.

: j ^

775466

..775467

775.468

77^469

77^470775^71

775^72

775^73775^7^

775475775476

775^771775^78

775479-775A80

JZ25^8.1775^82

775483

7^5484

-225-504

Expend. Days Cr.

Total number of mining claims covered by this report of work.

For Office Use OnlyTotal Days Cr. Recorded

Date Recorded

Date Approved as Recorded

Mining Recorder

Branch Director

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.

Name and Postal Address of Person Certifying

, Ste. -?00, K8 University A tario

1362 (81/9)

Page 21: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

Assessment Work Breakdown

Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..

Type of Survey

Technical Oayi Credit*

Line-cutting Oayt Total Credit*

Days per Claim

X 7

X 7

X 7

Page 22: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

Locai/on ria

p

LE&

E/VD

Co

nto

ur

inte

rva

l...

....

,...

....

.. 1

00

0

gam

mas

lOO

Ogam

mo

conto

ur.

,

5000 g

am

ma

conto

ur.

De

pre

ssio

n....

....

....

....

For

Ab

solu

te-

valu

es-

aolo

l 6

^. ^

OO

V

Base

S

ia-f

ion

. .

. .

. .

. .

. A

//O

^eaJ

/rt

A MA

P

Key

52N82SE9889 2.7541 EARNGEY

20

0

TO

TA

L

FIE

LD

M

AG

NE

TO

ME

TE

R.

SU

RV

EX

by

GE

OS

EA

RC

H C

ON

SU

LTA

NTS

LTD

.-f

or

DO

ME

E

XP

LO

RA

TIO

N)

(CA

NA

DA

) L

IMIT

ED

PR

OJE

CT

Z44

-E

AR

NG

EV

T

WP

,O

NT

AR

IO

SC

AL

E-

1 :

ZB

OO

8

4-1

ZO

A

Page 23: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

EA

RN

GE

Y

TU

P.

TO

TA

L

FIE

LD

M

AG

NE

TO

ME

TE

R S

UR

VE

X

by

GE

OS

EA

RC

H C

ON

SU

LTA

NT

S L

TD.

-fo

r

LEG

EN

Din

G

a. m

ma

t 9

Fo

r A

bsol

ute

va/u

es

add.

Con

tour

in

terv

al

......

....

....

...

1000

gam

mas

lOO

Oga

mm

a co

ntou

r

5000 g

amm

a co

nto

ur

Dep

ress

ion

DO

ME

E

XP

UD

RA

TIO

N

(CA

NA

DA

) L

IMIT

ED

PRO

JEC

T 2

44

EA

RW

GE

YO

NT

AR

IOM

AP

K

ey,

WS

4-

M. K

M-,

L3W

84 '1

ZO

SC

ALE

- l

: Z

5O

O

Page 24: RECEIVED - Ontario€¦ · CEDSERRCH COR5U 52N82SE9889 2.7541 EARNGEY 010 Magnetic Survey for DOME EXPLORATION (CANADA) LIMITED on PROJECT 2kk Earngey Township, Ontario (To Accompany

-t/

'-t/

LEGENDeaJ/fige /n Gammas

or Absolute values ac/d

Stolon

Contour interval .

lOOOgamma contour

5000 gamma contour.

Depression........,,.....

.1000 gammas

TOTAL FIELD MAGhJETOMETER SURVEX

byGEOSEARCH CONSULTAN15 LTD.

(fer

POME EXPLORATION (CAWADA) LIMITED

PROJECT 244MAP T\AIP

ONTARIO

- 25OO 84-12O C