43
Ratnagiri Gas & Power Pvt Ltd Vision: To emerge as significant player in energy sector Abdul Saleem, Dy GM (Energy Efficiency) Aman Kaul, Manager (Energy Efficiency) Mukul Sharma, Manager (Technical Services) 21 st National Award for Excellence in Energy Management

Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Ratnagiri Gas & Power Pvt Ltd

Vision: To emerge as significant player in energy sector

Abdul Saleem, Dy GM (Energy Efficiency)

Aman Kaul, Manager (Energy Efficiency)

Mukul Sharma, Manager (Technical Services)

21st National Award for Excellence in Energy Management

Page 2: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

RGPPL Overview

Page 3: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

RGPPL Snapshot

Dabhol Power Company was set up as one of the first projects with major FDI after liberalization in India.

DPC envisaged to set-up an integrated power generation and LNG regasification facility.

RGPPL was formed in 2005 as a SPV under aegis of Empowered Group of Minister of GoI to take over & revive assets of DPC.

Joint venture of NTPC, GAIL, MSEB & FIs

COD: 19.05.2009

Power & LNG businesses demerged in 2018.

Beneficiaries: Maharashtra, DD, DNH, Goa, Railways.

ISO 14001 & ISO 45001 certified plant.

No fatal accident in power plant since take-over.

3

25.5

25.5

13.5

35.5

Shareholding

NTPC

GAIL

MSEB

IFIs

Page 4: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

RGPPL Overview

4

India’s Largest Gas-based Power Plant at 1967.08 MW

Block Capacity - 640 / 663.54 / 663.54 MW

All blocks in multi-shaft combined cycle configuration

Each Block with

• 2 GTs (GE 9FA/9FA+)

• 2 HRSGs (Vogt/Kawasaki)

• 1 ST (GE D11)

Single shaft CTG with 18 stage compressor & 3-stage GT

Dry Low NOx Burners (DLN 2.0/DLN 2+)

Condenser cooling through sea water (Arabian Sea)

Sweet water supply through 50-km long pipeline

No diverted damper for open cycle operation

Power evacuation through four 400 KV lines

MH, 68%

DD, 2%

DNH, 2%

Goa, 1%

Railways, 27%

Power Allocation

1967.08

MW

Page 5: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Energy Consumption & Benchmarking

Page 6: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Total Energy Consumption FY 2019-20

6

Gross Generation4264 Million kWh

366,638 TOE

Sale to Customers4179 Million kWh

359,329 TOE

Township Power Consump.2.42 Million kWh

208 TOE

Aux. Power Consumption81.76 Million kWh

7,030 TOE

PLF 24.68 %APC 1.918

%

Raw Water consumption1,54,000 KL

DM Water consumption38,466 KL

Page 7: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

7

1843 1840 1833

1840

26.5

26.1

25.9

24.7

24.0

25.0

26.0

27.0

1800

1820

1840

1860

FY17 FY18 FY19 FY20

Heat Rate

Heat Rate PLF

Specific Energy Consumption

2.01.8 1.9 1.91

26.5

26.1

25.9

24.7

24.0

25.0

26.0

27.0

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

FY17 FY18 FY19 FY20*

APC

APC PLF

41.4% 37.6%36.6% 34.0%

On-bar Availability

Page 8: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Activities for Reduction of SEC

Single block operation to reduce APC & Heat Rate

Timely overhauling of GT (CI, HGPI) and ST (Minor, Major)

Compressor: inlet air filter replacement, online/offline water wash, online efficiency monitoring

Condenser: high pressure jet cleaning, helium leak test for vacuum improvement

Maintaining COC & chemical dosing for better heat transfer in condenser through cooling water

Cooling Tower: fills replacement, blade angle adjustment

Replacement with LEDs in plant

Optimization of plant auxiliaries operation

Use of thermal cameras for insulation survey in HRSGs

8

Page 9: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

9

2075 2100 2000 1975 2050 2040

1820

22122301

21332020 2068

2140

1840

0

500

1000

1500

2000

2500

Anta Auraiya Dadri Faridabad Kawas Gandhar RGPPL

Heat Rate in kcal / kWh

Target Actual

Benchmarking: Heat Rate in 2019-20

Best Heat Rate

Page 10: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

10

2.75 2.75 2.75 2.75 2.75 2.75 2.75

6.73

4.213.76

3.38 3.30

4.36

1.92

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

Anta Auraiya Dadri Faridabad Kawas Gandhar RGPPL

APC in %

Target Actual

Benchmarking: APC in 2019-20

Lowest APC

Page 11: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

PAT Targets

118/31/2020

Parameter 2019-20 2018-19 2017-18 2016-17

Gross Heat Rate (kCal/kwh) 1820.0 1832.8 1839.9 1842.8

APC (%) 2.75 1.94 1.74 1.93

Net Heat Rate (kCal/kwh) 1876.14 1869.1 1872.5 1879.1

RGPPL is covered under PAT Cycle 3. Net Heat Rate of 1876.14 is achieved against PAT target of 1873.12 kcal/kwh for assessment FY 2019-20.

Reason for higher Heat Rate:

Higher percentage of negative RRAS & lower PLF.

Lockdown in last fortnight of FY 19-20 also contributed to higher heat rate due to drastically reduction of load.

Activities for Achieving PAT Target:

Installation of 260 KW of LED in Power Plant & Colony.

Conversion of Duel Fuel Nozzle to Single Fuel Nozzle in Gas Turbine leading to saving of 51,048 MMBTU of Thermal Energy per annum

Installation of VFDs in DM makeup pumps

Page 12: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Most Efficient Power Plants

Nishi Nagoya Power Station, Japan

• 1188 MW installed capacity

• 63.08% efficiency (NCV) on 22.01.2018

• 3 GE 7HA GTs with 1 Toshiba ST

Bouchain Power Station, France

• 605 MW installed capacity

• 62.22 % efficiency (NCV) on 28.04.2016

• 1 GE 9HA GT with 1 GE D650 ST

RGPPL

• 55.62 % efficiency (NCV) on 21.07.2010

• Neat Heat Rate 1744 kcal/kWh

• 2 GE 9FA GTs with GE D11 ST

12

Torrent Sugen Surat - 1590

Torrent Unosugen Surat - 1599

Torrent Dgen Dahej – 1606

Siemen’s SGT5 4000F GT

OTPC Tripura – 1699

GE 9FA GT

Global National

Page 13: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Energy Saving Projects

Page 14: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

14

Energy Saving Projects: 2017-18

1.0

4.5

4.7

15.8

31.5

90.5

122.7

Installation of LEDs

Integrated Chiller Water System

Compressed Air Optimization

GT Compressor Water Washing

ST-2X Condenser Tube Cleaning

Single Block Operation (Heat Rate saving)

Single Block Operation (APC saving)

Savings in Rs Millions

34.08 MU

10.5 kcal/kWh

8.76 MU

4.38 MU

1.31 MU

1.24 MU

Energy Saving

0.26 MU

Page 15: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

15

Energy Saving Projects: 2018-19

4.4

4.5

7.9

15.7

31.5

37.8

90.2

172.4

Installation of LEDs

Integrated Chiller Water System

GT-3A Inlet Air Filter Replacement

GT Compressor Water Washing

ST-3X Condenser Tube Cleaning

ST Helium Leak Test for Vacuum Imp.

Single Block Operation (APC saving)

Single Block Operation (Heat Rate saving)

Savings in Rs Millions

20 kcal/kWh

25.05 MU

10.51 MU

8.76 MU

4.38 MU

2.19 MU

1.24 MU

1.23 MU

Energy Saving

Page 16: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

16

Energy Saving Projects: 2019-20

4.1

4.5

7.9

15.8

31.5

127.7

Installation of LEDs

Integrated Chiller Water System

GT-3A Inlet Air Filter Replacement

GT Compressor Water Washing

Condenser Tube Cleaning

Single Block Operation (APC saving)

Savings in Rs Millions

35.47 MU

8.76 MU

4.38 MU

2.19 MU

1.24 MU

1.14 MU

Energy Saving

Page 17: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Energy Saving Projects (Planned) FY 20-21

17

Conversion of dual fuel nozzles to single fuel firing (Competed in 2 Gas Turbine)

Electric vehicles for use inside plant area

Ground mound Solar panel of 100 KW as pilot project

Solar water heaters in township

Turbo-ventilators in place of motorized fans for TG hall and warehouses

Installation of light tubes in warehouse & conference halls

Page 18: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Energy Saving Projects (Planned in FY2020-21)

Existing BFP is 9 stage centrifugal pump, driven by 2660 kW / 6.6 kV electric motor.

Modification proposed for removal of two stages of pump impeller for pressure reduction from 177 kg/cm2.

Destaged BFP will provide 130 kg/cm2 pressure, which is sufficient for part load operation.

After modification, power consumption will be 1766 kW, thereby saving 607 kW per BFP.

Annual power saving per BFP @ 185 days running will be 2.70 million units.

18

Destaging of Boiler Feed Pump

Page 19: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Environment Management- Water

Page 20: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Environment Management- Water

20

DM water Consumption of Plant (Unit - %)

FY 2017-18

0.52 %

FY 2019-20

0.61%

FY 2018-19

0.58 %

Raw water Consumption of Plant (Unit – M^3/MW)

FY 2017-18

320 M^3/MWFY 2018-19

318 M^3/MWFY 2019-20

317 M^3/MW

Zero Liquid Discharge (ZLD) is not applicable for coastal power plant which are using sea water for condenser cooling.

For reuse of sewage water, RGPPL has planned to installed 0.5 MLD STP based on MBR technology in place of existing STP.

Page 21: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Environment Management- Water

Rainwater Harvesting:

RGPPL is self sufficient in term of sweet water from Rain Water Harvesting. RGPPL has harvested 304 m^3 rain water against requirement of 219 m^3 for power plant & colony for FY 21.

Chiller Coil Condensate Use:

RGPPL was envisaged as an integrated energy complex with a power plant and an LNG regasification facility. In this energy exchange process, heat energy of condenser cooling water from power plant is utilized for regasification of LNG and cold of LNG is utilized in power plant for inlet air chilling & circulating water cooling. When power plant units operate at base load condition, chiller coils are taken into service to enhance efficiency and also because the condensate formed on inlet air chiller coils. This condensate provides water at the rate of 10m3/hour per gas turbine, which is then re‐used as process water for plant activities.

21

Best Practices in water Management

Page 22: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Environment Management- Water

Auxiliary Make‐up: Auxiliary cooling towers are operated in closed loop so that the evaporation loss is null. This has helped in saving considerable quantity of clarified water.

HRSG Blowdown, quench water and Sample Loss: Water collected in blowdown tanks are treated for using in demineralization process, thereby reducing requirement of fresh water for process

STP Water Re-use: RGPPL has also planned to upgrade its existing sewage treatment at township with Membrane Bioreactor (MBR) technology based STP

22

Best Practices in water Management

Page 23: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Innovative Projects

Page 24: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Innovative Projects

Naphtha storage tanks converted as water storage tanks (3 X 40,000 m3)

Check dams & bunds constructed

Dewatering pumps installed in all storm water drains of plant

Diversion of gravity flow channels for sending rainwater to EWR

Supply of excess rainwater to nearby villages

24

224 220 219

170196

304

0

50

100

150

200

250

300

350

FY19 FY20 FY21

Tho

usa

nd

s

Sweet WaterRequirement

RainwaterHarvesting

Water quantities in cubic meters

Actual data for FY19 , FY20 & FY21

Further enhancement in FY 21

Repair of primary reservoir (120,000 m3) & use of fourth fuel tank for water storage (40,000 m3)

Water Positive in

FY21

Rainwater Harvesting

Page 25: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Innovative Projects

LNG is stored cryogenically at –160 oC.

Chilled water (DM water + 12% MEG) carries heat from condenser cooling water to LNG process area for regasification.

Cold energy of LNG is utilized in power plant for inlet air cooling and condenser cooling.

25

Use of chiller coil condensate water as process water (10m3/hr per GT)

Use of gravity for water supply from Tanks (139 m) to plant (105 m) & colony (120 m)

Chilled Water System

Other Projects

Page 26: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Utilization of Waste Material

Paper recycling machine of 20 kg capacityinstalled to effectively & sustainablyrecycle used papers.

Recycled paper is being used to makedrawing sheets & other small items suchas note pads, bags, files, folders, etc.

26

Waste Paper Recycling MachineHydro-pulper Paper-lifter

Screw-pressCalendaring

STP Water Re-useFinished Products

Re-use of treated water from Sewage Treatment Plant for horticulture

Page 27: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Green Supply Chain

27

Disposal of e-waste through OEM collection centers or MPCB authorized recyclers.

Installation of electric vehicle charging station

Procurement of energy efficient lighting, ACs & fans through BEE certified agencies

21% reduction in use of paper in last three years

Ban on plastic & tobacco.

Distribution of jute & recycle paper bags.

Reduction in township water consumption by 100 m3 per day by provision of individual tanks and replacement of taps & fittings.

Activity Planned

Relocation of weigh-bridge to reduce travel distance of vehicles by 1100 meter one-way, thereby saving fuel & emissions

Green Initiatives

Page 28: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Best Practices in the Plant

Page 29: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Best Practices in the Plant

Safety• 100% Safety induction training is imparted to all workers at the time of issue or renewal of

gate-pass.

• Pre-work briefing (tool box talk) is provided to contract workers before start of works under hot work and confined space permits.

• Cross Line marking in back Panel of SWGR to avoid accidental maintenance activity on live panels.

29

Flexibilization

• Smart blending of Fuel –RLNG,NAPM and Spot Gas

• USP in Electricity sales- LTA,TAM,DAM,RTM

Page 30: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Best Practices in the Plant

30

Maintenance and reliability

• Real time Compressor Blade health monitoring of compressor for early detection of abnormality

• Critical Analog inputs were shifted to TMR (Triple Modular Redundancy) channels to improve system reliability

• Control / power cable conduits, Hand Rail replacement by PVC/FRP to counter corrosion due to airborne salinity

• To increase insulation resistance of breakers under saline atmospheric conditions, RTV coating for generator breakers in 400 KV switchyard has been done.

• Monthly Hot washing of switchyard insulators to prevent deposit on insulators due to saline environment.

• Distributed emergency lighting system for all plant areas, staircases, switchgear rooms and control rooms.

Page 31: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Best Practices in the Plant

Asset Management• Dry Preservation of Pressure parts with N2 capping.

• Preservation of Gas turbine, Steam turbine and HRSG of units under long shut down with dry air using dehumidifier

31

Research

• Optimum Utilization of inlet air filter using ANN Model

• Compressor fouling identification using ANN regression & pattern recognition

Page 32: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Best Practices in the Plant

New Initiatives

• Upgradation of its existing sewage treatment at township with Membrane Bioreactor (MBR) technology based STP

• Replacement of conventional chlorine gas dosing system with Electro chlorinator.

• Installation of Condensed Aerosol based fire fighting system in Central control rooms and Local Control rooms

32

Page 33: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Team work, Involvement & Monitoring

Page 34: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Monitoring

Continuous & online monitoring of emissions through CEMS

Realtime monitoring of effluent quality through EQMS

Realtime ambient air quality monitoring through 4 AAQMS stations

Display of real-time emission parameters at plant main gate.

Daily monitoring of operational & commercial parameters including Heat Rate, APC, water consumption, etc in meeting chaired by HOP.

Monthly performance report of Gas /Steam Turbine & all critical equipment reviewed by HOP

Monthly Operation Review Team meeting chaired by HOP.

Annual technical audit for identification & correction of gaps.

Circulation of energy audit & equipment performance reports.

Real-time parameter monitoring through HMI (GT & ST) and DCS (HRSG & BOP)for immediate deviation identification.

34

Page 35: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Team Work & Employee Involvement

Interaction of HOP with all employees through Open Forum

Awareness & cleanliness drives in neighboring villages

Classes by executives in Township school on various subjects

Display of energy conservation slogans & posters in plant

Awareness amongst contract workers

Felicitation of workers & executives for safety & excellence

35

Page 36: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Suggestion Scheme – सुझाव

36

Suggestions Received

Suggestion scheme for executives & workers

Number of suggestion received in 2019-20: 83

Suggestions recommended for implementation: 56

Online portal developed for suggestions

Suggestion boxes installed at prominent locations

Installation of RTD pads for temperature measurement & indication in Control Room for immediate identification of passing in high energy drain valves.

Radar type level transmitters in Lube Oil tanks with alarm for quick identification of leakages.

Position feedback of valves of HRSG & condensate system in Control Room.

Auto-start of stand-by BFP based on feedwater flow (before tripping of running BFP) to avoid tripping of running turbines.

Page 37: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Long Term Vision on Energy Efficiency

Advance Gas Path modification in gas turbines for efficiency improvement and maintenance

optimization (approximate implementation cost Rs 250 Crore per GT)

Installation of MBR based Sewage Treatment Plant, for re-use of treated water as process water

Self-sufficiency in sweet water requirement through rainwater harvesting (Completed)

100% LED installation in plant & township (Completed)

Implementation of ISO 50001

Use of IOT for remote operation of equipments

37

Page 38: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Energy Conservation Budget

38

0.19 0.731.45

3.25

%, 0.04 %, 0.20

%, 0.36

%, 0.81

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

0

0.5

1

1.5

2

2.5

3

3.5

FY18 FY19 FY20 FY21

EnCon Investment as % of EBITDA

EnCon Investment %

Actual data for FY18 , FY19 , FY 20 & budgeted for FY21

EBITDA in Crore: 473 (FY18), 373 (FY19), 398 (FY20) ,403(FY21)

Investm

en

t in

Rs C

rore

FY21: Rs 2.80 Crores amount allocated for BFP de-staging

Page 39: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Awards & Accolades

Page 40: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

XIII World Aqua Congress-2019

Awarded Aqua Foundation Excellence Award for 2019 under two category

Water Reuse Project & Sustainable Development in thermal power sector

40

Page 41: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

20th National Award for Excellence in Energy Management

RGPPL received CII’s Energy Excellence Award 2019 for being ‘Energy Efficient Unit’

41

Page 42: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

Best Gas Power Plant

RGPPL received NTPC’s Best Gas Station Award at O&M Conference IPS 2020

42

RGPPL recognized as ‘Safe Plant’ by NTPC for 2019-20

Page 43: Ratnagiri Gas & Power Pvt Ltd - Green Business Centre · 2020. 9. 9. · Joint venture of NTPC, GAIL, MSEB & FIs COD: 19.05.2009 Power & LNG businesses demerged in 2018. Beneficiaries:

At Post Anjanvel, Taluka GuhagarDistrict Ratnagiri – 415703 (MH)

www.rgppl.com

Contact Us

Copyright 2018 @ RGPPL. All Rights Reserved.

02359 - 241146

[email protected]

[email protected]

[email protected]

Thanks