Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Embed Size (px)

Citation preview

Page 1: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Real life demonstration plant for benchmarking hydrogen

technologies

Adwin MartensWaterstofNet

Sydney, 13 October 2015

Page 2: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

WaterstofNet

Page 3: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

WaterstofNet Non profit organisation, started in 2009

Area: Belgium / Netherlands

Working close together with industry/government

Activities

Owner of 2 HRS , based upon green electricity

Facilitating projects with buses, garbage trucks, fork lifts, vessels, cars

Making roadmaps: H2-Mobility Belgium, roadmap Power to Gas

Representing Belgium within IEA HIA

Page 4: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Don Quichote Development of a New Qualititive and Innovative

concept for hydrogen out of turbine electricity

In other words:

Power to gas with different components and applications

Funded by the European JU-FCH (GA 303 411)

Page 5: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Don Quichote Starting points:

800 kW solar, 1,5 MW wind

Interested enduser in the retail sector

Hydrogen combined with logistic applications and smart grid

Page 6: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Don Quichote Phase 1:

Alkaline electrolyser, 30 Nm³/h, membrame compressor, storage 50 kg (450 bar), dispenser, fuelling forklifts

Phase 2: PEM electrolyser, 30 Nm³/h, PEM fuel cell 100 kW,

storage 50 kg (450 bar), forklifts and feed back electricity to the grid

Phase 3: Electrochemical compressor, electrochemical expander

Page 7: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Don Quichote

Page 8: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Partners

Page 9: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Phase 1: operation since 2012

Page 10: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Fuelling equipment

Page 11: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Fluctuating demand

Page 12: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Phase 1: Results Starting with 2 forklifts means limited hydrogen

demand (underutilisation):

efficiencies reduced

how to define/judge availibility

Now 12 forklifts:

efficiencies higher

availibility fuelling station > 95%

Next step:

almost full loaded HRS by additional forklifts

Page 13: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Availability

Page 14: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Phase 2

Page 15: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Phase 2: Installed 2015

Page 16: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Phase 2: Installed 2015

Page 17: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Phase 2: tests starting

Page 18: Real life demonstration plant for benchmarking hydrogen technologies Adwin Martens WaterstofNet Sydney, 13 October 2015

Conclusions Best learning is learning by doing

Dedicated/complementary partners are crucial

Efficiencies and availibility are relevant if nominal use

Every phase has its own dynamics, permits, issues

Contact: [email protected]