67
March 22, 2010 Transmitted via email: [email protected] Mr. Dmitri Belser The Ed Roberts Campus 3075 Adeline Street Berkeley, CA 94703 RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus 3075 Adeline Street, Berkeley, California ACC Project Number 8139-001.00 Dear Mr. Belser, This letter summarizes the results of the indoor air quality evaluation study conducted by ACC Environmental Consultants, Inc., (ACC) on February 11, 2011, of the newly constructed Ed Roberts Campus located at 3075 Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements of the United States Green Building Council’s (USGBC) Leadership in Energy and Environmental Design (LEED) Indoor Environmental Quality (EQ) Credit 3.2 Construction IAQ Management Plan – Before Occupancy for Commercial Interiors v2.0 (CI). The Subject Location was recently constructed (2010) and furnishings were moved into the space prior to the sampling event. Furnishings in place were typical for a commercial office building and include new walls and ceiling, paint, flooring materials and furniture. At the time of the sampling, the building was fully occupied. In order to determine if the subject area meets the EQ requirements of the LEED certification, ACC performed the following work: 1) obtained basic air quality measurements with an emphasis on carbon monoxide (CO), 2) obtained air samples for total volatile organic compounds (TVOC) including 4-PCH, 3) obtained air samples for formaldehyde, and 4) collected continuous measurements for dust particulates. Samples were collected in the five (5) major HVAC zones generally corresponding to the following areas: First floor, southeast hallway (Zone 1); first floor, south side center conference room (Zone 2); second floor, southwest office area (Zone 3); second floor, northwest office area (Zone 4); and first floor, atrium center (Zone 5). All measurements and samples were obtained for a minimum of four hours. Ms. Gwen Santos, Project Scientist, performed the indoor air quality (IAQ) investigation under the supervision of Mr. Tim Fallin, an ACC Sr. Project Manager and LEED AP. Northern California Office: 7977 Capwell Drive, Suite 100 • Oakland, CA 94621 • (510) 638-8400 • Fax (510) 638-8404 Southern California Office: 1545 Wilshire Blvd., Suite 500 • Los Angeles, CA 90016 • (213) 353-1240 • Fax (213) 353-1244

RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

March 22 2010 Transmitted via email dbelsercforatorg

Mr Dmitri Belser The Ed Roberts Campus 3075 Adeline Street Berkeley CA 94703

RE LEED Indoor Air Quality Evaluation The Ed Roberts Campus 3075 Adeline Street Berkeley California ACC Project Number 8139-00100

Dear Mr Belser

This letter summarizes the results of the indoor air quality evaluation study conducted by ACC Environmental Consultants Inc (ACC) on February 11 2011 of the newly constructed Ed Roberts Campus located at 3075 Adeline Street Berkeley California (subject location) This air sampling was performed to meet the requirements of the United States Green Building Councilrsquos (USGBC) Leadership in Energy and Environmental Design (LEED) Indoor Environmental Quality (EQ) Credit 32 Construction IAQ Management Plan ndash Before Occupancy for Commercial Interiors v20 (CI)

The Subject Location was recently constructed (2010) and furnishings were moved into the space prior to the sampling event Furnishings in place were typical for a commercial office building and include new walls and ceiling paint flooring materials and furniture At the time of the sampling the building was fully occupied

In order to determine if the subject area meets the EQ requirements of the LEED certification ACC performed the following work

1) obtained basic air quality measurements with an emphasis on carbon monoxide (CO) 2) obtained air samples for total volatile organic compounds (TVOC) including 4-PCH 3) obtained air samples for formaldehyde and 4) collected continuous measurements for dust particulates

Samples were collected in the five (5) major HVAC zones generally corresponding to the following areas First floor southeast hallway (Zone 1) first floor south side center conference room (Zone 2) second floor southwest office area (Zone 3) second floor northwest office area (Zone 4) and first floor atrium center (Zone 5) All measurements and samples were obtained for a minimum of four hours

Ms Gwen Santos Project Scientist performed the indoor air quality (IAQ) investigation under the supervision of Mr Tim Fallin an ACC Sr Project Manager and LEED AP

Northern California Office 7977 Capwell Drive Suite 100 bull Oakland CA 94621 bull (510) 638-8400 bull Fax (510) 638-8404 Southern California Office 1545 Wilshire Blvd Suite 500 bull Los Angeles CA 90016 bull (213) 353-1240 bull Fax (213) 353-1244

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 2 of 4 20 SAMPLING PROTOCOLS In accordance with the LEED CI v20 EQ Credit 32 protocols air samples and measurements were collected following the installation of all furnishings and full occupancy of the subject area The newly installed mechanical system was operating normally Sampling was conducted between 900 AM and 400 PM on February 11 2011 30 AIR QUALITY MEASUREMENTS Carbon Monoxide ACC collected carbon monoxide (CO) measurements from the five (5) sampling locations using Draumlger PAC III CO monitoring instruments The instruments were programmed to capture CO measurements once per minute

Carbon Monoxide Sampling Summary Carbon Monoxide (ppm) Area

Minimum Maximum Average Zone 1 ndash 1st Floor SE Hallway 0 0 0 Zone 2 ndash 1st Floor S Side Center Conference Room 0 0 0 Zone 3 ndash 2nd Floor SW Office Area 0 300 0 Zone 4 ndash 2nd Floor NW Office Area 0 0 0 Zone 5 ndash 1st Floor Atrium Center 0 0 0

LEED Criteria 9 ppm or

No more than 2 ppm above outside measurements The LEED EQ criteria for indoor CO is nine (9) parts per million (ppm) or no greater than two (2) ppm above outdoor levels All measurements obtained from each instrument during the sampling period were below the LEED EQ criteria of nine (9) ppm Instrument logs are attached to this letter for reference Total Volatile Organic Compounds (TVOC) amp 4-phenylcyclohexene Air samples for the presence of TVOCs were collected from the five sampling locations In addition to TVOC the samples were also analyzed for the presence of 4-phenylcyclohexene (4-PCH) The sampling pumps were calibrated using a Dry-Cal primary flow calibrator before and after the sampling period Samples for TVOCs were collected for a period of 233 to 288 minutes at flow rates ranging from 264 to 542 milliliters per minute yielding volumes of 632 to 782 liters of air After completion of sampling all sample collection media were packed in ice and delivered to Berkeley Analytical Laboratory in Richmond CA

Total Volatile Organic Compound Sampling Summary

Sample Number

Sample Location Volume (Liters of Air)

TVOC Concentration (microgm3)

Zone 1 HVAC Zone 1 First floor southeast hallway 632 151

Zone 2 HVAC Zone 2 First floor south side center conference room 638 111

Zone 3 HVAC Zone 3 Second floor southwest office area 782 148

Zone 4 HVAC Zone 4 Second floor northwest office area 653 276

Zone 5 HVAC Zone 5 First floor atrium center 651 138

LEED Criteria 500 microgm3

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 3 of 4

4-Phenylcyclohexane Sampling Summary Sample Number

Sample Location Volume (Liters of Air)

4-PCH Concentration (microgm3)

Zone 1 HVAC Zone 1 First floor southeast hallway 632 None Detected

Zone 2 HVAC Zone 2 First floor south side center conference room 638 None Detected

Zone 3 HVAC Zone 3 Second floor southwest office area 782 None Detected

Zone 4 HVAC Zone 4 Second floor northwest office area 653 None Detected

Zone 5 HVAC Zone 5 First floor atrium center 651 None Detected

LEED Criteria 65 microgm3

The LEED EQ criteria for TVOC is 500 microgm3 while the LEED EQ criteria for 4-PCH is 65 microgm3 TVOC sample results were below the criteria of le500 microgm3 No concentrations of 4-PCH were detected in the five samples Analytical reports are attached to this letter for reference Formaldehyde Air samples for the presence of formaldehyde were collected from the five sampling locations Waters Sep-Pak XPosure Aldehyde samplers were used to determine concentrations of formaldehyde and other low-molecular weight carbonyl compounds in the air Air samples were collected at flow rates ranging from 05 to 10 liters of air per minute (lpm) for a period of 239 to 249 minutes for a total volume of 1195 to 1245 liters of air Air being sampled was pulled through a sampling tube and the 24-dinitrophenylhydrazine (DNPH) reagent in the sampling tubes reacts with the carbonyl compounds to form the stable hydrazone derivatives which are retained by the sampling tubes After completion of sampling all sample collection media were packed in ice and delivered to Berkeley Analytical Laboratory in Richmond CA The analytical method used to detect formaldehyde was American Society for Testing and Materials (ASTM) D5197-09 Standard Test Method for Determination of Formaldehyde and Other Carbonyl Compounds in Air (Active Sampler Methodology)

Formaldehyde Sampling Summary Sample Number

Sample Location Sample Volume

(Liters of Air)

Concentration Formaldehyde

(ppb) Zone 1 HVAC Zone 1 First floor southeast hallway 122 225 Zone 2 HVAC Zone 2 First floor south side center conference room 1195 56 Zone 3 HVAC Zone 3 Second floor southwest office area 1245 111 Zone 4 HVAC Zone 4 Second floor northwest office area 1225 88 Zone 5 HVAC Zone 5 First floor atrium center 1215 55 LEED Criteria 50 ppb

The LEED EQ criteria for formaldehyde is le50 ppb All samples were below the LEED EQ criteria for formaldehyde Analytical reports are attached to this letter for reference Particulate (PM10) Dust Monitoring ACC obtained measurements for dust particulate matter less than 10 microns (PM10) from the subject area using a PDR1000 real-time aerosol monitors (dust monitors) The PDR1000 has data logging capabilities and each instrument was programmed to obtain a measurement every minute during the sampling period The PDR1000 recorded the average concentrations for every 1-minute period The dust monitor reports the dust concentrations

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 4 of 4 as milligrams per cubic meter of air (mgm3) and converted to micrograms per cubic meter of air (microgm3) During the sampling period 242 to 287 data points were collected The following is a summary of the data collected on February 11 2011

Particulates (PM10) Sampling Summary Location Average Concentration

(microgm3) Zone 1 ndash 1st Floor SE Hallway 3

Zone 2 ndash 1st Floor S Side Center Conference Room 6

Zone 3 ndash 2nd Floor SW Office Area 0

Zone 4 ndash 2nd Floor NW Office Area 6

Zone 5 ndash 1st Floor Atrium Center 0

LEED Criteria 50 microgm3

The LEED EQ criteria for total particulate is 50 micrograms per cubic meter (microgm3) The PM10 average concentrations for the five (5) sampling locations ranged from 0 to 6 microgm3 All of the PM10 average concentrations were below the LEED EQ criteria Instrument logs are attached to this letter for reference 40 CONCLUSIONS Based on air samples and measurements collected within the subject area on February 11 2011 the criteria for LEED EQ outlined in the Green Building Rating System for Commercial Interiors has been met 50 LIMITATIONS Indoor air quality is the product of multiple influences and attempts to ascertain the source of any problems does not always produce the expected results Environmental stresses such as improper lighting noise vibration ergonomic stressors and job-related psychosocial problems can produce symptoms that are similar to those associated with poor air quality ACC evaluated the environmental condition of the subject area in accordance with criteria specified in the USGBC LEED for Commercial Interiors version 20 using standard evaluation techniques as recommended by the US Environmental Protection Agency National Institute of Occupational Safety and Health and the California Department of Health Services However ACC shall not be responsible for claims that may arise out of failure to correct problems or to identify problems that may exist due to the air quality in this building ACC assumes no responsibility for damages for work performed or errors in documentation or missing information ACC does not guarantee the accuracy of information provided by other parties All statements andor recommendations are based on conditions observed and tested at the time of the inspection This report does not intend to identify all hazards or unsafe conditions or to indicate that other hazards or unsafe conditions do not exist at the subject site Please contact me at (510) 638-8400 ext 104 if you have any questions

Mark A Sanchez Gwen Santos Senior Project Manage Project Scientist

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0001

16502424

75

Zone 5

091101407-0002

16502399

75

Zone 2

091101407-0003

16502423

75

Zone 1

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium 4 169 100 - - - - - -

Basidiospores - - - - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - 2 84 100 - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ - - - - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 4 169 100 2 84 100 - None Detected -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen - - - - - - - - -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 3 - - 3 -

Fibrous Particulate (1-4) - 3 - - 3 - - 3 -

Background (1-5) - 3 - - 3 - - 3 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 1 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0004

16502419

75

Zone 4

091101407-0005

16502426

75

Zone 3

091101407-0006

16502403

75

Outside

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium - - - - - - - - -

Basidiospores - - - - - - 5 211 457

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - - - - 4 169 366

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - 1 42 91

Myxomycetes++ 1 42 100 - - - 2 27 58

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - 1 13 28

Total Fungi 1 42 100 - None Detected - 13 462 100

Hyphal Fragment 1 42 - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 13 - - - - 2 27 -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 2 - - 1 -

Fibrous Particulate (1-4) - 3 - - 2 - - 1 -

Background (1-5) - 3 - - 2 - - 2 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 2 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0007

16502397

75

Outside

091101407-9901

Dummy

Dummy

Dummy

091101407-9902

Dummy

Dummy

Dummy

Spore Types Raw Count Countmsup3 of Total - - - - - -Alternaria - - - - - - - - -

Ascospores 2 84 53 - - - - - -

AspergillusPenicillium 5 211 132 - - - - - -

Basidiospores 7 295 184 - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium 22 928 58 - - - - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ 2 84 53 - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 38 1600 100 - - - - - -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 42 - - - - - - -

Analyt Sensitivity 600x - 42 - - - - - - -

Analyt Sensitivity 300x - 13 - - - - - - -

Skin Fragments (1-4) - 1 - - - - - - -

Fibrous Particulate (1-4) - 1 - - - - - - -

Background (1-5) - 2 - - - - - - -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 3 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 2: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 2 of 4 20 SAMPLING PROTOCOLS In accordance with the LEED CI v20 EQ Credit 32 protocols air samples and measurements were collected following the installation of all furnishings and full occupancy of the subject area The newly installed mechanical system was operating normally Sampling was conducted between 900 AM and 400 PM on February 11 2011 30 AIR QUALITY MEASUREMENTS Carbon Monoxide ACC collected carbon monoxide (CO) measurements from the five (5) sampling locations using Draumlger PAC III CO monitoring instruments The instruments were programmed to capture CO measurements once per minute

Carbon Monoxide Sampling Summary Carbon Monoxide (ppm) Area

Minimum Maximum Average Zone 1 ndash 1st Floor SE Hallway 0 0 0 Zone 2 ndash 1st Floor S Side Center Conference Room 0 0 0 Zone 3 ndash 2nd Floor SW Office Area 0 300 0 Zone 4 ndash 2nd Floor NW Office Area 0 0 0 Zone 5 ndash 1st Floor Atrium Center 0 0 0

LEED Criteria 9 ppm or

No more than 2 ppm above outside measurements The LEED EQ criteria for indoor CO is nine (9) parts per million (ppm) or no greater than two (2) ppm above outdoor levels All measurements obtained from each instrument during the sampling period were below the LEED EQ criteria of nine (9) ppm Instrument logs are attached to this letter for reference Total Volatile Organic Compounds (TVOC) amp 4-phenylcyclohexene Air samples for the presence of TVOCs were collected from the five sampling locations In addition to TVOC the samples were also analyzed for the presence of 4-phenylcyclohexene (4-PCH) The sampling pumps were calibrated using a Dry-Cal primary flow calibrator before and after the sampling period Samples for TVOCs were collected for a period of 233 to 288 minutes at flow rates ranging from 264 to 542 milliliters per minute yielding volumes of 632 to 782 liters of air After completion of sampling all sample collection media were packed in ice and delivered to Berkeley Analytical Laboratory in Richmond CA

Total Volatile Organic Compound Sampling Summary

Sample Number

Sample Location Volume (Liters of Air)

TVOC Concentration (microgm3)

Zone 1 HVAC Zone 1 First floor southeast hallway 632 151

Zone 2 HVAC Zone 2 First floor south side center conference room 638 111

Zone 3 HVAC Zone 3 Second floor southwest office area 782 148

Zone 4 HVAC Zone 4 Second floor northwest office area 653 276

Zone 5 HVAC Zone 5 First floor atrium center 651 138

LEED Criteria 500 microgm3

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 3 of 4

4-Phenylcyclohexane Sampling Summary Sample Number

Sample Location Volume (Liters of Air)

4-PCH Concentration (microgm3)

Zone 1 HVAC Zone 1 First floor southeast hallway 632 None Detected

Zone 2 HVAC Zone 2 First floor south side center conference room 638 None Detected

Zone 3 HVAC Zone 3 Second floor southwest office area 782 None Detected

Zone 4 HVAC Zone 4 Second floor northwest office area 653 None Detected

Zone 5 HVAC Zone 5 First floor atrium center 651 None Detected

LEED Criteria 65 microgm3

The LEED EQ criteria for TVOC is 500 microgm3 while the LEED EQ criteria for 4-PCH is 65 microgm3 TVOC sample results were below the criteria of le500 microgm3 No concentrations of 4-PCH were detected in the five samples Analytical reports are attached to this letter for reference Formaldehyde Air samples for the presence of formaldehyde were collected from the five sampling locations Waters Sep-Pak XPosure Aldehyde samplers were used to determine concentrations of formaldehyde and other low-molecular weight carbonyl compounds in the air Air samples were collected at flow rates ranging from 05 to 10 liters of air per minute (lpm) for a period of 239 to 249 minutes for a total volume of 1195 to 1245 liters of air Air being sampled was pulled through a sampling tube and the 24-dinitrophenylhydrazine (DNPH) reagent in the sampling tubes reacts with the carbonyl compounds to form the stable hydrazone derivatives which are retained by the sampling tubes After completion of sampling all sample collection media were packed in ice and delivered to Berkeley Analytical Laboratory in Richmond CA The analytical method used to detect formaldehyde was American Society for Testing and Materials (ASTM) D5197-09 Standard Test Method for Determination of Formaldehyde and Other Carbonyl Compounds in Air (Active Sampler Methodology)

Formaldehyde Sampling Summary Sample Number

Sample Location Sample Volume

(Liters of Air)

Concentration Formaldehyde

(ppb) Zone 1 HVAC Zone 1 First floor southeast hallway 122 225 Zone 2 HVAC Zone 2 First floor south side center conference room 1195 56 Zone 3 HVAC Zone 3 Second floor southwest office area 1245 111 Zone 4 HVAC Zone 4 Second floor northwest office area 1225 88 Zone 5 HVAC Zone 5 First floor atrium center 1215 55 LEED Criteria 50 ppb

The LEED EQ criteria for formaldehyde is le50 ppb All samples were below the LEED EQ criteria for formaldehyde Analytical reports are attached to this letter for reference Particulate (PM10) Dust Monitoring ACC obtained measurements for dust particulate matter less than 10 microns (PM10) from the subject area using a PDR1000 real-time aerosol monitors (dust monitors) The PDR1000 has data logging capabilities and each instrument was programmed to obtain a measurement every minute during the sampling period The PDR1000 recorded the average concentrations for every 1-minute period The dust monitor reports the dust concentrations

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 4 of 4 as milligrams per cubic meter of air (mgm3) and converted to micrograms per cubic meter of air (microgm3) During the sampling period 242 to 287 data points were collected The following is a summary of the data collected on February 11 2011

Particulates (PM10) Sampling Summary Location Average Concentration

(microgm3) Zone 1 ndash 1st Floor SE Hallway 3

Zone 2 ndash 1st Floor S Side Center Conference Room 6

Zone 3 ndash 2nd Floor SW Office Area 0

Zone 4 ndash 2nd Floor NW Office Area 6

Zone 5 ndash 1st Floor Atrium Center 0

LEED Criteria 50 microgm3

The LEED EQ criteria for total particulate is 50 micrograms per cubic meter (microgm3) The PM10 average concentrations for the five (5) sampling locations ranged from 0 to 6 microgm3 All of the PM10 average concentrations were below the LEED EQ criteria Instrument logs are attached to this letter for reference 40 CONCLUSIONS Based on air samples and measurements collected within the subject area on February 11 2011 the criteria for LEED EQ outlined in the Green Building Rating System for Commercial Interiors has been met 50 LIMITATIONS Indoor air quality is the product of multiple influences and attempts to ascertain the source of any problems does not always produce the expected results Environmental stresses such as improper lighting noise vibration ergonomic stressors and job-related psychosocial problems can produce symptoms that are similar to those associated with poor air quality ACC evaluated the environmental condition of the subject area in accordance with criteria specified in the USGBC LEED for Commercial Interiors version 20 using standard evaluation techniques as recommended by the US Environmental Protection Agency National Institute of Occupational Safety and Health and the California Department of Health Services However ACC shall not be responsible for claims that may arise out of failure to correct problems or to identify problems that may exist due to the air quality in this building ACC assumes no responsibility for damages for work performed or errors in documentation or missing information ACC does not guarantee the accuracy of information provided by other parties All statements andor recommendations are based on conditions observed and tested at the time of the inspection This report does not intend to identify all hazards or unsafe conditions or to indicate that other hazards or unsafe conditions do not exist at the subject site Please contact me at (510) 638-8400 ext 104 if you have any questions

Mark A Sanchez Gwen Santos Senior Project Manage Project Scientist

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0001

16502424

75

Zone 5

091101407-0002

16502399

75

Zone 2

091101407-0003

16502423

75

Zone 1

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium 4 169 100 - - - - - -

Basidiospores - - - - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - 2 84 100 - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ - - - - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 4 169 100 2 84 100 - None Detected -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen - - - - - - - - -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 3 - - 3 -

Fibrous Particulate (1-4) - 3 - - 3 - - 3 -

Background (1-5) - 3 - - 3 - - 3 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 1 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0004

16502419

75

Zone 4

091101407-0005

16502426

75

Zone 3

091101407-0006

16502403

75

Outside

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium - - - - - - - - -

Basidiospores - - - - - - 5 211 457

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - - - - 4 169 366

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - 1 42 91

Myxomycetes++ 1 42 100 - - - 2 27 58

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - 1 13 28

Total Fungi 1 42 100 - None Detected - 13 462 100

Hyphal Fragment 1 42 - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 13 - - - - 2 27 -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 2 - - 1 -

Fibrous Particulate (1-4) - 3 - - 2 - - 1 -

Background (1-5) - 3 - - 2 - - 2 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 2 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0007

16502397

75

Outside

091101407-9901

Dummy

Dummy

Dummy

091101407-9902

Dummy

Dummy

Dummy

Spore Types Raw Count Countmsup3 of Total - - - - - -Alternaria - - - - - - - - -

Ascospores 2 84 53 - - - - - -

AspergillusPenicillium 5 211 132 - - - - - -

Basidiospores 7 295 184 - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium 22 928 58 - - - - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ 2 84 53 - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 38 1600 100 - - - - - -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 42 - - - - - - -

Analyt Sensitivity 600x - 42 - - - - - - -

Analyt Sensitivity 300x - 13 - - - - - - -

Skin Fragments (1-4) - 1 - - - - - - -

Fibrous Particulate (1-4) - 1 - - - - - - -

Background (1-5) - 2 - - - - - - -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 3 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 3: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 3 of 4

4-Phenylcyclohexane Sampling Summary Sample Number

Sample Location Volume (Liters of Air)

4-PCH Concentration (microgm3)

Zone 1 HVAC Zone 1 First floor southeast hallway 632 None Detected

Zone 2 HVAC Zone 2 First floor south side center conference room 638 None Detected

Zone 3 HVAC Zone 3 Second floor southwest office area 782 None Detected

Zone 4 HVAC Zone 4 Second floor northwest office area 653 None Detected

Zone 5 HVAC Zone 5 First floor atrium center 651 None Detected

LEED Criteria 65 microgm3

The LEED EQ criteria for TVOC is 500 microgm3 while the LEED EQ criteria for 4-PCH is 65 microgm3 TVOC sample results were below the criteria of le500 microgm3 No concentrations of 4-PCH were detected in the five samples Analytical reports are attached to this letter for reference Formaldehyde Air samples for the presence of formaldehyde were collected from the five sampling locations Waters Sep-Pak XPosure Aldehyde samplers were used to determine concentrations of formaldehyde and other low-molecular weight carbonyl compounds in the air Air samples were collected at flow rates ranging from 05 to 10 liters of air per minute (lpm) for a period of 239 to 249 minutes for a total volume of 1195 to 1245 liters of air Air being sampled was pulled through a sampling tube and the 24-dinitrophenylhydrazine (DNPH) reagent in the sampling tubes reacts with the carbonyl compounds to form the stable hydrazone derivatives which are retained by the sampling tubes After completion of sampling all sample collection media were packed in ice and delivered to Berkeley Analytical Laboratory in Richmond CA The analytical method used to detect formaldehyde was American Society for Testing and Materials (ASTM) D5197-09 Standard Test Method for Determination of Formaldehyde and Other Carbonyl Compounds in Air (Active Sampler Methodology)

Formaldehyde Sampling Summary Sample Number

Sample Location Sample Volume

(Liters of Air)

Concentration Formaldehyde

(ppb) Zone 1 HVAC Zone 1 First floor southeast hallway 122 225 Zone 2 HVAC Zone 2 First floor south side center conference room 1195 56 Zone 3 HVAC Zone 3 Second floor southwest office area 1245 111 Zone 4 HVAC Zone 4 Second floor northwest office area 1225 88 Zone 5 HVAC Zone 5 First floor atrium center 1215 55 LEED Criteria 50 ppb

The LEED EQ criteria for formaldehyde is le50 ppb All samples were below the LEED EQ criteria for formaldehyde Analytical reports are attached to this letter for reference Particulate (PM10) Dust Monitoring ACC obtained measurements for dust particulate matter less than 10 microns (PM10) from the subject area using a PDR1000 real-time aerosol monitors (dust monitors) The PDR1000 has data logging capabilities and each instrument was programmed to obtain a measurement every minute during the sampling period The PDR1000 recorded the average concentrations for every 1-minute period The dust monitor reports the dust concentrations

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 4 of 4 as milligrams per cubic meter of air (mgm3) and converted to micrograms per cubic meter of air (microgm3) During the sampling period 242 to 287 data points were collected The following is a summary of the data collected on February 11 2011

Particulates (PM10) Sampling Summary Location Average Concentration

(microgm3) Zone 1 ndash 1st Floor SE Hallway 3

Zone 2 ndash 1st Floor S Side Center Conference Room 6

Zone 3 ndash 2nd Floor SW Office Area 0

Zone 4 ndash 2nd Floor NW Office Area 6

Zone 5 ndash 1st Floor Atrium Center 0

LEED Criteria 50 microgm3

The LEED EQ criteria for total particulate is 50 micrograms per cubic meter (microgm3) The PM10 average concentrations for the five (5) sampling locations ranged from 0 to 6 microgm3 All of the PM10 average concentrations were below the LEED EQ criteria Instrument logs are attached to this letter for reference 40 CONCLUSIONS Based on air samples and measurements collected within the subject area on February 11 2011 the criteria for LEED EQ outlined in the Green Building Rating System for Commercial Interiors has been met 50 LIMITATIONS Indoor air quality is the product of multiple influences and attempts to ascertain the source of any problems does not always produce the expected results Environmental stresses such as improper lighting noise vibration ergonomic stressors and job-related psychosocial problems can produce symptoms that are similar to those associated with poor air quality ACC evaluated the environmental condition of the subject area in accordance with criteria specified in the USGBC LEED for Commercial Interiors version 20 using standard evaluation techniques as recommended by the US Environmental Protection Agency National Institute of Occupational Safety and Health and the California Department of Health Services However ACC shall not be responsible for claims that may arise out of failure to correct problems or to identify problems that may exist due to the air quality in this building ACC assumes no responsibility for damages for work performed or errors in documentation or missing information ACC does not guarantee the accuracy of information provided by other parties All statements andor recommendations are based on conditions observed and tested at the time of the inspection This report does not intend to identify all hazards or unsafe conditions or to indicate that other hazards or unsafe conditions do not exist at the subject site Please contact me at (510) 638-8400 ext 104 if you have any questions

Mark A Sanchez Gwen Santos Senior Project Manage Project Scientist

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0001

16502424

75

Zone 5

091101407-0002

16502399

75

Zone 2

091101407-0003

16502423

75

Zone 1

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium 4 169 100 - - - - - -

Basidiospores - - - - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - 2 84 100 - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ - - - - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 4 169 100 2 84 100 - None Detected -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen - - - - - - - - -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 3 - - 3 -

Fibrous Particulate (1-4) - 3 - - 3 - - 3 -

Background (1-5) - 3 - - 3 - - 3 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 1 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0004

16502419

75

Zone 4

091101407-0005

16502426

75

Zone 3

091101407-0006

16502403

75

Outside

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium - - - - - - - - -

Basidiospores - - - - - - 5 211 457

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - - - - 4 169 366

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - 1 42 91

Myxomycetes++ 1 42 100 - - - 2 27 58

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - 1 13 28

Total Fungi 1 42 100 - None Detected - 13 462 100

Hyphal Fragment 1 42 - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 13 - - - - 2 27 -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 2 - - 1 -

Fibrous Particulate (1-4) - 3 - - 2 - - 1 -

Background (1-5) - 3 - - 2 - - 2 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 2 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0007

16502397

75

Outside

091101407-9901

Dummy

Dummy

Dummy

091101407-9902

Dummy

Dummy

Dummy

Spore Types Raw Count Countmsup3 of Total - - - - - -Alternaria - - - - - - - - -

Ascospores 2 84 53 - - - - - -

AspergillusPenicillium 5 211 132 - - - - - -

Basidiospores 7 295 184 - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium 22 928 58 - - - - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ 2 84 53 - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 38 1600 100 - - - - - -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 42 - - - - - - -

Analyt Sensitivity 600x - 42 - - - - - - -

Analyt Sensitivity 300x - 13 - - - - - - -

Skin Fragments (1-4) - 1 - - - - - - -

Fibrous Particulate (1-4) - 1 - - - - - - -

Background (1-5) - 2 - - - - - - -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 3 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 4: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

Ed Roberts Campus LEED CI Credit 32 Air Sampling Report March 22 2011 Page 4 of 4 as milligrams per cubic meter of air (mgm3) and converted to micrograms per cubic meter of air (microgm3) During the sampling period 242 to 287 data points were collected The following is a summary of the data collected on February 11 2011

Particulates (PM10) Sampling Summary Location Average Concentration

(microgm3) Zone 1 ndash 1st Floor SE Hallway 3

Zone 2 ndash 1st Floor S Side Center Conference Room 6

Zone 3 ndash 2nd Floor SW Office Area 0

Zone 4 ndash 2nd Floor NW Office Area 6

Zone 5 ndash 1st Floor Atrium Center 0

LEED Criteria 50 microgm3

The LEED EQ criteria for total particulate is 50 micrograms per cubic meter (microgm3) The PM10 average concentrations for the five (5) sampling locations ranged from 0 to 6 microgm3 All of the PM10 average concentrations were below the LEED EQ criteria Instrument logs are attached to this letter for reference 40 CONCLUSIONS Based on air samples and measurements collected within the subject area on February 11 2011 the criteria for LEED EQ outlined in the Green Building Rating System for Commercial Interiors has been met 50 LIMITATIONS Indoor air quality is the product of multiple influences and attempts to ascertain the source of any problems does not always produce the expected results Environmental stresses such as improper lighting noise vibration ergonomic stressors and job-related psychosocial problems can produce symptoms that are similar to those associated with poor air quality ACC evaluated the environmental condition of the subject area in accordance with criteria specified in the USGBC LEED for Commercial Interiors version 20 using standard evaluation techniques as recommended by the US Environmental Protection Agency National Institute of Occupational Safety and Health and the California Department of Health Services However ACC shall not be responsible for claims that may arise out of failure to correct problems or to identify problems that may exist due to the air quality in this building ACC assumes no responsibility for damages for work performed or errors in documentation or missing information ACC does not guarantee the accuracy of information provided by other parties All statements andor recommendations are based on conditions observed and tested at the time of the inspection This report does not intend to identify all hazards or unsafe conditions or to indicate that other hazards or unsafe conditions do not exist at the subject site Please contact me at (510) 638-8400 ext 104 if you have any questions

Mark A Sanchez Gwen Santos Senior Project Manage Project Scientist

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0001

16502424

75

Zone 5

091101407-0002

16502399

75

Zone 2

091101407-0003

16502423

75

Zone 1

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium 4 169 100 - - - - - -

Basidiospores - - - - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - 2 84 100 - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ - - - - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 4 169 100 2 84 100 - None Detected -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen - - - - - - - - -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 3 - - 3 -

Fibrous Particulate (1-4) - 3 - - 3 - - 3 -

Background (1-5) - 3 - - 3 - - 3 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 1 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0004

16502419

75

Zone 4

091101407-0005

16502426

75

Zone 3

091101407-0006

16502403

75

Outside

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium - - - - - - - - -

Basidiospores - - - - - - 5 211 457

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - - - - 4 169 366

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - 1 42 91

Myxomycetes++ 1 42 100 - - - 2 27 58

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - 1 13 28

Total Fungi 1 42 100 - None Detected - 13 462 100

Hyphal Fragment 1 42 - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 13 - - - - 2 27 -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 2 - - 1 -

Fibrous Particulate (1-4) - 3 - - 2 - - 1 -

Background (1-5) - 3 - - 2 - - 2 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 2 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0007

16502397

75

Outside

091101407-9901

Dummy

Dummy

Dummy

091101407-9902

Dummy

Dummy

Dummy

Spore Types Raw Count Countmsup3 of Total - - - - - -Alternaria - - - - - - - - -

Ascospores 2 84 53 - - - - - -

AspergillusPenicillium 5 211 132 - - - - - -

Basidiospores 7 295 184 - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium 22 928 58 - - - - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ 2 84 53 - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 38 1600 100 - - - - - -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 42 - - - - - - -

Analyt Sensitivity 600x - 42 - - - - - - -

Analyt Sensitivity 300x - 13 - - - - - - -

Skin Fragments (1-4) - 1 - - - - - - -

Fibrous Particulate (1-4) - 1 - - - - - - -

Background (1-5) - 2 - - - - - - -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 3 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 5: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0001

16502424

75

Zone 5

091101407-0002

16502399

75

Zone 2

091101407-0003

16502423

75

Zone 1

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium 4 169 100 - - - - - -

Basidiospores - - - - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - 2 84 100 - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ - - - - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 4 169 100 2 84 100 - None Detected -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen - - - - - - - - -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 3 - - 3 -

Fibrous Particulate (1-4) - 3 - - 3 - - 3 -

Background (1-5) - 3 - - 3 - - 3 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 1 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0004

16502419

75

Zone 4

091101407-0005

16502426

75

Zone 3

091101407-0006

16502403

75

Outside

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium - - - - - - - - -

Basidiospores - - - - - - 5 211 457

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - - - - 4 169 366

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - 1 42 91

Myxomycetes++ 1 42 100 - - - 2 27 58

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - 1 13 28

Total Fungi 1 42 100 - None Detected - 13 462 100

Hyphal Fragment 1 42 - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 13 - - - - 2 27 -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 2 - - 1 -

Fibrous Particulate (1-4) - 3 - - 2 - - 1 -

Background (1-5) - 3 - - 2 - - 2 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 2 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0007

16502397

75

Outside

091101407-9901

Dummy

Dummy

Dummy

091101407-9902

Dummy

Dummy

Dummy

Spore Types Raw Count Countmsup3 of Total - - - - - -Alternaria - - - - - - - - -

Ascospores 2 84 53 - - - - - -

AspergillusPenicillium 5 211 132 - - - - - -

Basidiospores 7 295 184 - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium 22 928 58 - - - - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ 2 84 53 - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 38 1600 100 - - - - - -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 42 - - - - - - -

Analyt Sensitivity 600x - 42 - - - - - - -

Analyt Sensitivity 300x - 13 - - - - - - -

Skin Fragments (1-4) - 1 - - - - - - -

Fibrous Particulate (1-4) - 1 - - - - - - -

Background (1-5) - 2 - - - - - - -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 3 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 6: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0004

16502419

75

Zone 4

091101407-0005

16502426

75

Zone 3

091101407-0006

16502403

75

Outside

Spore Types Raw Count Countmsup3 of Total Raw Count Countmsup3 of Total Raw Count Countmsup3 of TotalAlternaria - - - - - - - - -

Ascospores - - - - - - - - -

AspergillusPenicillium - - - - - - - - -

Basidiospores - - - - - - 5 211 457

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium - - - - - - 4 169 366

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - 1 42 91

Myxomycetes++ 1 42 100 - - - 2 27 58

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - 1 13 28

Total Fungi 1 42 100 - None Detected - 13 462 100

Hyphal Fragment 1 42 - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 13 - - - - 2 27 -

Analyt Sensitivity 600x - 42 - - 42 - - 42 -

Analyt Sensitivity 300x - 13 - - 13 - - 13 -

Skin Fragments (1-4) - 3 - - 2 - - 1 -

Fibrous Particulate (1-4) - 3 - - 2 - - 1 -

Background (1-5) - 3 - - 2 - - 2 -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 2 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0007

16502397

75

Outside

091101407-9901

Dummy

Dummy

Dummy

091101407-9902

Dummy

Dummy

Dummy

Spore Types Raw Count Countmsup3 of Total - - - - - -Alternaria - - - - - - - - -

Ascospores 2 84 53 - - - - - -

AspergillusPenicillium 5 211 132 - - - - - -

Basidiospores 7 295 184 - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium 22 928 58 - - - - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ 2 84 53 - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 38 1600 100 - - - - - -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 42 - - - - - - -

Analyt Sensitivity 600x - 42 - - - - - - -

Analyt Sensitivity 300x - 13 - - - - - - -

Skin Fragments (1-4) - 1 - - - - - - -

Fibrous Particulate (1-4) - 1 - - - - - - -

Background (1-5) - 2 - - - - - - -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 3 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 7: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

Asbestos bull Lead bull Environmental bull Materials amp Indoor Air Analysis

EMSL Analytical Inc2235 Polvorosa Ave Suite 230 San Leandro CA 94577

Phone (510) 895-3675 Fax (510) 895-3680 Web httpwwwemslcom Emailmilpitaslabemslcom

Attn Julia Siudyla

ACC Environmental Consultants Inc

7977 Capwell Drive

Suite 100

Oakland CA 94621

Proj Ed Roberts Campus LEED 8139-00100

EMSL OrderCustomer ID

Received

Analyzed

Collected

091101407ACCE56

21420112162011

2112011

Test Report Air-O - Cell(trade) Analysis of Fungal Spores amp Particulates by Optical Microscopy (EMSL Method 05-TP-003)

Lab Sample Number

Client Sample ID

Volume (L)

Sample Location

091101407-0007

16502397

75

Outside

091101407-9901

Dummy

Dummy

Dummy

091101407-9902

Dummy

Dummy

Dummy

Spore Types Raw Count Countmsup3 of Total - - - - - -Alternaria - - - - - - - - -

Ascospores 2 84 53 - - - - - -

AspergillusPenicillium 5 211 132 - - - - - -

Basidiospores 7 295 184 - - - - - -

Bipolaris++ - - - - - - - - -

Chaetomium - - - - - - - - -

Cladosporium 22 928 58 - - - - - -

Curvularia - - - - - - - - -

Epicoccum - - - - - - - - -

Fusarium - - - - - - - - -

Ganoderma - - - - - - - - -

Myxomycetes++ 2 84 53 - - - - - -

Pithomyces - - - - - - - - -

Rust - - - - - - - - -

Scopulariopsis - - - - - - - - -

Stachybotrys - - - - - - - - -

Torula - - - - - - - - -

Ulocladium - - - - - - - - -

Unidentifiable Spores - - - - - - - - -

Zygomycetes - - - - - - - - -

Oidium - - - - - - - - -

Total Fungi 38 1600 100 - - - - - -

Hyphal Fragment - - - - - - - - -

Insect Fragment - - - - - - - - -

Pollen 1 42 - - - - - - -

Analyt Sensitivity 600x - 42 - - - - - - -

Analyt Sensitivity 300x - 13 - - - - - - -

Skin Fragments (1-4) - 1 - - - - - - -

Fibrous Particulate (1-4) - 1 - - - - - - -

Background (1-5) - 2 - - - - - - -

No discernable field blank was submitted with this group of samples

Samples analyzed by EMSL Analytical Inc 2235 Polvorosa Ave Suite 230 San Leandro CA AIHA-LAP LLC--EMLAP Lab 101748

Israel Gutierrez

or Other Approved Signatory

High levels of background particulate can obscure spores and other particulates leading to underestimation Background levels

of 5 indicate an overloading of background particulates prohibiting accurate detection and quantification Present = Spores

detected on overloaded samples Results are not blank corrected unless othewise noted The detection limit is equal to one

fungal spore structure pollen fiber particle or insect fragment Denotes particles found at 300X - Denotes not detected

EMSL maintains liability limited to cost of anaysis This report relates only to the samples reported above and may not be

reproduced except in full without written approval by EMSL EMSL bears no responsibility for sample collection activities or

analytical method limitations Interpretation and use of test results are the responsibility of the client Samples received in good

condition unless otherwise noted

Bipolaris++ = BipolarisDreschleraExserohilum Myxomycetes++ = MyxomycetesPericoniaSmut

Page 3 of 3

For Information on the fungi listed in this report please visit the Resources section at wwwemslcom

Test Report SPVER3-7227 Printed 2162011 114246AM

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 8: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 101911 AM2112011 21111 PM PAC IIIERXB-0030v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARTJ0051PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 101911 AMInstrument switched-onEVE2112011 101911 AMTemperature changed 21EVE2112011 101911 AMTemperature changed 0VAL2112011 101911 AMINVVAL2112011 102011 AM000VAL2112011 102111 AM000VAL2112011 102211 AM000VAL2112011 102311 AM000VAL2112011 102411 AM000VAL2112011 102511 AM000VAL2112011 102611 AM000VAL2112011 102711 AM000VAL2112011 102811 AM000VAL2112011 102911 AM000VAL2112011 103011 AM000VAL2112011 103111 AM000VAL2112011 103211 AM000VAL2112011 103311 AM000VAL2112011 103411 AM000VAL2112011 103511 AM000VAL2112011 103611 AM000EVE2112011 103711 AMTemperature changed 17VAL2112011 103711 AM000VAL2112011 103811 AM000VAL2112011 103911 AM000VAL2112011 104011 AM000VAL2112011 104111 AM000VAL2112011 104211 AM000VAL2112011 104311 AM000VAL2112011 104411 AM000VAL2112011 104511 AM000VAL2112011 104611 AM-100VAL2112011 104711 AM000VAL2112011 104811 AM-100VAL2112011 104911 AM000VAL2112011 105011 AM000VAL2112011 105111 AM-100VAL2112011 105211 AM-100VAL2112011 105311 AM-100VAL2112011 105411 AM-100EVE2112011 105511 AMTemperature changed 19

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 9: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 105511 AM-200VAL2112011 105611 AM-100VAL2112011 105711 AM-200VAL2112011 105811 AM-200VAL2112011 105911 AM-200VAL2112011 110011 AM-300VAL2112011 110111 AM-200VAL2112011 110211 AM-200VAL2112011 110311 AM-200VAL2112011 110411 AM-200VAL2112011 110511 AM-200VAL2112011 110611 AM-300VAL2112011 110711 AM-300VAL2112011 110811 AM-200VAL2112011 110911 AM-200VAL2112011 111011 AM-200VAL2112011 111111 AM-300VAL2112011 111211 AM-300VAL2112011 111311 AM-300VAL2112011 111411 AM-300VAL2112011 111511 AM-300VAL2112011 111611 AM-300VAL2112011 111711 AM-300VAL2112011 111811 AM-300VAL2112011 111911 AM-300VAL2112011 112011 AM-300VAL2112011 112111 AM-300VAL2112011 112211 AM-300VAL2112011 112311 AM-300VAL2112011 112411 AM-300VAL2112011 112511 AM-300VAL2112011 112611 AM-300EVE2112011 112711 AMTemperature changed 21VAL2112011 112711 AM-300VAL2112011 112811 AM-300VAL2112011 112911 AM-300VAL2112011 113011 AM-300VAL2112011 113111 AM-300VAL2112011 113211 AM-300VAL2112011 113311 AM-300VAL2112011 113411 AM-300VAL2112011 113511 AM-300VAL2112011 113611 AM-300VAL2112011 113711 AM-300VAL2112011 113811 AM-300VAL2112011 113911 AM-300VAL2112011 114011 AM-300VAL2112011 114111 AM-300VAL2112011 114211 AM-300VAL2112011 114311 AM-300VAL2112011 114411 AM-300

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 10: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114511 AM-300VAL2112011 114611 AM-300VAL2112011 114711 AM-300VAL2112011 114811 AM-300VAL2112011 114911 AM-300VAL2112011 115011 AM-300VAL2112011 115111 AM-300VAL2112011 115211 AM-300VAL2112011 115311 AM-300VAL2112011 115411 AM-300VAL2112011 115511 AM-300VAL2112011 115611 AM-300VAL2112011 115711 AM-300VAL2112011 115811 AM-300VAL2112011 115911 AM-300VAL2112011 120011 PM-300VAL2112011 120111 PM-300VAL2112011 120211 PM-300VAL2112011 120311 PM-300VAL2112011 120411 PM-300VAL2112011 120511 PM-300VAL2112011 120611 PM-300VAL2112011 120711 PM-300VAL2112011 120811 PM-300VAL2112011 120911 PM-300VAL2112011 121011 PM-300VAL2112011 121111 PM-400VAL2112011 121211 PM-300VAL2112011 121311 PM-300VAL2112011 121411 PM-300VAL2112011 121511 PM-300VAL2112011 121611 PM-300VAL2112011 121711 PM-300VAL2112011 121811 PM-300VAL2112011 121911 PM-300VAL2112011 122011 PM-300VAL2112011 122111 PM-300VAL2112011 122211 PM-300VAL2112011 122311 PM-300VAL2112011 122411 PM-300VAL2112011 122511 PM-400VAL2112011 122611 PM-300VAL2112011 122711 PM-300VAL2112011 122811 PM-300VAL2112011 122911 PM-300VAL2112011 123011 PM-300VAL2112011 123111 PM-400VAL2112011 123211 PM-300VAL2112011 123311 PM-300VAL2112011 123411 PM-300VAL2112011 123511 PM-300

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 11: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123611 PM-300VAL2112011 123711 PM-300VAL2112011 123811 PM-300VAL2112011 123911 PM-300VAL2112011 124011 PM-300VAL2112011 124111 PM-300VAL2112011 124211 PM-300VAL2112011 124311 PM-300VAL2112011 124411 PM-300VAL2112011 124511 PM-300VAL2112011 124611 PM-300VAL2112011 124711 PM-300VAL2112011 124811 PM-300VAL2112011 124911 PM-300VAL2112011 125011 PM-300VAL2112011 125111 PM-300VAL2112011 125211 PM-300VAL2112011 125311 PM-300VAL2112011 125411 PM-300VAL2112011 125511 PM-300VAL2112011 125611 PM-300VAL2112011 125711 PM-300VAL2112011 125811 PM-300VAL2112011 125911 PM-300VAL2112011 10011 PM-300VAL2112011 10111 PM-300VAL2112011 10211 PM-300VAL2112011 10311 PM-300VAL2112011 10411 PM-300VAL2112011 10511 PM-300VAL2112011 10611 PM-300VAL2112011 10711 PM-300VAL2112011 10811 PM-300VAL2112011 10911 PM-300VAL2112011 11011 PM-300VAL2112011 11111 PM-300VAL2112011 11211 PM-400VAL2112011 11311 PM-300VAL2112011 11411 PM-300VAL2112011 11511 PM-300VAL2112011 11611 PM-400VAL2112011 11711 PM-300VAL2112011 11811 PM-300VAL2112011 11911 PM-300VAL2112011 12011 PM-300VAL2112011 12111 PM-300VAL2112011 12211 PM-400VAL2112011 12311 PM-400VAL2112011 12411 PM-300VAL2112011 12511 PM-300VAL2112011 12611 PM-300

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 12: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12711 PM-300VAL2112011 12811 PM-300VAL2112011 12911 PM-300VAL2112011 13011 PM-400VAL2112011 13111 PM-300VAL2112011 13211 PM-300VAL2112011 13311 PM-300VAL2112011 13411 PM-300VAL2112011 13511 PM-300VAL2112011 13611 PM-300VAL2112011 13711 PM-300VAL2112011 13811 PM-400VAL2112011 13911 PM-300VAL2112011 14011 PM-300VAL2112011 14111 PM-300VAL2112011 14211 PM-300VAL2112011 14311 PM-400VAL2112011 14411 PM-300VAL2112011 14511 PM-400VAL2112011 14611 PM-300VAL2112011 14711 PM-300VAL2112011 14811 PM-400VAL2112011 14911 PM-400VAL2112011 15011 PM-400VAL2112011 15111 PM-300VAL2112011 15211 PM-300VAL2112011 15311 PM-300VAL2112011 15411 PM-300VAL2112011 15511 PM-400VAL2112011 15611 PM-300VAL2112011 15711 PM-300VAL2112011 15811 PM-300VAL2112011 15911 PM-400VAL2112011 20011 PM-300VAL2112011 20111 PM-300VAL2112011 20211 PM-300VAL2112011 20311 PM-300VAL2112011 20411 PM-300VAL2112011 20511 PM-300VAL2112011 20611 PM-300VAL2112011 20711 PM-300VAL2112011 20811 PM-400VAL2112011 20911 PM-300VAL2112011 21011 PM-400EVE2112011 21111 PMData only recordEVE2112011 21111 PMInstrument switched-offEVE2112011 21111 PMLog range changedEVE2112011 21111 PMGas type changedEVE2112011 21111 PMSensor removedEVE2112011 21111 PMLog interval changedEVE2112011 21111 PMTemperature changed 23

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 13: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 21111 PMMinimum peak concentration for session -2100EVE2112011 21111 PMMaximum peak concentration for session 000EVE2112011 21111 PMAlarm threshold(s) changedEVE2112011 21111 PMSession Id changed 00000000EVE2112011 21111 PMInstrument ID changed 00000OO0EVE2112011 21111 PMTWA accumulator at end of session 000EVE2112011 21111 PMSTEV at end of session 000EVE2112011 21111 PMTWA pre alarm limit changed 3000EVE2112011 21111 PMGas Display Unit changed ppmEVE2112011 21111 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 14: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 100749 AM2112011 15649 PM PAC IIIERYE-0228 R8654v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARXC0223PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 100749 AMInstrument switched-onVAL2112011 100749 AMINVVAL2112011 100849 AM000VAL2112011 100949 AM000VAL2112011 101049 AM000VAL2112011 101149 AM000VAL2112011 101249 AM000VAL2112011 101349 AM000VAL2112011 101449 AM000VAL2112011 101549 AM000VAL2112011 101649 AM000VAL2112011 101749 AM000VAL2112011 101849 AM000VAL2112011 101949 AM000VAL2112011 102049 AM000VAL2112011 102149 AM000VAL2112011 102249 AM000VAL2112011 102349 AM000VAL2112011 102449 AM000VAL2112011 102549 AM000VAL2112011 102649 AM000VAL2112011 102749 AM000VAL2112011 102849 AM000VAL2112011 102949 AM000VAL2112011 103049 AM000VAL2112011 103149 AM000VAL2112011 103249 AM000VAL2112011 103349 AM000EVE2112011 103449 AMTemperature changed 20VAL2112011 103449 AM000VAL2112011 103549 AM000VAL2112011 103649 AM000VAL2112011 103749 AM000VAL2112011 103849 AM000VAL2112011 103949 AM000VAL2112011 104049 AM000VAL2112011 104149 AM000VAL2112011 104249 AM000VAL2112011 104349 AM000VAL2112011 104449 AM000VAL2112011 104549 AM000VAL2112011 104649 AM000VAL2112011 104749 AM000

Page 1 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 15: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 104849 AM000VAL2112011 104949 AM000VAL2112011 105049 AM000VAL2112011 105149 AM000VAL2112011 105249 AM000VAL2112011 105349 AM000VAL2112011 105449 AM000VAL2112011 105549 AM000VAL2112011 105649 AM000VAL2112011 105749 AM000VAL2112011 105849 AM000VAL2112011 105949 AM000VAL2112011 110049 AM000VAL2112011 110149 AM000VAL2112011 110249 AM000VAL2112011 110349 AM000VAL2112011 110449 AM000VAL2112011 110549 AM000VAL2112011 110649 AM000VAL2112011 110749 AM000VAL2112011 110849 AM000VAL2112011 110949 AM000VAL2112011 111049 AM000VAL2112011 111149 AM000VAL2112011 111249 AM000VAL2112011 111349 AM000VAL2112011 111449 AM000VAL2112011 111549 AM000VAL2112011 111649 AM000VAL2112011 111749 AM000VAL2112011 111849 AM000VAL2112011 111949 AM000VAL2112011 112049 AM000VAL2112011 112149 AM000VAL2112011 112249 AM000VAL2112011 112349 AM000VAL2112011 112449 AM000VAL2112011 112549 AM000VAL2112011 112649 AM000VAL2112011 112749 AM000VAL2112011 112849 AM000VAL2112011 112949 AM000VAL2112011 113049 AM000VAL2112011 113149 AM000VAL2112011 113249 AM000VAL2112011 113349 AM000VAL2112011 113449 AM000VAL2112011 113549 AM000VAL2112011 113649 AM000VAL2112011 113749 AM000VAL2112011 113849 AM000VAL2112011 113949 AM000VAL2112011 114049 AM000

Page 2 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 16: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 114149 AM000VAL2112011 114249 AM000VAL2112011 114349 AM000VAL2112011 114449 AM000VAL2112011 114549 AM000VAL2112011 114649 AM000VAL2112011 114749 AM000VAL2112011 114849 AM000VAL2112011 114949 AM000VAL2112011 115049 AM000VAL2112011 115149 AM000VAL2112011 115249 AM000VAL2112011 115349 AM000VAL2112011 115449 AM000VAL2112011 115549 AM000VAL2112011 115649 AM000VAL2112011 115749 AM000VAL2112011 115849 AM000VAL2112011 115949 AM000VAL2112011 120049 PM000VAL2112011 120149 PM000VAL2112011 120249 PM000VAL2112011 120349 PM000VAL2112011 120449 PM000VAL2112011 120549 PM000VAL2112011 120649 PM000VAL2112011 120749 PM000VAL2112011 120849 PM000VAL2112011 120949 PM000VAL2112011 121049 PM000VAL2112011 121149 PM000VAL2112011 121249 PM000VAL2112011 121349 PM000VAL2112011 121449 PM000VAL2112011 121549 PM000VAL2112011 121649 PM000VAL2112011 121749 PM000VAL2112011 121849 PM000VAL2112011 121949 PM000EVE2112011 122049 PMTemperature changed 22VAL2112011 122049 PM000VAL2112011 122149 PM000VAL2112011 122249 PM000VAL2112011 122349 PM000VAL2112011 122449 PM000VAL2112011 122549 PM000VAL2112011 122649 PM000VAL2112011 122749 PM000VAL2112011 122849 PM000VAL2112011 122949 PM000VAL2112011 123049 PM000VAL2112011 123149 PM000VAL2112011 123249 PM000

Page 3 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 17: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 123349 PM000VAL2112011 123449 PM000VAL2112011 123549 PM000VAL2112011 123649 PM000VAL2112011 123749 PM000VAL2112011 123849 PM000VAL2112011 123949 PM000VAL2112011 124049 PM-100VAL2112011 124149 PM000VAL2112011 124249 PM000VAL2112011 124349 PM000VAL2112011 124449 PM000VAL2112011 124549 PM000VAL2112011 124649 PM000VAL2112011 124749 PM000VAL2112011 124849 PM000VAL2112011 124949 PM000VAL2112011 125049 PM000VAL2112011 125149 PM000VAL2112011 125249 PM000VAL2112011 125349 PM000VAL2112011 125449 PM000VAL2112011 125549 PM000VAL2112011 125649 PM000VAL2112011 125749 PM000VAL2112011 125849 PM000VAL2112011 125949 PM000VAL2112011 10049 PM000VAL2112011 10149 PM000VAL2112011 10249 PM000VAL2112011 10349 PM000VAL2112011 10449 PM000VAL2112011 10549 PM000VAL2112011 10649 PM000VAL2112011 10749 PM000VAL2112011 10849 PM000VAL2112011 10949 PM000VAL2112011 11049 PM000VAL2112011 11149 PM000VAL2112011 11249 PM000VAL2112011 11349 PM000VAL2112011 11449 PM000VAL2112011 11549 PM000VAL2112011 11649 PM000VAL2112011 11749 PM000VAL2112011 11849 PM000VAL2112011 11949 PM000VAL2112011 12049 PM000VAL2112011 12149 PM000VAL2112011 12249 PM000VAL2112011 12349 PM000VAL2112011 12449 PM000VAL2112011 12549 PM000

Page 4 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 18: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 12649 PM000VAL2112011 12749 PM000VAL2112011 12849 PM000VAL2112011 12949 PM000VAL2112011 13049 PM000VAL2112011 13149 PM000VAL2112011 13249 PM-100VAL2112011 13349 PM000VAL2112011 13449 PM000VAL2112011 13549 PM000VAL2112011 13649 PM000VAL2112011 13749 PM000VAL2112011 13849 PM000VAL2112011 13949 PM000VAL2112011 14049 PM000VAL2112011 14149 PM000VAL2112011 14249 PM-100VAL2112011 14349 PM000VAL2112011 14449 PM000VAL2112011 14549 PM-100VAL2112011 14649 PM000VAL2112011 14749 PM000VAL2112011 14849 PM000VAL2112011 14949 PM000VAL2112011 15049 PM000VAL2112011 15149 PM000VAL2112011 15249 PM000VAL2112011 15349 PM000VAL2112011 15449 PM000VAL2112011 15549 PM000EVE2112011 15649 PMData only recordEVE2112011 15649 PMInstrument switched-offEVE2112011 15649 PMLog range changedEVE2112011 15649 PMGas type changedEVE2112011 15649 PMSensor removedEVE2112011 15649 PMLog interval changedEVE2112011 15649 PMTemperature changed 24EVE2112011 15649 PMMinimum peak concentration for session -800EVE2112011 15649 PMMaximum peak concentration for session 000EVE2112011 15649 PMAlarm threshold(s) changedEVE2112011 15649 PMSession Id changed 00000000EVE2112011 15649 PMInstrument ID changed R8654 EVE2112011 15649 PMTWA accumulator at end of session 000EVE2112011 15649 PMSTEV at end of session 000EVE2112011 15649 PMTWA pre alarm limit changed 000EVE2112011 15649 PMGas Display Unit changed ppmEVE2112011 15649 PMMax gas range changed 200000

Page 5 of 5

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 19: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100SESSION_HEADERAver602112011 105707 AM2112011 34107 PM PAC IIIERYE-0232v350GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARZL0146PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 105707 AMInstrument switched-onVAL2112011 105707 AMINVVAL2112011 105807 AM000VAL2112011 105907 AM000VAL2112011 110007 AM000VAL2112011 110107 AM000VAL2112011 110207 AM000VAL2112011 110307 AM000VAL2112011 110407 AM000VAL2112011 110507 AM000VAL2112011 110607 AM000VAL2112011 110707 AM000VAL2112011 110807 AM000VAL2112011 110907 AM000VAL2112011 111007 AM000VAL2112011 111107 AM000VAL2112011 111207 AM000VAL2112011 111307 AM000VAL2112011 111407 AM000VAL2112011 111507 AM000VAL2112011 111607 AM000VAL2112011 111707 AM000VAL2112011 111807 AM000VAL2112011 111907 AM000VAL2112011 112007 AM000VAL2112011 112107 AM000VAL2112011 112207 AM000VAL2112011 112307 AM000VAL2112011 112407 AM000VAL2112011 112507 AM000VAL2112011 112607 AM000VAL2112011 112707 AM000VAL2112011 112807 AM000EVE2112011 112907 AMTemperature changed 20VAL2112011 112907 AM000VAL2112011 113007 AM000VAL2112011 113107 AM000VAL2112011 113207 AM000VAL2112011 113307 AM000VAL2112011 113407 AM000VAL2112011 113507 AM000

Page 1 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 20: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 113607 AM000VAL2112011 113707 AM000VAL2112011 113807 AM000VAL2112011 113907 AM000VAL2112011 114007 AM000VAL2112011 114107 AM000VAL2112011 114207 AM000VAL2112011 114307 AM000VAL2112011 114407 AM000VAL2112011 114507 AM000VAL2112011 114607 AM000VAL2112011 114707 AM000VAL2112011 114807 AM000VAL2112011 114907 AM000VAL2112011 115007 AM000VAL2112011 115107 AM000VAL2112011 115207 AM000VAL2112011 115307 AM000VAL2112011 115407 AM000VAL2112011 115507 AM000VAL2112011 115607 AM000VAL2112011 115707 AM000VAL2112011 115807 AM000VAL2112011 115907 AM000VAL2112011 120007 PM000VAL2112011 120107 PM000VAL2112011 120207 PM000VAL2112011 120307 PM000VAL2112011 120407 PM000VAL2112011 120507 PM000VAL2112011 120607 PM000VAL2112011 120707 PM000VAL2112011 120807 PM000VAL2112011 120907 PM000VAL2112011 121007 PM000VAL2112011 121107 PM000VAL2112011 121207 PM000VAL2112011 121307 PM000VAL2112011 121407 PM000VAL2112011 121507 PM000VAL2112011 121607 PM000VAL2112011 121707 PM000VAL2112011 121807 PM000VAL2112011 121907 PM000VAL2112011 122007 PM000VAL2112011 122107 PM000VAL2112011 122207 PM000VAL2112011 122307 PM000VAL2112011 122407 PM000VAL2112011 122507 PM000VAL2112011 122607 PM000

Page 2 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 21: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 122707 PM000VAL2112011 122807 PM000VAL2112011 122907 PM000VAL2112011 123007 PM000VAL2112011 123107 PM000VAL2112011 123207 PM000VAL2112011 123307 PM000VAL2112011 123407 PM000VAL2112011 123507 PM000VAL2112011 123607 PM000VAL2112011 123707 PM000VAL2112011 123807 PM000VAL2112011 123907 PM000VAL2112011 124007 PM000VAL2112011 124107 PM000VAL2112011 124207 PM000VAL2112011 124307 PM000VAL2112011 124407 PM000VAL2112011 124507 PM000VAL2112011 124607 PM000VAL2112011 124707 PM000VAL2112011 124807 PM000VAL2112011 124907 PM000VAL2112011 125007 PM000VAL2112011 125107 PM000VAL2112011 125207 PM000VAL2112011 125307 PM000VAL2112011 125407 PM000VAL2112011 125507 PM000VAL2112011 125607 PM000VAL2112011 125707 PM000VAL2112011 125807 PM000VAL2112011 125907 PM000VAL2112011 10007 PM000VAL2112011 10107 PM000VAL2112011 10207 PM000VAL2112011 10307 PM000VAL2112011 10407 PM000VAL2112011 10507 PM000VAL2112011 10607 PM000VAL2112011 10707 PM000VAL2112011 10807 PM000VAL2112011 10907 PM000VAL2112011 11007 PM000VAL2112011 11107 PM000VAL2112011 11207 PM000VAL2112011 11307 PM000VAL2112011 11407 PM000VAL2112011 11507 PM000VAL2112011 11607 PM000VAL2112011 11707 PM000

Page 3 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 22: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 11807 PM000VAL2112011 11907 PM000VAL2112011 12007 PM000VAL2112011 12107 PM000VAL2112011 12207 PM000VAL2112011 12307 PM000VAL2112011 12407 PM000VAL2112011 12507 PM000VAL2112011 12607 PM000VAL2112011 12707 PM000VAL2112011 12807 PM000VAL2112011 12907 PM000VAL2112011 13007 PM000VAL2112011 13107 PM000VAL2112011 13207 PM000VAL2112011 13307 PM000VAL2112011 13407 PM000VAL2112011 13507 PM000VAL2112011 13607 PM000VAL2112011 13707 PM000VAL2112011 13807 PM000VAL2112011 13907 PM000VAL2112011 14007 PM000VAL2112011 14107 PM000VAL2112011 14207 PM000VAL2112011 14307 PM000VAL2112011 14407 PM000VAL2112011 14507 PM000VAL2112011 14607 PM000VAL2112011 14707 PM000VAL2112011 14807 PM000VAL2112011 14907 PM000VAL2112011 15007 PM000VAL2112011 15107 PM000VAL2112011 15207 PM000VAL2112011 15307 PM000VAL2112011 15407 PM000VAL2112011 15507 PM000VAL2112011 15607 PM000VAL2112011 15707 PM000VAL2112011 15807 PM000VAL2112011 15907 PM000VAL2112011 20007 PM000VAL2112011 20107 PM000VAL2112011 20207 PM000VAL2112011 20307 PM000VAL2112011 20407 PM000VAL2112011 20507 PM000VAL2112011 20607 PM000VAL2112011 20707 PM000VAL2112011 20807 PM000

Page 4 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 23: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 20907 PM000VAL2112011 21007 PM000VAL2112011 21107 PM000VAL2112011 21207 PM000VAL2112011 21307 PM000VAL2112011 21407 PM000VAL2112011 21507 PM000VAL2112011 21607 PM000VAL2112011 21707 PM000VAL2112011 21807 PM000VAL2112011 21907 PM000VAL2112011 22007 PM000VAL2112011 22107 PM000VAL2112011 22207 PM000VAL2112011 22307 PM000VAL2112011 22407 PM000VAL2112011 22507 PM000VAL2112011 22607 PM000VAL2112011 22707 PM000VAL2112011 22807 PM000VAL2112011 22907 PM000VAL2112011 23007 PM000VAL2112011 23107 PM000VAL2112011 23207 PM000VAL2112011 23307 PM000VAL2112011 23407 PM000VAL2112011 23507 PM000VAL2112011 23607 PM000VAL2112011 23707 PM000VAL2112011 23807 PM000VAL2112011 23907 PM000VAL2112011 24007 PM000VAL2112011 24107 PM000VAL2112011 24207 PM000VAL2112011 24307 PM000VAL2112011 24407 PM000VAL2112011 24507 PM000VAL2112011 24607 PM000VAL2112011 24707 PM000VAL2112011 24807 PM000VAL2112011 24907 PM000VAL2112011 25007 PM000VAL2112011 25107 PM000VAL2112011 25207 PM000VAL2112011 25307 PM000VAL2112011 25407 PM000VAL2112011 25507 PM000VAL2112011 25607 PM000VAL2112011 25707 PM000VAL2112011 25807 PM000VAL2112011 25907 PM000

Page 5 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 24: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100VAL2112011 30007 PM000VAL2112011 30107 PM000VAL2112011 30207 PM000VAL2112011 30307 PM000VAL2112011 30407 PM000VAL2112011 30507 PM000VAL2112011 30607 PM000VAL2112011 30707 PM000VAL2112011 30807 PM000VAL2112011 30907 PM000VAL2112011 31007 PM000VAL2112011 31107 PM000VAL2112011 31207 PM000VAL2112011 31307 PM000VAL2112011 31407 PM000VAL2112011 31507 PM000VAL2112011 31607 PM000VAL2112011 31707 PM000VAL2112011 31807 PM000VAL2112011 31907 PM000VAL2112011 32007 PM000VAL2112011 32107 PM000VAL2112011 32207 PM000VAL2112011 32307 PM000VAL2112011 32407 PM000VAL2112011 32507 PM000VAL2112011 32607 PM000VAL2112011 32707 PM000VAL2112011 32807 PM000VAL2112011 32907 PM000VAL2112011 33007 PM000VAL2112011 33107 PM000VAL2112011 33207 PM000VAL2112011 33307 PM000VAL2112011 33407 PM000VAL2112011 33507 PM000VAL2112011 33607 PM000VAL2112011 33707 PM000VAL2112011 33807 PM000VAL2112011 33907 PM000VAL2112011 34007 PM000EVE2112011 34107 PMData only recordEVE2112011 34107 PMInstrument switched-offEVE2112011 34107 PMLog range changedEVE2112011 34107 PMGas type changedEVE2112011 34107 PMSensor removedEVE2112011 34107 PMLog interval changedEVE2112011 34107 PMTemperature changed 22EVE2112011 34107 PMMinimum peak concentration for session -200EVE2112011 34107 PMMaximum peak concentration for session 300EVE2112011 34107 PMAlarm threshold(s) changed

Page 6 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 25: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100EVE2112011 34107 PMSession Id changed 00000000EVE2112011 34107 PMInstrument ID changed 00000000EVE2112011 34107 PMTWA accumulator at end of session 000EVE2112011 34107 PMSTEV at end of session 000EVE2112011 34107 PMTWA pre alarm limit changed 3000EVE2112011 34107 PMGas Display Unit changed ppmEVE2112011 34107 PMMax gas range changed 200000

Page 7 of 7

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 26: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 104432 AM2112011 24832 PM PAC IIIERTK-0321R7028 v340GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYE0205PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 104432 AMInstrument switched-onEVE2112011 104432 AMTemperature changed 19EVE2112011 104432 AMTemperature changed 0VAL2112011 104432 AMINVVAL2112011 104532 AM000VAL2112011 104632 AM000VAL2112011 104732 AM000VAL2112011 104832 AM000VAL2112011 104932 AM000VAL2112011 105032 AM000VAL2112011 105132 AM000VAL2112011 105232 AM000VAL2112011 105332 AM000VAL2112011 105432 AM000VAL2112011 105532 AM000VAL2112011 105632 AM000VAL2112011 105732 AM000VAL2112011 105832 AM000VAL2112011 105932 AM000VAL2112011 110032 AM000VAL2112011 110132 AM000VAL2112011 110232 AM000VAL2112011 110332 AM000EVE2112011 110432 AMTemperature changed 18VAL2112011 110432 AM000VAL2112011 110532 AM000VAL2112011 110632 AM000VAL2112011 110732 AM000VAL2112011 110832 AM000VAL2112011 110932 AM000VAL2112011 111032 AM000VAL2112011 111132 AM000VAL2112011 111232 AM000VAL2112011 111332 AM000VAL2112011 111432 AM000VAL2112011 111532 AM000VAL2112011 111632 AM000VAL2112011 111732 AM000VAL2112011 111832 AM000VAL2112011 111932 AM000VAL2112011 112032 AM000VAL2112011 112132 AM000VAL2112011 112232 AM000VAL2112011 112332 AM000VAL2112011 112432 AM000VAL2112011 112532 AM000VAL2112011 112632 AM000VAL2112011 112732 AM000VAL2112011 112832 AM000VAL2112011 112932 AM000VAL2112011 113032 AM000VAL2112011 113132 AM000VAL2112011 113232 AM000VAL2112011 113332 AM000VAL2112011 113432 AM000VAL2112011 113532 AM000VAL2112011 113632 AM000VAL2112011 113732 AM000VAL2112011 113832 AM000

Page 1 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 27: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 113932 AM000VAL2112011 114032 AM000VAL2112011 114132 AM000VAL2112011 114232 AM000VAL2112011 114332 AM000VAL2112011 114432 AM000VAL2112011 114532 AM000VAL2112011 114632 AM000VAL2112011 114732 AM000VAL2112011 114832 AM000VAL2112011 114932 AM000EVE2112011 115032 AMTemperature changed 20VAL2112011 115032 AM000VAL2112011 115132 AM000VAL2112011 115232 AM000VAL2112011 115332 AM000VAL2112011 115432 AM000VAL2112011 115532 AM000VAL2112011 115632 AM000VAL2112011 115732 AM000VAL2112011 115832 AM000VAL2112011 115932 AM000VAL2112011 120032 PM000VAL2112011 120132 PM000VAL2112011 120232 PM000VAL2112011 120332 PM000VAL2112011 120432 PM000VAL2112011 120532 PM000VAL2112011 120632 PM000VAL2112011 120732 PM000VAL2112011 120832 PM000VAL2112011 120932 PM000VAL2112011 121032 PM000VAL2112011 121132 PM000VAL2112011 121232 PM000VAL2112011 121332 PM000VAL2112011 121432 PM000VAL2112011 121532 PM000VAL2112011 121632 PM000VAL2112011 121732 PM000VAL2112011 121832 PM000VAL2112011 121932 PM000VAL2112011 122032 PM000VAL2112011 122132 PM000VAL2112011 122232 PM000VAL2112011 122332 PM000VAL2112011 122432 PM-100VAL2112011 122532 PM000VAL2112011 122632 PM000VAL2112011 122732 PM000VAL2112011 122832 PM000VAL2112011 122932 PM000VAL2112011 123032 PM000VAL2112011 123132 PM000VAL2112011 123232 PM000VAL2112011 123332 PM-100VAL2112011 123432 PM000VAL2112011 123532 PM000VAL2112011 123632 PM000VAL2112011 123732 PM-100VAL2112011 123832 PM000VAL2112011 123932 PM000VAL2112011 124032 PM000VAL2112011 124132 PM000VAL2112011 124232 PM000VAL2112011 124332 PM000VAL2112011 124432 PM000VAL2112011 124532 PM000VAL2112011 124632 PM000

Page 2 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 28: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124732 PM000VAL2112011 124832 PM000VAL2112011 124932 PM000VAL2112011 125032 PM000VAL2112011 125132 PM000VAL2112011 125232 PM-100VAL2112011 125332 PM000VAL2112011 125432 PM000VAL2112011 125532 PM000VAL2112011 125632 PM000VAL2112011 125732 PM-100VAL2112011 125832 PM000VAL2112011 125932 PM000VAL2112011 10032 PM000VAL2112011 10132 PM000VAL2112011 10232 PM000VAL2112011 10332 PM000VAL2112011 10432 PM000VAL2112011 10532 PM000VAL2112011 10632 PM-100VAL2112011 10732 PM-100VAL2112011 10832 PM000VAL2112011 10932 PM000VAL2112011 11032 PM000VAL2112011 11132 PM000VAL2112011 11232 PM-100VAL2112011 11332 PM-100VAL2112011 11432 PM000VAL2112011 11532 PM000VAL2112011 11632 PM000VAL2112011 11732 PM-100VAL2112011 11832 PM000VAL2112011 11932 PM-100VAL2112011 12032 PM000VAL2112011 12132 PM-100VAL2112011 12232 PM000VAL2112011 12332 PM000VAL2112011 12432 PM000VAL2112011 12532 PM000VAL2112011 12632 PM000VAL2112011 12732 PM000VAL2112011 12832 PM-100VAL2112011 12932 PM000VAL2112011 13032 PM000VAL2112011 13132 PM000VAL2112011 13232 PM000VAL2112011 13332 PM000VAL2112011 13432 PM000VAL2112011 13532 PM000VAL2112011 13632 PM-100VAL2112011 13732 PM-100VAL2112011 13832 PM-100VAL2112011 13932 PM000VAL2112011 14032 PM-100VAL2112011 14132 PM-100VAL2112011 14232 PM-100VAL2112011 14332 PM-100VAL2112011 14432 PM000VAL2112011 14532 PM000VAL2112011 14632 PM000VAL2112011 14732 PM000VAL2112011 14832 PM-100VAL2112011 14932 PM-100VAL2112011 15032 PM000VAL2112011 15132 PM-100VAL2112011 15232 PM-100VAL2112011 15332 PM-100VAL2112011 15432 PM-100VAL2112011 15532 PM-100

Page 3 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 29: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 15632 PM-100VAL2112011 15732 PM000VAL2112011 15832 PM-100VAL2112011 15932 PM-200VAL2112011 20032 PM-100VAL2112011 20132 PM-100VAL2112011 20232 PM000VAL2112011 20332 PM-100VAL2112011 20432 PM000VAL2112011 20532 PM-100VAL2112011 20632 PM-100VAL2112011 20732 PM-100VAL2112011 20832 PM-100VAL2112011 20932 PM-200VAL2112011 21032 PM-100VAL2112011 21132 PM-100VAL2112011 21232 PM-100VAL2112011 21332 PM-100VAL2112011 21432 PM-100VAL2112011 21532 PM-100VAL2112011 21632 PM-100VAL2112011 21732 PM-100VAL2112011 21832 PM000VAL2112011 21932 PM000VAL2112011 22032 PM-200VAL2112011 22132 PM000VAL2112011 22232 PM-100VAL2112011 22332 PM-100VAL2112011 22432 PM-100VAL2112011 22532 PM-100VAL2112011 22632 PM-100VAL2112011 22732 PM-200VAL2112011 22832 PM-200VAL2112011 22932 PM-200VAL2112011 23032 PM-100VAL2112011 23132 PM-100VAL2112011 23232 PM-100VAL2112011 23332 PM-100VAL2112011 23432 PM-100VAL2112011 23532 PM-100VAL2112011 23632 PM-100VAL2112011 23732 PM-200VAL2112011 23832 PM-100VAL2112011 23932 PM-100VAL2112011 24032 PM-200VAL2112011 24132 PM-200VAL2112011 24232 PM-100VAL2112011 24332 PM-100VAL2112011 24432 PM-100VAL2112011 24532 PM-100VAL2112011 24632 PM-100VAL2112011 24732 PM-100EVE2112011 24832 PMData only recordEVE2112011 24832 PMInstrument switched-offEVE2112011 24832 PMLog range changedEVE2112011 24832 PMGas type changedEVE2112011 24832 PMSensor removedEVE2112011 24832 PMLog interval changedEVE2112011 24832 PMTemperature changed 22EVE2112011 24832 PMMinimum peak concentration for session -300EVE2112011 24832 PMMaximum peak concentration for session 000EVE2112011 24832 PMAlarm threshold(s) changedEVE2112011 24832 PMSession Id changed 00000000EVE2112011 24832 PMInstrument ID changed R7028 EVE2112011 24832 PMTWA accumulator at end of session 000EVE2112011 24832 PMSTEV at end of session 000EVE2112011 24832 PMTWA pre alarm limit changed 000EVE2112011 24832 PMGas Display Unit changed ppmEVE2112011 24832 PMMax gas range changed 200000

Page 4 of 4

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 30: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

SESSION_HEADERAver602112011 93937 AM2112011 13137 PM PAC IIIERXL-0137GASTYPECOUNITNAMEppmGAS_A13000GAS_A26000RANGE200000SERIALNOARYD0030PARTNO--CALDATE2102011SENSORTYPEElchEVE2112011 93937 AMInstrument switched-onEVE2112011 93937 AMTemperature changed 21VAL2112011 93937 AMINVVAL2112011 94037 AM000VAL2112011 94137 AM000VAL2112011 94237 AM000VAL2112011 94337 AM000VAL2112011 94437 AM000VAL2112011 94537 AM000VAL2112011 94637 AM000VAL2112011 94737 AM000EVE2112011 94837 AMTemperature changed 19VAL2112011 94837 AM000VAL2112011 94937 AM000VAL2112011 95037 AM000VAL2112011 95137 AM000VAL2112011 95237 AM000VAL2112011 95337 AM000VAL2112011 95437 AM000VAL2112011 95537 AM000VAL2112011 95637 AM000VAL2112011 95737 AM000VAL2112011 95837 AM000VAL2112011 95937 AM000VAL2112011 100037 AM000VAL2112011 100137 AM000VAL2112011 100237 AM000VAL2112011 100337 AM000VAL2112011 100437 AM000VAL2112011 100537 AM000VAL2112011 100637 AM000VAL2112011 100737 AM000VAL2112011 100837 AM000VAL2112011 100937 AM000VAL2112011 101037 AM000VAL2112011 101137 AM000VAL2112011 101237 AM000VAL2112011 101337 AM000VAL2112011 101437 AM000VAL2112011 101537 AM000

Page 1 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 31: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 101637 AM000VAL2112011 101737 AM000VAL2112011 101837 AM000VAL2112011 101937 AM000VAL2112011 102037 AM000VAL2112011 102137 AM000VAL2112011 102237 AM000VAL2112011 102337 AM000VAL2112011 102437 AM000VAL2112011 102537 AM000VAL2112011 102637 AM000VAL2112011 102737 AM000VAL2112011 102837 AM000VAL2112011 102937 AM000VAL2112011 103037 AM000VAL2112011 103137 AM000VAL2112011 103237 AM000VAL2112011 103337 AM000VAL2112011 103437 AM000VAL2112011 103537 AM000VAL2112011 103637 AM000VAL2112011 103737 AM000VAL2112011 103837 AM000VAL2112011 103937 AM000VAL2112011 104037 AM000VAL2112011 104137 AM000VAL2112011 104237 AM000VAL2112011 104337 AM000VAL2112011 104437 AM000VAL2112011 104537 AM000VAL2112011 104637 AM000VAL2112011 104737 AM000VAL2112011 104837 AM000VAL2112011 104937 AM000VAL2112011 105037 AM000VAL2112011 105137 AM000VAL2112011 105237 AM000VAL2112011 105337 AM000VAL2112011 105437 AM000VAL2112011 105537 AM000VAL2112011 105637 AM000VAL2112011 105737 AM000VAL2112011 105837 AM000VAL2112011 105937 AM000VAL2112011 110037 AM000VAL2112011 110137 AM000VAL2112011 110237 AM000VAL2112011 110337 AM000VAL2112011 110437 AM000VAL2112011 110537 AM000

Page 2 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 32: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 110637 AM000VAL2112011 110737 AM000VAL2112011 110837 AM000VAL2112011 110937 AM000VAL2112011 111037 AM000VAL2112011 111137 AM000VAL2112011 111237 AM000VAL2112011 111337 AM000VAL2112011 111437 AM000VAL2112011 111537 AM000VAL2112011 111637 AM000VAL2112011 111737 AM000VAL2112011 111837 AM000VAL2112011 111937 AM000VAL2112011 112037 AM000VAL2112011 112137 AM000VAL2112011 112237 AM000VAL2112011 112337 AM000VAL2112011 112437 AM000VAL2112011 112537 AM000VAL2112011 112637 AM000VAL2112011 112737 AM000VAL2112011 112837 AM000VAL2112011 112937 AM000VAL2112011 113037 AM000VAL2112011 113137 AM000VAL2112011 113237 AM000VAL2112011 113337 AM000EVE2112011 113437 AMTemperature changed 21VAL2112011 113437 AM000VAL2112011 113537 AM000VAL2112011 113637 AM000VAL2112011 113737 AM000VAL2112011 113837 AM000VAL2112011 113937 AM000VAL2112011 114037 AM000VAL2112011 114137 AM000VAL2112011 114237 AM000VAL2112011 114337 AM000VAL2112011 114437 AM000VAL2112011 114537 AM000VAL2112011 114637 AM000VAL2112011 114737 AM000VAL2112011 114837 AM000VAL2112011 114937 AM000VAL2112011 115037 AM000VAL2112011 115137 AM000VAL2112011 115237 AM000VAL2112011 115337 AM000VAL2112011 115437 AM000

Page 3 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 33: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 115537 AM000VAL2112011 115637 AM000VAL2112011 115737 AM000VAL2112011 115837 AM000VAL2112011 115937 AM000VAL2112011 120037 PM000VAL2112011 120137 PM000VAL2112011 120237 PM000VAL2112011 120337 PM000VAL2112011 120437 PM000VAL2112011 120537 PM000VAL2112011 120637 PM000VAL2112011 120737 PM000VAL2112011 120837 PM000VAL2112011 120937 PM000VAL2112011 121037 PM000VAL2112011 121137 PM000VAL2112011 121237 PM000VAL2112011 121337 PM000VAL2112011 121437 PM000VAL2112011 121537 PM000VAL2112011 121637 PM000VAL2112011 121737 PM000VAL2112011 121837 PM000VAL2112011 121937 PM000VAL2112011 122037 PM000VAL2112011 122137 PM000VAL2112011 122237 PM000VAL2112011 122337 PM000VAL2112011 122437 PM000VAL2112011 122537 PM000VAL2112011 122637 PM000VAL2112011 122737 PM000VAL2112011 122837 PM000VAL2112011 122937 PM000VAL2112011 123037 PM000VAL2112011 123137 PM000VAL2112011 123237 PM000VAL2112011 123337 PM000VAL2112011 123437 PM000VAL2112011 123537 PM000VAL2112011 123637 PM000VAL2112011 123737 PM000VAL2112011 123837 PM000VAL2112011 123937 PM000VAL2112011 124037 PM000VAL2112011 124137 PM000VAL2112011 124237 PM000VAL2112011 124337 PM000VAL2112011 124437 PM000

Page 4 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 34: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

VAL2112011 124537 PM000VAL2112011 124637 PM000VAL2112011 124737 PM000VAL2112011 124837 PM000VAL2112011 124937 PM000VAL2112011 125037 PM000VAL2112011 125137 PM000VAL2112011 125237 PM000VAL2112011 125337 PM000VAL2112011 125437 PM000VAL2112011 125537 PM000VAL2112011 125637 PM000VAL2112011 125737 PM000VAL2112011 125837 PM000VAL2112011 125937 PM000VAL2112011 10037 PM000VAL2112011 10137 PM000VAL2112011 10237 PM000VAL2112011 10337 PM000VAL2112011 10437 PM000VAL2112011 10537 PM000VAL2112011 10637 PM000VAL2112011 10737 PM000VAL2112011 10837 PM000VAL2112011 10937 PM000VAL2112011 11037 PM000VAL2112011 11137 PM000VAL2112011 11237 PM000VAL2112011 11337 PM000VAL2112011 11437 PM000VAL2112011 11537 PM000VAL2112011 11637 PM000VAL2112011 11737 PM000VAL2112011 11837 PM000VAL2112011 11937 PM000VAL2112011 12037 PM000VAL2112011 12137 PM000VAL2112011 12237 PM000VAL2112011 12337 PM000VAL2112011 12437 PM000VAL2112011 12537 PM000VAL2112011 12637 PM000VAL2112011 12737 PM000VAL2112011 12837 PM000VAL2112011 12937 PM000VAL2112011 13037 PM000EVE2112011 13137 PMData only recordEVE2112011 13137 PMInstrument switched-offEVE2112011 13137 PMLog range changedEVE2112011 13137 PMGas type changed

Page 5 of 6

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 35: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingDraeger Data

Ed Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

EVE2112011 13137 PMSensor removedEVE2112011 13137 PMLog interval changedEVE2112011 13137 PMTemperature changed 23EVE2112011 13137 PMMinimum peak concentration for session 000EVE2112011 13137 PMMaximum peak concentration for session 000EVE2112011 13137 PMAlarm threshold(s) changedEVE2112011 13137 PMSession Id changed 00000000EVE2112011 13137 PMInstrument ID changed 00000001EVE2112011 13137 PMTWA accumulator at end of session 000EVE2112011 13137 PMSTEV at end of session 000EVE2112011 13137 PMTWA pre alarm limit changed 000EVE2112011 13137 PMGas Display Unit changed ppmEVE2112011 13137 PMMax gas range changed 200000

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 36: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000User ID R5388Tag Number 01Number of logged points 242Start time and date 100628 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0106 mgmgeTime at maximum 105804 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 101958 Feb 11Overall Avg Conc 0003 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 100728 00042 11-Feb 100828 00043 11-Feb 100928 00044 11-Feb 101028 00115 11-Feb 101128 00056 11-Feb 101228 00037 11-Feb 101328 00058 11-Feb 101428 00219 11-Feb 101528 0004

10 11-Feb 101628 000511 11-Feb 101728 000612 11-Feb 101828 000513 11-Feb 101928 000414 11-Feb 102028 000515 11-Feb 102128 000516 11-Feb 102228 000617 11-Feb 102328 000518 11-Feb 102428 000519 11-Feb 102528 000920 11-Feb 102628 000821 11-Feb 102728 000322 11-Feb 102828 000423 11-Feb 102928 000524 11-Feb 103028 000325 11-Feb 103128 000526 11-Feb 103228 000527 11-Feb 103328 000328 11-Feb 103428 000329 11-Feb 103528 000830 11-Feb 103628 000931 11-Feb 103728 000332 11-Feb 103828 0002

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 37: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 103928 000434 11-Feb 104028 000335 11-Feb 104128 000636 11-Feb 104228 000237 11-Feb 104328 000238 11-Feb 104428 000239 11-Feb 104528 001140 11-Feb 104628 000441 11-Feb 104728 000442 11-Feb 104828 001243 11-Feb 104928 000444 11-Feb 105028 000345 11-Feb 105128 000246 11-Feb 105228 000847 11-Feb 105328 000248 11-Feb 105428 000249 11-Feb 105528 000250 11-Feb 105628 000251 11-Feb 105728 000852 11-Feb 105828 002353 11-Feb 105928 000254 11-Feb 110028 000355 11-Feb 110128 000556 11-Feb 110228 000257 11-Feb 110328 000358 11-Feb 110428 000259 11-Feb 110528 000360 11-Feb 110628 000461 11-Feb 110728 000362 11-Feb 110828 000263 11-Feb 110928 000364 11-Feb 111028 000365 11-Feb 111128 000266 11-Feb 111228 000367 11-Feb 111328 000968 11-Feb 111428 000369 11-Feb 111528 000870 11-Feb 111628 000471 11-Feb 111728 000272 11-Feb 111828 000273 11-Feb 111928 000574 11-Feb 112028 000275 11-Feb 112128 000276 11-Feb 112228 000277 11-Feb 112328 000278 11-Feb 112428 0005

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 38: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 112528 000580 11-Feb 112628 000381 11-Feb 112728 000382 11-Feb 112828 000283 11-Feb 112928 000384 11-Feb 113028 000285 11-Feb 113128 000286 11-Feb 113228 000287 11-Feb 113328 000388 11-Feb 113428 000289 11-Feb 113528 000290 11-Feb 113628 000291 11-Feb 113728 000192 11-Feb 113828 000993 11-Feb 113928 000694 11-Feb 114028 000195 11-Feb 114128 000296 11-Feb 114228 000297 11-Feb 114328 000298 11-Feb 114428 000299 11-Feb 114528 0003

100 11-Feb 114628 0003101 11-Feb 114728 0009102 11-Feb 114828 0002103 11-Feb 114928 0002104 11-Feb 115028 0002105 11-Feb 115128 0002106 11-Feb 115228 0001107 11-Feb 115328 0002108 11-Feb 115428 0002109 11-Feb 115528 0002110 11-Feb 115628 0002111 11-Feb 115728 0004112 11-Feb 115828 0002113 11-Feb 115928 0001114 11-Feb 120028 0002115 11-Feb 120128 0001116 11-Feb 120228 0001117 11-Feb 120328 0001118 11-Feb 120428 0001119 11-Feb 120528 0002120 11-Feb 120628 0003121 11-Feb 120728 0001122 11-Feb 120828 0002123 11-Feb 120928 0002124 11-Feb 121028 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 39: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 121128 0002126 11-Feb 121228 0003127 11-Feb 121328 0001128 11-Feb 121428 0001129 11-Feb 121528 0003130 11-Feb 121628 0005131 11-Feb 121728 0001132 11-Feb 121828 0005133 11-Feb 121928 0002134 11-Feb 122028 0001135 11-Feb 122128 0002136 11-Feb 122228 0001137 11-Feb 122328 0002138 11-Feb 122428 0007139 11-Feb 122528 0002140 11-Feb 122628 0002141 11-Feb 122728 0001142 11-Feb 122828 0002143 11-Feb 122928 0001144 11-Feb 123028 0003145 11-Feb 123128 0001146 11-Feb 123228 0003147 11-Feb 123328 0001148 11-Feb 123428 0001149 11-Feb 123528 0002150 11-Feb 123628 0002151 11-Feb 123728 0001152 11-Feb 123828 0001153 11-Feb 123928 0001154 11-Feb 124028 0002155 11-Feb 124128 0001156 11-Feb 124228 0001157 11-Feb 124328 0001158 11-Feb 124428 0001159 11-Feb 124528 0003160 11-Feb 124628 0001161 11-Feb 124728 0008162 11-Feb 124828 0002163 11-Feb 124928 0001164 11-Feb 125028 0002165 11-Feb 125128 0001166 11-Feb 125228 0001167 11-Feb 125328 0001168 11-Feb 125428 0001169 11-Feb 125528 0008170 11-Feb 125628 0003

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 40: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 125728 0001172 11-Feb 125828 0001173 11-Feb 125928 0002174 11-Feb 130028 0001175 11-Feb 130128 0001176 11-Feb 130228 0001177 11-Feb 130328 0002178 11-Feb 130428 0001179 11-Feb 130528 0001180 11-Feb 130628 0003181 11-Feb 130728 0001182 11-Feb 130828 0001183 11-Feb 130928 0002184 11-Feb 131028 0001185 11-Feb 131128 0001186 11-Feb 131228 0001187 11-Feb 131328 0001188 11-Feb 131428 0002189 11-Feb 131528 0002190 11-Feb 131628 0001191 11-Feb 131728 0001192 11-Feb 131828 0002193 11-Feb 131928 0001194 11-Feb 132028 0002195 11-Feb 132128 0001196 11-Feb 132228 0003197 11-Feb 132328 0001198 11-Feb 132428 0001199 11-Feb 132528 0001200 11-Feb 132628 0001201 11-Feb 132728 0002202 11-Feb 132828 0002203 11-Feb 132928 0002204 11-Feb 133028 0001205 11-Feb 133128 0001206 11-Feb 133228 0001207 11-Feb 133328 0208 11-Feb 133428 0016209 11-Feb 133528 0001210 11-Feb 133628 0001211 11-Feb 133728 0001212 11-Feb 133828 0001213 11-Feb 133928 0001214 11-Feb 134028 0001215 11-Feb 134128 0216 11-Feb 134228 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 41: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 134328 0002218 11-Feb 134428 0002219 11-Feb 134528 0001220 11-Feb 134628 0001221 11-Feb 134728 0003222 11-Feb 134828 0001223 11-Feb 134928 0224 11-Feb 135028 0003225 11-Feb 135128 0226 11-Feb 135228 0001227 11-Feb 135328 0228 11-Feb 135428 0229 11-Feb 135528 0001230 11-Feb 135628 0001231 11-Feb 135728 0232 11-Feb 135828 0233 11-Feb 135928 0001234 11-Feb 140028 0235 11-Feb 140128 0001236 11-Feb 140228 0002237 11-Feb 140328 0002238 11-Feb 140428 0001239 11-Feb 140528 0002240 11-Feb 140628 0241 11-Feb 140728 0242 11-Feb 140828 0001

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 42: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 242Start time and date 095016 11-Feb Elapsed time 040200Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0054 mgmgeTime at maximum 121748 Feb 11Max STEL Concentration 0010 mgmgeTime at max STEL 135247 Feb 11Overall Avg Conc 0006 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 095116 0012 11-Feb 095216 00073 11-Feb 095316 00074 11-Feb 095416 00055 11-Feb 095516 00076 11-Feb 095616 00047 11-Feb 095716 00048 11-Feb 095816 00119 11-Feb 095916 0006

10 11-Feb 100016 000511 11-Feb 100116 000812 11-Feb 100216 000913 11-Feb 100316 000514 11-Feb 100416 000515 11-Feb 100516 000316 11-Feb 100616 000417 11-Feb 100716 000418 11-Feb 100816 000619 11-Feb 100916 00120 11-Feb 101016 000421 11-Feb 101116 000422 11-Feb 101216 000323 11-Feb 101316 000524 11-Feb 101416 000425 11-Feb 101516 000526 11-Feb 101616 000427 11-Feb 101716 000428 11-Feb 101816 000429 11-Feb 101916 000430 11-Feb 102016 000331 11-Feb 102116 000432 11-Feb 102216 0004

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 43: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 102316 000934 11-Feb 102416 000435 11-Feb 102516 000436 11-Feb 102616 000337 11-Feb 102716 000338 11-Feb 102816 000439 11-Feb 102916 000740 11-Feb 103016 000341 11-Feb 103116 000442 11-Feb 103216 000343 11-Feb 103316 000444 11-Feb 103416 000445 11-Feb 103516 000346 11-Feb 103616 000447 11-Feb 103716 000448 11-Feb 103816 000449 11-Feb 103916 000450 11-Feb 104016 000451 11-Feb 104116 000452 11-Feb 104216 000453 11-Feb 104316 000454 11-Feb 104416 000555 11-Feb 104516 000456 11-Feb 104616 000457 11-Feb 104716 000558 11-Feb 104816 000559 11-Feb 104916 000560 11-Feb 105016 000761 11-Feb 105116 000462 11-Feb 105216 000563 11-Feb 105316 000564 11-Feb 105416 000565 11-Feb 105516 000866 11-Feb 105616 000467 11-Feb 105716 000568 11-Feb 105816 000569 11-Feb 105916 000470 11-Feb 110016 000671 11-Feb 110116 000572 11-Feb 110216 000573 11-Feb 110316 000574 11-Feb 110416 000575 11-Feb 110516 000476 11-Feb 110616 000577 11-Feb 110716 000978 11-Feb 110816 0006

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 44: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 110916 000680 11-Feb 111016 000781 11-Feb 111116 000982 11-Feb 111216 000583 11-Feb 111316 000984 11-Feb 111416 000585 11-Feb 111516 000486 11-Feb 111616 000787 11-Feb 111716 000688 11-Feb 111816 000889 11-Feb 111916 000790 11-Feb 112016 000591 11-Feb 112116 000692 11-Feb 112216 000593 11-Feb 112316 000594 11-Feb 112416 000695 11-Feb 112516 000996 11-Feb 112616 000997 11-Feb 112716 000698 11-Feb 112816 000699 11-Feb 112916 0005

100 11-Feb 113016 0005101 11-Feb 113116 0004102 11-Feb 113216 0005103 11-Feb 113316 0007104 11-Feb 113416 0005105 11-Feb 113516 0006106 11-Feb 113616 0005107 11-Feb 113716 0006108 11-Feb 113816 0006109 11-Feb 113916 0008110 11-Feb 114016 0006111 11-Feb 114116 0006112 11-Feb 114216 0005113 11-Feb 114316 0005114 11-Feb 114416 0006115 11-Feb 114516 0005116 11-Feb 114616 0005117 11-Feb 114716 0006118 11-Feb 114816 0007119 11-Feb 114916 0006120 11-Feb 115016 0006121 11-Feb 115116 0009122 11-Feb 115216 0006123 11-Feb 115316 0006124 11-Feb 115416 0006

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 45: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 115516 0006126 11-Feb 115616 0006127 11-Feb 115716 0006128 11-Feb 115816 0007129 11-Feb 115916 0006130 11-Feb 120016 0006131 11-Feb 120116 0006132 11-Feb 120216 0006133 11-Feb 120316 0006134 11-Feb 120416 0006135 11-Feb 120516 0006136 11-Feb 120616 0006137 11-Feb 120716 0006138 11-Feb 120816 0006139 11-Feb 120916 0006140 11-Feb 121016 0006141 11-Feb 121116 0006142 11-Feb 121216 0007143 11-Feb 121316 0007144 11-Feb 121416 0006145 11-Feb 121516 0006146 11-Feb 121616 0006147 11-Feb 121716 0006148 11-Feb 121816 0015149 11-Feb 121916 0006150 11-Feb 122016 0006151 11-Feb 122116 0007152 11-Feb 122216 0006153 11-Feb 122316 0009154 11-Feb 122416 0007155 11-Feb 122516 0006156 11-Feb 122616 0007157 11-Feb 122716 0006158 11-Feb 122816 0007159 11-Feb 122916 0006160 11-Feb 123016 0007161 11-Feb 123116 0006162 11-Feb 123216 0008163 11-Feb 123316 0007164 11-Feb 123416 0007165 11-Feb 123516 0007166 11-Feb 123616 0006167 11-Feb 123716 0007168 11-Feb 123816 0008169 11-Feb 123916 0007170 11-Feb 124016 0007

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 46: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 124116 0007172 11-Feb 124216 0007173 11-Feb 124316 0007174 11-Feb 124416 0007175 11-Feb 124516 0007176 11-Feb 124616 0007177 11-Feb 124716 0007178 11-Feb 124816 0008179 11-Feb 124916 0007180 11-Feb 125016 0007181 11-Feb 125116 0007182 11-Feb 125216 0008183 11-Feb 125316 0007184 11-Feb 125416 0007185 11-Feb 125516 0007186 11-Feb 125616 0008187 11-Feb 125716 0008188 11-Feb 125816 0008189 11-Feb 125916 0008190 11-Feb 130016 0007191 11-Feb 130116 0009192 11-Feb 130216 0008193 11-Feb 130316 0008194 11-Feb 130416 0008195 11-Feb 130516 0008196 11-Feb 130616 0007197 11-Feb 130716 0009198 11-Feb 130816 0008199 11-Feb 130916 0009200 11-Feb 131016 0008201 11-Feb 131116 0009202 11-Feb 131216 0007203 11-Feb 131316 0007204 11-Feb 131416 0009205 11-Feb 131516 0008206 11-Feb 131616 0008207 11-Feb 131716 0008208 11-Feb 131816 0008209 11-Feb 131916 0008210 11-Feb 132016 0008211 11-Feb 132116 0008212 11-Feb 132216 0008213 11-Feb 132316 0008214 11-Feb 132416 0008215 11-Feb 132516 0008216 11-Feb 132616 0009

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 47: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 132716 0008218 11-Feb 132816 0009219 11-Feb 132916 0008220 11-Feb 133016 0009221 11-Feb 133116 0008222 11-Feb 133216 0008223 11-Feb 133316 0008224 11-Feb 133416 0008225 11-Feb 133516 0009226 11-Feb 133616 0008227 11-Feb 133716 0008228 11-Feb 133816 0008229 11-Feb 133916 0009230 11-Feb 134016 0009231 11-Feb 134116 0008232 11-Feb 134216 0009233 11-Feb 134316 0008234 11-Feb 134416 0011235 11-Feb 134516 001236 11-Feb 134616 001237 11-Feb 134716 0012238 11-Feb 134816 0011239 11-Feb 134916 0009240 11-Feb 135016 001241 11-Feb 135116 0009242 11-Feb 135216 0009

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 48: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06436User ID R5388Tag Number 01Number of logged points 287Start time and date 104459 11-Feb Elapsed time 044700Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0102 mgmgeTime at maximum 145610 Feb 11Max STEL Concentration 0003 mgmgeTime at max STEL 150259 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 104559 00032 11-Feb 104659 00033 11-Feb 104759 04 11-Feb 104859 00025 11-Feb 104959 06 11-Feb 105059 00037 11-Feb 105159 00018 11-Feb 105259 09 11-Feb 105359 0

10 11-Feb 105459 011 11-Feb 105559 012 11-Feb 105659 013 11-Feb 105759 014 11-Feb 105859 015 11-Feb 105959 016 11-Feb 110059 017 11-Feb 110159 018 11-Feb 110259 019 11-Feb 110359 020 11-Feb 110459 021 11-Feb 110559 022 11-Feb 110659 023 11-Feb 110759 024 11-Feb 110859 025 11-Feb 110959 026 11-Feb 111059 027 11-Feb 111159 000428 11-Feb 111259 029 11-Feb 111359 030 11-Feb 111459 031 11-Feb 111559 032 11-Feb 111659 0

Page 1 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 49: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 111759 034 11-Feb 111859 035 11-Feb 111959 036 11-Feb 112059 037 11-Feb 112159 038 11-Feb 112259 039 11-Feb 112359 040 11-Feb 112459 041 11-Feb 112559 000342 11-Feb 112659 043 11-Feb 112759 044 11-Feb 112859 045 11-Feb 112959 046 11-Feb 113059 047 11-Feb 113159 048 11-Feb 113259 049 11-Feb 113359 050 11-Feb 113459 051 11-Feb 113559 052 11-Feb 113659 000253 11-Feb 113759 054 11-Feb 113859 055 11-Feb 113959 056 11-Feb 114059 057 11-Feb 114159 000158 11-Feb 114259 059 11-Feb 114359 060 11-Feb 114459 061 11-Feb 114559 062 11-Feb 114659 063 11-Feb 114759 064 11-Feb 114859 065 11-Feb 114959 066 11-Feb 115059 067 11-Feb 115159 068 11-Feb 115259 069 11-Feb 115359 070 11-Feb 115459 071 11-Feb 115559 072 11-Feb 115659 073 11-Feb 115759 074 11-Feb 115859 075 11-Feb 115959 000176 11-Feb 120059 077 11-Feb 120159 078 11-Feb 120259 0

Page 2 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 50: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 120359 080 11-Feb 120459 081 11-Feb 120559 082 11-Feb 120659 083 11-Feb 120759 000384 11-Feb 120859 085 11-Feb 120959 086 11-Feb 121059 000487 11-Feb 121159 088 11-Feb 121259 089 11-Feb 121359 090 11-Feb 121459 000191 11-Feb 121559 092 11-Feb 121659 093 11-Feb 121759 094 11-Feb 121859 095 11-Feb 121959 096 11-Feb 122059 097 11-Feb 122159 098 11-Feb 122259 099 11-Feb 122359 0

100 11-Feb 122459 0101 11-Feb 122559 0102 11-Feb 122659 0103 11-Feb 122759 0104 11-Feb 122859 0105 11-Feb 122959 0106 11-Feb 123059 0107 11-Feb 123159 0108 11-Feb 123259 0109 11-Feb 123359 0110 11-Feb 123459 0111 11-Feb 123559 0112 11-Feb 123659 0113 11-Feb 123759 0114 11-Feb 123859 0115 11-Feb 123959 0116 11-Feb 124059 0001117 11-Feb 124159 0001118 11-Feb 124259 0119 11-Feb 124359 0120 11-Feb 124459 0121 11-Feb 124559 0122 11-Feb 124659 0001123 11-Feb 124759 0124 11-Feb 124859 0001

Page 3 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 51: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 124959 0126 11-Feb 125059 0001127 11-Feb 125159 0128 11-Feb 125259 0001129 11-Feb 125359 0001130 11-Feb 125459 0001131 11-Feb 125559 0001132 11-Feb 125659 0133 11-Feb 125759 0134 11-Feb 125859 0135 11-Feb 125959 0136 11-Feb 130059 0137 11-Feb 130159 0001138 11-Feb 130259 0139 11-Feb 130359 0140 11-Feb 130459 0002141 11-Feb 130559 0142 11-Feb 130659 0001143 11-Feb 130759 0144 11-Feb 130859 0145 11-Feb 130959 0146 11-Feb 131059 0147 11-Feb 131159 0148 11-Feb 131259 0149 11-Feb 131359 0150 11-Feb 131459 0151 11-Feb 131559 0152 11-Feb 131659 0153 11-Feb 131759 0001154 11-Feb 131859 0155 11-Feb 131959 0156 11-Feb 132059 0157 11-Feb 132159 0001158 11-Feb 132259 0001159 11-Feb 132359 0160 11-Feb 132459 0001161 11-Feb 132559 0162 11-Feb 132659 0163 11-Feb 132759 0002164 11-Feb 132859 0001165 11-Feb 132959 0166 11-Feb 133059 0001167 11-Feb 133159 0001168 11-Feb 133259 0169 11-Feb 133359 0001170 11-Feb 133459 0

Page 4 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 52: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 133559 0172 11-Feb 133659 0173 11-Feb 133759 0001174 11-Feb 133859 0175 11-Feb 133959 0176 11-Feb 134059 0004177 11-Feb 134159 0178 11-Feb 134259 0001179 11-Feb 134359 0180 11-Feb 134459 0181 11-Feb 134559 0182 11-Feb 134659 0183 11-Feb 134759 0002184 11-Feb 134859 0185 11-Feb 134959 0186 11-Feb 135059 0187 11-Feb 135159 0188 11-Feb 135259 0189 11-Feb 135359 0190 11-Feb 135459 0001191 11-Feb 135559 0001192 11-Feb 135659 0193 11-Feb 135759 0194 11-Feb 135859 0195 11-Feb 135959 0196 11-Feb 140059 0197 11-Feb 140159 0198 11-Feb 140259 0199 11-Feb 140359 0200 11-Feb 140459 0201 11-Feb 140559 0202 11-Feb 140659 0203 11-Feb 140759 0204 11-Feb 140859 0205 11-Feb 140959 0206 11-Feb 141059 0207 11-Feb 141159 0208 11-Feb 141259 0209 11-Feb 141359 0210 11-Feb 141459 0211 11-Feb 141559 0212 11-Feb 141659 0213 11-Feb 141759 0214 11-Feb 141859 0215 11-Feb 141959 0216 11-Feb 142059 0

Page 5 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 53: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 142159 0218 11-Feb 142259 0219 11-Feb 142359 0220 11-Feb 142459 0221 11-Feb 142559 0222 11-Feb 142659 0001223 11-Feb 142759 0224 11-Feb 142859 0225 11-Feb 142959 0226 11-Feb 143059 0001227 11-Feb 143159 0228 11-Feb 143259 0001229 11-Feb 143359 0230 11-Feb 143459 0001231 11-Feb 143559 0232 11-Feb 143659 0001233 11-Feb 143759 0001234 11-Feb 143859 0001235 11-Feb 143959 0001236 11-Feb 144059 0237 11-Feb 144159 0001238 11-Feb 144259 0001239 11-Feb 144359 0002240 11-Feb 144459 0241 11-Feb 144559 0001242 11-Feb 144659 0001243 11-Feb 144759 0001244 11-Feb 144859 0001245 11-Feb 144959 0001246 11-Feb 145059 0001247 11-Feb 145159 0001248 11-Feb 145259 0001249 11-Feb 145359 0001250 11-Feb 145459 0001251 11-Feb 145559 0001252 11-Feb 145659 0018253 11-Feb 145759 0002254 11-Feb 145859 0001255 11-Feb 145959 0001256 11-Feb 150059 0002257 11-Feb 150159 0001258 11-Feb 150259 0006259 11-Feb 150359 0001260 11-Feb 150459 0001261 11-Feb 150559 0001262 11-Feb 150659 0001

Page 6 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 54: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

263 11-Feb 150759 0001264 11-Feb 150859 0002265 11-Feb 150959 0001266 11-Feb 151059 0001267 11-Feb 151159 0268 11-Feb 151259 0001269 11-Feb 151359 0001270 11-Feb 151459 0001271 11-Feb 151559 0001272 11-Feb 151659 0001273 11-Feb 151759 0001274 11-Feb 151859 0001275 11-Feb 151959 0001276 11-Feb 152059 0001277 11-Feb 152159 0001278 11-Feb 152259 0001279 11-Feb 152359 0002280 11-Feb 152459 0001281 11-Feb 152559 0001282 11-Feb 152659 0003283 11-Feb 152759 0001284 11-Feb 152859 0002285 11-Feb 152959 0001286 11-Feb 153059 0011287 11-Feb 153159 001

Page 7 of 7

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 55: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

pDR-1000 SN 00000User ID R5388Tag Number 01Number of logged points 251Start time and date 103058 11-Feb Elapsed time 041100Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0201 mgmgeTime at maximum 103304 Feb 11Max STEL Concentration 0006 mgmgeTime at max STEL 104428 Feb 11Overall Avg Conc 0001 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 103158 00022 11-Feb 103258 00243 11-Feb 103358 00274 11-Feb 103458 00125 11-Feb 103558 00096 11-Feb 103658 07 11-Feb 103758 08 11-Feb 103858 00019 11-Feb 103958 001

10 11-Feb 104058 011 11-Feb 104158 012 11-Feb 104258 000113 11-Feb 104358 000114 11-Feb 104458 000215 11-Feb 104558 016 11-Feb 104658 017 11-Feb 104758 018 11-Feb 104858 019 11-Feb 104958 020 11-Feb 105058 021 11-Feb 105158 022 11-Feb 105258 023 11-Feb 105358 024 11-Feb 105458 000125 11-Feb 105558 000226 11-Feb 105658 027 11-Feb 105758 028 11-Feb 105858 029 11-Feb 105958 030 11-Feb 110058 031 11-Feb 110158 032 11-Feb 110258 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 56: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)33 11-Feb 110358 034 11-Feb 110458 035 11-Feb 110558 036 11-Feb 110658 000137 11-Feb 110758 038 11-Feb 110858 039 11-Feb 110958 000140 11-Feb 111058 041 11-Feb 111158 042 11-Feb 111258 043 11-Feb 111358 000244 11-Feb 111458 045 11-Feb 111558 046 11-Feb 111658 047 11-Feb 111758 048 11-Feb 111858 049 11-Feb 111958 050 11-Feb 112058 000251 11-Feb 112158 052 11-Feb 112258 053 11-Feb 112358 054 11-Feb 112458 055 11-Feb 112558 056 11-Feb 112658 057 11-Feb 112758 058 11-Feb 112858 059 11-Feb 112958 060 11-Feb 113058 061 11-Feb 113158 062 11-Feb 113258 000163 11-Feb 113358 064 11-Feb 113458 065 11-Feb 113558 066 11-Feb 113658 067 11-Feb 113758 000468 11-Feb 113858 069 11-Feb 113958 070 11-Feb 114058 000271 11-Feb 114158 072 11-Feb 114258 073 11-Feb 114358 074 11-Feb 114458 075 11-Feb 114558 000176 11-Feb 114658 077 11-Feb 114758 078 11-Feb 114858 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 57: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)79 11-Feb 114958 080 11-Feb 115058 000181 11-Feb 115158 082 11-Feb 115258 083 11-Feb 115358 084 11-Feb 115458 085 11-Feb 115558 086 11-Feb 115658 087 11-Feb 115758 000188 11-Feb 115858 089 11-Feb 115958 090 11-Feb 120058 091 11-Feb 120158 092 11-Feb 120258 093 11-Feb 120358 094 11-Feb 120458 095 11-Feb 120558 096 11-Feb 120658 097 11-Feb 120758 098 11-Feb 120858 099 11-Feb 120958 0001

100 11-Feb 121058 0005101 11-Feb 121158 0001102 11-Feb 121258 0103 11-Feb 121358 0104 11-Feb 121458 0105 11-Feb 121558 0106 11-Feb 121658 0107 11-Feb 121758 0108 11-Feb 121858 0109 11-Feb 121958 0110 11-Feb 122058 0111 11-Feb 122158 0002112 11-Feb 122258 0113 11-Feb 122358 0001114 11-Feb 122458 0002115 11-Feb 122558 0001116 11-Feb 122658 0117 11-Feb 122758 0118 11-Feb 122858 0119 11-Feb 122958 0120 11-Feb 123058 0121 11-Feb 123158 0001122 11-Feb 123258 0123 11-Feb 123358 0124 11-Feb 123458 0001

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 58: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)125 11-Feb 123558 0001126 11-Feb 123658 0001127 11-Feb 123758 0003128 11-Feb 123858 0129 11-Feb 123958 0130 11-Feb 124058 0002131 11-Feb 124158 0001132 11-Feb 124258 0001133 11-Feb 124358 0001134 11-Feb 124458 0001135 11-Feb 124558 0001136 11-Feb 124658 0002137 11-Feb 124758 0005138 11-Feb 124858 0139 11-Feb 124958 0140 11-Feb 125058 0001141 11-Feb 125158 0142 11-Feb 125258 0001143 11-Feb 125358 0003144 11-Feb 125458 0002145 11-Feb 125558 0001146 11-Feb 125658 0001147 11-Feb 125758 0003148 11-Feb 125858 0003149 11-Feb 125958 0003150 11-Feb 130058 0003151 11-Feb 130158 0001152 11-Feb 130258 0001153 11-Feb 130358 0154 11-Feb 130458 0004155 11-Feb 130558 0156 11-Feb 130658 0002157 11-Feb 130758 0002158 11-Feb 130858 0003159 11-Feb 130958 0001160 11-Feb 131058 0001161 11-Feb 131158 0001162 11-Feb 131258 0001163 11-Feb 131358 0001164 11-Feb 131458 0002165 11-Feb 131558 0002166 11-Feb 131658 0002167 11-Feb 131758 0004168 11-Feb 131858 0002169 11-Feb 131958 0001170 11-Feb 132058 0002

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 59: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)171 11-Feb 132158 0003172 11-Feb 132258 0004173 11-Feb 132358 0003174 11-Feb 132458 0001175 11-Feb 132558 0001176 11-Feb 132658 0003177 11-Feb 132758 0003178 11-Feb 132858 0003179 11-Feb 132958 0002180 11-Feb 133058 0004181 11-Feb 133158 0001182 11-Feb 133258 0005183 11-Feb 133358 0002184 11-Feb 133458 0002185 11-Feb 133558 0002186 11-Feb 133658 0002187 11-Feb 133758 0004188 11-Feb 133858 0001189 11-Feb 133958 0001190 11-Feb 134058 0003191 11-Feb 134158 0001192 11-Feb 134258 0002193 11-Feb 134358 0001194 11-Feb 134458 0003195 11-Feb 134558 0004196 11-Feb 134658 0001197 11-Feb 134758 0003198 11-Feb 134858 0002199 11-Feb 134958 0005200 11-Feb 135058 0003201 11-Feb 135158 0004202 11-Feb 135258 0006203 11-Feb 135358 0009204 11-Feb 135458 0003205 11-Feb 135558 0003206 11-Feb 135658 0001207 11-Feb 135758 0002208 11-Feb 135858 0002209 11-Feb 135958 0004210 11-Feb 140058 0001211 11-Feb 140158 0005212 11-Feb 140258 0004213 11-Feb 140358 0002214 11-Feb 140458 0003215 11-Feb 140558 0003216 11-Feb 140658 0002

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 60: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100

Point Date Time Avg(mgmge)217 11-Feb 140758 0002218 11-Feb 140858 0002219 11-Feb 140958 0003220 11-Feb 141058 0002221 11-Feb 141158 0003222 11-Feb 141258 0002223 11-Feb 141358 0003224 11-Feb 141458 0002225 11-Feb 141558 0003226 11-Feb 141658 0003227 11-Feb 141758 0003228 11-Feb 141858 0005229 11-Feb 141958 0001230 11-Feb 142058 0002231 11-Feb 142158 0004232 11-Feb 142258 0002233 11-Feb 142358 0003234 11-Feb 142458 0002235 11-Feb 142558 0004236 11-Feb 142658 0003237 11-Feb 142758 0001238 11-Feb 142858 0002239 11-Feb 142958 0002240 11-Feb 143058 0003241 11-Feb 143158 0004242 11-Feb 143258 0003243 11-Feb 143358 0002244 11-Feb 143458 0002245 11-Feb 143558 0002246 11-Feb 143658 0003247 11-Feb 143758 0004248 11-Feb 143858 0005249 11-Feb 143958 0002250 11-Feb 144058 0002251 11-Feb 144158 0003

Page 6 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 61: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100pDR-1000 SN 06504User ID R5388Tag Number 01Number of logged points 254Start time and date 091227 11-Feb Elapsed time 041400Logging period (sec) 60Calibration Factor () 100Max Display Concentration 0158 mgmgeTime at maximum 093951 Feb 11Max STEL Concentration 0000 mgmgeTime at max STEL 091227 Feb 11Overall Avg Conc 0000 mgmgeLogged DataPoint Date Time Avg(mgmge)

1 11-Feb 091327 00022 11-Feb 091427 03 11-Feb 091527 04 11-Feb 091627 05 11-Feb 091727 06 11-Feb 091827 07 11-Feb 091927 08 11-Feb 092027 09 11-Feb 092127 0

10 11-Feb 092227 011 11-Feb 092327 012 11-Feb 092427 013 11-Feb 092527 014 11-Feb 092627 015 11-Feb 092727 016 11-Feb 092827 017 11-Feb 092927 018 11-Feb 093027 019 11-Feb 093127 020 11-Feb 093227 021 11-Feb 093327 022 11-Feb 093427 023 11-Feb 093527 024 11-Feb 093627 025 11-Feb 093727 026 11-Feb 093827 027 11-Feb 093927 028 11-Feb 094027 002829 11-Feb 094127 030 11-Feb 094227 031 11-Feb 094327 032 11-Feb 094427 0

Page 1 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 62: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

33 11-Feb 094527 034 11-Feb 094627 000435 11-Feb 094727 036 11-Feb 094827 037 11-Feb 094927 038 11-Feb 095027 039 11-Feb 095127 040 11-Feb 095227 041 11-Feb 095327 042 11-Feb 095427 043 11-Feb 095527 044 11-Feb 095627 045 11-Feb 095727 046 11-Feb 095827 047 11-Feb 095927 048 11-Feb 100027 049 11-Feb 100127 050 11-Feb 100227 051 11-Feb 100327 052 11-Feb 100427 053 11-Feb 100527 054 11-Feb 100627 055 11-Feb 100727 056 11-Feb 100827 057 11-Feb 100927 058 11-Feb 101027 059 11-Feb 101127 060 11-Feb 101227 061 11-Feb 101327 062 11-Feb 101427 063 11-Feb 101527 064 11-Feb 101627 065 11-Feb 101727 066 11-Feb 101827 067 11-Feb 101927 068 11-Feb 102027 069 11-Feb 102127 070 11-Feb 102227 071 11-Feb 102327 072 11-Feb 102427 073 11-Feb 102527 074 11-Feb 102627 075 11-Feb 102727 076 11-Feb 102827 077 11-Feb 102927 078 11-Feb 103027 0

Page 2 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 63: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

79 11-Feb 103127 080 11-Feb 103227 081 11-Feb 103327 082 11-Feb 103427 083 11-Feb 103527 084 11-Feb 103627 085 11-Feb 103727 086 11-Feb 103827 087 11-Feb 103927 088 11-Feb 104027 089 11-Feb 104127 090 11-Feb 104227 091 11-Feb 104327 092 11-Feb 104427 093 11-Feb 104527 094 11-Feb 104627 000495 11-Feb 104727 00296 11-Feb 104827 001397 11-Feb 104927 000598 11-Feb 105027 099 11-Feb 105127 0005

100 11-Feb 105227 0003101 11-Feb 105327 0102 11-Feb 105427 0103 11-Feb 105527 0104 11-Feb 105627 0004105 11-Feb 105727 0106 11-Feb 105827 0107 11-Feb 105927 0108 11-Feb 110027 0109 11-Feb 110127 0110 11-Feb 110227 0111 11-Feb 110327 0112 11-Feb 110427 0113 11-Feb 110527 0114 11-Feb 110627 0002115 11-Feb 110727 0001116 11-Feb 110827 0117 11-Feb 110927 0002118 11-Feb 111027 0119 11-Feb 111127 0120 11-Feb 111227 0121 11-Feb 111327 0122 11-Feb 111427 0123 11-Feb 111527 0124 11-Feb 111627 0

Page 3 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 64: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

125 11-Feb 111727 0126 11-Feb 111827 0127 11-Feb 111927 0128 11-Feb 112027 0129 11-Feb 112127 0130 11-Feb 112227 0131 11-Feb 112327 0132 11-Feb 112427 0003133 11-Feb 112527 0001134 11-Feb 112627 0135 11-Feb 112727 0136 11-Feb 112827 0137 11-Feb 112927 0016138 11-Feb 113027 0139 11-Feb 113127 0002140 11-Feb 113227 0141 11-Feb 113327 0142 11-Feb 113427 0143 11-Feb 113527 0144 11-Feb 113627 0145 11-Feb 113727 0146 11-Feb 113827 0147 11-Feb 113927 0148 11-Feb 114027 0003149 11-Feb 114127 0001150 11-Feb 114227 0151 11-Feb 114327 0152 11-Feb 114427 0153 11-Feb 114527 0154 11-Feb 114627 0155 11-Feb 114727 0156 11-Feb 114827 0003157 11-Feb 114927 0158 11-Feb 115027 0159 11-Feb 115127 0160 11-Feb 115227 0161 11-Feb 115327 0162 11-Feb 115427 0163 11-Feb 115527 0164 11-Feb 115627 0165 11-Feb 115727 0166 11-Feb 115827 0167 11-Feb 115927 0168 11-Feb 120027 0169 11-Feb 120127 0170 11-Feb 120227 0

Page 4 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 65: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

171 11-Feb 120327 0172 11-Feb 120427 0173 11-Feb 120527 0174 11-Feb 120627 0175 11-Feb 120727 0176 11-Feb 120827 0177 11-Feb 120927 0178 11-Feb 121027 0179 11-Feb 121127 0180 11-Feb 121227 0181 11-Feb 121327 0182 11-Feb 121427 0183 11-Feb 121527 0184 11-Feb 121627 0185 11-Feb 121727 0186 11-Feb 121827 0187 11-Feb 121927 0188 11-Feb 122027 0189 11-Feb 122127 0190 11-Feb 122227 0191 11-Feb 122327 0192 11-Feb 122427 0193 11-Feb 122527 0194 11-Feb 122627 0195 11-Feb 122727 0196 11-Feb 122827 0197 11-Feb 122927 0198 11-Feb 123027 0199 11-Feb 123127 0200 11-Feb 123227 0201 11-Feb 123327 0202 11-Feb 123427 0203 11-Feb 123527 0204 11-Feb 123627 0205 11-Feb 123727 0206 11-Feb 123827 0207 11-Feb 123927 0001208 11-Feb 124027 0209 11-Feb 124127 0210 11-Feb 124227 0211 11-Feb 124327 0212 11-Feb 124427 0213 11-Feb 124527 0214 11-Feb 124627 0215 11-Feb 124727 0216 11-Feb 124827 0

Page 5 of 6

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6

Page 66: RE: LEED Indoor Air Quality Evaluation The Ed Roberts Campus …€¦ · Adeline Street, Berkeley, California (subject location). This air sampling was performed to meet the requirements

LEED IAQ SamplingEd Roberts Campus3075 Adeline StreetBerkeley CA 94703

ACC Project Number 8139-00100Point Date Time Avg(mgmge)

217 11-Feb 124927 0218 11-Feb 125027 0002219 11-Feb 125127 0220 11-Feb 125227 0221 11-Feb 125327 0222 11-Feb 125427 0223 11-Feb 125527 0224 11-Feb 125627 0001225 11-Feb 125727 0226 11-Feb 125827 0227 11-Feb 125927 0228 11-Feb 130027 0229 11-Feb 130127 0230 11-Feb 130227 0231 11-Feb 130327 0232 11-Feb 130427 0233 11-Feb 130527 0234 11-Feb 130627 0235 11-Feb 130727 0236 11-Feb 130827 0237 11-Feb 130927 0238 11-Feb 131027 0239 11-Feb 131127 0240 11-Feb 131227 0241 11-Feb 131327 0242 11-Feb 131427 0243 11-Feb 131527 0244 11-Feb 131627 0245 11-Feb 131727 0246 11-Feb 131827 0009247 11-Feb 131927 0248 11-Feb 132027 0249 11-Feb 132127 0250 11-Feb 132227 0251 11-Feb 132327 0252 11-Feb 132427 0253 11-Feb 132527 0254 11-Feb 132627 0

Page 6 of 6