Sandbukta-Moss-Såstad
Østfold Line – a part of InterCity
• New Moss station –meeting point of the future
• Moss-Oslo 30 minutes
• More trains on schedule
• More trains per hour
• Opening scheduled for 2024
• New double track 10.4 km • 2 tunnels totalling approx. 4.5 km • 3 evacuation tunnels • New Moss station
Sandbukta-Moss-Såstad
Contract Contract type and strategy
Announcement Construction start
Completion
SMS 2BCatenary and track
NS8405, constructioncontract
Q3-4/2020 Q1/ 2022 Des.2024
SMS 2CElectricity and telecoms
NS8405, constructioncontract
Q1-2/2021 Q1/ 2022 Des.2024
Investments for Railway Sandbukta-Moss-Såstad
Scope • 10,4 km double track, K0• 4 tracks to platform• 26 point switches with jointed frog• 2 temporary point switches at
Sandbukta/Dilling including sub track• Approximately 75000 m3 ballast
Contract type and strategy
NS8405, construction contract
Completion December 2024
SMS 2B Track
Description
Scope • OCL installation to be built with AT system on the 10.4 km double track line. 4 tracksto platform at new Moss station
• 8 AT transformers4 at Smørbekk converter station (Km 50.500) 2 at Moss station (Km 60.200) 2 at Såstad (Km 66.400)
• New AT line between Smørbekk converter station (Km 50.500) and plot boundarySandbukta (Km 56.370)
• 5 km (double track) OCL system 20 (double track) • 5.4 km (double track) OCL system 25
Contract type and strategy
NS8405, construction contract
Completion December 2024
SMS 2B Catenary
Description
Scope • 22kV cable installation including cable conduit along 10.4 km new line
• 22kV cable installation including cable conduit on existing sections Kambo – Sandbukta (5 km) and from Såstad to Haug (6.0 km). => A total of 21.4 km with 22kV cable installationincluding cable conduit
• 1 sub station at Kambo Km 56.650 receives input from network grid owner (Hafslund Nett), and has transformer 11/22kV with high-voltage metering equipment and interface to network grid owner
Contracttype and strategy
NS8405, construction contract
Completion December 2024
SMS 2C Electricity
Description
Scope • Substations: 8 substations for primary distribution, UPS system, remote control (RTU), monitoring, etc. The substations supply technical systems, site lighting, tunnel lighting. emergencylighting, point heaters (26 point switches), telecoms installation, signalling installation, etc.
• Lighting installation:Site lighting (station and point areas). Tunnel lighting for telecoms cubicles, signal cabinets, emergency lighting in tunnels and evacuation tunnels. Lighting in station building and technical buildings
Contract type and strategy
NS8405, construction contract
Completion December 2024
SMS 2C Electricity (continued)
Description
Scope • Remote control/monitoring:Remote control/monitoring of OCL switches and 22 kV switches. Monitoring of technical installations, alarms, status (UPS), etc.
• Approximately 50 fire fans for tunnel ventilation
Contract type and strategy NS8405, construction contract
Completion December 2024
SMS 2C Electricity (continued)
Description
Scope • SRO system• Fibre: Access and transport fibre + fibre connections up to
terminal equipment (group cabinets, telecoms cubicles, etc.) • Access control• Fire alarm• Transmission
Contract type and strategy NS8405, construction contract
Completion December 2024
SMS 2C Telecom
Geir Solvin 2B/C - Technical [email protected]
Marie Oppegaard 2B/C - Contract [email protected]