Upload
donal
View
54
Download
1
Embed Size (px)
DESCRIPTION
Ramiro Nava and Stacy Savoca Federal Program Monitoring Office September 20, 2012. California Accountability and Improvement System Nuts and Bolts. Pre-CAIS. Local educational agencies (LEAs) responded to Program Instrument items using hard copy documents - PowerPoint PPT Presentation
Citation preview
CALIFORNIA DEPARTMENT OF EDUCATIONTom Torlakson, State Superintendent of Public Instruction
Ramiro Nava and Stacy Savoca Federal Program Monitoring Office
September 20, 2012
California Accountability and Improvement System
Nuts and Bolts
TOM TORLAKSONState Superintendent of Public Instruction
2
Pre-CAIS• Local educational agencies (LEAs) responded to
Program Instrument items using hard copy documents
• LEAs prepared numerous files and boxes for monitoring visits
• Communication via phone, e-mail and fax
TOM TORLAKSONState Superintendent of Public Instruction
3
CAIS Beginning
• A web-based system, designed to enhance and streamline the Federal Program Monitoring (FPM) process including:
– Tools for storage and retrieval of LEA documents– Electronic communication specific to compliance
monitoring– Opportunity for effective monitoring and targeted
technical assistance– Transparency in the monitoring process
TOM TORLAKSONState Superintendent of Public Instruction
4
CAIS Today
• CAIS has expanded:– Compliance monitoring for FPM, School
Improvement Grants (SIG), Civil Rights Review of Career Technical Education (CRR-CTE), and Charter Schools
– Review of local educational agency (LEA) and school plans
– Special Education Nonpublic Schools and Agencies (NPS/As) application submission
TOM TORLAKSONState Superintendent of Public Instruction
5
CDE CAIS Web pagehttp://www.cde.ca.gov/ta/ac/ca/
TOM TORLAKSONState Superintendent of Public Instruction
6
CAIS and FPM
• CAIS provides CDE a tool to assist with monitoring LEAs to ensure that they meet fiscal and program requirements – CAIS is limited to LEAs in the FPM
monitoring process– CAIS access, training, and assistance is
available for these LEAs through the FPM Office
TOM TORLAKSONState Superintendent of Public Instruction
77
CAIS Roles and Definitions
Roles DefinitionsSchool User A user who has the ability to upload
documents in draft form only.District User A user who has the ability to upload
documents. Submitter A District User who has the ability to
submit the instrument on behalf of the LEA. Receives comments for each assigned program instrument.
Administrator A District User who can add and manager users.
LEA Review Coordinator
A District User with administrative rights and is assigned as a Submitter for all program instruments being reviewed.
Each user accessing the system must have an individual user account.
TOM TORLAKSONState Superintendent of Public Instruction
8
LEA Overview
TOM TORLAKSONState Superintendent of Public Instruction
9
LEA Review Schedule
9
TOM TORLAKSONState Superintendent of Public Instruction
10
Instrument Overview
TOM TORLAKSONState Superintendent of Public Instruction
1111
Uploading Documents
1. Add a New File by browsing your computer and selecting the file to add. • Provide a Title and Description. • The default for the Title is the file name, but you
may uncheck this to create your own. • Be sure to include file types that are generally
able to be opened on most computers: Microsoft Office applications such as Word and Excel, PDF files, and text files.
• If you have files in a software format not available to most users (Photoshop or design software), please convert to a PDF file.
TOM TORLAKSONState Superintendent of Public Instruction
1212
Uploading Documents 2. Select an Existing File uploaded by the LEA or
School to the File Cabinet. • Only documents (including links and hard copy
references) already uploaded by your LEA will be available for selection to attach to a new instrument item.
• Select Existing File, then select Browse. • You will see a view of the entire LEA file cabinet. • You may select one or multiple documents by
checking the box to the left of each document title.
• Select Review at the bottom of the screen to confirm the selected documents.
• Then select Attach to save.
TOM TORLAKSONState Superintendent of Public Instruction
1313
Uploading Documents
3. Select a link to a Web page if the document(s) are on at Web page i.e., LEA Web page parent notifications. • Add a URL, including “http://” to create the
record• Provide a direct link to the document• Provide a Title and Description of the Web
page
TOM TORLAKSONState Superintendent of Public Instruction
1414
Uploading Documents
4. Select the Hard Copy Reference Only option when a document containing student-identifying or other sensitive information is not uploaded.
• Provide a Title and Description• Indicate in the Description field where the
document is available for review
TOM TORLAKSONState Superintendent of Public Instruction
1515
Notification Of Findings: No Findings
• When an FPM review is completed and there are no findings, the LEA will receive this comment
• The Notification of Findings (NOF) report will be posted in CAIS File Cabinet
TOM TORLAKSONState Superintendent of Public Instruction
1616
Notification Of Findings: Findings
• When the FPM review is completed and there are findings the LEA will receive this comment
• The Notification of Findings (NOF) report will be posted in CAIS File Cabinet
1
2
TOM TORLAKSONState Superintendent of Public Instruction
1717
Resolution of Findings
• LEAs will resolve all findings within 45 calendar days from the last day of a review
• Program reviewers respond to uploaded resolution documents within 15 calendar days
• When LEAs cannot resolve findings within the 45 calendar days, they can request a Resolution Agreement
• Resolution Agreement requests are granted or denied within 5 calendar days
• Resolution Agreement requests cannot extend over 225 days from the last day of a review
TOM TORLAKSONState Superintendent of Public Instruction
1818
Uploading Resolution Documents
• LEA uploads resolution documents at the instrument item with a status of Does Not Meet Requirements
• LEA selects paper clip under Associated Documents or Required and Suggested Documents to upload documents
2
2
1
TOM TORLAKSONState Superintendent of Public Instruction
19
Contact InformationFederal Program Monitoring Office
916-319-0935
Ramiro Nava, Educational Programs Consultant
916-319-0375
Stacy Savoca, Associate Governmental Program Analyst
916-319-0502
CDE Compliance Monitoring Web page
http://www.cde.ca.gov/ta/cr/
CDE CAIS Web page
http://www.cde.ca.gov/ta/ac/ca/index.asp
19
TOM TORLAKSONState Superintendent of Public Instruction
20
Other Program ContactsCharter Schools
916-322-6029
LEA Plan Implementation
Clement Mok, 916-319-0940
LEA Plan
Janice Morrison, 916-319-0259
School Improvement Grant
916-319-0833
Special Education, Interagency-Nonpublic Schools and Agencies
916-327-0141
Title III: Year 2 and 4 Improvement Plans
Lilia Sanchez, 916-319-0265