© ABB Future of Distribution Automation i – PCGRID Workshop – 2013 San Francisco, CA, USA March 26-28, 2013 Ratan Das, Senior Principal Engineer, Distribution Automation, March 27, 2013 27 March 2013 | Slide 1

Ratan Das, Senior Principal Engineer, Distribution ... · COM600/Micro-SCADA. for example . Control Center . Substation . Bay Process Units . IED 3 . PU 1… Hardwired . PU x… IEC61970/61968,

Embed Size (px)

Citation preview

© ABB

Future of Distribution Automation i – PCGRID Workshop – 2013 San Francisco, CA, USA March 26-28, 2013

Ratan Das, Senior Principal Engineer, Distribution Automation, March 27, 2013

27 March 2013 | Slide 1

© ABB

Towards Centralized Substation Protection

and Automation

Use of Sensors

Use of GPS in Asset Management

Introduction

27 March 2013 | Slide 2

© ABB

IED Interfaces

27 March 2013 | Slide 3

Sensor

IED

Switchgear

Circuit Breaker Station Computer/ Concentrator/Station Automation System

PC/Tablet Instrument Transformer

© ABB

Distribution System 1

27 March 2013 | Slide 4

DMS

IED 1 IED 2 IED n

RTU

Non Microprocessor

Relay PU n… MU 2… MU 1…

Comm. Network

Comm. Network

IEC 61850-9-2

GOOSE

Instrument Transformer/Sensor/Breaker

LAN/WAN/Serial

LAN/WAN

COM600/Micro-SCADA for example

Control Center

Substation

Bay

Process Units

IED 3

PU 1…

Hardwired

PU x…

IEC61970/61968, IEC61580, IEC101, IEC104, DNP, Modbus, etc.

Station Automation System

© ABB

Distribution System 2

27 March 2013 | Slide 5

DMS

Station Protection & Automation System

IMU 1… IED n

RTU

Non Microprocessor

Relay PU n…

Comm. Network

Comm. Network

GOOSE

LAN/WAN/Serial

LAN/WAN

Control Center

Substation

Bay

Process Units

IED 1

PU 1…

Hardwired

PU x…

IMU 2…

Instrument Transformer/Sensor/Breaker

IEC61970/61968, IEC61580, IEC101, IEC104, DNP, Modbus, etc.

© ABB

Current Sensor in MV Applications

27 March 2013 | Slide 6

Rated Ratio 250A/150mv or 180 mV for 50/60 Hz

Rated burden 10 MΩ

6-24 kV AIS, up to 1250 A

Accuracy class 0.5/5P630 (KEVCD A)

Small size and low weight

Extremely low power consumption

Minimize sources of partial discharge

No saturation of current sensor

Secondary circuit of current sensor could be left opened – no risk of high voltage on secondary terminals, great for IEDs

KEMA certified as per IEC 60044-8

KEVCD A

IP

VS

dttdi

Mtv ps

)()( =

© ABB

Voltage Sensor in MV Applications

27 March 2013 | Slide 7

Rated Ratio 1:10,000

Rated burden 10 MΩ

6-24 kV AIS

Rated voltage factor : 1.9/8hours

Accuracy class 1/3P (KEVA 24A1) or 0.5/3P (KEVA 24A2)

Small size and low weight

Extremely low power consumption

Minimize sources of partial discharge

No risk of Ferro-resonance

Secondary circuit of voltage sensor can be left shorted – no risk of explosions, great for IEDs

KEMA certified as per IEC 60044-7

KEVA 24A1

KEVA 24A2

VS

VP

PS VRR

RV21

2

+=

R1=250 MΩ

R2=25 kΩ

© ABB

UniGearTM Air Insulated Switchgear

27 March 2013 | Slide 8

KEVCD sensors

KEVA sensors

© ABB

Device Serial Number

IP Address Latitude Longitude Time

Circuit ID

Max current

Max Demand -

REF615 1VHR91032101 99.22.888.11 37.792715 -122.397057 13/03/27/14/20/05/220 BW-13 228 3055 -- - - - - - - - - -- - - - - - - - - -

REF615 1VHR91032101 99.22.888.11 37.792715 -122.397057 13/02/11/14/10/03/223 BW-13 233 3076 -REF615 1VHR91032101 99.22.888.11 37.792715 -122.397057 13/01/25/10/10/04/100 BW-13 150 2070 -REF615 1VHR91032101 99.22.999.22 37.780755 -121.966631 13/01/15/15/23/17/423 BW-13 150 2070 -REF615 1VHR91032101 99.22.999.22 37.780755 -121.966631 13/01/15/14/20/23/379 ABCDE 480 6624 -REF615 1VHR91032101 10.63.181.66 26.285450 -80.286133 13/01/04/11/10/22/151 ABCDE 480 6624 -REF615 1VHR91032101 10.63.181.66 26.285450 -80.286133 13/01/04/11/05/15/171 ABCDE 0 0 -

Possible Use of GPS in Asset Management

27 March 2013 | Slide 9

GPS use possibility in IED (Requires standardization in the industry) Circuit breaker (operation counter, fault current, partial discharge) Transformer and motor (fault current, oil/winding/ambient temperatures)

yr/mo/day/hr/min/sec/msec Production

Customization

Use

Power Up Power Down

© ABB

Summary

27 March 2013 | Slide 10

Future of Distribution Automation

Towards Centralized Substation Protection and Automation

Use of Sensors

Use of GPS in Asset Management

© ABB

For Additional Information or Discussion

27 March 2013 | Slide 11

Contact: Ratan Das Senior Principal Engineer ABB Inc., Distribution Automation +1-610-751-7193 [email protected]