    Re-assessment Of Sukh Saghir Air-Conditioning And Ventilation System

    Introduction

    The system of air-conditioning and ventilation of Sukh Saghir mainly composed of

    1-Supply Air

    2-Exhaust Air

    3-Air-Conditioning

    Along the tunnel, these services are interconnected by MER(Mechanical-Electrical Room) that altogether

    make up the ventilation system.

    The rooms are as shown figure 1.0 :

    MER-01, MER-02, MER-03, MER-04, MER-05, MER-06, MER-07, MER-08, MER-09, MER-10, MER-11,

    MER-12 and MER-13

    Figure 1.0

    Three(3) important characteristics were again assessed namely :

    1-Assessment On The Conditions Of The Air Path And Service Area

    2-Functionality Of Each Equipment That Make Up The MER Room

    3-Safety And Health Assessment Of The Services For The Tunnel Users

    Remarks are indicated to confirm for the recommended solutions.

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    2/16

    MER-01

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -EF3A1

    -EF3A2

    -EF3A3

    -EF3A4

    -Exhaust Shaft

    -Control Panel Room(CPR)

    -Air-Cond Unit(CPR) 1 Unit 3Hp

    -Lighting (CPR)

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Clogged

    To be Replaced

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    To be redesigned

    In The Main

    Tender Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    3/16

    MER-02

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -EF3.1-EF3.2

    -EF3.3

    -EF3.4

    -Exhaust Shaft

    -Control Panel Room(CPR)

    -Air-Cond Unit(CPR) 1 Unit 3Hp

    -Lighting (CPR)

    Yes, But DirtyYes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Clogged

    To be Replaced

    To Be Replaced

    Lack of maintenanceLack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCACleaning In The

    Main Tender

    Exercise

    To be redesigned

    In The Main

    Tender Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    4/16

    MER-03

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -EF4.1

    -EF4.2

    -EF4.3

    -Exhaust Shaft

    -Control Panel Room(CPR)

    -Air-Cond Unit(CPR) 1 Unit 3Hp

    -Lighting (CPR)

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Clogged

    To be Replaced

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    To be redesigned

    In The Main

    Tender Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    5/16

    MER-04

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -EF1A.1-EF1A.2

    -EF1.1

    -EF1.2

    -Booster Fan-2

    -Exhaust Shaft

    -Control Panel Room(CPR)

    -Air-Cond Unit(CPR) 1 Unit 3Hp

    -Lighting (CPR)

    Notes:

    -New Chiller Design For Bus Station

    2 shall be located at this area

    Yes, But DirtyYes, But Dirty

    Yes, But Dirty

    Yes,But Dirty

    Yes, But Dirty

    Yes, But Clogged

    To be Replaced

    To Be Replaced

    Lack of maintenanceLack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCACleaning In The

    Main Tender

    Exercise

    To be redesigned

    In The Main

    Tender Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    Main Tender

    Exercise

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    6/16

    MER-05

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -SF-3A

    -AHU-2

    -Control Panel Room(CPR)

    -Lighting (CPR)

    Yes, But Dirty

    Only Blower

    To Be Replaced

    Lack of maintenance

    No operation & Lack of

    maintenance

    Lack of maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    For third-party

    subcontracting

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And DegradedHigh Air Pollutant

    Source

    Lack Of Maintenance

    And Quality AuditTeam

    Recommended In

    Tender Operation& Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    7/16

    MER-06

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -SF1A-1

    -SF1A-2

    -SF1B-1

    -SF1B-2

    -Control Panel Room(CPR)

    -Lighting (CPR)

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    Yes,But Dirty

    To be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    Main Tender

    Exercise

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    8/16

    MER-07

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -EF-2A1

    -EF-2A2

    -EF-2.1

    -EF-2.2

    -Exhaust Shaft

    -Control Panel Room(CPR)

    -Air-Cond Unit(CPR) 1 Unit 3Hp

    -Lighting (CPR)

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    Yes,But Dirty

    Yes, But Clogged

    To be Replaced

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    To be redesigned

    In The Main

    Tender Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    `

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    9/16

    MER-08

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each EquipmentThat Make Up The MER Room

    -BF-3.1

    -BF-3.2

    -SF-5

    -Control Panel Room(CPR)

    -Air-Cond Unit(CPR) 1 Unit 3Hp

    -Lighting (CPR)

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    To be reinstall to

    standard

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    10/16

    MER-09

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriaterubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implementedmaintenance

    procedures

    Recommended

    For NADCACleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -SF6-2

    -Control Panel Room(CPR)

    -Air-Cond Unit(CPR) 1 Unit 3Hp

    -Lighting (CPR)

    Yes, But Dirty

    To be reinstall to

    standard

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    11/16

    MER-10

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room

    -SF2.2

    -SF1.2

    -AHU-3(CP-1 & CP-2)

    -Control Panel Room(CPR)

    -Lighting (CPR)

    Notes:-New Chiller Design For Bus Station

    3 shall be located at this area of

    Intermediate level

    Yes, But Dirty

    Yes, But Dirty

    Only Blower

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of operation &

    maintenance

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    Main TenderExercise

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    12/16

    MER-11

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room-SF2-1

    -SF1-1

    -AHU-1(CHP-1 & CHP-2)

    -Control Panel Room(CPR)

    -Lighting (CPR)

    Notes:

    -New Chiller Design For Bus Station

    1 shall be located at this area of

    Intermediate level

    Yes, But Dirty

    Yes, But Dirty

    Only Blower

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of operation &

    maintenance

    RecommendedFor NADCA

    Cleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    Main Tender

    Exercise

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    13/16

    MER-12

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each EquipmentThat Make Up The MER Room

    -SF6-1

    -Control Panel Room(CPR)

    -Lighting (CPR)

    Yes, But Dirty

    To Be Replaced

    Lack of maintenance

    RecommendedFor NADCA

    Cleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment OfThe Services For Tunnel Users

    ContaminatedAnd Degraded

    High Air Pollutant

    Source

    Lack Of MaintenanceAnd Quality Audit

    Team

    Recommended InTender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    14/16

    MER-13

    Type Assessment Technical Operation&Maintenan

    ce

    Remarks

    1-Assessment On The Conditions Of

    Air Path And Service Area

    Dirt & Debris

    In appropriate

    rubbish dump

    and un-

    authorised

    storage

    Lack of properly

    implemented

    maintenance

    procedures

    Recommended

    For NADCA

    Cleaning In The

    Main Tender

    Exercise

    2-Functionality Of Each Equipment

    That Make Up The MER Room-BF-1.1

    -BF-1.2

    -SF-3

    -Control Panel Room(CPR)

    -Lighting (CPR)

    -Air-Cond Split Unit (3Hp)

    Yes, But Dirty

    Yes, But Dirty

    Yes, But Dirty

    To Be Replaced

    To Be Replaced

    Lack of maintenance

    Lack of maintenance

    Lack of maintenance

    Recommended

    For NADCACleaning In The

    Main Tender

    Exercise

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

    3-Safety And Health Assessment Of

    The Services For Tunnel Users

    Contaminated

    And Degraded

    High Air Pollutant

    Source

    Lack Of Maintenance

    And Quality Audit

    Team

    Recommended In

    Tender Operation

    & Maintenance By

    Tunnel Operators

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    15/16

  • 7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012

    16/16