APRIL 11TH 2019
RDCR 20191st ERD Well In Western Siberia
Artur Abalian – Repsol Drilling Engineer
1
2 km
1
Well infoDrilling Project team
2
Integrated Approach3
QAQC program and
Results4
Engineering 5
Processes for perf and support centers6
10R – 1st ERD Horizontal Well in Central West Siberia Region
What could have we done better?
CONTENT:
10R ERD HW
Karabashsky
License area
KHMAO autonomy
Peer fields
2
Benchmarking: 10-R well classified as a shallow Extended Reach category
- Completion
Drilling Fluids -
- Cementing
- Directional
Drilling
ERD consultancy
Geomechanics -
- Rig services
- Mud Logging
Wireline Logging -
3
ECD management within Narrow Geopressures window
Main Challenges
Well overview
Well schematic
Time vs. Depth
Key Numbers
ZERO
2000
97.4
3785m
m
%
HSE incidents LTI=LTA=0 / Man Hrs: 194300
Total drilled Measured Depth (Main hole & Pilot)
Of Horizontal Section through the reservoir
Productive Time, with NPT = 2.6 %
MP, 2.33, 9%
TD, 8.50, 31%
RO, 5.40, 20%
WL, 5.50, 20%
CM, 2.58, 9%
DE, 3.00, 11%
Planned trajectory execution – following Catenary profile
Smooth Run of 4.5’’ Liner in 2000 m horizontal hole
Equipment preparation - key in preventing lost time events
TD – Top Drive
DE – Directional Drilling
WL – Wireline Log
RO – Rig Others
MP – Mud Pumps
CM - Cementing
4
Road Map of the Well Construction Project
QAQC campaign
Drilling Operations
Rig Down & Demob
ERD training
DWOP
Close-Out
July 2017 Sep 2017
IWCF training
Nov 2017 Dec 2017 Feb 2018
LOGOP HAZID
Apr 2018
PR
TR
Project was planned and executed within half of a year
Engineering Planning
Procurement Processes
Rig Acceptance
P. S. - acronymsPR -- Peer ReviewTR -- Technical ReviewLOGOP -- Logistics on PaperHAZID – Hazards Identification
5
Project Planning Process
Design validation -
3x
Offset analysis
Trajectory
Drilling
Fluids
REPSOL Russia Core Drilling team
REPSOL Global Drilling team- PEER Review
MERLIN ERD
▪ FF Calibration▪ Tortuosity prediction▪ Operational problems
analysis
▪ Critical equipment validation
▪HSE & QAQC programs Supervision
1 2
Pseudo-catenary
type 3
▪ PST (production screen test), RPT (return permeability test) performed
▪ Mineral OBM with OWR = 80/20; Kinematic Viscosity = 2 mm2/s; Sag<0.5
▪ Mud treatment & displacement plans
Idea to involve several parties to cross-reference and validate outputs
▪ Optimized Casing design▪ PP_FG prognosis▪ Trajectory issues▪ WBS issues
Guide for Proper data capture
6
QAQC Program & Results made possible to avoid equipment failures and potential LIH incidents
3 thread connections rejected – Rework
1 Jar Polish shaft Rejected
(cracks indications – Replaced)
1 LWD tool Rejected collar hatch pockets
imperfections (Rejected – Replaced)
1 LWD tool Rejected. Washouts on the pulser
mechanism
16 days of In-house Csg inspection
12 ¾’’ Conductor – 9 pipes inspected
9 5/8’’ Surface Csg – 80 pipes inspected
7” Production Csg – 200 pipes inspected
One 7” Csg rejected. Drift did not pass.
3.5’’ DP inspection rejection
306 pipes rejected (corroded threads, worn
hardbanding, axial misalignment)
Involved TOP mngmnt (CEO) in 3.5’’ DP issue.
Drilling contractor accepted faulty work.
Quality meeting held.
Corrective actions agreed.
Rig inspection by own and external recourses
32 Non conformances found
13 – Critical
10 – Major
9 – Minor
Rig Refurbishment 70%
Findings
7
24/7 monitoring
and support
Office hours monitoring
Core Management team
Real-Time Operations supervision and support was performed 24/7
STC-DSC* - GPN Science & Technology center. Real-Time Drilling Support center
MEMBERSFUNCTIONS: WORKFLOW
Rig SensorsDaily reports
+ DD / LWDdata + Mud dataDrilling Metrics
Office extended team
TEAM
▪ Drilling program execution▪ Plan of Actions preparation▪ Contractors Management▪ Inventory control▪ Drilling Engineering▪ Drilling practices training▪ Tool Box Talks 10R Well site
STC-DSC*
NORMAL REPORT
ALERT
RECOMENDATION
Notification line Decision line
BHGE DD engineer
Drilling Fluids advisor – TPI
Well Site Drilling Engineer
Drilling Supervisor on site
Well Site Geologist
MERLIN advisor
Support DE team
Project Lead
▪ Operations follow up▪ Support in Decision making▪ Support in Trouble solving▪ Engineering QC▪ Plans of Action Validation
▪ Real-time Drilling monitoring
▪ Support on engineering▪ Alerts issuance▪ Simulations validation▪ KPI analysis
Information line
+Geomechanics team
8
10-R well
Narrow window of Collapse gradient vs Fluid
Loss gradient
10-R well oriented in the direction of Shmin
to maximize wellbore stability
Mud rheology had a dominating
influence which was confirmed by the fact
ERD best practices were implemented to
manage ECD which was a major challenge
ECD Tornado chart
Geomechanical model was updated in RT for constant wellbore condition monitoring and quick reaction on any issues
9
Engineering QC performed on-site by matching simulations from different software. E.g. Triple check on Liner RIH case
Landmark Well Plan TAD Pro - Merlin SLB ERA software
4 ½” Liner SCREEN RIH
10
RESULTS & Way forward
Added Value
4
Feasibility
3
1
2
1
2
3
4
5
1. Drill ERD well with WBM
fluids
2. RIH ordinary Screen with
non HT connection
3. Fishbones Drilling
4. MTL well Drilling
What is next ?
6
Proved Feasibility of Drilling shallow ERD well with 2 km lat
Demonstrated Effectiveness of QAQC and HSE focused
approach
Accumulated important Engineering Data
(FF, Hydraulics match, Cuttings load %) and Operational LL
RT surveillance appeared to be very helpful in engineering
validation and decision making – will be applied at future
ops (Repsol – Inwell / GPN – NTC)
Defined Areas for optimization (Drilling Fluids, Completion)
Rig Personnel training and involvement into Project
Planning played important Role in the Project Success
Advice
FeedbackConcern/Questions