7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
1/16
Re-assessment Of Sukh Saghir Air-Conditioning And Ventilation System
Introduction
The system of air-conditioning and ventilation of Sukh Saghir mainly composed of
1-Supply Air
2-Exhaust Air
3-Air-Conditioning
Along the tunnel, these services are interconnected by MER(Mechanical-Electrical Room) that altogether
make up the ventilation system.
The rooms are as shown figure 1.0 :
MER-01, MER-02, MER-03, MER-04, MER-05, MER-06, MER-07, MER-08, MER-09, MER-10, MER-11,
MER-12 and MER-13
Figure 1.0
Three(3) important characteristics were again assessed namely :
1-Assessment On The Conditions Of The Air Path And Service Area
2-Functionality Of Each Equipment That Make Up The MER Room
3-Safety And Health Assessment Of The Services For The Tunnel Users
Remarks are indicated to confirm for the recommended solutions.
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
2/16
MER-01
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-EF3A1
-EF3A2
-EF3A3
-EF3A4
-Exhaust Shaft
-Control Panel Room(CPR)
-Air-Cond Unit(CPR) 1 Unit 3Hp
-Lighting (CPR)
Yes, But Dirty
Yes, But Dirty
Yes, But Dirty
Yes, But Dirty
Yes, But Clogged
To be Replaced
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
To be redesigned
In The Main
Tender Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
3/16
MER-02
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-EF3.1-EF3.2
-EF3.3
-EF3.4
-Exhaust Shaft
-Control Panel Room(CPR)
-Air-Cond Unit(CPR) 1 Unit 3Hp
-Lighting (CPR)
Yes, But DirtyYes, But Dirty
Yes, But Dirty
Yes, But Dirty
Yes, But Clogged
To be Replaced
To Be Replaced
Lack of maintenanceLack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCACleaning In The
Main Tender
Exercise
To be redesigned
In The Main
Tender Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
4/16
MER-03
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-EF4.1
-EF4.2
-EF4.3
-Exhaust Shaft
-Control Panel Room(CPR)
-Air-Cond Unit(CPR) 1 Unit 3Hp
-Lighting (CPR)
Yes, But Dirty
Yes, But Dirty
Yes, But Dirty
Yes, But Clogged
To be Replaced
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
To be redesigned
In The Main
Tender Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
5/16
MER-04
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-EF1A.1-EF1A.2
-EF1.1
-EF1.2
-Booster Fan-2
-Exhaust Shaft
-Control Panel Room(CPR)
-Air-Cond Unit(CPR) 1 Unit 3Hp
-Lighting (CPR)
Notes:
-New Chiller Design For Bus Station
2 shall be located at this area
Yes, But DirtyYes, But Dirty
Yes, But Dirty
Yes,But Dirty
Yes, But Dirty
Yes, But Clogged
To be Replaced
To Be Replaced
Lack of maintenanceLack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCACleaning In The
Main Tender
Exercise
To be redesigned
In The Main
Tender Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
Main Tender
Exercise
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
6/16
MER-05
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-SF-3A
-AHU-2
-Control Panel Room(CPR)
-Lighting (CPR)
Yes, But Dirty
Only Blower
To Be Replaced
Lack of maintenance
No operation & Lack of
maintenance
Lack of maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
For third-party
subcontracting
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And DegradedHigh Air Pollutant
Source
Lack Of Maintenance
And Quality AuditTeam
Recommended In
Tender Operation& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
7/16
MER-06
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-SF1A-1
-SF1A-2
-SF1B-1
-SF1B-2
-Control Panel Room(CPR)
-Lighting (CPR)
Yes, But Dirty
Yes, But Dirty
Yes, But Dirty
Yes,But Dirty
To be Replaced
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
Main Tender
Exercise
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
8/16
MER-07
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-EF-2A1
-EF-2A2
-EF-2.1
-EF-2.2
-Exhaust Shaft
-Control Panel Room(CPR)
-Air-Cond Unit(CPR) 1 Unit 3Hp
-Lighting (CPR)
Yes, But Dirty
Yes, But Dirty
Yes, But Dirty
Yes,But Dirty
Yes, But Clogged
To be Replaced
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
To be redesigned
In The Main
Tender Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
`
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
9/16
MER-08
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each EquipmentThat Make Up The MER Room
-BF-3.1
-BF-3.2
-SF-5
-Control Panel Room(CPR)
-Air-Cond Unit(CPR) 1 Unit 3Hp
-Lighting (CPR)
Yes, But Dirty
Yes, But Dirty
Yes, But Dirty
To be reinstall to
standard
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
10/16
MER-09
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriaterubbish dump
and un-
authorised
storage
Lack of properly
implementedmaintenance
procedures
Recommended
For NADCACleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-SF6-2
-Control Panel Room(CPR)
-Air-Cond Unit(CPR) 1 Unit 3Hp
-Lighting (CPR)
Yes, But Dirty
To be reinstall to
standard
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
11/16
MER-10
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room
-SF2.2
-SF1.2
-AHU-3(CP-1 & CP-2)
-Control Panel Room(CPR)
-Lighting (CPR)
Notes:-New Chiller Design For Bus Station
3 shall be located at this area of
Intermediate level
Yes, But Dirty
Yes, But Dirty
Only Blower
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of operation &
maintenance
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
Main TenderExercise
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
12/16
MER-11
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room-SF2-1
-SF1-1
-AHU-1(CHP-1 & CHP-2)
-Control Panel Room(CPR)
-Lighting (CPR)
Notes:
-New Chiller Design For Bus Station
1 shall be located at this area of
Intermediate level
Yes, But Dirty
Yes, But Dirty
Only Blower
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of operation &
maintenance
RecommendedFor NADCA
Cleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
Main Tender
Exercise
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
13/16
MER-12
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each EquipmentThat Make Up The MER Room
-SF6-1
-Control Panel Room(CPR)
-Lighting (CPR)
Yes, But Dirty
To Be Replaced
Lack of maintenance
RecommendedFor NADCA
Cleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment OfThe Services For Tunnel Users
ContaminatedAnd Degraded
High Air Pollutant
Source
Lack Of MaintenanceAnd Quality Audit
Team
Recommended InTender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
14/16
MER-13
Type Assessment Technical Operation&Maintenan
ce
Remarks
1-Assessment On The Conditions Of
Air Path And Service Area
Dirt & Debris
In appropriate
rubbish dump
and un-
authorised
storage
Lack of properly
implemented
maintenance
procedures
Recommended
For NADCA
Cleaning In The
Main Tender
Exercise
2-Functionality Of Each Equipment
That Make Up The MER Room-BF-1.1
-BF-1.2
-SF-3
-Control Panel Room(CPR)
-Lighting (CPR)
-Air-Cond Split Unit (3Hp)
Yes, But Dirty
Yes, But Dirty
Yes, But Dirty
To Be Replaced
To Be Replaced
Lack of maintenance
Lack of maintenance
Lack of maintenance
Recommended
For NADCACleaning In The
Main Tender
Exercise
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
3-Safety And Health Assessment Of
The Services For Tunnel Users
Contaminated
And Degraded
High Air Pollutant
Source
Lack Of Maintenance
And Quality Audit
Team
Recommended In
Tender Operation
& Maintenance By
Tunnel Operators
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
15/16
7/30/2019 Re-Assessment of Sukh Saghir Air-Conditioning and Ventilation-04082012
16/16