34
Rick Curtice October 31, 2006 Brownfield Optimizing Mature Assets Denver, Colorado WATER CONFORMANCE

RCurtice

Embed Size (px)

DESCRIPTION

petroleum

Citation preview

  • Rick Curtice

    October 31, 2006

    Brownfield Optimizing Mature Assets

    Denver, Colorado

    WATER CONFORMANCE

  • OVERVIEW

    WATER PRODUCTION SUCCESSFUL TREATMENT COMPUTER PROGRAMS NEW PRODUCTS SUMMARY

  • WHAT DOES WATER PRODUCTION COST??

    25,263,000,000 BBLS OF WATER PRODUCED IN UNITED STATES- 2000

    AVERAGE WATER CUT 94% per WELL

    $5 BILLION COST TO THE INDUSTRY

    MORE IS SPENT ON PRODUCED WATER THAN ALL OTHER MAJOR SERVICES COMBINED

  • PROBLEM IDENTIFICATION + QUALITY EVALUATION = BEST

    SOLUTION UP-FRONT INVOLVEMENT - PROACTIVE RESERVOIR UNDERSTANDING DIAGONSITCS APPLY PROPER TECHNOLOGY

    TREATMENT SUCCESS IS TYPICALLY 90% !

  • MAJOR INTERVENTION TAKEN

    0

    50,000

    100,000

    150,000

    200,000

    250,000

    300,000

    350,000

    1

    9

    7

    7

    1

    9

    7

    8

    1

    9

    7

    9

    1

    9

    8

    0

    1

    9

    8

    1

    1

    9

    8

    2

    1

    9

    8

    3

    1

    9

    8

    4

    1

    9

    8

    5

    1

    9

    8

    6

    1

    9

    8

    7

    1

    9

    8

    8

    1

    9

    8

    9

    1

    9

    9

    0

    1

    9

    9

    1

    1

    9

    9

    2

    1

    9

    9

    3

    1

    9

    9

    4

    1

    9

    9

    5

    1

    9

    9

    6

    1

    9

    9

    7

    1

    9

    9

    8

    1

    9

    9

    9

    2

    0

    0

    0

    2

    0

    0

    1

    2

    0

    0

    2

    2

    0

    0

    3

    YEAR

    T

    O

    T

    A

    L

    V

    O

    L

    U

    M

    E

    -

    B

    B

    L

    S

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    50.00

    W

    A

    T

    E

    R

    O

    I

    L

    R

    A

    T

    I

    O

    -

    W

    O

    R

    WATER PRODUCTION IN BBLS

    WOR

    OIL PRODUCTION IN BBLS

  • COMPUTER SOFTWARE Water Control Expert System

    XERO PROBLEM IDENTIFICATION PRODUCT SELECTION PLACEMENT TECHNIQUES TREATMENT SIZE

  • COMPUTER SOFTWARE SIMULATOR

    3-D, 4-PHASE NON-ISOTHERMAL, MULTIWELL BLACK OIL AND PSEUDO-COMPOSTIONALSIMULATOR

    RESERVOIR SIMULATOR IS LINKED WITH A WELLBORE TEMPERATURE SIMULATOR WITH PRESSURE PROFILES

    SPEED IN FORECASTING RESULTS OF WELL INTERVENTIONS

    ACCURACY IN UNDERSTANDING OF RESERVOIR AND WELLBORE MECHANISMS

    EFFICIENCY IN SENSITIVITY STUDIES BY VARYING DESIGN PARAMETERS

  • NEW PRODUCTS

    POLY - CRYSTAL THIXOTROPIC MONOMER HIGH TEMPERATURE POLOYMER RIGID SETTING FLUID RELATIVE PERMABILITY MODIFIERS

  • POLY-CRYSTALS

    APPLICABLE FOR LOSS CIRCULATION, PROFILE MODIFICATION AND INTERWELL COMMUNICATION PROBLEMS

    VARIABLE SIZE MAXIMUM SIZE = 14 MM VARIATIONS 1 MM AND 4 MM CAPABILITY OF PLACEMENT CONTROL

    DEHYDRATED FORM COMPACT CONCENTRATION

    EQUIVALENT FORM < 1/10 BASE POLYMER

    ECONOMICS FAVORABLE

  • POLY-CRYSTALS

    ATTRIBUTES AND PROPERTIES RESISTANT TO BACTERIAL GROWTH RESISTANT TO ACID HIGHLY RESISTANT TO CO2

    TECHNOLOGY IS ECONOMICALLY FAVORABLE COMPARISON TO POLYMER GEL TECHNOLOGY

    GENERALLY 1/10 THE COST FOR THE SAME GEL LOADING SHORT TIME FOR PLACEMENT REDUCED EQUIPMENT AND

    PUMP TIME CHARGES SIMPLICITY IN OPERATION AND QC

  • THIXOTROPIC MONOMER

    BROADENS CAPABILITES TO SHUT-OFF WATER IN CHALLENGING COMPLETIONS GRAVEL PACKS SCREENS HORIZONTAL WELLBORES.

    THIXOTROPIC PROPERTIES PREVENT GRAVITY SLUMPING

    FORMS CHEMICAL PACKER TO PERMANTELY SEAL THE TARGET ZONE.

  • THIXOTROPIC MONOMER

    SHEAR THINNING PERMANENT SEALANT

    GENERATES HIGH LEVELS OF VISCOSITY AS SHEAR RATE DECREASES

    PUMPABLE THROUGH CT, GRAVEL PACK SLOTTED LINER

    WILL NOT SLUMP IN A HORIZONTAL WELLBORE

    WILL NOT BYPASS STRADDLE PACK ASSEMBLY

    CAN BE WASHED OUT WITH CT

  • HIGH TEMPERATURE POLYMER

    TEMPERATURE RANGE 100 to 350 F

    PERMEABILITY FROM 0.1 MD to 10 DARCY

    MIXING BRINES KCL, NACL OR SEAWATER

  • HIGH TEMPERATURE POLYMER

    HIGH TEMPERATURE POLYMER (HTP) SLURRY SQUEEZE SYSTEM FOR WATER/GAS SHUTOFF

    COMBINATION HTP WITH FLUID LOSS

    FOLLOWING SQUEEZE TREATMENT OIL/GAS ZONES CAN BE RE-PERFORATED

    CAN BE USED IN PLACE OF STANDARD CEMENT SQUEEZES FOR VARIOUS APPLICATIONS

  • HIGH TEMPERATURE POLYMERADVANTAGES OF HTP SLURRY:

    NO NEED FOR ZONAL ISOLATION AS WITH STANDARD CEMENT OPERATIONS

    SLURRY IS BULLHEADED INTO ALL PERFORATIONS

    SHALLOW PENETRATION OF THE FILTRATE ALLOWS FOR RE-PERFORATION IN THE HYDROCARBON ZONE

    HTP SLURRY LEFT IN THE HOLE DOES NOT HAVE TO BE DRILLED OUT, AND CAN EASILY BE JETTED OUT WITH COILED TUBING.

  • RIDGID SETTING FLUID

    FORMULATION OF INORGANIC NON TOXIC POWDERS AND FLUIDS MIXED IN A BRINE SOLUTION

    USED TO PERFORM CHEMICAL ISOLATIONS/SHUT OFFS IN VERTICAL AND HORIZONTAL WELLBORES

    CHARACTERISED BY A CONTROLLED RIGHT ANGLE SET FOLLOWED BY RAPID STRENGTH DEVELOPMENT.

    ONCE SET PRODUCT HAS MECHANICAL CHARACTERISTICS SIMILAR TO CEMENT BUT IT IS NOT A CEMENT.

  • RIDGID SETTING FLUID

    ZERO SHRINKAGE.

    ZERO STATIC GEL GENERATION.

    WILL NOT INVADE FORMATION.

    100% ACID SOLUBLE WITH 15% HCL.

    TREATMENTS TYPICALLY 25 BBLS OR LESS.

  • RIDGID SETTING FLUID

    IMMISCIBLE IN OIL.

    TOLERATES UP TO 50% CONTAMINATION.

    TYPICALLY 5 MICRON MEDIAN PARTICAL SIZE.

    VARIABLE VISCOSITY FROM 18 CP TO 100 CP.

  • RIDGID SETTING FLUID

    NEAR WELLBORE PHENOMENON

    EXOTHERMIC REACTION TIME AND TEMPERATURE DEPENDENT.

    COMPRESSIVE STRENTH BUILDS RAPIDLY > 3000 PSI IN 2 HOURS.

    OPERATING TEMPERATURE RANGE 0 - 270 F.

    SET TIME IS COMPLETELY PREDICTABLE AND CONTROLLABLE 10 MINUTES TO SEVERAL HOURS.

    CAN BE PUMPED THROUGH BHA USES CONVENTIONAL PUMPING EQUIPMENT.

  • RELATIVE PERMEABILITY MODIFIER (RPM)

    A WATER SOLUBLE POLYMER

    HYDROPHOBIC RESULTS - INCREASED ADSORPTION

    OIL/WATER SEPARATION IN THE RESERVOIR

  • RELATIVE PERMEABILITY MODIFIER

    135 142

    340

    6

    0

    50

    100

    150

    200

    250

    300

    350

    P

    e

    r

    m

    e

    a

    b

    i

    l

    i

    t

    y

    (

    m

    d

    )

    oil core water core

    Permeability Modification for Oil and Water Saturated Cores

    Initial Perm (md)

    Final Perm (md)

    Permeability to oil increased by 7%

    Permeability to water decreased by 98%

  • RELATIVE PERMEABILITY MODIFIER

    WHAT IS AN RPM CANDIDATE?

    LAYERED FORMATION

    BOTTOM HOLE STATIC TEMPERATURE (BHST) UP TO 325F

    MATRIX PERMEABILITY RANGE FROM 0.1 MD TO 6 DARCYS

  • RELATIVE PERMEABILITY MODIFIER

    WHAT ARE THE APPLICATIONS?

    CONVENTIONAL WATER CONFORMANCE

    DIVERTOR

    PRE & POST FRAC TREATMENT

    LOSS CIRCULATION

  • RELATIVE PERMEABILITY MODIFIER

    WHAT IS A CONVENTIONAL RPM CANDIDATE?

    LAYERED FORMATION WITHOUT RESERVOIR CROSS FLOW

    SANDSTONE OR CARBONATE

    BHST UP TO 325F

    MATRIX PERMEABILITY RANGE 0.1 MD 6 DARCY

    PERFORATION OR GRAVEL PACKS

  • RELATIVE PERMEABILITY MODIFIER

    WHAT IS A DIVERTOR RPM CANDIDATE?

    NEED FOR DIVERSION DURING ACID STIMULATION

    BHST UP TO 350F

    PERMEABILITY RANGE FROM 0.1 MD TO 6 DARCY

    NEED FOR DIVERSION AWAY FROM HIGH WATER SATURATED ZONES

  • RELATIVE PERMEABILITY MODIFIER

    HOW IS AN RPM DIVERTOR USED?

    BULLHEAD TREATMENT: ALTERNATING STAGES OF RPM FLUID AND ACID

    NO DAMAGE TO HYDROCARBON BEARING ZONES

    ENHANCES ZONAL COVERAGE BY DIVERTING ACID AWAY FROM WATER BEARING ZONES

    DOES NOT REQUIRE VISCOSITY TO AID IN DIVERSION

    SIMPLE AND EASY TO USE: NO ZONAL ISOLATION NEEDED. NO SPECIAL PLACEMENT TECHNIQUES REQUIRED.

  • SOMETIMES FRACTURE STIMULATION RESULTS IN MORE THAN HYDROCABON PRODUCTION?

    RPM FRAC SERVICE

  • RPM FRAC SERVICE CONFORMANCE WHILE FRACTURING:

    LIMITS RISK ASSOCIATED WITH FRACTURING NEAR HIGH WATER SATURATION

    REDUCES PERMEABILITY TO WATER

    REQUIRES NO SPECIAL PLACEMENT TECHNIQUES A SIMPLIE LIQUID ADDITIVE THAT CAN BE INCLUDED AS PREPAD

    OR ADDED TO THE ENTIRE TREATMENT

  • RPM FRAC SERVICE

    COMPATIBLE WITH MOST EXISTING FRAC FLUID SYSTEMS

    LAB RESULTS INDICATE IMPROVED LOAD RECOVERY.

    EXTENDS THE ECONOMIC LIFE OF THE WELL.

  • WHAT IS AN RPM FRAC SERVICE CANDIDATE?

    LAYERED FORMATION

    BHST UP TO 325F

    FRACTURING CLOSE TO WATER ZONE

    MATRIX PERMEABILITY RANGE FROM 0.1 MD TO 6 DARCYS

    RPM FRAC SERVICE

  • WHAT IS AN RPM POSTFRAC SERVICE CANDIDATE?

    FRAC THAT IS PRODUCING LARGE AMOUNTS OF WATER

    BHST UP TO 325F

    MATRIX PERMEABILITY RANGE FROM 0.1 MD TO 6 DARCYS

    RPM POST FRAC SERVICE

  • ZONES PRODUCING WATER MUST BE IDENTIFIED

    ZONES PRODUCING WATER MUST BE ISOLATED WHEN TREATED

    RPM FLUID MUST BE PUMPED THROUGH THE PROPPANT PACK TO BE EFFECTIVE

    RPM POST FRAC SERVICE

  • DURING ROUTINE WORKOVERS

    DURING DRILLING OPERATIONS?

    RPM LOST CIRCULATION APPLICATIONS

  • EXCESSIVE WATER PRODUCTION CONTINUES TO COST THE INDUSTRY BILLIONS OF DOLLARS A YEAR

    SUCCESSFUL TREATMENTS CAN BE PUMPED

    SOFTWARE FOR DESIGN AND APPLICATIONS ARE AVALIABLE

    NEW PRODUCTS HAVE BEEN DEVELOPED FOR ADDITONAL APPLICATIONS.

    SUMMARY

    OVERVIEWWHAT DOES WATER PRODUCTION COST??PROBLEM IDENTIFICATION + QUALITY EVALUATION = BEST SOLUTIONMAJOR INTERVENTION TAKENCOMPUTER SOFTWARE COMPUTER SOFTWARE NEW PRODUCTSPOLY-CRYSTALSPOLY-CRYSTALSTHIXOTROPIC MONOMERTHIXOTROPIC MONOMERHIGH TEMPERATURE POLYMERHIGH TEMPERATURE POLYMERHIGH TEMPERATURE POLYMERRIDGID SETTING FLUIDRIDGID SETTING FLUIDRIDGID SETTING FLUIDRIDGID SETTING FLUIDRELATIVE PERMEABILITY MODIFIER (RPM)RELATIVE PERMEABILITY MODIFIERRELATIVE PERMEABILITY MODIFIERRELATIVE PERMEABILITY MODIFIERRELATIVE PERMEABILITY MODIFIERRELATIVE PERMEABILITY MODIFIERRELATIVE PERMEABILITY MODIFIERSOMETIMES FRACTURE STIMULATION RESULTS IN MORE THAN HYDROCABON PRODUCTION?RPM FRAC SERVICERPM FRAC SERVICERPM FRAC SERVICERPM POST FRAC SERVICERPM POST FRAC SERVICERPM LOST CIRCULATION APPLICATIONSSUMMARY