Upload
pranavbonde
View
214
Download
0
Embed Size (px)
Citation preview
MCA Part-III SEM VI: Industrial Training Project Report Outline
1. College Certificate2. Company Certificate3. Acknowledgement 4. Company Profile5. Problem Definition
Switch Optimization: Technical:
I. Disconnected but occupied Interfaces on Switches.II. Difficulty in Identifying Free ports on switch via Console.III. Difficulty in allotting new network connections.IV. Improper Utilization of Switch Capacity.
Commercial and Mangerial: I. Cost Cutig regarding network hardware.
II. Network Layout of Bosch NapIII. Miss management of Network Racks.IV. Network Rack Key Management.
Planning & Implementing a VLAN: Technical:
I. Need to Secure NetworkII. Isolating Machine from corporate network.III. Dealocating Assigined static IP address.
6. Existing Scenario Switch Optimization:
Technical: I. Connected but unused ports on switch
II. The Free Ports on switch can be identified only by visual observation III. Scarcity of ports while allotting new network connections. IV. Improper Utilization of Switch Capacity.
Commercial and Mangerial: I. Need to Procure New Network Hardware.
II. Scattered (dept. Wise layout)III. No Maintenance or preventive Maintenance of network racksIV. Missing Standard Convention for network rack keys
Planning & Implenting a VLAN: Technical: I. Unsecured Network
II. Machines have access to corporate networkIII. Static IP address are assigned to machines.
7. Feasibility Study Technical Feasibility Operational Feasibility Economical feasibility
8. Scope of the work Switch Optimization (Passive Networking)
Survey of existing network infrastructure Ploting Network Racks & Connectivity on Bosch Nap Layout Preparation of Reports Preparing & Planning Preventive Maintenance Report Desigining switch optimization strategy Implementing switch Optimization Cost Cuting.
VLAN: Planning & Implementing a VLAN (Active Networking)
9. Requirement Analysis10. Network Infrastructure: Passive11. Network Infrastructure: Active12. Network Topology 13. Cabling & Cabling Standards14. Network Connectivity Equipments15. Network Racks16. Process of Switch Optimization
Survey of Network Racks & Switches Constructing a detailed Survey Report Grading Network Racks Traceing Ports: connected but unused & free ports Traceing Cables (Uplink Cables) Study of End user connectivity requirement Switch Optimization Report Implementation How the Switch Optimization was Benificial to Organization?
17. Planning & Implementing a VLAN VLAN Fundamentals Purpose for Creation of a VLAN IP Address Monitoring Identifying Switch & Ports on which these machines (hosts) are connected Realign these machines on switch in serial order Confgiguring VLAN Settings on Switch