Rates for Construction

Embed Size (px)

DESCRIPTION

Construction

Citation preview

  • RATES

    ITEM NO DESCRIPTION UNIT QTY RATE AMOUNT

    A EXCAVATION & EARTH WORK Cube 3,000.00

    B CONCRETE WORK

    Lean concrete

    Reinforced cement concrete 1:3:6[3/4"]

    mixed concrete in the follows ;(3" thick) Sqrs 12,500.00

    Reinforced concrete

    Reinforced cement concrete 1:2:4 [3/4"]

    mixed concrete in the follows ; Cube 44,500.00

    Form work

    Form work is measured as the net

    contacts surface measurement between

    concrete and form work. Form work

    for columns and beams is given as

    girth measurement Sqrs 9,500.00

    Reinforcement

    Tor steel rod reinforcement including

    bends, hooks, wire, distance blocks

    and ordinery spaces Cwt 13,000.00

    C RUBBLE WORK

    Random rubble masonry in cement and Cube 22,000.00

    sand 1:5 in wall foundation

    D ELECTRICAL INSTALLATION

    Electrical installation Sum(condutes pipe,wire and labour for laying

    only)

    G BRICK WORK

    9" thick brick wall in 1:5 cement and sand

    mortar Sqrs24,000.00

    6" thick brick wall in 1:5 cement and sand

    mortar20,000.00

    H CARPENTRY AND JOINERY

    H.1 Timber doors; Sq.ft. 1,500.00

    H.2 Glazed windows; Sq.ft 1,800.00

    1

  • RATES

    I PLUMBING Sum

    J FINISHES

    J.1Smooth plastering in 1:1:5 cement lime

    and sand mortar [internal] Sqrs 7,500.00

    J.2Semi - rough plastering in 1:1:5 cement

    lime and sand mortar [external] Sqrs 7,000.00

    J.3 Sofit plaster Sqrs 7,700.00

    J.4Floor finishes-Tilling [without tiles, tile

    grout and beadings] [a] Tilling area

    J.5 Wall and door window painting /Polishing Sqrs

    KGROUND FLOOR ROOF COVERING AND

    ROOF PLUMBING

    Roof covering with Asbastos sheet

    roofing on necessary open rafter timber

    frame work with all necessary GI hooks,

    bolts, nuts, limpet and bitumestic washers

    etc. rate shall include roof frame work,

    timber ceiling sheet & necessary foil

    insulation and necessary Roof Pollishing

    and roof plumbing all necessary to

    complete the work as per drawings and

    specification.

    In main roof

    Sqrs 105000.00

    *Note:

    Rates not included

    1 Tiles(Provide by client)

    2 Light fittings (Provide by client)

    3 Toilet bathroom fittings (Provide by client)

    2