Project Background

• History of Rantoul Street • Deterioration of roads and sidewalks • How the project is being funded• Allocation of project responsibilities

• City of Beverly• Designed with consultant Dewberry• Pre-work due diligence • Constituent support

• MassDOT • Approved design• Selected General Contractor• Providing Project Management

• Middlesex Corp• The General Contractor

Page 3: Rantoul Street / 1A Reconstruction Project December 10, 2015

Looking back

Rantoul St. at Broadway in the 1920s253-259 Rantoul St. in the 1940s

Page 4: Rantoul Street / 1A Reconstruction Project December 10, 2015

Existing Conditions

Page 5: Rantoul Street / 1A Reconstruction Project December 10, 2015

Existing Conditions

• Project roadways• Rantoul Street: 5900 ft. / 66 ft. ROW• Cabot Street: 3800 ft. / 50 ft. – 66 ft. ROW • Elliot Street: 1000 ft. / 66 ft. ROW

• Five (5) existing traffic signals• Utilities – underground and overhead• Rail crossings• Historic properties

Page 6: Rantoul Street / 1A Reconstruction Project December 10, 2015

Scope of Project

Page 7: Rantoul Street / 1A Reconstruction Project December 10, 2015

New Design – Roads and Infrastructure

• Drainage improvements• Reconstruction traffic signals / New traffic signals• Rail grade crossings• Gloucester Crossing improvements• Complete Streets design

Page 8: Rantoul Street / 1A Reconstruction Project December 10, 2015

Gloucester Crossing Improvements

Page 9: Rantoul Street / 1A Reconstruction Project December 10, 2015

Typical Complete Streets Cross Section

Page 10: Rantoul Street / 1A Reconstruction Project December 10, 2015

New Design – Streetscapes

• What it includes• Lighting• Elements• Sidewalks• Street Trees

• Goals• Improve Economic Development• Enhance Pedestrian Environment• Safety Improvements

Page 11: Rantoul Street / 1A Reconstruction Project December 10, 2015

Lighting

Page 12: Rantoul Street / 1A Reconstruction Project December 10, 2015

Elements

Page 13: Rantoul Street / 1A Reconstruction Project December 10, 2015

Sidewalks

Page 14: Rantoul Street / 1A Reconstruction Project December 10, 2015

Street Trees

Page 15: Rantoul Street / 1A Reconstruction Project December 10, 2015

Rendition of Rantoul Street at Odell Park

Page 16: Rantoul Street / 1A Reconstruction Project December 10, 2015

Rendition of Cabot Street at Herrick Street

Page 17: Rantoul Street / 1A Reconstruction Project December 10, 2015

Work Schedule

Page 18: Rantoul Street / 1A Reconstruction Project December 10, 2015

Impact of work on Residents and Businesses

• New traffic patterns• Two way traffic• Single lane traffic• Full street closures and detours

• No parking at times • Sidewalk closures at times• Staging locations

Page 19: Rantoul Street / 1A Reconstruction Project December 10, 2015

Outreach/Updates and Reporting Issues

• How to find out information:• Website – www.Bev1A.com• Twitter - @Beverly1A• Sign up for weekly email notifications • Concentrated Reverse 9-1-1 calls• Day-to-day outreach by onsite contractor • Project signage• 1A Committee• Kevin Harutunian, Chief of Staff

• 978-605-2333• [email protected]

• Open for Business Campaign:• Upcoming Business forums• Beverly Main Streets efforts

Page 20: Rantoul Street / 1A Reconstruction Project December 10, 2015

Questions