NOZZLE & MANWAY SCHEDULE
MARK pcs. SIZE ASME CLASS thk. SERVICE NOTES
M1 1 24" 150# WN RF VTA
N1 1 3" 150# WN RF VTA
N2 1 4" 300# WN RF VTA
N3 1 4" 150# WN RF VTA
N4 1 4" 150# WN RF VTA
N5 1 2" 300# LWN RF VTA
N6 1 X" 150# WN RF VTA
N7A-B 2 3" 150# WN RF VTA
N8A-B 2 3" 150# WN RF VTA
N9A 2 2" 150# LWN RF VTA
N9B 2 2" 150# LWN RF VTA
N10 1 2" 150# LWN RF VTA
N11 1 2" 150# LWN RF VTA
INTERNAL PRESSURE: NORMAL: INSULATION THICKNESS:
MAXIMUM: SHELL FIREPROOFING THICKNESS:
EXTERNAL PRESSURE: NORMAL: - BASE MATERIAL SHOP PRIME & PAINT
MAXIMUM: - CLADDING OR OVERLAY (SAPCS NO):
SERVICE BOOT FIELD PRIME & PAINT
- BASE MATERIAL (SAPCS NO):
- CLADDING OR OVERLAY ESTIMATED VESSEL WEIGHTS
TEMPERATURE: NORMAL: HEADS SHIPPING:
MAXIMUM - TYPE EMPTY: REQUISITION NO.:
- BASE MATERIAL OPERATING: VENDOR:
DATA SHEET TO BE COMPLETED IN ACCORDANCE WITH SAES-D-001. - CLADDING OR OVERLAY TEST:
VESSELS TO BE MANUFACTURED IN ACCORDANCE WITH 32-SAMSS-004, ASME SEC. VIII, DIV. 1 FLANGES:
PIPE: NOTES: THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
SEE SHEET 2 OF 2 REQUREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATION NO
STUD BOLTS:
NUTS:
INTERNALS:
SUPPORTS
- SKIRT:
- SADDLES:
- LEGS:
OTHER (SPECIFY): JOB ORDER/EWO NO. BI THIS DRAWING IS NOT TO BE USED FOR
NAMEPLATE CONSTRUCTION UNTIL CERTIFIED AND DATED
NAMEPLATE BRACKET
LIFTING LUG
GROUNDING LUGS
GASKETS
SAUDI ARABIA
TIT
Nitrogen Inlet
Off Gas Out HOLD
LIT (LICH,LICL)
LIT (LSLL,LALL)
LP-Steam Inlet to heating coils
LP-Condensate Outlet from heating coils
Manhole blind flange w/ davit
Flushing Oil Inlet
Product from PZV blind flange
Drain
Flushing Oil Outlet w/ vortex breaker
-
lbs
INSULATION FIREPROOFING & PAINTING
2 in
acc. SAES-H-001
N/A in
semi elliptical
-
MATERIALS OF CONSTRUCTION
Closed Drain System Drum
OPERATING CONDITIONS
REVISION VALIDATION
BI-10-01265-0001
- lbs
SA516 Gr. 70 lbs
SA105
SA106 Gr. B
122480
lbs
102160
acc. SAES-H-001
20800
30690- Deg. F
293
REFERENCE DRAWINGS
INTERNAL ATTACHMENT CLIPS:
EXTERNAL ATTACHMENT CLIPS: ASME DESIGN CODE & EDITION: ASME VIII Div 1 Latest Edition SA516 Gr. 70
SA516 Gr. 70
Later psig COMPONENT ASME NO:
SA194 Gr. 2H
SA193 Gr. B7psig
- psig
- psig SA516 Gr. 70
- psig -
N/A
Deg. F
EARTHQUAKE:
ZONE:
IMPACT TESTING (I.T.): YES NO
SPECIAL SERVICE
(Lethal, Cyclic, Wet Sour)
SPECIFIC GRAVITY OF LIQUID:
SA516 Gr. 70
YES NO CODE SERVICE
M.D.M.T.: 41
WIND SPEED: 145 KPH
-
-
Deg. F
Deg. F
N/A
CORROSION ALLOWANCE: 0.125 in
Gr. 304L / 316L
RADIOGRAPHY: SPOT DRAWING TYPE
I.T. TEMPERATURE:
Refer Note 7
INTERNAL PRESSURE: 100 (see Note 15)
TEMPERATURE: INT / EXT 572 / - Deg. F
N/A
Av: Refere Note : 5
CODE SERVICE
I.T. ENERGY AVE./MIN.:
SOIL COEFF: Refere Note : 5
SA 516 Gr. 70
L.P.F.T.: N/A Deg. F
P.W.H.T.:
DATE
SAUDI ARABIAN OIL COMPANY
REV. NO.
DAT
REVISION DESCRIPTION
B
SA 516 Gr. 70
Refere Note : 5 05/27/14 ISSUED FOR 50% SUBMITTAL
BI-10-01265-0001
Saudi Aramco SDS-ME-9527 (05/2005)
VMP VSS AAN JMY
05/27/14 05/27/14 05/27/14 05/27/14
B
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY)
DESIGN CONDITIONS SA516 Gr. 70
EXTERNAL PRESSURE: - psig
THIS
DR
AW
ING
AN
D T
HE
INFO
RM
ATI
ON
CO
NTA
INED
HER
EIN
AR
E TH
E SO
LE P
RO
PER
TY O
F SA
UD
I AR
AM
CO
. NO
REP
RO
DU
CTI
ON
IN F
ULL
, OR
IN P
AR
T, S
HA
LL B
E O
BTA
INED
FR
OM
TH
IS D
RA
WIN
G W
ITH
OU
T TH
E W
RIT
TEN
CO
NSE
NT
OF
SAU
DI A
RA
MC
O.
REQUIRED (SAUDI ARAMCO)
ENG'G/DATE CERTIFIED BY/DATE CONS. AGENCY/DATE OPERATIONS/DATE BY/DATE
SHT. NO. REV. NO.
CDS DRUM (015-D-0009)
EXPAND ASPHALT PRODUCTION FACILITIES, RTR
INDEX
D 001 B
DRAWING NUMBER
RD-D00012015
PLANT NO.
RAS TANURA
Slop Oil Inlet
Saudi Aramco 2615 ENG.(05/05)
N7A
N8A
N7B
N8B
M1N6N3N11
N9BN5N4N9A
N2
N10
N1
HHL + HOLD
HLL + 2m
LLL + 0.6 m
STEAM COIL
(Note 18)
4800
C/C to C/C2262
2140
254
2 x 1 1/4" ANCHOR
BOLT
(TO BE CONFIRMED
BY VENDOR)
50 mm
Insulation
ID : 2
500
8000 TL - TL
NOTES:
1 DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED
2 NOZZLE ELEVATION & ORIENTATION ARE PRELIMINARY ONLY AND USED FOR ESTIMATE PURPOSE ONLY.
3 BOLT HOLES SHALL STRADDLE CENTERLINES
4 SURFACE PREPARATION & COATING SYSTEM:
EXTERNAL: APCS 11C
INTERNAL: N/A
5 SEISMIC DATA SHALL BE AS FOLLOWS AND IN ACCORDANCE WITH SAES-A-112
SHORT PERIOD ACCELERATION (SS) = 8.8 %g
1-SECOND PERIOD ACCELERATION (S1) = 3.2 %g
SITE CLASS: D
6 VESSEL ATTACHMENTS:
LIFTING LUGS REINFORCING PLATES FOR NOZZLES (WHERE REQUESTED)
NAMEPLATE WITH BRACKET BOLTS NUTS AND GASKETS FOR BLIND FLANGES
GROUNDING LUGS PADS AND CLIPS FOR PLATFORMS, LADDERS AND PIPE SUPPORTS
INTERNAL PIPES ANCHOR BOLTS, NUTS, WASHERS AND SHIM PLATES FOR VESSEL SUPPORT
INSULATION CLIPS
BAFFLES
7 GASKET: SPIRAL WOUND GRAPHITE FILLED, TYPE 304SS OR 316SS WINDING, C.S OUTER RING,
CONFORMING TO ASME B16.20
8 FLANGES SHALL BE IN ACCORDANCE WITH ASME B16.5 UPTO 24" AND ABOVE 24" & UPTO 60" SHALL BE
AS PER ASME 16.47 SERIES A
9 ALL WELDS SHALL BE FULL PENETRATION TYPE.
10 VESSEL MANUFACTURER IS RESPONSIBLE FOR ENSURING STRESSES DURING SLING OPERATION
DOES NOT EXCEED ALLOWABLES
11 VESSEL MANUFACTURER SHALL BE RESPONSIBLE FOR COMPLETE MECHANICAL AND STRUCTURAL
DESIGN, INCLUDING VESSEL THICKNESS, COATING AND REQUIRED SUPPORT ARRANGEMENT.
12 INSULATION MATERIAL SHALL BE POLYURETHANE FOAM AND SHALL BE IN VENDOR SCOPE OF SUPPLY (AS LOOSE MATERIAL).
13 SPARE PARTS:
2 SETS OF GASKETS FOR EVERY TYPE/SIZE INSTALLED
10% (MIN. 5 PIECES) BOLTS AND NUTS FOR EVERY SIZE/TYPE INSTALLED
14 ALL PARTS DIRECTLY WELDED TO THE SHELL MUST BE SAME MATERIAL AS THE SHELL
COPPER OR COPPER ALLOYS ARE NOT ALLOWED
15 WEIGHTS INDICATED ARE FOR REFERENCE ONLY. IT SHALL NOT FORM BASIS FOR QUOTATION.
16 SADDLE C/C AND ANCHOR BOLT SIZE SHALL BE ON HOLD AND SHALL BE CONFIRMED BY VENDOR DURING DETAIL ENGINEERING.
17 FINAL DESIGN PRESSURE HAS TO BE ALIGNED WITH THE DESIGN PRESSURE OF THE FLARE
SYSTEM. IT SHALL BE CONFIRMED LATER. REQUISITION NO.:
VENDOR:
18 THE STEAM COIL DSIGN PARAMETERS : THE TEMPERATURE INSIDE THE VESSEL SHALL BE MAINTAINED @ 293 C. THE EXTERNAL TEMPERATURE TO BE CONSIDERED 5 C WITH STILL AIR.
STEAM SHALL BE 60 PSIG PRESSURE @ 305 F. VENDOR TO DESIGN THE STEAM COIL CONSIDERING ABOVE PARAMETERS.
THIS REVISION NO. IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATION NO
SPECIFICATION AND STANDARDS32-SAMSS-004 MANUFACTURE OF PRESSURE VESSELS
SAES-H-001 COATING SELECTION AND APPLICATION
SAES-W-010 WELDING REQUIREMENTS FOR PRESSURE VESSELS
PIP VEFV1100 VESSEL STANDARD DETAILS
STANDARD DRAWINGSAD-036981 TOLERANCE FOR PRESSURE VESSELS
AE-036451 PREHEAT LEVELS FOR WELDING CARBON STEEL JOB ORDER/EWO NO. BI THIS DRAWING IS NOT TO BE USED FOR
AB-036386 HARDNESS TESTING FOR WELD PROCEDURE QUALIFICATIONS CONSTRUCTION UNTIL CERTIFIED AND DATED
AB-036719 REINFORCEMENT OF WELDED BRANCH CONNECTIONS.
DD-950003 MANWAY COVER DETAILS FOR PRESSURE VESSEL AND COLUMNS
DB-950006 WELDS, LUGS, SKIRT, VENTS AND SUPPORTS
DD-950022 STRUCTURAL STEEL EARTHING LUGS
DD-950005-001 VORTEX BREAKERS DETAILS FOR COLUMNS AND VESSELS SAUDI ARABIA
AAN JMY
0 0
BI-10-01265-0001
B
0 0
OPERATIONS/DATE
DESIGN CERTIFICATION
B
DRAWING TYPE
PLANT NO. REV. NO.
DATEXPAND ASPHALT PRODUCTION FACILITIES, RTR
SHT. NO.
RAS TANURA
INDEX DRAWING NUMBER
CDS DRUM (015-D-0009)
CONS. AGENCY/DATE
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
REFERENCE DRAWINGS
BY/DATE
REVISION VALIDATION
VMP VSS
015
Saudi Aramco SDS-ME-9527 (05/2005)
ENG'G/DATE CERTIFIED BY/DATE
BI-10-01265-0001
REV. NO.
SAUDI ARABIAN OIL COMPANY
REVIEW FOR KEY DRAWINGS OTHER
THIS
DR
AW
ING
AN
D T
HE
INFO
RM
ATI
ON
CO
NTA
INED
HER
EIN
AR
E TH
E SO
LE P
RO
PER
TY O
F SA
UD
I AR
AM
CO
. NO
REP
RO
DU
CTI
ON
IN F
ULL
, OR
IN P
AR
T, S
HA
LL B
E O
BTA
INED
FR
OM
TH
IS D
RA
WIN
G W
ITH
OU
T TH
E W
RIT
TEN
CO
NSE
NT
OF
SAU
DI A
RA
MC
O.
B 05/27/14 ISSUED FOR 50% SUBMITTAL
05/27/14 05/27/14 05/27/14 05/27/14
DATE REVISION DESCRIPTION
D RD-D00012 002Saudi Aramco 2615 ENG.(05/05)