35
PENNSYLVANIA Rapid Bridge Replacement Project PA Rapid Bridge Replacement Project GC Outreach 10:00 AM – 12:00 PM

Rapid Bridge Replacement Project

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

PA Rapid Bridge Replacement Project GC Outreach

10:00 AM – 12:00 PM

Page 2: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

PROJECT OVERVIEW

Presented by:Aaron Tubbs – Project Director

Page 3: Rapid Bridge Replacement Project

SCOPE OF WORK

558 BRIDGES

Bridge Definitions

• ECB (Early Completion Bridges): 87

• REB (Remaining Eligible Bridges): 471

Page 4: Rapid Bridge Replacement Project

PLENARY WALSH KEYSTONE PARTNERS TEAM STRUCTURE

Page 5: Rapid Bridge Replacement Project

• Culverts: 138

• Integral Abutments: 374

• Conventional Cantilevered Abutment: 46

SCOPE OF WORK

Page 6: Rapid Bridge Replacement Project

BRIDGE CONSRUCTION SCHEDULE

Page 7: Rapid Bridge Replacement Project

2016 / 2017 CONSTRUCTION - BRIDGE LOCATIONS

Page 8: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

REGIONAL TEAM

INTRODUCTIONS

Presented by:Regional Manager

Page 9: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

WEST EASTCENTRAL

• John Tracy - PM• Josh Santina – GS• Dan Blevins – PM D1/10• Dean Marten – PM D11• Matt Filipowski – PM D12• Jordan Foster - Logistics• Aaron Ashley - Safety

• Curt Beveridge - PM• Jason Raplee• Brad Lawer• Mike Heiple - Logistics• James Sallows - Safety

• Glenn Olechnowich – RM• Stephen Ascoli – Deputy RM• Mike Cerretani – GS• Steve Swartz – Senior Super• Yves Rugasaguhunga – PM D4• Abdoul Diallo – PM D5• Rodney Wood – PM D8• James Boudart - Logistics• William Bowermaster – Safety

Page 10: Rapid Bridge Replacement Project

2015 Summary – BRIDGE CONSTRUCTION

23 12 15

Page 11: Rapid Bridge Replacement Project

2015 Summary – BRIDGE OPENINGS

Page 12: Rapid Bridge Replacement Project

2015 Summary – BRIDGE OPENINGS

Page 13: Rapid Bridge Replacement Project

2015 Summary – BRIDGE OPENINGS

Page 14: Rapid Bridge Replacement Project

2015 Summary – REGIONAL SUBCONTRACTORS

Walsh II

Clearwater

Beech

CH&D

Allison Park

R.L. Johnson

J.F. Shea

Mekis

Swank

Paliotta

PLUM

Jet Excav

Pugliano

Walsh II

Clearwater

Beech

Hawbaker

L.C. Whitford

C.P. Ward

Rylind

HRI

Walsh II

Clearwater

Fahs Const

Minichi

R. DeVincentis

Kohrs Exc

Leeward

Page 15: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

Project Improvements –• RFC Documents

• Bridge Design

• Non-Compliance Reporting

• Quality Control

PROJECT SITE DASHBOARD

Page 16: Rapid Bridge Replacement Project

Bridge Project Dashboard

BRIDGE PROJECT DASHBOARD - SharePoint

• In 2015 it was just a place to store documentation

• In 2016 the Dashboard Bridge Sites will follow the path

of construction. It will be much easier to find the

documents you are looking for. We will be able to track

what documentation we do and do not have in order to

proceed with construction.

• Notification of updates to the Bridge Site Dashboard

• All documentation easily accessible via links

Page 17: Rapid Bridge Replacement Project

Bridge Project Dashboard

Page 18: Rapid Bridge Replacement Project

NCR / NCE Reporting

Page 19: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

BID PROCEDURES /

WEBSITE NAVIGATION

Presented by:Curt Reppert, Bid Procurement Manager [email protected]

Page 20: Rapid Bridge Replacement Project

BIDDING PROCEDURES / WEBSITE NAVIGATION

• Bidder Prequalification

• Account Access / Notifications

• Bidding Opportunities Webpage

• Bid Letting Schedule / Bid Results

• Project Standard Contract Documents

• Bridge Bid Documents and Details

• Planholders List / Pre-Bid Q&A

Page 21: Rapid Bridge Replacement Project

Website Navigation / Bid Packages

Project Website Address:

The Pennsylvania

Rapid Bridge Replacement

Project

http://parapidbridges.com/

Page 22: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

2016 BID LETTING SCHEDULE

Page 23: Rapid Bridge Replacement Project

BID LETTING SCHEDULE 2016

Page 24: Rapid Bridge Replacement Project

BID LETTING SCHEDULE

Page 25: Rapid Bridge Replacement Project

2016 Bid Letting – Bridge Locations

Page 26: Rapid Bridge Replacement Project

2016 Bid Letting – STATEWIDE STRUCTURE TYPES

Page 27: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

SUBCONTRACTOR BENEFITS –• Multiple Bridge Awards (Sub Select)

• Bonus Incentive

• Payment Terms

• WGJV Material & Sub Procurement

• Dedicated PRBR GC Crews- Allows for several benefits such as risk

reduction, secured back-log, resource sharing (i.e. WGJV may perform

piling operations)

Page 28: Rapid Bridge Replacement Project

SUBCONTRACTOR PAYMENT TERMS

Payment Payment

MilestonePercentage of

Contract ValueSOS

CS-4171 /

COCMilestone

Percentage of

Contract ValueSOS CS-4171 / COC

Demolition of Existing Bridge 25% 50% 25% Demolition of Existing Bridge 25% 50% 25%

Set Beams (Bearings set, release to CJV

for beam erection) 25% 100% 50% Set Precast Box Culvert 25% 100% 50%

Placement of Deck Concrete 25% 75% Installation of Asphalt Roadway 25% 75%

Substantial Completion 15% 100% Substantial Completion 15% 100%

Final Acceptance 10% Final Acceptance 10%

Payment Payment

MilestonePercentage of

Contract ValueSOS

CS-4171 /

COCMilestone

Percentage of

Contract ValueSOS CS-4171 / COC

Demolition of Existing Bridge (PH1) 15% 50% 25% Demolition of Existing Bridge (PH1) 15% 50% 25%

Set Beams (Bearings set, release to CJV

for beam erection) (PH1) 15% 100% Set Precast Box Culvert (PH1) 15% 100%

Placement of Deck Concrete (PH1) 15% 50% Switch Traffic to PH2 15% 50%

Set Beams (Bearings set, release to CJV

for beam erection) (PH2) 15% Demolition of Existing Bridge (PH2) 15%

Placement of Deck Concrete (PH2) 15% 75% Set Precast Box Culvert (PH2) 15% 75%

Substantial Completion 15% 100% Substantial Completion 15% 100%

Final Acceptance 10% Final Acceptance 10%

Payment

MilestonePercentage of

Contract ValueSOS

CS-4171 /

COC

Demolition of Existing Bridge 30% 50% 50%

Substantial Completion 60% 100% 100%

Final Acceptance 10%

*Note: Every SOS, COC and QC Plans must be submitted and approved prior to relevant work beginning.

% Complete - Submitted and

Approved in Sharepoint

% Complete - Submitted

and Approved in

Sharepoint

% Complete - Submitted

and Approved in

Sharepoint

Detoured Bridge Structure Detoured Culvert Structure

Phased Bridge Structure Phased Culvert Structure

14-Day Detoured Structure

% Complete - Submitted and

Approved in Sharepoint

% Complete - Submitted and

Approved in Sharepoint

Page 29: Rapid Bridge Replacement Project

CJV MANAGED SUBCONTRACTOR & MATERIAL SUPPLIERS

Subcontractors

Scope ResponsibilityAsphalt CJV/GC

Guiderail CJV

Precast Girder Erection CJV

Steel Girder Erection CJV

Dynamic Pile Testing CJV

Polyester Overlay CJV

Material Suppliers

Scope ResponsibilityPrecast Girders CJV

Box Culverts CJV

Rebar CJV

H-Pile CJV

Steel Girders CJV

Bearings CJV

Temporary Signals CJV

SIP CJV

Precast Deck CJV

Strip Seal Dams CJV

Aesthetic Emblems CJV

Page 30: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

Page 31: Rapid Bridge Replacement Project

BID LETTING PRICE COMBINATION FORM

Page 32: Rapid Bridge Replacement Project

Walsh II – Bridge Construction

Bid Letting –Budget vs. Low Bidder Negotiation

Page 33: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

General Contractor Bridge Bundles

Handout

Page 34: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

CLOSING

COMMENTS

Page 35: Rapid Bridge Replacement Project

PENNSYLVANIARapid Bridge Replacement

Project

QUESTIONS?