Ramp-up AREVA RESOURCES CANADA INC. 2015 ANNUAL SUSTAINABILITY REVIEW

Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Ramp-up

AREVA RESOURCES CANADA INC.2015 ANNUAL SUSTAINABILITY REVIEW

Page 2: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

With the restart and the last of the mill expansion construction, the camp at McClean Lake is full every day. Employees don’t just take their meals and sleep at camp, that’s also where they enjoy some well-deserved relaxation when they are not on shift. Jamming in the music room, playing table tennis or racquetball, or working out in the gym are only a few of the activities they enjoy at camp.

Table of Contents

President’s message

It all starts with safety

We’re more than a team, we’re a family

We’re committed to continuous learning

We’re committed to preserving the environment

We’re preparing for the future through exploration

We’re ramping up production at McClean Lake

We’re investing in our partnerships

We’re part of our communities

We’re invested in our communities

Looking back and looking ahead

AREVA Resources Canada at a glance

Cover image: The new packaging and loading area at the McClean Lake mill is a hub of activity. In 2015, over 16,650 drums were packaged and loaded into trailers for the drive south on the way to supply customers around the world.

1

2

4

7

11

8

14

13

17

19

20

22

Page 3: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Safety is always top of mind at AREVA Resources Canada, particularly when restarting an operation such as was the case at McClean Lake. With many new inexperienced employees on site, the commissioning of new circuits, and ore grades more than 10 times higher than those processed in previous years at McClean Lake, 2015 was an excellent safety year. We implemented new programs and continued to build our safety culture. It is particularly impressive to see everyone making safety their business.

2015 was truly a year of exciting changes and outstanding milestones. We experienced the first full year of production at our McClean Lake operation after four years of care and maintenance without production — and it has been quite the year! A record-breaking 11.3 million pounds of uranium concentrate was produced at the McClean Lake mill in 2015, well above targets and up from a past maximum output of 6.5 million pounds. AREVA’s share of 2015 production at the mill totaled 4.2 million pounds.

The substantial rise in output at McClean Lake is a direct result of our upgrade and expansion work at the mill and the higher grade ore coming from our partnership with the Cigar Lake mine. With the upgrade, our McClean Lake family has grown to 330 permanent employees with many more hired to complete specific projects. With our joint venture partnerships in the McArthur River mine and Key Lake mill, AREVA’s share of uranium concentrate production reached 12.9 million pounds!

Despite our many successes, this year was not without its challenges. The fires that burned through northern Saskatchewan early in the summer of 2015 threatened the communities of our families and our friends. It is during times like these that we truly experience the meaning and importance of community. We witnessed firsthand the kindness and generosity of our team through their many hours of volunteer work at evacuation shelters and their numerous donations to evacuees. The safety and security of our family members is always priority number one, both inside and outside the workplace.

This year, while exploring many sites and thousands of kilometres throughout northern Saskatchewan and Nunavut, our exploration team celebrated four years without a lost-time incident. This achievement is a testament to the wide-ranging nature of AREVA’s safety training endeavours and culture.

Our many accomplishments this year did not come without the hard work and dedication exemplified by the AREVA family at McClean Lake, Saskatoon, and exploration projects. I would like to extend my utmost gratitude for the support that has been shown over the last year through the actions of each AREVA employee. I am confident and look forward to a bright and sustainable future together.

Vincent MartinPresident and Chief Executive Officer

AREVA Resources Canada Inc.

President’s message

Board of Directors

Jim CormanVice President, Operations and Projects AREVA Resources Canada Inc.

Pierre HardouinVice President, Finance & Chief Financial OfficerAREVA Resources Canada Inc.

Vincent MartinPresident and Chief Executive OfficerAREVA Resources Canada Inc.

Andreas MittlerVice President, Operations and ProjectsAREVA Group, Mining Business Line

Tammy Van LambalgenVice President, Corporate Affairs & General CounselAREVA Resources Canada Inc.

Executive Management

Vincent MartinPresident and Chief Executive Officer

Jim CormanVice President, Operations and Projects

Pierre HardouinVice President, Finance & Chief Financial Officer

Dale HuffmanVice President, Health, Safety & Environment & Regulatory Relations

Patrick LedruVice President, Exploration

Tammy Van LambalgenVice President, Corporate Affairs & General Counsel

Bruce WallsVice President, Human Resources & Industrial Relations

The McClean Lake services group maintains the roads, transports employees, keeps facilities in good order and much more.

Mission Statement - AREVA Resources Canada Inc. exists to profitably produce high quality uranium concentrate, in an environmentally and socially sustainable manner to help meet global energy needs.

Vision Statement - AREVA Resources Canada Inc. is committed to being a leader in uranium mining. For AREVA this means a long-term commitment to sustainable development by balancing economic, social and environmental performance.

1

Page 4: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Rescue Competition. The team’s dedication paid off with a first place win in the Proficiency Surface category for the second consecutive year and a second place finish in the First Aid category.

Prevention – Best Step ForwardPrevention is an integral part of maintaining a safe work environment in our offices, at our exploration sites, and of course, at our McClean Lake operation. In two separate occasions this summer, McClean Lake personnel performed precautionary shutdowns of the McClean Lake mill in order to assure the safety of employees and protection of the environment. In each case, operations were restarted within a few hours, once we were confident that employees and the environment would be safe.

In July, after a full month of voluntarily suspending our shipments of product, due to road closures caused by the forest fires that engulfed the North, McClean Lake transported its first loads of uranium concentrate. Following the re-opening of northern roads, McClean Lake shipped the first loads together in a convoy. As a safety precaution, a pilot vehicle escorted them from McClean Lake to La Ronge. Once we were sure of safe passage, normal shipment of yellowcake resumed one truckload at a time.

Beyond workplace safety, radiation protection is also top of mind at AREVA. Radiation exposure is a risk we take very seriously. We monitor our workplaces and our employees closely. We observed a relatively minor increase in our radiation doses in 2015, attributed mainly to the processing of higher grade ore compared to our historical ore grades and the increased production

Safety – Always at the ForefrontSafety is paramount in actions and decisions made by AREVA and our employees. Our commitment to safety is demonstrated through our work practices, which focus on risk reduction. The constant focus on safety throughout our operations is a direct result of our wide range of safety programs, which contribute to our culture of keeping safety at the forefront of our minds.

AREVA’s annual Safety Day was a success once again this year; the event provided employees with opportunities to reflect, ask questions, and evaluate both our successes and our shortcomings. This year, the McClean Lake Occupational Health Committee and McClean Lake Safety Group introduced the new Safe Worker Program in conjunction with WorkSafe Saskatchewan. Through the program,

It all starts with safety

of uranium concentrate. McClean Lake’s Nuclear Energy Workers’ total average effective dose for 2015 was 0.89 millisievert* (mSv), up from 0.37 mSv in 2014 when very limited quanties of uranium ore concentrates were produced. The maximum annual total radiation dose of 5.28 mSv was well below the average regulatory effective dose limit of 20 mSv in any one year and not exceeding 100 mSv in 5 years, demonstrating the effectiveness of the mill design to process ore grades over 25%.

With many new employees on site, in 2015 we introduced the new “Green Hand Program” at McClean Lake to help new employees become familiar with the site, its procedures and best practices. As part of the Green Hand Program, all new employees at McClean Lake receive a Green Hand sticker to wear on their hard hat for their first six months on site. The Green Hand sticker is a visual signal to all employees that a team member is fairly new to the workplace. It is meant to encourage supervisors and co-workers to offer these new employees additional support as needed. After six months, new employees receive a safety “re-orientation”, as well as a review of any incidents the worker may have been involved in. These extra steps provide more opportunities to correct behaviour before it becomes an ingrained habit, as well as occasions to encourage and reinforce positive behaviour. Green Hand or experienced hand, we all have a hand in our own and each other’s safety.

Our actions and efforts follow a consistent value; AREVA is committed to providing a safe and healthy work environment and production will not be made at the expense of safety.

AREVA recognizes its employees whose actions and efforts have led to a safer work environment and a positive contribution to AREVA’s overall safety culture. Lanny Storey, a Journeyperson Scaffolder, was the winner of the 2015 McClean Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe Worker Award in early 2016. He was recognized for his willingness to put safety first by stepping-out of his own role to solve an issue that was negatively impacting his co-workers and had the potential to have a severe adverse safety outcome.

In May, the McClean Lake Emergency Response Team demonstrated their dedication and commitment to emergency preparedness at the 2015 Saskatchewan Mining Association Mine

AREVA maintains its international occupational health and safety OHSAS 18001 certification for its McClean Lake operation, exploration activities and at its Cluff Lake decommissioned site.

Emergency Response Team Captain, Tracy Gaudry, and team member Lindsay Haeusler competed at the annual Saskatchewan Mining Association Mine Rescue Competition in May 2015. Along with their team, they won first place in the surface proficiency event and runner-up in the first aid surface event.

McClean Lake Employees Annual Effective Radiation Dose

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Worker Average Effective Dose

Annual McClean Lake Internal LimitMaximum Annual Regulatory Limit (Not Exceeding 100 mSv/5-years)

Average Annual Regulatory Limit (Not Exceeding 100 mSv/5-years)

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

mill

isie

vert

(mS

v)

* The millisievert is a measure of radiation dose and exposure.

2 3

Page 5: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

We’re more than a team, we’re a family

Providing Meaningful and Rewarding WorkAt AREVA, our employees are our family. It’s particularly true at our McClean Lake operation where employees develop a close bond with one another as they live, work, have fun and eat together. As a large employer of people from small northern communities, many of our employees are in fact brothers, sisters, mothers, fathers, aunts, uncles, cousins and in-laws of one another.

As an equal opportunity employer, AREVA is committed to contributing to the prosperity of our province through fair and equitable recruitment practices. Given the location of our operation, we give hiring priority to local northern talent. The Saskatchewan uranium mining industry is the largest industrial employer of Aboriginal people in Canada.

As of December 2015, 51% of employees at our McClean Lake operation were residents of northern Saskatchewan and 46% were of Aboriginal descent.

Within AREVA, women are represented at every level in the organization. To date, 26% of AREVA’s workforce is female, compared to an overall 17% average in the Canadian mining industry. We continue to look for ways to increase recruitment and retention of women. Our ongoing partnership with programs such as the University of Saskatchewan’s Edwards School of Business Womentorship Program and organizations such as Women In Mining and Women in Nuclear Saskatchewan allows our employees to actively participate in events and workshops geared specifically toward women in industry.

Our education and training opportunities allow employees to continually grow and advance within AREVA throughout their careers. This year, AREVA celebrated 33 employees who reached long service milestones including two employees with 35 years at the company. Beyond the opportunities for education, training, and advancement, AREVA offers an above-average pay scale and benefits to its employees.

While most AREVA employees work at our McClean Lake operation in northern Saskatchewan, we also

have a full time presence in Saskatoon where our 149 employees occupied three office buildings in 2015 and in La Ronge with our Northern Affairs office. Due to the recent restart of the McClean Lake mill, there has been substantial growth in employment at the site. As of December 2015, AREVA employees at McClean Lake numbered 330, up from 150 only five years ago when mining had stopped and the mill was in care and maintenance mode.

McClean Lake Employees - Where are they from?

49% 51%

13%

16% 3%

19%

SouthernSask & other

NorthernSask

- Northwest

- Northeast

- North Central

- Athabasca Basin

16%

3%

19%

13%

At McClean Lake we are family, literally. Marcus and Dalton, father and son, make a great team at home and at work as environmental technicians. They are one of 13 multi-generation pairs at the site.

Region of Origin

4 5

Page 6: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

AREVA relies on the ingenuity and dedication of the diverse Saskatchewan people. Our nearly 500 employees within the province represent a vital force to the success of our operations. In order to ensure continued success, AREVA invests heavily in people and in the communities near which we operate.

Training - A Big Part of What We DoThrough the support of a wide variety of innovative training programs, AREVA builds opportunities for both present and prospective employees. In 2015, over $600,000 was devoted to training initiatives at the McClean Lake operation. Our operational training requirements include classroom and on-the-job training, one-on-one training with a mill trainer, equipment training with vendors, peer-training with senior operators and of course self-study courses. From safety related training such as the respiratory protection program, to heavy equipment operation, heavy duty equipment mechanics, personal fall protection, advanced radiation protection, mobile equipment certifications, Saskatchewan apprenticeship programs and many more, training is ongoing at McClean Lake.

AREVA has partnered with Northern Career Quest to offer the Mill Operator Training Program. Since the start of the program in 2012, there have been seven sessions, and to date, 65 residents of northern Saskatchewan were given the opportunity to learn new skills and experience life at McClean Lake. In 2015, 11 trainees successfully completed

We’re committed to continuous learning

the Mill Operator Training Program and seven of them are now employed at our site. The program has been deemed one of the best run partnerships with Northern Career Quest, with a retention rate at McClean Lake of over 90%. AREVA is proud of the trainers that work hard to make the program outstanding and we look forward to seeing these successful trainees and many more build their careers within the uranium mining industry.

Employees in the Saskatoon offices also have opportunities to gain valuable knowledge and improve their skills through attendance at conferences and workshops. The lunch and learns are also well-attended sessions during which employees can learn about topics such as uranium ore traceability, wills and estate planning, or healthy living.

Education is the KeySince 1979, AREVA has awarded annual scholarships to residents of Saskatchewan’s North. To date, AREVA has invested over $1,645,500 through 471 scholarships for northern students. In 2015, AREVA disbursed a total of $100,000 amongst 31 recipients. Over the years, many of our scholarship recipients have established their careers with AREVA. We currently count 11 past scholarship recipients who are currently employed by AREVA in positions ranging from recreation technician to environmental technician to instrumentation technologist or power engineer. We are proud to have been able to contribute to their professional development in a meaningful way and delighted that they are now members of the AREVA family.

Supporting innovative educational programs is definitely one of AREVA’s key areas of community investment. In 2015, AREVA provided funding to support Connected North, a new virtual educational program connecting northern Saskatchewan students to other students and subject matter experts from around the country.

As senior training advisor, Ian Pollock facilitates required operational training and personal development of most of the employees at McClean Lake. He is particularly proud of the accomplishments of the Mill Operator Training Program and the Job Shadow Program for young northerners.

At McClean Lake, training is ongoing. From Standard First Aid, to Personal Fall Protection to Radiation Protection or Transportation of Dangerous Goods, training is at the heart of what we do.

6 7

Page 7: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

AREVA recognizes the importance of healthy ecosystems as the backbone of vibrant communities, and our continued strong environmental performance is a commitment to the regions in which we operate. Our strict environmental policies reflect this knowledge and go beyond compliance to include commitments to continual improvement and innovation. We have the utmost respect for the northern land where we operate and we are committed to the environmental preservation of its pristine nature. Monitoring of the environment around our operations is a constant priority at AREVA. Our environmental monitoring programs allow us to understand and transparently communicate our environmental performance to our stakeholders and the public.

Emissions and discharges from operations at McClean Lake remain well below regulatory limits, and we have pride in protecting the environment throughout all mining phases including exploration and decommissioning. AREVA has taken great care in the decommissioning of the Cluff Lake mine in northwest Saskatchewan and our ongoing monitoring confidently demonstrates that the site is, and will continue to be, safe for traditional land uses.

A Focus on WaterWater – one of the most important substances for life on Earth. Abundant, available, clean water is important to the people who reside, hunt, trap, and fish in northern Saskatchewan. At the McClean Lake operation we divert clean water around the site and recycle process water to reduce our water footprint. Water that does come into contact with our mine area and process water from the milling of ore is treated, held for testing to confirm the treated water meets acceptable quality, and then is released. AREVA routinely adjusts water management, evaluates water treatment improvements, and monitors water quality downstream from our operations in a continuous feedback process that drives a steady and strong performance.

We also support community and regional monitoring programs to provide communities with additional and independent assurance. Water samples taken near each of the Athabasca Basin communities by community members and processed by an independent environmental firm continue to show that the surface water quality is meeting all provincial objectives. These results are published annually in the Athabasca Working Group Environmental Monitoring Program report issued

We’re committed to preserving the environment

by Canada North Environmental Services. The water quality remains excellent in the region and the uranium mining operations continue to demonstrate responsible resource development – economic opportunity without compromise to ecosystem integrity.

Monitoring of McClean Lake Treated Water Released in the Environment

0

50

100

150

200

250

300

350

400

450

2010 2011 2012 2013 2014 2015

McClean Lake and Saskatoon OfficeGreenhouse Gas Emissions

ton

equi

vale

nt C

O2

Greenhouse gas emissions from coolant, refrigerant and fire-retardent fluids

CO2 emissions from processes and installations, including CO2 emissions caused by onsite waste burning

Waste Generated at McClean Lake McClean Lake SO2 Emissions

Processing of Cigar Lake ore generates more SO2

than with previous ores

Breanne Senik, environment technician at McClean Lake, knows the area quite well. From air to water samples, she monitors the site’s environmental performance. Here at the Sink-Vulture reservoir, she takes samples to make sure that the McClean Lake mill effluent releases meet water quality standards.

leach tonnes

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

tonnes SO2 / tonne produced

tonn

es

tonn

es S

O2

/ to

nne

prod

uced

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

lires

x10

00

Constructionstarts

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Propane

0

1

2

3

4

5

6

7

2010 2011 2012 2013 2014 2015

Reportable Spills

All reportable spills are cleaned-up, investigated and appropriate measures are implemented to prevent future reoccurance.

Spill notifications are posted on the website: www.arevaresources.ca.

num

ber

of s

pills

0

100

200

300

400

500

600

700

800

2010 2011 2012 2013 2014 2015

was

te in

m3

Domestic waste incinerated on site

Domestic waste recycled off site

Industrial waste

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

Conc

entra

tion

(mg/

L)

Radium (Bq/L) Maximum Allowable Concentration

2015 Radium in Effluent

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

Conc

entra

tion

(mg/

L)

Radium (Bq/L) Maximum Allowable Concentration

0.00

0.50

1.00

1.50

2.00

2.50

3.00

Conc

entra

tion

(mg/

L)

Uranium (mg/L) Maximum Allowable Concentration

2015 Uranium in Effluent

0.00

0.50

1.00

1.50

2.00

2.50

3.00

Conc

entra

tion

(mg/

L)

Uranium (mg/L) Maximum Allowable Concentration

0.00

0.10

0.20

0.30

0.40

0.50

0.60

Conc

entra

tion

(mg/

L)

Nickel (mg/L) Maximum Allowable Concentration

2015 Nickel in Effluent

0.00

0.10

0.20

0.30

0.40

0.50

0.60

Conc

entra

tion

(mg/

L)

Nickel (mg/L) Maximum Allowable Concentration

0.00

0.10

0.20

0.30

0.40

0.50

0.60

Conc

entra

tion

(mg/

L)

Arsenic (mg/L) Maximum Allowable Concentration

2015 Arsenic in Effluent

0.00

0.10

0.20

0.30

0.40

0.50

0.60

Conc

entra

tion

(mg/

L)

Arsenic (mg/L) Maximum Allowable Concentration

Note: The McClean Lake mill went under a period of care and maintanence starting in the summer of 2010 and ending in the fall of 2014. No mining has taken place at McClean Lake from 2009 to date.

McClean Lake Consumption

0

0.002

0.004

0.006

0.008

0.01

0.012

0.014

0.016

0.018

0.0

50.0

100.0

150.0

200.0

250.0

300.0

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 0

0.002

0.004

0.006

0.008

0.01

0.012

0.014

0.016

0.018

0.0

50.0

100.0

150.0

200.0

250.0

300.0

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Fresh Water

leach tonnes

0

10

20

30

40

50

60

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

m3/tonne (leach feed)

leac

h fe

ed to

nnag

e x1

000

m3

/ to

nne

0

5

10

15

20

25

30

35

40

0

20

40

60

80

100

120

140

160

180

200

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015leach tonnes m3/tonne (leach feed)

0

5

10

15

20

25

30

35

40

0

20

40

60

80

100

120

140

160

180

200

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015leach tonnes m3/tonne (leach feed)

Gasoline

lires

x10

00

0

50

100

150

200

250

300

350

400

450

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

0

50

100

150

200

250

300

350

400

450

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

0

1000

2000

3000

4000

5000

6000

7000

8000

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Diesel

lires

x10

00

0

1000

2000

3000

4000

5000

6000

7000

8000

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

8 9

Page 8: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Canada is the largest focus of the AREVA group’s worldwide exploration activities due to the prevalence of extremely high-grade uranium ore-bodies. Our exploration team is actively searching for these uranium deposits in northern Saskatchewan, northern Alberta and Nunavut. In 2015, we completed a total of 48,000 metres of drilling with an additional 71,000 metres completed with joint venture partners. In all, AREVA is involved in a total of 45 exploration projects in Saskatchewan, Alberta and Nunavut. In addition, AREVA has some properties in Quebec which are not currently active.

Exploration is done by air using geophysical instruments and by ground using geophysical surveying methods and drilling. Uranium is five hundred times more common than gold, however, high concentrations are rare. Saskatchewan’s Athabasca Basin is home to the highest known concentrations in the world with grades over 20% uranium.

We’re preparing for the future through exploration

Year-Round ExplorationAlthough our explorations teams do take time off, they spend a lot of time in the field, drilling, collecting data, surveying, reviewing and logging drill core. It’s not always all fun and games being out in the elements year round, yet the appeal of the next big find keeps them going one field season after the next.

Our Projects of InterestIn 2015, the main focus of AREVA’s uranium exploration in Saskatchewan was the Waterbury Cigar Lake Project, situated on the eastern Athabasca Basin. The program was aimed at discovering new resources and possible extensions of the Cigar Lake deposit.

We also explored possible extensions of the known Shea Creek deposits. Situated in the western Athabasca Basin, Shea Creek is one of the largest known undeveloped uranium resources in Canada.

AREVA’s Kiggavik Project is located 80 kilometres west of Baker Lake, Nunavut. The project is currently awaiting a decision from the federal Minister of Indigenous and Northern Affairs Canada related to its environmental assessment. However, for now it is only an exploration project, which field season ran in the summer months. Aside from the Kiggavik Project, the exploration team also ran a drilling campaign at the St. Tropez Project located about three kilometres north of Kiggavik. The St.Tropez Project is owned and operated solely by AREVA.

Exploration Projects Ownership

KiggavikAREVA Resources (Operator)………...............….64.8%JCU Exploration (Canada) Co. Ltd….............….33.5%DAEWOO Corporation…………………..................….1.7%

Shea CreekAREVA Resources (Operator)……....................……51%UEX……………………………………………......................…..49%

Waterbury Cigar LakeAREVA Resources (Operator)………………..........37.1%Cameco Corporation ………………………..................50%Idemitsu Uranium Exploration Canada Ltd. ….7.9%TEPCO Resources Inc. ……………………....................5%

Dunja Gaco started with AREVA as a geology summer student at the Kiggavik project in Nunavut. After completing her degree she joined AREVA as a geologist-in-training, building her hours to obtain her professional geoscience certification. In this photo she inspects some of the drill cores from Kiggavik.

AREVA Properties in the Athabasca Basin

Our exploration team has drilled through 120km of ground over the last three years in order to obtain and analyze thousands of samples.

10 11

Page 9: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Production MilestonesFollowing the recent restart of the McClean Lake mill in October 2014 and the start of production at the Cigar Lake mine in early 2014, the year 2015 has been filled with exciting and significant production milestones. In July, for the first time in 16 years of production at McClean Lake, the mill packaged over 1.5 million pounds of uranium concentrate in just one month. By the end of 2015, another production milestone was reached with the processing of over 11.3 million pounds of U3O8 throughout the year. This momentous breakthrough well exceeded targets of 6-8 million pounds.

The McClean Lake mill is truly a unique facility as it is the most technologically advanced mill in the world for the processing of high-grade uranium ore without dilution. Over the 2015 period, feed grades were well above historical mill levels of about 1%, averaging over 17.5%, and at times exceeding 25% uranium.

The mill is currently undergoing an extension project, which will bring about further production milestones. The project, due for competition in late 2016, will substantially increase the mill’s capacity. The mill will be capable of producing 24 million pounds of uranium concentrate annually. However, our current production plan is set to reach and stay constant at 18 million pounds of production from the Cigar Lake mine ore for several years. The remaining capacity may be used in the future for ores from other sources such as the deposits still available at McClean Lake or the nearby Midwest property.

Since the McClean Lake mill’s initial start in 1999

We’re ramping up production at McClean Lake

to the end of 2015, it has achieved a production of over 52 million pounds of uranium concentrate. Prior to shutdown (2010-2014), McClean Lake produced up to 6.5 million pounds of uranium concentrate a year. However, the upgrade and expansion work and the higher grade ore coming from Cigar Lake, all contributed to the sharp rise in production output in 2015.

Continual ImprovementWith the restart of the mill in 2014, AREVA embarked on implementing a Lean Six Sigma approach to various projects in the Saskatoon office, within our exploration projects and Cluff Lake decommissioned mine monitoring, and at the McClean Lake operation. Lean Six Sigma provides process improvement tools and methods geared to improve performance by reducing waste and making results more predictable and less variable.

At McClean Lake, Lean Six Sigma is helping AREVA be more profitable by making our processes more efficient, leading to costs reductions. It is also helping to make the mill safer by tackling incidents with the potential to become serious incidents if left unaddressed. It also helps the employees directly involved in the projects to develop or improve their skillsets in regard to decision-making, problem solving and teamwork.

Examples of our Lean Six Sigma projects at McClean Lake in 2015 included the optimization of bulk-issue consumable management, employee transport and aircraft capacity optimization, and mill air quality improvements.

Checking the valves and inner workings of the uranium ore slurry receiving platform is all in a day’s work for Alphonse Roberts, mill operator. With the increase in production these days he is particularly busy with the unloading of, on average, 14 trucks of ore slurry from Cigar Lake every day.

12 13

Page 10: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Cigar LakeThe Cigar Lake mine production ramp-up exceeded expectations in 2015. In September, AREVA was pleased to celebrate with its partners and many stakeholders, the grand opening of the Cigar Lake mine and the processing of its ore at the McClean Lake mill. The grand opening was a great opportunity to recognize the dedication and hard work of our employees and partners in the inauguration of this significant achievement.

Cigar Lake is the highest-grade uranium mine in the world. Working together, the Cigar Lake and McClean Lake sites will become the second largest uranium producer in the world once they achieve full ramp-up. Cigar Lake is expected to produce 16 million pounds of uranium concentrate in 2016 and 18 million pounds once fully ramped-up in 2017.

McArthur River & Key LakeProduction at McArthur River has been excellent with ore grades about 100 times the world average. In 2015, AREVA received 5.8 million pounds of uranium concentrate from McArthur River ore after processing at the Key Lake mill.

Over the years, the McArthur River mine has tested different mining methods including boxhole boring and blasthole stopping. However, the raise boring method has been the one predominantly used at McClean Lake to date. All of these methods use remote-control equipment, which allows the ore to be mined while minimizing employee exposure to radiation. Once the ore is mined, it is crushed and processed underground. The ore is then pumped to the surface as a slurry or mud and trucks take the slurry to the Key Lake mill for further processing. The Key Lake mill has been in operation since 1983 and in 1999 it started processing high-grade uranium ore slurry from the McArthur River mine.

We’re investing in our partnerships

Kiggavik

Joint Ventures Ownership

McClean LakeAREVA Resources (Operator) ...........................70%Denison Mines Inc. ...........................................22.5%OURD (Canada) Co. Ltd. .................................7.5%

Cigar LakeAREVA Resources ............................................37.1%Cameco Corporation (Operator) .......................50%Idemitsu Uranium Exploration Canada Ltd. ....7.9%TEPCO Resources Inc. ..........................................5%

Key LakeAREVA Resources ............................................16.7%Cameco Corporation (Operator) ...................83.3%

McArthur RiverAREVA Resources ............................................30.2%Cameco Corporation (Operator) ...................69.8%

Underground at the Cigar Lake mine, a jet-boring operator checks the equipment before starting to mine a new cavity. The jet boring mining system was specifically designed to mine this deposit.

14 15

Page 11: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Community Support Matters to UsCommunity is at the heart of our operations and we take pride in ensuring that our activities are not only safe and environmentally friendly, but also support the livelihood and development of the communities near our operations and in which many of our employees live.

We know many of our stakeholders understand and appreciate our industry’s commitment to running sustainable operations and being active in the communities. We believe that this is reflected in the high level of support for uranium mining throughout Saskatchewan. This support continued to grow over the last year. 86% of overall residents and 81% of northern residents support the industry while 62% of overall residents and 66% of northern residents recognize the industry as being extremely important to the province. Moreover, awareness of AREVA Resources Canada and our operations is significant in the North at 75%. We appreciate everyone’s support of our industry and work hard to continue to meet or exceed our stakeholders’ expectations of our industry and company.

Staying ConnectedAREVA strives to raise awareness and keep an open dialogue with our stakeholders and the public about our activities. In keeping with this

We’re part of our communities

commitment, this year we introduced AREVA Nįh Ghalaná Honie, our new quarterly newsletter geared specifically to the seven Athabasca Basin communities to provide information related to our operations and the participation of Athabasca residents in these activities. This publication is distributed directly to elected leadership and officials while being made available to all community members. The newsletter’s name, AREVA Nįh Ghalaná Honie, means “news about AREVA’s activity” in Dene language.

Over the past several years, AREVA has increased its online presence, predominantly on social media. Channels such as Twitter, Facebook, LinkedIn, and YouTube have made information about AREVA more accessible while building a platform for two-way communication. During 2015, activity and interaction with the public grew on each of AREVA’s social media channels. Likes on our Facebook page grew by 41%, followers on Twitter grew by 22%, views on Youtube grew by 14%, and we nearly doubled our follower count on LinkedIn. We encourage everyone to visit our various online social media platforms regularly for our latest news, to ask questions, and to connect with us as often as you’d like.

For the past five years, AREVA has sponsored the Don Allen Saskaloppet helping provide an opportunity for young and old to have fun on the ski trails around La Ronge, Saskatchewan.

84% 84% 82% 82% 81% 86% 79% 81% 79% 79%

86%

76% 77% 81%

0%

50%

100%

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Overall North

Support for Uranium Mining in Saskatchewan (2005-2015)

16 17

Page 12: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

One of the ways AREVA invests in Saskatchewan communities is through our supply chain. AREVA’s operations have come to rely on the services and materials provided by northern and Aboriginal owned businesses. In 2015, we purchased over $47 million in goods and services from businesses such as West Wind Aviation, Northern Resource Trucking, Points North Group, Athabasca Basin Security, Athabasca Catering, Points Athabasca Construction Limited, Team Drilling, and Flyer Electric. These businesses are all owned by northern or First Nations organizations.

Another way we contribute to the communities where employees live, is through our community investment program. In February, AREVA donated $100,000 in support of the Yuthe Dene Sekwi Chu La Koe Betsedi, a 10-bed therapeutic home facility located in Stony Rapids, for at risk northern youth. This donation represented the second and last installment of AREVA’s $200,000 financial support. We are pleased to be able to help northern Saskatchewan youth and their families grow into healthy, productive, and strong communities.

AREVA supported and sponsored other initiatives in 2015 including the annual Saskaloppet in La Ronge, Bloom in support of Saskatoon’s Royal University Hospital Neonatal Intensive Care Unit, Steps for Life Walk, and the Annual Northern Saskatchewan Football Jamboree by the Northern Lights School Division No.113. In addition to these events, AREVA employees also continued to mentor elementary school students at Caroline Robins Community School in Saskatoon and participated in Treaty Day Celebrations, Elders’

We’re invested in our communities

Gatherings, and Academic Achievements Day in Athabasca Basin communities including Fond du Lac, Black Lake, Pinehouse and Ile-à-la-Crosse.

In 2015, AREVA donated over $340,000 in northern Saskatchewan communities, about $40,000 for communities in Nunavut, and close to $200,000 in the “south” or greater Saskatoon area for support of community events and organizations. This represents an average of over $1,200 per AREVA employee provided to non-profit and community organizations.

Lending a HandBeing a part of our communities also means lending a hand when help is needed. 2015 was a challenging year throughout northern Saskatchewan as fires wreaked havoc and forced the evacuation of many communities. Community is never more important than in difficult times like this and at AREVA we witnessed its power firsthand.

AREVA and its employees donated about $10,000 in cash and in-kind supplies for evacuation shelters, including bags full of clothes for evacuees and steel-toed boots for emergency help workers. Furthermore, employees volunteered well over 400 work-hours during the evacuations, providing essential services such as emergency operations and firefighting. Many of them also spent many hours during their time off to provide assistance in any way they could. We are very proud of our employees for stepping up to the plate when it mattered most.

Magdalena Anderson and Odile Maufrais-Smith, AREVA geologists, took some time while not in the field to lend a hand at one of the northern fires evacuation shelters in Saskatoon where they distributed hygiene and baby supplies. In all, AREVA employees donated over 400 work-hours to help with the evacuation relief efforts.

18 19

Page 13: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

At Cluff Lake, nature is reclaiming its place. Grasses and trees are growing steadily on the former tailings management area. AREVA’s environmental scientists continue to monitor the progress of the vegetation growth and the water quality in the area to ensure they meet the decommissioning plan.

Looking back and looking ahead

Cluff Lake Decommissioned MineMining and milling operations began at AREVA’s Cluff Lake project in 1980. The project ran for 22 years and had produced 62 million pounds of uranium concentrate by the time it was shut down in 2002. Since its decommissioning, 800,000 trees have been planted at the Cluff Lake site and the area is progressively returning to its natural state.

In late 2013, the Cluff Lake site was opened to the public for use in traditional activities such as hunting and trapping. AREVA continues to monitor the site and carries out inspections four times a year. Eventually, once AREVA and the regulatory agencies are satisfied that the decommissioned site meets

requirements, the Province of Saskatchewan will assume control of the site through the Institutional Control Program.

As part of our commitment to keep our stakeholders informed of our ongoing monitoring activities at the site of the former Cluff Lake mine, in 2015 AREVA employees travelled to La Loche, Buffalo Narrows, Île-à-la-Crosse, and Beauval to discuss the progress of the Cluff Lake decommissioning. We met with the communities’ mayors and councils as well as Metis and First Nations representatives. The team also organized public meetings to present their studies’ findings to residents directly.

Tailings Management FacilityAREVA is planning to increase its tailings management capacity under the JEB Tailings Management Facility (TMF) Expansion Project. This project involves increasing the approved height of placed tailings within the TMF to maximize storage of tailings below ground surface to secure capacity for tailings that will be produced by the McClean Lake mill over the next 20 years. The construction of a berm to contain the tailings pond water during the operations phase will be required. After its useful life, during the decommissioning phase, the water cover will be removed, the berm will be pushed in and graded to blend into the existing landscape and a cover will be placed over the tailings. This project will take place entirely on the existing surface lease of the McClean Lake operation, and will not involve disturbing any new untouched areas.

The project requires approval from the Canadian Nuclear Safety Commission (CNSC) and construction approval from the Province of Saskatchewan.

Industry Trends

Today there are over 440 nuclear power reactors operating in 31 countries and generating 13.5% of the world’s electricity.

There are currently more than 60 nuclear reactors under construction worldwide and hundreds more planned over the next decade.

Uranium demand is slated to increase by over 25% between 2020 and 2030, driven by the increase in energy demand and planned nuclear reactor construction, particularly in countries like China, India and South Korea.

Source: World Nuclear Association

20 21

Page 14: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

Record ProductionThe Cigar Lake operation mined 12.9 million pounds of uranium in 2015, compared to 0.52 million pounds in 2014. All of the ore mined at Cigar Lake is processed at the McClean Lake mill. AREVA Resources has a 37.1% interest in the Cigar Lake operation. In 2015, AREVA achieved its first full year of high-grade uranium ore processing at the McClean Lake mill following its upgrade and restart. Production at the mill surpassed expectations by totaling 11.3 million pounds. This total is up from the 0.34 million pounds of uranium processed in 2014. This year, AREVA’s share of production totaled 4.2 million pounds.

Mining of uranium at the McArthur River operation reached 19.7 million pounds in 2015. All McArthur River ore is milled at the Key Lake facility. In 2015, AREVA received 5.8 million pounds of uranium from McArthur River’s production through its 30.2% ownership of this operation.

Increased RevenueRevenues were $435 million in 2015, significantly higher than 2014 revenues of $284 million. This increase was due to a combination of higher sales volumes and a favorable exchange rate, offset by lower contract prices.

Higher production volumes from the Cigar Lake operation contributed to increased sales volumes. Although the spot price increased slightly from 2014, the majority of uranium sold is under long-term contracts, thereby reducing the exposure to spot price variations.

Challenging MarketThe uranium market strengthened slightly in 2015 for the first time since 2011, after four consecutive years of decline.

The average spot price was $36US in 2015 versus $33US in 2014. The spot price was relatively stable compared to previous years, peaking in March at $39US and bottoming out in December at $34US. Even with the slight increase, the uranium market remains challenging.

AREVA Resources Canada at a glance

More 2015 Numbers

Community investment: $580,000 or over $1,200 per employee

Spending in goods and services from Saskatchewan businesses: $219 million

Spending in goods and services from northern Saskatchewan businesses: $47 million

Women at AREVA compared to industry average: 25% vs. 17%

Although the industry is going through a “bear market” with low uranium prices, at McClean Lake the hustle and bustle at the mill does not prevent the local wildlife to make use of its natural habitat.

-

50

100

150

200

250

300

350

400

450

500

2009 2010 2011 2012 2013 2014 2015

AREVA Resources Canada’s Revenue (millions CDN$)

-

10

20

30

40

50

60

70

80

90

100

2009 2010 2011 2012 2013 2014 2015

Average AnnualSpot Price (US$/lb. U3O8)

Source: Trade Tech

-

10

20

30

40

50

60

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2015 MonthlySpot Price (US$/lb. U3O8)

Source: Trade Tech

Northerners at McClean Lake: 51% of employees

Northern students scholarships: $1,645,500 since 1979. $100,000 in 2015

Metres drilled during exploration campaigns: 48,000

Ore grade at Cigar Lake: 20%, it’s 100 times the world average

Number of employees: 330 at McClean Lake and 150 in Saskatoon

Number of trees planted at Cluff Lake: +800,000

People who support the uranium industry in Saskatchewan: 86%

Saskatchewan’s share of world uranium production: 22% up from 15%

AREVA’s Share ofProduction (million lbs. U3O8)

McArthur River mine & Key Lake mill Cigar Lake mine & McClean Lake mill

McClean Lake Sue mines and mill

-

1

2

3

4

5

6

7

8

2009 2010 2011 2012 2013 2014 2015

Learn more about AREVA’s mining activities and corporate social responsibility in Canada, Kazakhstan, Mongolia and Niger. See how the AREVA group meets its sustainability commitments at www.csr-mines.areva.com.

22 23

Page 15: Ramp-up - Arevamining.areva.com/canada/liblocal/docs/Information/... · Lake Safety Award and went on to win the provincial Saskatchewan Workers Compensation Board Mission Zero Safe

AREVA Resources Canada Inc. is a subsidiary of the AREVA group. AREVA supplies high added-value products and services to support the operation of the global nuclear fleet.

The company is present throughout the entire nuclear cycle, from uranium mining to used-fuel recycling, including nuclear reactor design and operating services.

AREVA is recognized by utilities around the world for its expertise, its skills in cutting-edge technologies and its dedication to the highest level of safety.

AREVA’s 40,000 employees are helping build tomorrow’s energy model: supplying ever safer, cleaner and more economical energy to the greatest number of people.

AREVA Resources Canada Inc.PO Box 9204 817 - 45th Street West

Saskatoon, SK, Canada S7K 3X5Tel: (306) 343-4500

Toll free in Saskatchewan: 1-866-99AREVAwww.arevaresources.ca

www.areva.com