  • Report run on: March 15, 2010 9:42 PM

    RECAPP Facility Evaluation Report

    Duclos SchoolB2465A

    Bonnyville

    Northern Lights School Div #69

  • Report run on: March 15, 2010 9:42 PM Page 2 of 49

    B2465ABuilding Id:

    Duclos SchoolBuilding Name:

    BonnyvilleLocation:4801 - 52 Avenue Address:

    4,002.83Gross Area (sq. m): $12,798,758Replacement Cost:1992Construction Year:

    Evaluation Date: June 12 2009

    Wade EngineeringEvaluation Company:

    Mike PangmanEvaluator Name:

    This school is located in the town of Bonnyville with a stable population of 6500. The schools current enrollment is 332.The steel framed building was constructed in 1992 and is 3,259.2 sq.m. in area. Bulk of school is single storey but has several small mezzanines. A single story steel framed addition of 743.63 sq.m. was added in 2002.

    School is in good to excellent condition with minor barrier free upgrades to be considered as the need arises.

    General Summary:

    Structural Summary:Foundation system is typically concrete spread footings and grade beams. Both the original building ang the addition are steel framed with some glu-lam beams in places. Exterior walls are predominately metal stud infill with concrete block around the gym. Roofs are typically metal deck while floors have concrete slab on grade.

    Structural systems are in good condition.

    Envelope Summary:Original building and addition have a variety of finishes including; brick, stone work, stucco and metal siding.

    Aluminum entrances set in aluminum frames and hollow metal doors set in hollow metal frames. Original windows andskylights are aluminum framed. South facing greenhouse skylights require vents to mitigate overheating of interior spaces. Roof has a combination of 2 ply SBS membrane with rigid insulation sloped to drain and steel roofing with good access.

    Building envelope is in good condition.

    Interior Summary:Partitions are typically concrete block and metal stud with gypsum board.

    Ceiling finishes including acoustic tile, gypsum board and exposed metal deck. Floor finishes including vinyl tile, sheetvinyl, carpet, ceramic tile and painted concrete.

    Doors are hollow metal and solid core wood set in pressed steel frames. Some doors are glazed. Lites are pressed steel frames with tempered and wired glass where appropriate. Requirement to include electro magnetic hold opens at4 doors. Barrier free access is good but require minor modifications to the barrier free washrooms and public reception counter.

    Building interiors are in good condition.

    Mechanical Summary:Heating provided by hydronic heating system. Ventilation provided by single medium pressure system complete with terminal boxes. Ceiling space used as return air plenum. Exhaust fans provided to rooms with activities which requireexhaust.

    Fire protection consists of totally sprinklered building multipurpose fire extinguishers.

    BMCS system provides global control of the mechanical systems.

    Items found during school review which should be addressed.- Install handicap lavatories in washrooms with handicap water closet.- Install laminator exhaust in office work area.- Install auxiliary cooling for computer lab and two adjacent classrooms.

    2.01%5 year Facility Condition Index (FCI):

    Facility Details Evaluation Details

    Total Maintenance Events Next 5 years: $257,277

    Bonnyville - Duclos School (B2465A)

  • Report run on: March 15, 2010 9:42 PM Page 3 of 49

    Mechanical systems and components are in good condition.

    Electrical Summary:1200 ampere-120/208V/3PH/4W main power service to building, fluorescent light fixtures retro-fitted with T8 lamps and electronic ballasts, high pressure sodium lights along building perimeter wall, power panels have capacity to accommodate future additions.

    Fire alarm panel is Simplex 4002 hard wired system system is functional but outdated by today's standards.

    Electrical installation appears to be in good condition with no major concerns noted.

    Bonnyville - Duclos School (B2465A)

    Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

    3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

    Rating Guide

    5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

  • Report run on: March 15, 2010 9:42 PM Page 4 of 49

    A1010 Standard Foundations*

    A1030 Slab on Grade*

    A2020 Basement Walls (& Crawl Space)*

    B1010.01 Floor Structural Frame (Building Frame)*

    B1010.03 Floor Decks, Slabs, and Toppings*

    B1010.05 Mezzanine Construction*

    B1010.09 Floor Construction Fireproofing*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    0

    0

    1992

    0

    0

    1992

    0

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    100

    100

    100

    100

    100

    100

    50

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Bonnyville - Duclos School (B2465A)S1 STRUCTURAL

    Perimeter grade beams bearing on strip footings. All Sections

    Concrete slab on grade in all sections

    Cast in place concrete walls in basement under admin area of 1992 section.

    Steel frame floor assembly at second floor mechanical penthouse. Cast concrete slab at suspended stage floor.

    Concrete topping slab and metal deck on steel framing at mechanical room and mezzanines.

    Steel frame floor assembly at mezzanines.

    Non-combustible construction.

  • Report run on: March 15, 2010 9:42 PM Page 5 of 49

    B1020.01 Roof Structural Frame*

    B1020.04 Canopies*

    B1020.06 Roof Construction Fireproofing*

    B1020.08 Other Roof Construction Gazebo*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    0

    0

    0

    0

    Installed

    Installed

    Installed

    Installed

    100

    50

    50

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Bonnyville - Duclos School (B2465A)

    Exposed flat and arched glu-lam beams bearing on steel frame over mezzanines and street. Open web steel joists bearing on steel frame throughout remaining areas

    Steel framed canopies over exterior play areas on east and west sides of gym.

    Steel framed roof bearing on steel columns.

  • Report run on: March 15, 2010 9:42 PM Page 6 of 49

    B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

    B2010.01.03 Stone Assemblies: Exterior Wall Skin*

    B2010.01.06.03 Metal Siding** 1992

    B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

    B2010.01.09 Expansion Control: Exterior Wall Skin*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    0

    0

    1992

    0

    0

    Installed

    Installed

    Installed

    Installed

    Installed

    75

    75

    40

    75

    75

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Metal Siding - (338m2)

    Lifecycle Replacement 2032 $132,800 Unassigned

    Bonnyville - Duclos School (B2465A)S2 ENVELOPE

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Brick cladding on portions of exterior elevations of varying heights

    Stone cladding on lower portions of exterior walls below brick veneer and stucco.

    1992 section only: standing seam metal siding on clear story section of gym and fascia on various elevations. Profiles match standing seam metal roof. Corrugated galvanized steel siding on granary style walls in library.

    Stucco on portions of exterior walls throughout all sections.

    Control joints at dissimilar materials and in long walls throughout.

  • Report run on: March 15, 2010 9:42 PM Page 7 of 49

    B2010.01.11 Joint Sealers (caulking): Ext. Wall** 1992 and 2002

    B2010.01.99 Other Exterior Wall Skin*

    B2010.02.03 Masonry Units: Ext. Wall Const.*

    B2010.02.04 Load-Bearing-Metal Studs: Ext. Wall*

    B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*

    2 - Poor

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    0

    1992

    1992

    0

    0

    Installed

    Installed

    Installed

    Installed

    Installed

    20

    0

    100

    100

    100

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Caulking - (225m)

    Failure Replacement 2010 $12,400 Medium

    1992 and 2002 sections; caulking failures noted throughout, both adhesive and cohesive failures. Poor installation, quality of materials and UV breakdown noted.

    Concern:

    Cut out and replace sealants and backer rod on all building sections with a high performance, low modulus urethane sealant.

    Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Caulking at all windows, control joints and connection of dissimilar materials.

    Glass block used at concession area and administration office area.

    Concrete block walls around gym.

    Metal studs infill on majority of exterior walls.

    Batt insulation and poly vapour barrier on framed exterior walls. Sheet membrane and rigid insulation in cavity wall at gym.

  • Report run on: March 15, 2010 9:42 PM Page 8 of 49

    B2010.05 Parapets*

    B2010.06 Exterior Louvers, Grilles, and Screens*

    B2010.09 Exterior Soffits*

    B2020.01.01.06 Vinyl, Fibreglass & Plastic Windows** 2002 Section

    B2020.01.01.06 Vinyl, Fibreglass &Plastic Windows** 1992 Section

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    0

    0

    1992

    2002

    1992

    Installed

    Installed

    Installed

    Installed

    Installed

    50

    50

    50

    40

    30

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Windows - (91m2)

    Replace Windows - (227m2)

    Lifecycle Replacement

    Lifecycle Replacement

    2042

    2022

    $136,800

    $341,200

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Pre-finished cap flashings where exposed to view and galvanized where not exposed to view in most areas.

    Painted and clear anodized aluminum grilles throughout.

    Pre-finished vented metal soffit panels on 1992 sections.

    Vinyl window frames complete with double glazed sealed units, hopper vents and vinyl frames to simulate divided lites in bulk of windows.

    Vinyl window frames complete with double glazed sealed units, hopper vents and vinyl frames to simulate divided lites in bulk of windows.

  • Report run on: March 15, 2010 9:42 PM Page 9 of 49

    B2020.03 Glazed Curtain Wall**

    B2020.03 Glazed Curtain Wall** With Sloped Glazing

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    1992

    1992

    Installed

    Installed

    40

    40

    Design Life

    Design Life

    MAR-10

    MAR-10

    Updated

    Updated

    Replace Curtain Wall - (83m2)

    Replace Glass (36m2)

    Replace curtain wall with sloped glazing (52m2)

    Lifecycle Replacement

    Operating Efficiency Upgrade

    Lifecycle Replacement

    2032

    2010

    2032

    $181,200

    $16,540

    $110,000

    Unassigned

    Low

    Unassigned

    Greenhouse windows have tremendous heat gain through warm months. Drapes provide only limited relief. At two locations that join classrooms. Go to high performance glass to reduce heat gain.

    Concern:

    Replace glass with reflective glass and Low-E glass to reducesolar gain.

    Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Aluminum curtain wall in gymnasium and at main entrance.

    Aluminum curtain wall section complete with sloped glazing component at two locations on south side and on roof over stage facing street. All lites are double glazed and fixed.

  • Report run on: March 15, 2010 9:42 PM Page 10 of 49

    B2030.01.01 Aluminum-Framed Storefronts: Doors** 1992 Section

    B2030.01.01 Aluminum-Framed Storefronts: Doors** 2002 Section

    B2030.02 Exterior Utility Doors** 1992 Section

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    1992

    2002

    1992

    Installed

    Installed

    Installed

    30

    30

    40

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Replace Doors - (2 Panels)

    Replace Doors - (8 Panels)

    Replace Doors - (8 Panels)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2032

    2032

    $7,900

    $31,500

    $9,100

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Glazed aluminum set in curtain wall frames at main entrance. Insulated hollow metal with and without glazing set in pressed steel frames in balance.

    Glazed aluminum set in curtain wall frames at main entrance. Insulated hollow metal with and without glazing set in pressed steel frames in balance.

    Steel hollow core door throughout school.

  • Report run on: March 15, 2010 9:42 PM Page 11 of 49

    B2030.02 Exterior Utility Doors** 2002 Section

    B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** 1992 Section

    B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** 2002 Section

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    2002

    1992

    2002

    Installed

    Installed

    Installed

    40

    25

    25

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Replace Door - (1 Panel)

    Replace SBS Roofing - (1568m2)

    Replace SBS Roofing - (521m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2042

    2017

    2027

    $1,200

    $676,790

    $154,422

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Steel hollow core door to storage room.

    Two ply SBS membrane in most areas of school. Minor blistering and creasing should be repaired under a regular maintenance program together with removal of moss build up.

    Two ply SBS membrane in most areas of school.

  • Report run on: March 15, 2010 9:42 PM Page 12 of 49

    B3010.07 Sheet Metal Roofing** 1992 Section

    B3010.07 Sheet Metal Roofing** 2002 Section

    B3010.08.02 Metal Gutters and Downspouts** 1992 Section

    2 - Poor

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    1992

    2002

    1992

    Installed

    Installed

    Installed

    40

    40

    30

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Repair Fascia and Ice Slide Inhibitor - (4m)

    Replace Sheet Metal Roofing - (1588m2)

    Replace Sheet Metal Roofing - (222m2)

    Replace Dowsnpouts and Gutters - (388m)

    Repair

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2010

    2032

    2042

    2022

    $1,500

    $499,000

    $69,800

    $12,912

    Medium

    Unassigned

    Unassigned

    Unassigned

    Previous ice damage has created potential for future ice and snow sliding off roof onto play area below.

    Concern:

    Repair fascia and ice and snow slide inhibitor.Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Type

    Year

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Standing seam metal roofing at gym roof and at curved roof over mezzanines. Segmented galvanized metal roofing at three silos.

    Standing seam metal roofing that is overtop of the main corridor.

    Metal gutters and downspouts throughout.

  • Report run on: March 15, 2010 9:42 PM Page 13 of 49

    B3010.08.02 Metal Gutters and Downspouts** 2002 Section

    B3010.09 Roof Specialties and Accessories*

    B3010.11 Roof Covering Other*

    B3020.01 Skylights**

    B3020.02 Other Roofing Openings (Hatch,Vent, etc)*

    5 - Good

    5 - Good

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    2002

    1992

    1992

    1992

    2002

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    0

    0

    25

    25

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Downspouts and Gutters - (11m)

    Replace Skylights - (7 Hexagons and 3 Caps)

    Lifecycle Replacement

    Lifecycle Replacement

    2032

    2017

    $600

    $12,500

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Metal gutters and downspouts throughout.

    Roof accessed through door from mechanical penthouse.

    Concrete sidewalk pads used where eaves or downspouts from upper roofs spill onto lower roofs.

    Acrylic domes in aluminum frames in various locations in 1992 section. 900mm diameter round on grain silos, 1200mm hexagonal.

    Roof access hatch and standard mechanical venting.

  • Report run on: March 15, 2010 9:42 PM Page 14 of 49

    C1010.01 Interior Fixed Partitions*

    C1010.03 Interior Operable Folding Panel Partitions**

    C1010.05 Interior Windows*

    C1020.01 Interior Swinging Doors (& Hardware)*

    C1020.02 Interior Entrance Doors*

    C1020.03 Interior Fire Doors*

    4 - Acceptable

    4 - Acceptable

    5 - Good

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1992

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    100

    30

    80

    40

    0

    50

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Folding Partitions - (24m2)

    Lifecycle Replacement 2022 $46,100 Unassigned

    Bonnyville - Duclos School (B2465A)S3 INTERIOR

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Concrete block partitions in gym area and shower rooms, metal studs with gypsum board in balance.Glass block partitions in areas.

    Folding partition between classrooms at two locations on south side of building.

    Single glazing set in pressed steel frames throughout. Glass appears to be laminated or tempered.

    Painted solid core wood set in pressed steel frames.

    Glazed aluminum entrance doors at main entrance vestibule. Glazed hollow metal doors set in pressed steel frames at balance of vestibules.

    Hollow metal and solid core wood set in pressed steel frames.

  • Report run on: March 15, 2010 9:42 PM Page 15 of 49

    C1020.04 Interior Sliding and Folding Doors*

    C1020.04 Interior Sliding and Folding Doors*

    C1020.05 Interior Large Doors*

    C1030.01 Visual Display Boards** - Smart Boards

    C1030.01 Visual Display Boards** 1992 Section

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1992

    2007

    1992

    Installed

    Installed

    Installed

    Installed

    Installed

    25

    25

    40

    20

    20

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Smart Boards - (17)

    Replace Boards - (37)

    Lifecycle Replacement

    Lifecycle Replacement

    2027

    2013

    $85,000

    $32,400

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Sliding glass doors at both sides of stage and at greenhouses. Aluminum sliding grilles at concessions, Phys. Ed. office and at two locations adjacent gym in order to isolate gym after hours and entry to staff lunch room.

    Sliding partition located in music room and staff room.

    Wood framed sliding barn doors at stage opening onto gym.

    12 Smart boards in classrooms of 1992 section.5 Smart boards in classrooms of 2002 section.

    31 whiteboards and 6 tackboards throughout.

  • Report run on: March 15, 2010 9:42 PM Page 16 of 49

    C1030.01 Visual Display Boards** 2002 Section

    C1030.02 Fabricated Compartments(Toilets/Showers)** 1992 Section

    C1030.08 Interior Identifying Devices*

    C1030.10 Lockers** 1992 Section

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    2002

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    20

    30

    20

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Boards - (12)

    Replace Fabricated Compartments - (6 Compartments)

    Replace Lockers - (288)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2022

    2022

    $10,800

    $10,500

    $377,100

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    10 whiteboards and 2 tackboards throughout.

    Floor supported metal toilet partitions in shower rooms.

    Plastic signage throughout school.

    Full height and half height lockers in all classrooms.

  • Report run on: March 15, 2010 9:42 PM Page 17 of 49

    C1030.10 Lockers** 2002 Section

    C1030.12 Storage Shelving*

    C1030.14 Toilet, Bath, and Laundry Accessories*

    C2010 Stair Construction*

    C2020.05 Resilient Stair Finishes**

    5 - Good

    4 - Acceptable

    4 - Acceptable

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    2002

    0

    0

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    30

    20

    100

    20

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Lockers - (75)

    Replace Resilient Stair Finish - (6m2)

    Lifecycle Replacement

    Lifecycle Replacement

    2032

    2013

    $98,200

    $1,250

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Full height and half height lockers in all classrooms.

    Clear finish plywood storage shelving in basement and steel shelving at various locations.

    Commercial grade mirrors, soap dispensers, paper towel dispensers and toilet tissue holders in all washrooms.

    Steel treads and risers with concrete pans from main floor to mechanical room and mezzanines. Cast in place concrete steps from main floor down to library and conversation pits in classrooms. Wood framed stair to basement below administration house. Concrete ramp from street level up to stage.

    Vinyl tile on risers and treads at stair to basement.

  • Report run on: March 15, 2010 9:42 PM Page 18 of 49

    C2020.06 Carpet Stair Finishes**

    C2020.08 Stair Railings and Balustrades*

    C2030.02 Ramp Finishes*

    C3010.06 Ceramic Tile Wall Finishes**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    10

    40

    30

    40

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Carpet Stair Finish - (15m2)

    Replace Ceramic Tile - (388m2)

    Lifecycle Replacement

    Lifecycle Replacement

    2013

    2032

    $1,800

    $135,500

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Carpet on stairs and ramps from main floor to library and stage. Carpet on stairs to mezzanines.

    Wood handrail on metal railings at stairs and as guard around mezzanines.

    Carpet ramp finish going up to music room.

    Ceramic wall tile in washrooms.

  • Report run on: March 15, 2010 9:42 PM Page 19 of 49

    C3010.09 Acoustical Wall Treatment**

    C3010.11 Interior Wall Painting*

    C3010.12 Wall Coverings*

    C3010.14 Other Wall Finishes*

    C3020.01.02 Paint Concrete Floor Finishes*

    4 - Acceptable

    5 - Good

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1992

    2002

    2002

    0

    0

    Installed

    Installed

    Installed

    Installed

    Installed

    20

    10

    15

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Acoustical Wall Treatment - (200m2)

    Lifecycle Replacement 2013 $52,400 Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Fabric and insulation acoustic panels on upper portion of gym walls. Some staining on north wall panels below radiation cabinets. Clean after leaks fixed.

    All wall surfaces are painted.

    Vinyl wall coverings on selected walls in classrooms and main corridors.

    Desco wall finishes to concrete block in gym area and vestibules. Corrugated metal siding at simulated grain silo locations. Face brick at interior locations throughout.

    Painted concrete floor finishes in selected mechanical and electrical rooms.

  • Report run on: March 15, 2010 9:42 PM Page 20 of 49

    C3020.02 Tile Floor Finishes** - 1992

    C3020.02 Tile Floor Finishes** - 2002

    C3020.04 Wood Flooring**

    C3020.07 Resilient Flooring** 1992 Section

    5 - Good

    5 - Good

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    1992

    2002

    1992

    2002

    Installed

    Installed

    Installed

    Installed

    50

    50

    30

    20

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Ceramic Tile - (239m2)

    Replace Ceramic Tile - 84m2

    Refinish Wood Flooring - (517m2)

    Replace Sheet Vinyl - (1171m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2042

    2052

    2022

    2022

    $54,300

    $19,100

    $26,400

    $132,800

    Unassigned

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Type

    Year

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Ceramic floor tile in washrooms throughout.

    Ceramic floor tile in washrooms and corridors.

    Sprung hard wood gym flooring.

    Sheet vinyl to corridors and selected classrooms.

  • Report run on: March 15, 2010 9:42 PM Page 21 of 49

    C3020.07 Resilient Flooring** 2002 Section

    C3020.08 Carpet Flooring ** 2002 Section

    C3020.08 Carpet Flooring** 1992 Section

    5 - Good

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    2002

    2002

    2006

    Installed

    Installed

    Installed

    20

    15

    15

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Replace Sheet Vinyl - (492m2)

    Replace Carpet - (47m2)

    Completed - Replace Carpet - (50m2)

    Replace Carpet - (1252m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Failure Replacement

    Lifecycle Replacement

    2022

    2017

    2009

    2024

    $55,900

    $3,600

    $4,660

    $94,000

    Unassigned

    Unassigned

    Low

    Unassigned

    Carpet is worn and stained in a number of areas.Concern:

    Replace carpet in selected areas.Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Type

    Year

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Sheet vinyl to corridors and selected classrooms.

    Carpet in portions of classrooms.

    Carpet tile in library, hallways and miscellaneous room.

  • Report run on: March 15, 2010 9:42 PM Page 22 of 49

    C3020.14 Other Floor Finishes*

    C3030.02 Ceiling Paneling (Wood)*

    C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)** 1992 Section

    C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)** 2002 Section

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1992

    2002

    Installed

    Installed

    Installed

    Installed

    0

    60

    25

    25

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Acoustic Ceiling - (950m2)

    Replace Acoustic Ceiling - (564m2)

    Lifecycle Replacement

    Lifecycle Replacement

    2017

    2027

    $51,500

    $30,600

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Rubberized athletic flooring in gym storage and corridors from gym to change rooms.

    Wood ceiling at various locations in 1992 section.

    Suspended t-bar grid system with acoustic tiles in corridors, classrooms and office rooms.

    Suspended t-bar grid system with acoustic tiles in corridors, classrooms and office rooms.

  • Report run on: March 15, 2010 9:42 PM Page 23 of 49

    D2010.04 Sinks** 1992

    D2010.05 Showers ** 1992

    D2010.08 Drinking Fountains / Coolers** 1992

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    1992

    1992

    2002

    Installed

    Installed

    Installed

    30

    30

    35

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Replace Sinks (2)

    Replace Showers (3)

    Replace Hallway Drinking Fountains / Coolers (3)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2022

    2037

    $3,600

    $10,000

    $12,877

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)S4 MECHANICAL

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Counter sunk kitchen (staff room sinks)

    (2) tiled showers for students. (1) BF shower for special needs students. Fiberglass.

    (3) Wall mounted, non refrigerated. Bubblers installed at all classroom sinks in 2002 addition.

  • Report run on: March 15, 2010 9:42 PM Page 24 of 49

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 2002

    D2010.10 Washroom Fixtures (WC, Lav, Urnl)** 1992

    D2020.01.01 Pipes and Tubes: Domestic Water*

    D2020.01.02 Valves: Domestic Water** 1992

    6 - Excellent

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    2007

    1992

    0

    1992

    Installed

    Installed

    Installed

    Installed

    30

    35

    40

    40

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Completed - Replace mix valve assemblies (1)

    Replace WC, (5), Lav (5)

    Replace (WC, Lav, Urnl)

    Replace Valves (GFA: 4003)

    Program Functional Upgrade

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2009

    2037

    2027

    2032

    $2,983

    $21,250

    $67,100

    $19,539

    Unassigned

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Type

    Year

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Lavatories - Stainless steel sinks in each class room. Use is kindergarten.

    Copper piping and fittings.

    Ball valves installed in 1992.

  • Report run on: March 15, 2010 9:42 PM Page 25 of 49

    D2020.01.02 Valves: Domestic Water**2002

    D2020.01.03 Piping Specialties (Backflow Preventors)** 1992

    D2020.02.02 Plumbing Pumps: Domestic Water**

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    2002

    1992

    1992

    Installed

    Installed

    Installed

    40

    20

    20

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Replace Valves (GFA: 4003)

    Replace Piping Specialties (2)

    Replace Plumbing Pumps (2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2042

    2013

    2013

    $19,539

    $11,980

    $19,784

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Ball valves installed in 2002 additions.

    Installed on heating system cold water make up line. Installed on water supply to wet fire protection system. Supplies 2002 section.

    Inline domestic hot water recirculation pump.

  • Report run on: March 15, 2010 9:42 PM Page 26 of 49

    D2020.02.06 Domestic Water Heaters**

    D2020.03 Water Supply Insulation: Domestic*

    D2030.01 Waste and Vent Piping*

    D2040.01 Rain Water Drainage Piping Systems*

    D2040.02.04 Roof Drains*

    4 - Acceptable

    4 - Acceptable

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    2005

    0

    0

    0

    0

    Installed

    Installed

    Installed

    Installed

    Installed

    20

    40

    50

    50

    40

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    NOV-08

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Domestic Water Heaters (1)

    Lifecycle Replacement 2025 $48,000 Unassigned

    Install new second DHW tank as back up to accommodate increase in demand. P.F. upgrade for second unit.

    Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Two heaters were previously installed. Only one DHW tank in use. One removed previously and not re-installed. Operations seem OK with only one. Hot water supply may suffer as a result.

    Majority of domestic cold, hot and recirculation piping insulated. Insulation removed to install new DHW tank in 2005. Reinstall insulation as part of annual maintenance as cost is less then $1000.00 to repair.

    PVC, cast iron and copper.

    Rain water leaders discharge to grade.

    Full open flow roof drains installed on 1992, 2002 additions. Domes cast aluminum. Two missing on 2002 addition.Have not been replaced as of 2009.

  • Report run on: March 15, 2010 9:42 PM Page 27 of 49

    D3010.02 Gas Supply Systems*

    D3020.02.01 Heating Boilers and Accessories: H.W.** 1992

    D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler** 1992

    D3020.02.03 Water Treatment: H. W. Boiler*

    6 - Excellent

    5 - Good

    4 - Acceptable

    6 - Excellent

    Rating

    Rating

    Rating

    Rating

    0

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    60

    35

    30

    30

    Design Life

    Design Life

    Design Life

    Design Life

    NOV-08

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Heating Boilers and Accessories (2)

    Replace Chimneys (1)

    Lifecycle Replacement

    Lifecycle Replacement

    2027

    2022

    $117,662

    $22,827

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Gas distribution piping to heating boilers, domestic hot water heater.

    (2) natural draft coppertube boilers ( 2,400,000 BTU/hr each. Complete with low water cut off, relief valve, flow switch, spark ignition. Supplies heat to 2002 section.

    Boilers discharge into common Class B chimney. None needed in 2002 section.

    Chemical pot feeder allows addition of water treatment. Side stream filter installed.

  • Report run on: March 15, 2010 9:42 PM Page 28 of 49

    D3040.01.01 Air Handling Units: Air Distribution** - 2002

    D3040.01.01 Air Handling Units: Air Distribution** 1992

    D3040.01.02 Fans: Air Distribution (Remote from AHU)*

    D3040.01.03 Air Cleaning Devices:Air Distribution*

    6 - Excellent

    5 - Good

    6 - Excellent

    5 - Good

    Rating

    Rating

    Rating

    Rating

    2002

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    30

    30

    30

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Air Handling Units (GFA: 700)

    Replace Air Handling Units (GFA: 3300)

    Lifecycle Replacement

    Lifecycle Replacement

    2032

    2022

    $79,800

    $376,000

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Air distribution supply and return is medium velocity air ductwork to electronic terminal boxes supplied by one unit.

    Indoor air system consists of supply and return fans complete with variable frequency drives, motorized fresh and return exhaust dampers, glycol heating coil, low efficiency pad filters, evaporative pad humidifier, medium velocity ductwork, electronic terminal boxes, low velocity ductwork distributed to air outlets, ceiling return air.

    Circulating fans installed in corridor.

    Air system filter section complete with 50 mm low efficiency throw away filters.

  • Report run on: March 15, 2010 9:42 PM Page 29 of 49

    D3040.01.04 Ducts: Air Distribution*

    D3040.01.07 Air Outlets & Inlets:Air Distribution*

    D3040.03.01 Hot Water Distribution Systems**

    3 - Marginal

    6 - Excellent

    5 - Good

    Rating

    Rating

    Rating

    1992

    1992

    1992

    Installed

    Installed

    Installed

    50

    30

    40

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Balance Building Air

    Replace H.W Distribution System (GFA 4003m2)

    Preventative Maintenance

    Lifecycle Replacement

    2010

    2032

    $10,000

    $306,956

    Medium

    Unassigned

    Air flow in main office's and library graineries is inadequate. Concern:

    Have air balancing done on entire building.Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Medium velocity ductwork to terminal boxes. Low velocity after box to air outlets ceiling space return air plenum.Balancing dampers provided in branch line ducts to air outlets. Fire dampers installed in fire rated walls.Air flow velocity in main office and library area is inadequate. Recommend Air Balance to identify in efficient air flow and correct.

    Square ceiling supply air diffusers fixed pattern. Egg crate lay in T-bar for return air.

    Two inline circulation pumps circulate heated water via black iron piping to radiation, unit heater, radiant panels, glycol heat exchanger, entrance heaters, and terminal box coils. System connects into 2002 section.

    Consequences of Deferral:Air quality and staff comfort will be compromised until rectified.

  • Report run on: March 15, 2010 9:42 PM Page 30 of 49

    D3040.04.01 Fans: Exhaust** 1992

    D3040.04.01 Fans: Exhaust** 2002

    D3040.04.03 Ducts: Exhaust*

    D3040.04.05 Air Outlets and Inlets: Exhaust*

    5 - Good

    5 - Good

    6 - Excellent

    6 - Excellent

    Rating

    Rating

    Rating

    Rating

    1992

    2002

    0

    1992

    Installed

    Installed

    Installed

    Installed

    30

    30

    50

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    NOV-08

    SEP-04

    Updated

    Updated

    Updated

    Updated

    Replace Fans (10)

    Replace Fans: Exhaust (5)

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2032

    $20,197

    $11,000

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Separation of out flow from air intake adequate. Inline ceiling mounted fans ducted to gooseneck and roof mounted exhaust fans.

    Wash room roof top fans

    Low velocity ductwork to exhaust air outlets and fans. Balancing dampers provided in branch line ducts.

    Egg crate exhaust air grilles.

  • Report run on: March 15, 2010 9:42 PM Page 31 of 49

    D3040.05 Heat Exchangers - 1992

    D3050.03 Humidifiers** 1992 gymnasium

    D3050.05.02 Fan Coil Units** - 1992

    5 - Good

    3 - Marginal

    5 - Good

    Rating

    Rating

    Rating

    1992

    1992

    1992

    Installed

    Installed

    Installed

    30

    25

    30

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Replace Heat Exchangers (1)

    Replace Humidifiers (1)

    Replace Fan Coil Units (4)

    Lifecycle Replacement

    Failure Replacement

    Lifecycle Replacement

    2022

    2010

    2022

    $5,075

    $17,119

    $26,000

    Unassigned

    Medium

    Unassigned

    Water carryover is resulting in fan casing, motor and unit internals rusting resulting in poor aseptic condition.

    Concern:

    Replace humidifierRecommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Plate heat exchanger for air system heating coil. Also supplies 2002 section.

    Air system complete with wetted evaporative pads complete with reservoir. Evidence of carry over. Air system complete with chemical injected treatment and pellets in reservoir.

    Hot water fan coil units installed in main and secondary entrances.

  • Report run on: March 15, 2010 9:42 PM Page 32 of 49

    D3050.05.02 Fan Coil Units** - 2002

    D3050.05.03 Finned Tube Radiation**

    D3050.05.06 Unit Heaters**

    D3050.05.08 Radiant Heating (Ceiling & Floor)** 1992

    5 - Good

    5 - Good

    5 - Good

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    2002

    2002

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    30

    40

    30

    35

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Fan Coil Units (1)

    Replace Finned Tube Radiation (GFA: 4003)

    Replace Unit Heaters (1)

    Lifecycle Replacement (GFA 3260 m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2032

    2042

    2022

    2127

    $6,500

    $244,569

    $6,510

    $211,200

    Unassigned

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Type

    Year

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Gymnasium, 2002 reading areas in classrooms.

    Hot water Unit heater in mechanical room. Electric thermostat controlled. Preheats combustion air.

    Perimeter radiant ceiling panels installed in majority of rooms.

  • Report run on: March 15, 2010 9:42 PM Page 33 of 49

    D3050.05.08 Radiant Heating (Ceiling & Floor)** 2002

    D3060.02.05 Building Systems Controls (BMCS, EMCS)** 1992

    D3060.02.05 Building Systems Controls (BMCS, EMCS)** 2002

    D4010 Sprinklers: Fire Protection*

    5 - Good

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    2002

    1992

    2002

    1992

    Installed

    Installed

    Installed

    Installed

    35

    30

    20

    60

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Radiant Heating (GFA: 744 m2)

    Replace Electric and Electronic Controls (GFA 3260 m2)

    Lifecycle Replacement GFA 744 m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2037

    2022

    2032

    $49,500

    $88,020

    $20,088

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Perimeter radiant ceiling panels installed in majority of rooms.

    Total DDC system. Electronic room thermostats control radiation, radiant panels and variable volume terminal boxes. BMCS enables and controls air system, interlocked exhaust fans, heating system, glycol system, humidity. Electric thermostat cycles fan coil units in entrances and combustion air unit heater.

    Wet sprinkler system complete with sprinkler valve assembly.

  • Report run on: March 15, 2010 9:42 PM Page 34 of 49

    D4030.01 Fire Extinguisher, Cabinets and Accessories*

    5 - GoodRating

    1992Installed

    30Design Life

    MAR-10Updated

    Bonnyville - Duclos School (B2465A)

    Portable ABC fire extinguishers provided in fire extinguishers cabinets. Evidence of annual inspection.

  • Report run on: March 15, 2010 9:42 PM Page 35 of 49

    D5010.03 Main Electrical Switchboards (Main Distribution)**

    D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

    D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    1992

    1992

    2002

    Installed

    Installed

    Installed

    40

    30

    30

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Replace Main Electrical Switchboards (2)

    Replace Panelboards (5 Panels)

    Replace Panelboards (5 Panels)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2032

    2022

    2032

    $39,569

    $30,750

    $30,750

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)S5 ELECTRICAL

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    1200 ampere, 120/208V/3PH/4W metered power service in a Siemens main distribution switchboard.

    Siemens branch distribution panels located throughout the building. Panels appear to have spare space to accommodatefuture additions.

    1200Capacity Size

    ampsCapacity Unit

  • Report run on: March 15, 2010 9:42 PM Page 36 of 49

    D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers**

    D5010.07.02 Motor Starters and Accessories**

    D5010.07.03 Variable Frequency Drives**

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    1992

    1992

    2002

    Installed

    Installed

    Installed

    30

    30

    30

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Lifecycle Replacement (4 Sections)

    Replace Manual Starters (20 Manual Starters)

    Replace V.F. Drives (1)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2022

    2032

    $33,779

    $5,525

    $11,461

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Motor control centre in the mechanical room c/w motor starters wired in conduit. MCC is of Siemans manufacture.

    Allen Bradley combination magnetic motor starters.

    Variable frequency drives provided to air handling unit in mechanical room as part of mechanical equipment.

    400

    20

    Capacity Size

    Capacity Size

    amps

    hp

    Capacity Unit

    Capacity Unit

  • Report run on: March 15, 2010 9:42 PM Page 37 of 49

    D5010.07.03 Variable Frequency Drives**

    D5020.01 Electrical Branch Wiring*

    D5020.02.01 Lighting Accessories (Lighting Controls)*

    D5020.02.02.01 Interior Incandescent Fixtures*

    D5020.02.02.02 Interior Florescent Fixtures**

    5 - Good

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    1992

    0

    1992

    0

    2002

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    50

    30

    30

    30

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace V.F. Drives (1)

    Replace Florescent Fixtures (4003 Msq GFA)

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2032

    $11,461

    $349,500

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Variable frequency drives provided to air handling unit in mechanical room as part of mechanical equipment.

    Conduit and wire with ivory devices and ivory coverplates.

    Each room appears to have separate light switch. 1 GE LVRC in Main electrical room 119.,

    Incandescent track light fixtures provided to stage.

    Surface & recessed fluorescent fixtures upgraded to T8 lamps with electronic ballasts in 1998.

    20Capacity Size

    hpCapacity Unit

  • Report run on: March 15, 2010 9:42 PM Page 38 of 49

    D5020.02.02.03 Interior Metal Halide Fixture*

    D5020.02.03.02 Emergency Lighting Battery Packs**

    D5020.02.03.03 Exit Signs*

    D5020.02.05 Special Purpose Lighting*

    D5020.03.01.01 Exterior Incandescent Fixtures*

    D5020.03.01.02 Exterior Florescent Fixtures*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1999

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    20

    30

    30

    30

    30

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Battery Packs(12 packs)

    Lifecycle Replacement 2013 $17,600 Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Pendant hung fixtures provided to gymnasium and main corridors, wall mounted fixtures in staff room and reading roomsoff library.

    Emergency lighting is comprised of battery pack power supplies and remote mounted emergency fixture heads.

    Exit signs upgraded to LED lamps in 1999.

    6 Stage lights in Gym mounted on 2" rigid pipe.

    There is 1 exterior incandescent fixture beside the roof access door.

    Fluorescent weatherproof high output T-12 strip type lights provided to highlight to front of building from metal channel valence.

  • Report run on: March 15, 2010 9:42 PM Page 39 of 49

    D5020.03.01.03 Exterior Metal Halide Fixtures*(2002 front vestibules)

    D5020.03.01.04 Exterior H.P. Sodium Fixtures*

    D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

    D5030.01 Detection and Fire Alarm**

    D5030.02.02 Intrusion Detection**

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    Rating

    2002

    2002

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    30

    30

    25

    25

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Detection and Fire Alarm (4003 Msq GFA)

    Replace Intrusion Detection (4003 Msq GFA)

    Lifecycle Replacement

    Lifecycle Replacement

    2017

    2017

    $98,826

    $58,132

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Recessed lights in front entry soffits.

    Wall mounted HPS light fixtures.

    Exterior lighting is fed from central lighting control panel in main electrical room with photocell control.

    Simplex 4002 hard wired, zoned, fire alarm system. Fire alarm bells provided along with strobe lights.

    System comprised of key pad entry, main controller, Ademco manufacture, Multi Zones, motion sensors & door contacts. Intrusion Alarm entry key pads are located for entry/exit.

  • Report run on: March 15, 2010 9:42 PM Page 40 of 49

    D5030.02.04 Video Surveillance**

    D5030.03 Clock and Program Systems*

    D5030.04.01 Telephone Systems*

    D5030.04.02 Paging Systems*

    3 - Marginal

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    25

    20

    25

    0

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Repair 130' of exterior security camera cable

    Replace Video Surveillance (1)

    Repair

    Lifecycle Replacement

    2010

    2017

    $2,200

    $8,977

    Medium

    Unassigned

    Cable for exterior pole mounted camera is currently not installed in conduit or strapped. The cable is exposed to physical damage.

    Concern:

    Install new cable and conduit fastened to side of mechanical room wall.

    Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Security cameras located throughout building interior and exterior.

    Class change provided through school intercom system. Battery operated clocks.

    System Panasonic EMSS-192 model telephone system.

    Paging provided over Rauland intercom system with speakers located in corridors and classrooms.

  • Report run on: March 15, 2010 9:42 PM Page 41 of 49

    D5030.04.03 Call Systems**

    D5030.04.04 Data Systems*

    D5030.05 Public Address and Music Systems**

    D5030.06 Television Systems*

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    Rating

    Rating

    Rating

    Rating

    1992

    2000

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    15

    15

    25

    20

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace intercom system (24 stn)

    Replace Sound system in gymnasium

    Lifecycle Replacement

    Lifecycle Replacement

    2013

    2017

    $61,000

    $6,700

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Rauland phone intercom system with control panel located in Admin Office. Call buttons in each classroom. Surface & recessed mounted speakers through the school.

    Cat 5 data wiring with patch panel installed on rack in mezzanine mechanical room. Rack has capacity for future additions.

    Gymnasium has stand alone sound system operated from music room / stage.

    Cable TV provided by Northern Cable.

  • Report run on: March 15, 2010 9:42 PM Page 42 of 49

    E1010.07 Vending Equipment*

    E1090 Other Equipment

    E1090.04 Residential Equipment*

    E1090.07 Athletic, Recreational, and Therapeutic Equipment*

    E2010.02 Fixed Casework** 1992 Section

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    4 - Acceptable

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1992

    1992

    1992

    Installed

    Installed

    Installed

    Installed

    Installed

    0

    0

    10

    15

    35

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Fixed Casework - (GFA: 3259)

    Lifecycle Replacement 2027 $386,900 Unassigned

    Bonnyville - Duclos School (B2465A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Vending machines located adjacent concessions.

    Metal boot racks located at entrance vestibules.

    Residential range, refrigerator and microwave ovens in staff room and ECS.

    Two wall hung Plexiglas, two wall hung plywood and two ceiling hung plywood basketball backboards. Electric scoreboard.

    Clear finish plywood casework with plastic laminate clad tops in most classrooms, in staff room and ECS.Plasric laminate clad and clear finish plywood shelving in library.

  • Report run on: March 15, 2010 9:42 PM Page 43 of 49

    E2010.02 Fixed Casework** 2002 Section

    E2010.02.99 Other Casework

    E2010.03.01 Blinds** 1992 Section

    E2010.03.01 Blinds** 2002 Section

    5 - Good

    5 - Good

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    2002

    1992

    1992

    2002

    Installed

    Installed

    Installed

    Installed

    35

    0

    30

    30

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Replace Fixed Casework - (GFA: 744)

    Replace Blinds - (110m2)

    Replace Blinds - (91m2)

    Lifecycle Replacement

    Lifecycle Replacement

    Lifecycle Replacement

    2037

    2022

    2032

    $88,400

    $15,400

    $12,800

    Unassigned

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Casework throughout classrooms.

    Display case at main entrance with tempered glass doors and stone cladding.

    Horizontal aluminum blinds and vertical Louvre blinds throughout.

    Horizontal aluminum blinds and vertical Louvre blinds throughout.

  • Report run on: March 15, 2010 9:42 PM Page 44 of 49

    E2010.03.06 Curtains and Drapes**

    E2020 Moveable Furnishings

    F1010.02.05 Grandstands and Bleachers**

    F2020.01 Asbestos*

    F2020.04 Mould*

    5 - Good

    4 - Acceptable

    4 - Acceptable

    5 - Good

    5 - Good

    Rating

    Rating

    Rating

    Rating

    Rating

    1992

    1992

    1992

    0

    0

    Installed

    Installed

    Installed

    Installed

    Installed

    30

    0

    30

    0

    0

    Design Life

    Design Life

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Updated

    Updated

    Replace Curtain and Drapes - (117m2)

    Replace Bleachers - (5 Riser and 184 Seats)

    Lifecycle Replacement

    Lifecycle Replacement

    2022

    2022

    $16,400

    $85,200

    Unassigned

    Unassigned

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Curtains and drapes in music room and attached to silos.

    Wide variety of educational and office furnishings including desks, tables, bookshelves and chairs.

    Plastic benches with steel framework for folding bleachers seating 184 in gym.

    None noted or reported.

    None noted or reported.

  • Report run on: March 15, 2010 9:42 PM Page 45 of 49

    F2020.09 Other Hazardous Materials*

    4 - AcceptableRating

    1992Installed

    0Design Life

    MAR-10Updated

    Bonnyville - Duclos School (B2465A)

    Typical cleaning materials located in janitorial room.

  • Report run on: March 15, 2010 9:42 PM Page 46 of 49

    K3020 Indoor Environment - Computer

    2 - PoorRating

    1992Installed

    0Design Life

    MAR-10Updated

    Install auxiliary cooling

    Replace A.C. (1)

    Operating Efficiency Upgrade

    Lifecycle Replacement

    2010

    2040

    $100,700

    $65,000

    Medium

    Unassigned

    Temperatures have been as high as 35 degrees Celsius during exams and classes.

    Concern:

    Install air conditioning with remote condensing unit.Recommendation:

    Bonnyville - Duclos School (B2465A)S8 FUNCTIONAL ASSESSMENT

    Event:

    Event:

    Type

    Type

    Year

    Year

    Cost

    Cost

    Priority

    Priority

    Updated:

    Updated:

    MAR-10

    MAR-10

    Computer room has no air conditioning and room temperatures have been as high as 35 degrees Celsius. Similar conditions occur in two adjacent classrooms.

    Consequences of Deferral:Staff and students air quality and comfort will be compromised.

  • Report run on: March 15, 2010 9:42 PM Page 47 of 49

    K3020 Indoor Environment - Laminator

    K40 Current Code Issues - Fire Door Closures

    2 - Poor

    3 - Marginal

    Rating

    Rating

    1992

    1992

    Installed

    Installed

    0

    0

    Design Life

    Design Life

    MAR-10

    MAR-10

    Updated

    Updated

    Install laminator exhaust fan

    Replace laminator exhaust fan

    Introduce Electro Magnetic Hold Open Devices

    Operating Efficiency Upgrade

    Lifecycle Replacement

    Code Repair

    2010

    2040

    2010

    $8,000

    $8,000

    $11,184

    Medium

    Unassigned

    Low

    Laminator has no exhaust and odors have been noted in adjacent spaces to work room.

    Fire doors in corridors work to control spread of smoke from one fire compartment to another. Propping doors open in heavy use locations is commonplace but defeats their purpose.

    Concern:

    Concern:

    Install exhaust hood and fan.

    Remove wedges and introduce electro magnetic hold open devices tied in to fire alarm to release on activation (4 doors).

    Recommendation:

    Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Event:

    Event:

    Type

    Type

    Type

    Year

    Year

    Year

    Cost

    Cost

    Cost

    Priority

    Priority

    Priority

    Updated:

    Updated:

    Updated:

    MAR-10

    MAR-10

    MAR-10

    Laminator has no exhaust and odors have been noted in adjacent spaces to work room.

    There are no obvious issues apparent that would warrant a code analysis. An exit through lobby condition exists at exit from basement (+/- 150 sq.m.).

  • Report run on: March 15, 2010 9:42 PM Page 48 of 49

    K4010.01 Barrier Free Route: Parking to Entrance*

    K4010.02 Barrier Free Entrances*

    K4010.03 Barrier Free Interior Circulation*

    5 - Good

    5 - Good

    3 - Marginal

    Rating

    Rating

    Rating

    0

    2002

    1992

    Installed

    Installed

    Installed

    0

    0

    0

    Design Life

    Design Life

    Design Life

    MAR-10

    MAR-10

    MAR-10

    Updated

    Updated

    Updated

    Modify Section Of Reception Counter

    Barrier Free Access Upgrade 2010 $2,796 Low

    Public counter has a lowered section which complies but kneespace as well as access across counter is not provided to ( ABC 3.8.3.14.1).

    Concern:

    Modify section of reception counter to bring in to compliance.Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Access provided from drop off zone at east end (2002) of school and from designated parking stall in north parking lot (1992).

    Barrier free access provided at east entrance.

    Access good to most areas. Slope on ramps is slightly less than current code standards but would have complied at time of construction. Public counter at main entrance reception area.

  • Report run on: March 15, 2010 9:42 PM Page 49 of 49

    K4010.04 Barrier Free Washrooms*

    3 - MarginalRating

    1992Installed

    0Design Life

    MAR-10Updated

    Provide BFA Vanity

    Barrier Free Access Upgrade 2010 $4,660 Low

    Height of vanity is 700 mm where 835 mm is required. Clearance below vanity is 400 mm where 735 mm is required. Door to toilet cubicle swings in rather than out.

    Concern:

    Provide new section of vanity to bring into compliance. Reverse swing of toilet cubicle door.

    Recommendation:

    Bonnyville - Duclos School (B2465A)

    Event:

    Type Year Cost Priority

    Updated: MAR-10

    Washrooms in shower rooms designed for barrier free accessibility.