49
REACT Workshop Planning Business Trajectories Present & Future - … from an Airline’s Perspective - eville, June 24 th , 2008 Ekkehard Gut ASM - Planning & AT EK Flight Operations Suppor

REACT Workshop Planning Business Trajectories Present & Future

Embed Size (px)

DESCRIPTION

REACT Workshop Planning Business Trajectories Present & Future - … from an Airline’s Perspective -. Ekkehard Gutt ASM - Planning & ATM EK Flight Operations Support. Seville, June 24 th , 2008. How to predict the best Route …. 1. Status quo. Status Quo. Oil reaches record $140 a barrel. - PowerPoint PPT Presentation

Citation preview

Page 1: REACT  Workshop Planning Business Trajectories Present & Future

REACT Workshop

Planning Business TrajectoriesPresent & Future

- … from an Airline’s Perspective -

Seville, June 24th, 2008

Ekkehard GuttASM - Planning & ATM

EK Flight Operations Support

Page 2: REACT  Workshop Planning Business Trajectories Present & Future

How to predict the best Route …

Page 3: REACT  Workshop Planning Business Trajectories Present & Future

1. Status quo

Page 4: REACT  Workshop Planning Business Trajectories Present & Future

Status Quo Oil reaches record $140 a barrel. Air traffic to double until 2020. Available capacity on current ATS-Route structure not sufficient – “ground

based infrastructure”.

Missing civil/military cooperation and coordination in most part of the world.

Aeronautical Information Management not ‘state-of-the-art’.

Ground Delays / Enroute Delays. Not all airspace stakeholders are involved in future decision-making.

National borders – not traffic flows – dictate the airspace environment.

Page 5: REACT  Workshop Planning Business Trajectories Present & Future

FANS-1/A – Aircraft Equipment

• Typically the Emirates Aircraft equipage includes :– ADS-C & CPDLC– VHF & SATCOM Data Links via ACARS– FMS & RNAV– 3 Inertial Reference Systems– Classic Navigation Systems (VOR, DME, ILS, etc)– GPS

How are these technically quite modern aircraft treated in the environment?

Page 6: REACT  Workshop Planning Business Trajectories Present & Future

Current Airspace environment (?)

Why do we operate a brand-new 300t aircraft on Non-Precision Approaches using 60 year old criteria and profiles? (Emirates is authorised for 7 Approach Types; we would just like to operate two in the future: ILS & RNAV.)

RNAV and RNP form the globally harmonised ICAO “Performance Based Navigation” (PBN) concept.RNAV/RNP is a proven method for effectively increasing the safety, dependability and efficiency of flight operations. (ICAO Doc 9613 (PBN Manual)).

Page 7: REACT  Workshop Planning Business Trajectories Present & Future

The “Casablanca Curve”…

Page 8: REACT  Workshop Planning Business Trajectories Present & Future

The “Casablanca Curve”…

Page 9: REACT  Workshop Planning Business Trajectories Present & Future

The “Casablanca Curve”… - Available FPL-Routing CMN-DXB

Page 10: REACT  Workshop Planning Business Trajectories Present & Future

All airspace is the concern of ATM and an usable resource

Page 11: REACT  Workshop Planning Business Trajectories Present & Future

2. Where are we today?

- some examples…

Page 12: REACT  Workshop Planning Business Trajectories Present & Future

AUSOTS – Australia / NOROTS - Canada

Page 13: REACT  Workshop Planning Business Trajectories Present & Future

UPR (User Preferred Routes): DXB-PER-PER

Page 14: REACT  Workshop Planning Business Trajectories Present & Future

“DARP”-ing in the Pacific Region…

“Dynamic Airborne Re-route Procedure”

Page 15: REACT  Workshop Planning Business Trajectories Present & Future

Organised Track Systems/Random Routes in Oceanic Airspaces

Page 16: REACT  Workshop Planning Business Trajectories Present & Future

NavCanada: Traffic Density Analyser (TDA)

The TDA is the collaboration tool for NAT-(North Atlantic) Operators and Air Traffic Service Providers.

It is the first time in aviation history that acollaborative decision making-tool is available on a global basis.

Page 17: REACT  Workshop Planning Business Trajectories Present & Future

31

Bottom

Page 18: REACT  Workshop Planning Business Trajectories Present & Future

Runway Averages

AAL01

Close

Page 19: REACT  Workshop Planning Business Trajectories Present & Future

Ground Status

FL350 ERAKA (12)

Page 20: REACT  Workshop Planning Business Trajectories Present & Future

3. “On-Time” Management

Page 21: REACT  Workshop Planning Business Trajectories Present & Future

Airport “On-Time” Management

Page 22: REACT  Workshop Planning Business Trajectories Present & Future

How can we improve the Airport “On-Time” Management?

Page 23: REACT  Workshop Planning Business Trajectories Present & Future

-This is an important aspect for trajectory operationsin regards to predictability!

In order to solve the general issue of on-timeperformance at the Airport, all stakeholders have to be involved:

Airport “On-Time” Management

• Airport Operators• ATC• Airlines• Handling Agents• Regulators• …

Page 24: REACT  Workshop Planning Business Trajectories Present & Future

4. Trajectory Prediction

Page 25: REACT  Workshop Planning Business Trajectories Present & Future

Trajectory Contract for airspace access

“CONTRACT”

ATC (1) ATC (2)

“CONTRACT”FI

R (1

) FIR (2)

Page 26: REACT  Workshop Planning Business Trajectories Present & Future

EGDS – Emirates Ground Data Link System

Datalink Service Provider

GroundEarthStation

RemoteGroundStation

Air Traffic Control / ATC

Aircraft Flight Management System (FMS)

CPDLC / ADS

SATCOMSatellite

GPSSatellite

Airline Operations Control / AOC

GN

D C

OM

M N

ETW

OR

KD

SP N

ETW

OR

KA

I R /

GN

D

CO

MM

AIR

CR

AFT

A

VIO

NI C

S SA

T EL L

ITE

CO

NST

ELLA

T IO

N

EGDSEGDS

LIDOLIDO

Page 27: REACT  Workshop Planning Business Trajectories Present & Future

Trajectory Intend - Transmission

Page 28: REACT  Workshop Planning Business Trajectories Present & Future

Trajectory Prediction

Page 29: REACT  Workshop Planning Business Trajectories Present & Future

Trajectory Prediction

Page 30: REACT  Workshop Planning Business Trajectories Present & Future

Detecting conflicts and the resolution (revised flight paths)

V = >

V = <

FL = +

FL = =

Page 31: REACT  Workshop Planning Business Trajectories Present & Future

Trajectory Prediction – Coordination of Problems

Page 32: REACT  Workshop Planning Business Trajectories Present & Future

Trajectory Prediction

Transmit & Receive…• FPL Intend• Separation• Coordination of “problems”• Time• 4D-Trajectories: Latitude, Longitude, Altitude, Time• Winds• Weather hazards• Traffic hazards• Fuel• Terrain hazards• …

Page 33: REACT  Workshop Planning Business Trajectories Present & Future

Trajectory Prediction

ATC

AOC AOC

Page 34: REACT  Workshop Planning Business Trajectories Present & Future

Airspace is the resource

Today: ATS-Routes

Page 35: REACT  Workshop Planning Business Trajectories Present & Future

Airspace is the usable resource

Tomorrow: Airspace

Increase of capacity…

Page 36: REACT  Workshop Planning Business Trajectories Present & Future

5. The role of Air Traffic Control

Page 37: REACT  Workshop Planning Business Trajectories Present & Future

ATC vs. ATM

Air Traffic CONTROL

Air Traffic MANAGEMENT

Page 38: REACT  Workshop Planning Business Trajectories Present & Future

The role of ATC ATM in the future Planned Routing / Dynamic changes of Trajectories Conflict Management – Controller has still authority! Terminal Airspace – Tailored SIDs/Tailored STARs Providing, Sharing and Collecting information (traffic, WX, AIP, NOTAM…)

“AIM”

Coordination Civil/Military Users and Airspaces Traffic Flow depends on most current information (Flexible) Responding to changing conditions Search and Rescue Security and Safety Transform global ATM Support/cooperate in technology development

ICAO Annex 11 (S

ARPs)

Air Traffic

Service

s

ICAO Doc 4444 (PANS-ATM)

Air Traffic

Man

agem

ent

Page 39: REACT  Workshop Planning Business Trajectories Present & Future

6. The FMS and the EFF/EFP

What will the future bring us?

Page 40: REACT  Workshop Planning Business Trajectories Present & Future

• Most current FMCs cannot easily meet a Required Time of Arrival (RTA) on descent.

• Terminal airspace/Arrivals: typically radar vectoring off the path by ATC to make adjustments.

• Current on-board FMS data base has limited capacity that will be exceeded in the future by more RNAV arrivals at more locations (limited memory).

• Many systems and database entries in the cockpit remind me of an ‘Excel Sheet’ environment.

Today’s limitations

Page 41: REACT  Workshop Planning Business Trajectories Present & Future

The FMS and the EFB/EFF technology

The average mobile phone has300 times the memory and processing power of a FMS.

The development of the EFBtechnology is a consequence of where we stand with the FMStechnology.

Ideally - on future aircraft types -concepts of FMS and EFB development should lead to a single integrated system.

Page 42: REACT  Workshop Planning Business Trajectories Present & Future

EFB/EFF Evolution – Situational Display

B4776/08 NOTAMNQ)LRBB/QRRCA/IV/BO/W/285/460/4727N02702E045A)LRBBB)0806230900 C)0806231300E)RESTRICTED AREA LRR6 ACTIVATED. MIL FLT FLT WILL BE COORD BTN CIV AND MIL ATC EXPECT RADAR VECTORINGF)FL100 G)FL240

Page 43: REACT  Workshop Planning Business Trajectories Present & Future

Drift-down/Depressurisation – Situational Display

Page 44: REACT  Workshop Planning Business Trajectories Present & Future

7. Conclusion…

Page 45: REACT  Workshop Planning Business Trajectories Present & Future

Business Trajectories

Isn’t it all about information managementand data sharing?

Page 46: REACT  Workshop Planning Business Trajectories Present & Future

Our Vision for the future…

“Our vision for our future global ATM system is one where a pilot can fly into JFK International Airport in New York, Changi Airport in Singapore or Capital Airport in Beijing without any differences in equipment, procedures, or the quality of air traffic services.”

FAA Administrator Marion Blakey

Increased capacity in the airspace, higher flexibility and improved cost efficiency can only be achieved in a regional ATM system. We need to ensure there is no a disconnect between Europe, Canada, Australia or the U.S.

DubaiDjakarta StockholmLagos

Page 47: REACT  Workshop Planning Business Trajectories Present & Future

Summary…• Record high fuel costs• Global concerns about the environment: fuel saving and reducing emissions are both in everybody’s interest

• More operational flexibility – combined with the existing modern technology – is essential to meeting the airspace demands.• Consideration of a regional ATM-System

• All airspace is the concern of ATM & is a useable resource

• The Airlines are more than happy to assist and to work together

• Quality of Aeronautical Information Management has to improve

• Continuous military/civil coordination

Page 48: REACT  Workshop Planning Business Trajectories Present & Future
Page 49: REACT  Workshop Planning Business Trajectories Present & Future

Thank you for attention.

Ekkehard GuttEmiratesFlight Operations SupportASM – Planning & ATMDubai/U.A.E.

Phone: +971 4 708 4307Fax: +971 4 286 4085SITA: DXBONEKAFTN: [email protected]