18
RE- INVEST 2015: LUCKNOW, U.P.

RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

  • Upload
    vudung

  • View
    225

  • Download
    5

Embed Size (px)

Citation preview

Page 1: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

RE- INVEST 2015: LUCKNOW, U.P.

Page 2: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

SOURCE WISE ESTIMATEDPOTENTIAL OF RENEWABLEPOWER IN STATE(MW)

1260 4611617

176

22800

WIND POWER

SMALL HYDRO461

BIO MASS

WASTE TO ENERGY

SOLAR ENERGY

SOURCE WISE INSTALLED CAPACITY IN MW

2119.26

10825.1 71.7

BIO MASS POWER

INDUSTRIAL WASTE

SMALL HYDRO

SOLAR POWER

GRID INTERACTIVE

2323

50.1

2818

28.22 347 BIO GAS

BIOMASS

SOLAR PUMP

SPV PLANT

OFF GRID

Page 3: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

GRID CONNECTED SOLAR POWER IN UP Abundant sunshine

available for solar power generation .

Solar irradiation levels in State range between 5-5.5 kwh/sqm.

Availability of contiguous wastelands in Bundelkhand region suitable for setting up of Solar Power Projects .

Page 4: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

IMPLEMENTATION OF SOLAR POLICY-2013

In first phase bidding, 130 MW total capacity Solar PowerProjects allocated in August 2013 .

40 MW commissioned & 50 MW is expected in sept’2015. In Second phase bidding, 105 MW total capacity Solar Power

Projects allocated in January 2015. In third phase Bidding of 215 MW in August 2015. BundelKhand Saur Urja Ltd ,a JVC incorporated on 2nd Feb

2015 with NHPC for 50 MW

Page 5: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

SOLAR PARKSolar Park of total capacity 600 MW proposed to be set up .JVC set up between UPNEDA and SECI named LucknowSolar Power Development Corporation Ltd.Total 1152.545 ha land identified for the development of Park

570 ha land in possession of UPNEDA .Estimated cost for development of Solar Park is Rs 720 Cr .Ministry to provide CFA of Rs 120 Cr.Solar Projects will be allocated for setting up in the solar Parkthrough Bidding based on viability Gap Funding.

Investment opportunity of 36000 million Rupees.

Page 6: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

GRID CONNECTED ROOFTOP SPV PLANTS-2014 Targeted capacity 20 MW

The rooftop solar photovoltaic power plant shall be implementedutilizing at least 25% of the available plinth area in Govt. buildings.Allocation of 7 MW capacity subsidy received from MNRE.Roop top Solar Power Plants of total capacity 700 KW installed onroofs of NTPC Netra ,National Fertilizers Ltd and Ansals Mallbuilding in Noida and in Kanpur Plastic factory in Kanpur.Rooftop solar Power Plants of capacity proposed on KESCObuilding , Kanpur Plastics, Lucknow DM office, UPSRTCKesarbagh Bus depot.Rates and EPC firms for installation of Solar Rooftops Power Plantsfinalized through Bidding.(Rs 75/watt to 65/watt )

Investment opportunity of 1425 million rupees.

Page 7: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

ANSAL PLAZA, GREATER NOIDA 100 KW

NATIONAL FERTILIZERS LIMITED -100 KW

Page 8: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

OFF-GRID SOLAR SYSTEMS (SOLARPUMPS)950 Solar Pumpingsystems provided lastyear for Irrigationpurposes.5000 Solar Pumpingsystems of variouscapacity 2H.P ,3 H.P and5 H.P underImplementation .State Govt providing 45% Subsidy apart from 30% subsidy of Ministry.6000 Solar Pumpsproposed for 2015-16 .

Investment opportunity of 2400 million rupees

Page 9: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

OFF GRID SOLAR POWER PLANTS

Off Grid SolarPOWER Plants ofmore than 4 MWinstalled in variouseducationalInstitutes, Industries,and Offices, etc.

1 KW Solar PowerPack for Residentialhouses underImplementation withsubsidy from MNRE.

Page 10: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

SOLAR RO WATER & FAN FOR PRIMARY SCHOOL CHILDREN

Potable water and fan for rural Primary School Children

1.1 KW Solar P V Plant with 1 HP Submersible Pump, RO water purifier and fan

Ideal solution of rural dwelling where drinking water is not safe

System cost about INR 269500

Page 11: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

DECENTRALISED DISTRIBUTED GENERATION 100 percent funded by REC. District Lakhimpur, Sitapur, Bahraich, Lalitpur and Hamirpur

sanctioned. Total capacity 921 KW for 47 projects. 300 more DPRs under preparation this financial year

INVESTMENT OPPORTUNITY OF 750 MILLIONMINI GRID 250 Kw solar power plant installed in district Kannauj to fulfill

energy requirement of village Fakirpura & Chanduahar. 23 projects having capacity of 27 Kw each has been completed by

M/s OMC. Out of sanctioned 70 projects. Mini grid policy is under preparation by state Govt. Huge Investment opportunity in the Scheme.

Page 12: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

LOHIA AWAS SOLAR HOME LIGHTING SYSTEM

88000 Dr Ram Manohar Lohia Awasconstructed for rural below poverty linefamilies by the State Govt in 2012-13 and2013-14 provided with Solar power packsof 120 Wp capacity each.Each Solar Power Pack consists of two 3watt LED and 5 watt LED luminaire and25 watt DC Ceiling fan with mobilecharging facility.unique- Grid Solar System (10.5 MWtotal capacity)installed in such a largescale in country.State Govt proposes to install 1,13,000 inLohia & Janeshwar Mishra Awas in year2014-15

Investment opportunity for Rs 3260 million.

Page 13: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

TRAINING

Two training centres: one in Chinhat ,Lucknow and other in Ghosi, Mau

Training centre in Kannaujunder construction.

Training centres in Chinhatand Mau empanalledunderSkill Development Mission.

Proposal for Suryamitra from Institutions being collected.

REQUEST LETTERS SENT TO THE INDUSTRY TO ACTIVELY PARTICIPATE IN TRAININGS AND HELP IN DESIGNING THE CURRICULUM

Page 14: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

STATE DESIGNATED AGENCY (SDA)• UPNEDA has been nominated as State Designated Agency

(SDA) under Energy Conservation ACT-2001 w.e.f. July 2015• UPNEDA is Preparing an action Plan of Energy Efficiency

measures in the state. Potential of saving 10 to 15 % i.e 15450MU of annual consumption of 1,03,000 MU or saving willresult 1763 MW of avoidable capacity.

Perform, Achieve and Trade (PAT) This scheme is being implemented under NMEEE-2008 Specific Energy Consumption (SEC) is defined for different industrial

sector and they are known as Designated Consumers (DCs) DCs have been given a target for reduction in SEC If they save more than the target, they get Escerts which can be traded. 27 DCs are registered in UP under PAT Scheme Cross Verification is being done by BEE and SDA.

Page 15: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

DSM Demand side Management: Municipal DSM through replacement with

energy efficient street lights. Agriculture Sector DSM through replacement with energy efficient

(star rated) pumps. Energy efficiency in buildings by improving the power factor (PF)

through APFC panel and by replacing the lights with energy efficientlights.

ECBC Energy Certified Building Code(ECBC) codes are to be notified very

soon. First ECBC cell has been established at UPNEDA head

office, Lucknow New and existing buildings are to be identified and ECBC compliance

will be ensured.

Page 16: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

WHAT TO LOOK FOR………….

Page 17: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction

THE 4 MOST EXPENSIVE WORD IN THE ENGLISH LANGUAGE ARE “THIS TIME IT’S DIFFERENT”….JOHN TEMPLETON

FOR AN ECONOMY BUILT TO LAST WE MUST INVEST IN WHAT WILL FUEL US FOR GENERATIONS TO COME…….

Page 18: RE- INVEST 2015: LUCKNOW, U.P. - UPNEDAupneda.org.in/.../files/all/section/FINAL_RE_INVEST.pdfChinhat ,Lucknow and other in Ghosi, Mau Training centre in Kannauj under construction