28
Civil Engineering Power Generation, Distribution and Transmission Electro-Mechanical and Plumbing Ranya Group

Ranya Group Draft v1 · provide unparalleled service to the client. The Ranya Group human resources philosophy is “once a part of the Ranya ... control of injury, damage and fire

  • Upload
    buianh

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Civil EngineeringPower Generation, Distribution and TransmissionElectro-Mechanical and Plumbing

Ranya Group

Established in 1967, Ranya Group is a multi-disciplined organization in the United ArabEmirates with expertise in the fields of civilengineering, power generation, distribution andtransmission, electromechanical works andplumbing services. Over the years, Ranya Grouphas developed a reputation for excellence inthese various fields by consistently providing thehighest quality services in a timely andprofessional manner.

Ranya Group has offices located in Abu Dhabi,Dubai and Sharjah employing 1800 people andhas financial and technical capability to undertakeprojects in our specified specialties. Ranya Groupcomprised:

Group Overview

Ranya General Construction LLC (RGC) - Through this entity, Ranya Groupprovides civil contracting services to its clients, which includes Nakheel,Musanada, Road and Transport Authority (RTA), Department of Transport(DOT), EMARAT, ADNOC, IFA and UP in addition to prominent privatedevelopers in the United Arab Emirates. RGC has executed various types ofprojects including the construction of high rise towers, residential complexes,hotels and infrastructure works.

Civil Engineering, Power Generation, Distribution and Transmission, Electro-Mechanical and Plumbing

Ranya Contracting Establishment (RCE) - RCE is a power generation,distribution and transmission company operating out of Abu Dhabi. RCEspecializes in the execution of LV, MV and HV overhead lines, undergroundcables and associated quipment for ADDC, AADC, ADCO and Technip. RCEalso represents world renowned cable manufacturing companies in the UnitedArab Emirates who arepresently executing high voltage works such as132/22KV as well as 400KV for TRANSCO / ADWEA.

Techmep - An electromechanical company in the United Arab Emirates,TechMep was formed by the Ranya Group in order to increase its ability toprovide a full range of services to its clients. In addition to servicing RanyaGroup projects, TechMep provides services to third parties.

� – Partnerwith our clients toimplement their visionand achieve their goalsby providing the highestquality services in atimely and professionalmanner..

� – Cultivatea collegial andstimulating workenvironment thatencourages continuouslearning andprofessional growth.

� – Conduct ourbusiness according tothe highest ethical,safety andenvironmentalstandards.

� – Provide thehighest standard andquality of workmanship.

Mission, Vision and Core Values

We are committed to theimplementation of the highestquality work-product in a mannerthat surpasses our clientexpectations. For each project, wededicate ourselves to:

� Timely completion� Production of the highest quality

deliverables� Conformity to client

specifications� Compliance with agreed-

budgets

We believe that true appreciationof each client's vision is integral tothe successful implementation of aproject. To this end, we arefocused on building strong lines ofcommunication and long-lastingrelationships with our clientele.

In addition, we understand thatevery team is only as strong aseach of its part and, thus, we takegreat pride in our employees. Inour offices and on project sites, wecultivate a collegial professionalenvironment in which ouremployees work together as one

unit, utilizing each of theireducational backgrounds andprofessional experiences toprovide unparalleled service to theclient.

The Ranya Group human resourcesphilosophy is “once a part of the RanyaGroup family, always a part of the RanyaGroup family”.

We sincerely believe that an investmentin any one employee is an investment inthe future of the Ranya Group. As aresult, we provide our employees withdevelopment opportunities (including on-site training programs and externallearning opportunities) in order toempower them with the skills andknowledge necessary to fulfill theirindividual potential and to best serviceour clients.

We also recognize that our people arethe back bone of the organization and,thus, we take great pride in the effortsand contributions of each employee. Inappreciation of such efforts andcontributions, we constantly aim tocreate a work environment that createsvalue to each employee on a personal andprofessional level.

Against this backdrop, our humanresources objectives are as follows:

� Developing a community and asupport system that integrates each

employee into the Ranya Group family;

� Providing each employee with aplatform to excel and fulfill his or herpotential;

� Recognizing and rewardingachievements on an individual andgroup level; and

� Creating a collegial and professionalwork environment that fosters growthand professional stimulation andprovides employees with the mostfavorable conditions and resources forexcellence.

Board of Directors Statement & Human Resource Philosophy

All of our commitments, actions and products must be recognized asan expression of quality.

Our most important criterion of quality is the satisfaction of ourcustomers. We must aim at maintaining their full confidence in Ranya asan organization. The demands and stipulations of the customer must bemet by our commitments and executions conforming to agreed terms.Each delivery should create a recommendation for further business.

Our overriding goal is to continue operating as a competitive andsuccessful enterprise, will both be determine by our resources, by ourorganization, by the dedication we show in our work and, above all, byour attitude to quality.

To ensure the achievement of these goals, we commit to continuouslyimprove the company’s quality system by providing a framework forestablishing and reviewing quality objectives.

Integrated Management System (IMS)

ISO 9001: 2008 Certification

ISO 9001: 2008 Certification

ISO 9001:2008Quality Management System

ISO 14001:2004

Environmental Managem

ent

System

OHSA

S 18

001:

2007

Heal

th &

Saf

ety

Man

agem

ent S

yste

m

Ranya Group of companies adheres to an Integrated Management System (IMS):

• Developed to ensure that we achieve customer satisfaction.• Through consistently providing products and services that exceed the clients’ expectations .• Through an application of systems, continual improvement and prevention of product/process health andsafety and environmental non – conformity. 

views an integrated accidentprevention and safety program as primeimportance on each of the Company’sproject.

With this objective the Company hasdesigned this HSE program with setstandards, procedures and guidelines. Thisprogram enables Ranya Group and itspersonnel to be committed to thefollowing:

� Prevention of Ill Health and Injuries toEmployees, subcontractors, visitors etc� Prevention of environmental incidents leading to pollution & mitigation of

impacts� Promoting safe and healthy work culture among the workforce� Ensuring compliance to legal and other requirements at all times� Ensure continual improvement

Ranya Group supports sustainability and green initiatives through itsbusiness operations. Ranya Group implements International Standardpractices for Health, Safety and Environmental Management System.

The company encourages all project personnel to take active role in thecontinuous implementation of best health safety and environmentalpractices. It is the responsibility of every project manager, superintendent,safety engineer and every one involved to read, understand and carry outthe policy, standards and procedures set forth.

1. Initiate the company’s policy for the

control of injury, damage and fire.

2. Administer the policy himself or

appoint a senior member of his staff

to do so.

3. Know the HSE related Legal and

other regulations and ensure the

company observed them.

4. Ensure that all levels of Supervision

are qualified and receive adequate

and appropriate training.

5. Make sure that in tendering; at

planning stages, and throughout the

contract, allowance is made for

suitable and sufficient equipment to

enable the jobs to be done with

minimum risk.

6. Coordinate HSE activities between

Ranya, sub-contractors, and any

other individual contractors who

may be working on the same site.

7. Institute proper system for

reporting, investigation, and

estimating the cost of injury, damage

and fire. Promote action to prevent

recurrence and initiate analysis to

discover accident trends.

8. Reprimand any member of

supervision for failing to discharge

satisfactorily the responsibility

allocated to him on

Integrated Management System (IMS)

� Conduct activities in such a way as toavoid harm to the health ofemployees, contractors, visitors andthose living in close proximity tooperations.

� Promote, as appropriate, health workenvironment both for employees andcontractors.

� Design facilities, establish practices,provide training, and conductoperations in a manner consistentwith best practices of the industry tominimize risks and potential hazards

to workers, property, and to thecommunities.

� Promote safe work practice amongemployees and contractors.

� Strive to progressively andconsistently reduce emissions,discharges, and wastes.

� Minimize the impact of our activitieson the environment.

� Preserve sites of archaeological andhistorical interest in our areas ofoperation.

� Continuously improve the efficientuse of energy and natural resources.

ISO 14001: 2004 & OHSAS 18001: 2007 Certifications

Integrated Management System (IMS)

ISO 14001: 2004 & OHSAS 18001: 2007 Certifications

Projects Executed� Construction of Mohamad Saeed Al Danhani Ser-

vice Station in Fujairah� Theme Park Infrastracture and Empower Corridor

Roads, City of Arabia Dubai� Construction of ADNOC Service station in West-

ern Region (Gayathi and Madinat Zayed)� Laguna Hotel & Residential Tower in Dubai� Construction of ADNOC Service station in Bay-

noona Western Region� Modification of Abu Dhabi Ladies Club in AD� Remodelling, Improvement and Refurbishment of

Al Shamma School (Package 5) in Al Ain.

� Construction of 2 Service Stations Inside De-fense Camps – Seih Al Deai and Mazyed

� Remodeling, Improvement and Refurbishment ofAl Ghaith and Al Sadarah School in Al Ain

� Remodeling, Improvement and Refurbishment ofMariam Bint Sultan School in Al Ain

� Prime Business Center in Dubai� Abu Dhabi Core 64Rack Expansions Works in AD� Refurbishment of School Package 1 (Al Ameen)

& 2 (Al Raqiah) Schools in Abu Dhabi & Al Ain� RTA Bus Depot at Al Ruwayah Dubai� Rivera Lake View Apartments in Dubai� Garden’s Furnished Apartments in Dubai� Green Community Villas in Dubai� Package 13 Bldgs in Dubai� Umer Bin Abdul Aziz Mosque and Service Bldg.� Construction, Completion & Maintenance of Tem-

porary Bus Depot on Old Eid Prayer Ground� Main Power Upgradation Works at Etisalat Qas-

simiyah & Jubail Exchange Building in Sharjah.

Projects Under Execution� Construction of ADDC Khalifa Branch Building

and New Control Center at Khalifa City� Construction of G+2 Podium + 2 Offices + 12

Type Residential floor + Roof at Al Jadaf, Dubai� Design and Build of 2 Nos. of Telecom Buildings

at Expo 2020� Civil Works for Over Ground Metro Stations R70,

R71, and R72� Health Point Hospital Pack. 2.1� Health Point Hospital Pack 4 and 8

Group Experience

WorkGroup Experience

Projects Executed� Construction of 2 Service Sta-

tions Inside Defense Camps –Seih Al Deai and Mazyed

� Remodeling, Improvement andRefurbishment of Al GhaithSchool and Al Sadarah School

� Remodeling, Improvement andRefurbishment of Mariam BintSultan School

� Prime Business Center� Abu Dhabi Core 64 Rack Expan-

sions Works

� Refurbishment of School Pack-age 1 (Al Ameen) & 2 (Al Raqiah)Schools

� RTA Bus Depot at Al RuwayahDubai

� Main Power Upgradation Worksfor Etisalat at Qassimiyah andJubail Exchange Building in Shar-jah

� Construction, Completion & Main-tenance of Temporary Bus Depoton Old Eid Prayer Ground in AbuDhabi

Civil Engineering

Electro-Mechanical and Plumbing Works

WorkGroup Experience

Projects Executed� No. A-3877: Supply & Installation of 33/11kV

OHL and Associated Equip.� No. D9649: Cable Installation to Eastern Region� No. D-10359: Cable Inst. for 11KV network

reconf. into Zonal S/S Design� No. D-11586: Reinf. and Augmentation of

33/11KV Network in Sir Baniyas Island� REEM Island: Supply & Installation of 11Kv Tem-

porary Network� CONTRACT G1976 - Stand-by Power To H. H.

Sheikh Mohammad Bin Zayed Rest House� NORTH EAST BAB – 33kv line Phase 1 Devel-

opment project� Contract D2362 - Supply & Inst’n of 11KV, &

Associated Equip., Eastern Region� No. D-10387: B LTRA for Central Region St.

Lighting Improvement Works� A-1837 - Supply & Installation of 11 KV OHL in

Al Ain� No. D 11908: Inst. of 33/11 kv P/U & 9 Nos. of

11/0.4kv P/Us w/ Cabling Works� A-10660: Installation of L.V Cables, D.E Meters,

Feeder Pillars and Service Turrets ( Lot-1)� D-102048: Inst’n. & Supply of under ground

cables, Electrical Dist’n. Equip., OHL and AlliedWork in A.D. C.R.

� D-102050: Inst’n. & Supply of under groundcables, Electrical Dist’n. Equip., OHL and AlliedWork in A.D C.R.

� D-102052: Inst’n. & Supply of under groundcables, Electrical Dist’n. Equip., OHL and AlliedWork in A.D E.R.

� D-102054: Inst’n. & Supply of under groundcables, Electrical Dist’n. Equip., OHL and AlliedWork in A.D. E.R.

� D-102056: Inst’n. & Supply of under groundcables, Electrical Dist’n. Equip., OHL and AlliedWork in A.D. E.R.

� D-102058: Inst’n & Supply of under groundcables, Electrical Dist’n Equip., OHL and AlliedWork in A.D. W.R. ( Liwa) and Related Islands

� D-102060: Inst’n. & Supply of under groundcables, Electrical Dist’n. Equip., OHL and AlliedWork in A.D. W.R. ( Madinat Zayed) and RelatedIslands

Projects Under Execution

� D-10983.1: Load Transfer for New Primaries andReinf. in the Eastern Region (Baniyas, Al Adla &Shamkha)

� MV WORK PACKAGE for Midfield terminal AbuDhabi – Airport

� A-11808:Installation of MV/LV Cable, Equipmentand Digital Energy Meters.

� D-104709:Long Term Rate Agreement forInstallation & supply of Underground cables,Electrical Distribution Equipment’s, OHL andallied works in Abu Dhabi Central Region (East& Related Islands).

� D–104730:Long Term Rate Agreement forInstallation & supply of Underground cables,Electrical Distribution Equipment’s, OHL andallied works in Abu Dhabi Western Region(Mirfa, Abu Abyad,Grain Al Eish, Liwa area,Madinat Zayed Area and related Islands).

� D–103147:Replacement Insulator & fittings of33KV Abu Alabyad OHL in Western Region

� Construct Life Support Area Electrical CapacityUpgrade for Al Dhafra Air Base

� A-14153-33KV & 11KV Load Transfer Worksfrom Existing to New Grid Stations andAssociated Works in Zakher & AAPS

� D-105980-Construction Work for ElectricityFeeding Arrangement For Two VIP Islands inHanjurah Area in Eastern Region

Power Generation and Distribution

RTA Bus Depot at Al Ruwayah, Dubai

Phase-1 Bus Depot Project comprising of aG+1 workshop bldg, a guard house, a singlestorey filling station, a washing bays shed, aninspection bays shed, a substation andstabling yard. We were responsible forinfrastructure works, including storm waterdrainage, fire hydrant systems, seweragesystems, water supply and cable laying andducts and road works in addition to all civiland MEP works being executed byTechmep. Ranya received “ ”for executing the work in record time.

RTA Bus Depot at Al Ruwayah, Dubai

RTA Bus Depot

Project Title : RTA Bus Depot at Al Ruwayah, DubaiClient: : M/s Roads & Transport AuthorityConsultant : M/s Jurong InternationalProject Value : AED 228,000,000Built up area : 893,400 Square Ft.

Prime Business Center, Dubai

The project constitutes of two commercialtowers with two basements, ground floor,two podiums and 17 typical floorsconnected with a link bridge. There are 170offices and the car park has a capacity of 500to 600 cars.

Ranya are responsible for all civil works andTechmep is executing the MEP works

Prime Business Center, Dubai

Prime Business Center

Project Title : Prime Business Center, DubaiClient: : M/s Prescott Enterprise Ltd.Consultant : M/s National Engineering BureauProject Mngt : M/s Morganti InternationalValue : 107,500,000

Laguna Tower & Residence, Jumeirah Lake Tower (JLT) Dubai

Located on Plot A-2 of Jumeirah Lake TowersDevelopment, the project comprises of threebasement + ground floor + 40 typical floors.Hotel Facilities include the following: Healthcentre and spa, Treatment and steam rooms,Fully-equipped gymnasium and aerobics studio,Residents’ pool and private lap pool, Jacuzzi, Fullyequipped business centre, State-of-the-art audioand visual equipment, Restaurants and cafés,Lobby coffee shop, All-day dining signaturerestaurant, Themed-lounge concept, Privatedining and function rooms.

Laguna Tower & Residence, Jumeirah Lake Tower (JLT) Dubai

Laguna Tower & Residence

Project Title : Laguna Tower & ResidenceClient : M/s IFA Hotels & ResortsConsultant : Al GurgProject Value : AED 365,000,000Built up area : 818,060 Square Ft.

The project comprises of thirty threecommercial & residential buildings in theInternational City development.

Of the 33 buildings, 11 buildings are G+2, 14buildings are G+3 and 8 are G+4.

Package 13 International City Dubai - 33 Commercial and Residential Buildings

Package 13

Project Title : Package 13 (33 Commercial and Residential Buildings)Client: : M/s NakheelConsultant : M/s Associated ConsultingProject Value : AED 303,000,000Built up area : 1,703,602 Square Ft.

A set of 8 buildings with two basements,ground floor plus nine additional floors builton one common podium. The Buildings wasmultiuse, comprising of 1,500 Apartmentsand the two basement Car Park has acapacity for 1,100 cars.

Ranya were responsible for the civil worksexcluding Joinery and Aluminum works.Ranya were also responsible for themanagement of sub contractors and alldisciplines in the project.

The Gardens Furnished Apartment, Dubai

The GardensFurnished Apartment

Project Title : Package 13 (33 Commercial and Residential Buildings)Client: : M/s NakheelConsultant : M/s Engineering Consultant GroupProject Value : AED 210,000,000Built up area : 1,291,668 Square Ft.

Located on Emirates Highway behind DubaiAutodrome adjacent to Arabian RanchesDevelopment, the project scope of worksinclude construction of fifty three family villas,hundred and fifty nine town houses togetherwith service buildings and hard landscapingworks.

153 Town Houses and 53 Villas

Project Title : 153 Town Houses and 53 Villas, Motor City DubaiClient: : M/s Union PropertiesConsultant : M/s EDARAProject Value : AED 208,200,000Built up area : 1,014,373 Square Ft.

153 Town Houses and 53 Villas, Motor City Dubai

The building comprised of Two Basements, aGround Floor plus ten floors. The buildingwas multiuse, with the ground floor having500m2 of commercial space, 210 apartmentson the ten residential floors and car parkcapacity for 211 cars.

The Riviera Lake View Apartments, International City Dubai

Riviera Lake View Apartments

Project Title : Riviera Lake View ApartmentsClient: : M/s B & M FZCOProject Value : AED 39,700,000Built up area : 430,556 Square Ft.

Musanada Schools Refurbishment Program 2010 - Package 1 & 2

Musanada

This project is part of the plan initiated byAbu Dhabi Education Council's (ADEC) toupgrade existing school facilities. The projectinvolves remodeling, improvement andrefurbishment works, which include but notlimited to demolition, structural works &rectification, upgrade of all finishing works,modification and upgrade of all services suchas HVAC, electrical and plumbing.

Musanada School Refurbishment Program 2011

Musanada

Power Generation and Distribution

Power Generation and Distribution

Power Generation and Distribution

Supply & Installation of 2,500Mtrs. 11kV Submarine Cable at Al Aryam Island

Supply and Installation of 33kV Switchgear Panel at Al Dabbiya

Shifting of 33kV 7.5 MVA Substation at Al Khatim

Power Generation and Distribution

Supply and Installation of 33kV Switchgear Panel at Al Dabbiya

Cable Installation to Eastern Region No. D9649

1500kvA Stand-by Power ToH. H. Sheikh Mohammad BinZayed Rest House Projectconsisting of electro -mechanical and Civil worksfor 2x 1500kVA generatorsets,11 kV and LV panelsubstation and control centreand civil works for RCCbasement.

Type of job: Design,engineering, procurementand construction-EPC.

Power Generation and Distribution

Stand-by Power To H. H. Sheikh Mohammad Bin ZayedRest House Project

7046J east Bab –Phase 2Development Project-ADCO(Technip/NPCC). Seventy Kmof 33kV double circuit overheadlines with OPGW on woodenpoles at Dhabbiya.

Type of job: Design of towersand foundations ,engineering ofelectrical; system, procurementand construction of transmissionlines-EPC.

Seventy Km of 33kV double circuit overhead lines Installation of Street Lighting Poles at Shahama

Installation of Street LightingPoles at Shahama

Contract No. WED/PD/S-INST-856 of transmissionlines-EPC.

Supply & Installation of 11kV Overhead Line at Al Bahya

Major MEP Installation

MEP Installations

Major MEP Installation

Ranya GroupABU DHABIP.O. Box 602-43837, Citibank BuildingFlat No.: 803 (8th floor) Salam Street,Abu Dhabi, U.A.E.Tel: + 9712 677 3063Fax: + 971 2 679 3320—--------------------------------------------------DUBAIOffice 401, 4th Floor, Sobha Ivory IIBusiness Bay, P.O. Box 113499,Dubai, U.A.E.Tel : + 9714 262 8993Fax: + 9714 262 8995—--------------------------------------------------SHARJAHOffice 302 , 3rd Floor, Robot Park Tower,Al Khan Corniche Road, P.O. Box 1433,Sharjah, U.A.E.Tel: + 9716 559 3784Fax: + 9716 559 6490—--------------------------------------------------EMAIL: [email protected]: http://www.ranyagroup.com