Sandbukta-Moss-Såstad

Østfold Line – a part of InterCity

• New Moss station –meeting point of the future

• Moss-Oslo 30 minutes

• More trains on schedule

• More trains per hour

• Opening scheduled for 2024

• New double track 10.4 km • 2 tunnels totalling approx. 4.5 km • 3 evacuation tunnels • New Moss station

Sandbukta-Moss-Såstad

Contract Contract type and strategy

Announcement Construction start

Completion

SMS 2BCatenary and track

NS8405, constructioncontract

Q3-4/2020 Q1/ 2022 Des.2024

SMS 2CElectricity and telecoms

NS8405, constructioncontract

Q1-2/2021 Q1/ 2022 Des.2024

Investments for Railway Sandbukta-Moss-Såstad

Mossetunnel with view from Sandbukta

Scope • 10,4 km double track, K0• 4 tracks to platform• 26 point switches with jointed frog• 2 temporary point switches at

Sandbukta/Dilling including sub track• Approximately 75000 m3 ballast

Contract type and strategy

NS8405, construction contract

Completion December 2024

SMS 2B Track

Moss station

Description

Scope • OCL installation to be built with AT system on the 10.4 km double track line. 4 tracksto platform at new Moss station

• 8 AT transformers4 at Smørbekk converter station (Km 50.500) 2 at Moss station (Km 60.200) 2 at Såstad (Km 66.400)

• New AT line between Smørbekk converter station (Km 50.500) and plot boundarySandbukta (Km 56.370)

• 5 km (double track) OCL system 20 (double track) • 5.4 km (double track) OCL system 25

Contract type and strategy

NS8405, construction contract

Completion December 2024

SMS 2B Catenary

Såstad AT transformators

Description

Scope • 22kV cable installation including cable conduit along 10.4 km new line

• 22kV cable installation including cable conduit on existing sections Kambo – Sandbukta (5 km) and from Såstad to Haug (6.0 km). => A total of 21.4 km with 22kV cable installationincluding cable conduit

• 1 sub station at Kambo Km 56.650 receives input from network grid owner (Hafslund Nett), and has transformer 11/22kV with high-voltage metering equipment and interface to network grid owner

Contracttype and strategy

NS8405, construction contract

Completion December 2024

SMS 2C Electricity

Sub station HK1005 Sandbukta

Description

Scope • Substations: 8 substations for primary distribution, UPS system, remote control (RTU), monitoring, etc. The substations supply technical systems, site lighting, tunnel lighting. emergencylighting, point heaters (26 point switches), telecoms installation, signalling installation, etc.

• Lighting installation:Site lighting (station and point areas). Tunnel lighting for telecoms cubicles, signal cabinets, emergency lighting in tunnels and evacuation tunnels. Lighting in station building and technical buildings

Contract type and strategy

NS8405, construction contract

Completion December 2024

SMS 2C Electricity (continued)

Description

Scope • Remote control/monitoring:Remote control/monitoring of OCL switches and 22 kV switches. Monitoring of technical installations, alarms, status (UPS), etc.

• Approximately 50 fire fans for tunnel ventilation

Contract type and strategy NS8405, construction contract

Completion December 2024

SMS 2C Electricity (continued)

Description

Scope • SRO system• Fibre: Access and transport fibre + fibre connections up to

terminal equipment (group cabinets, telecoms cubicles, etc.) • Access control• Fire alarm• Transmission

Contract type and strategy NS8405, construction contract

Completion December 2024

SMS 2C Telecom

Telecom GSM-R at Moss station

SMS 2B/C principles for cable conduits

Cable conduits for substation

Geir Solvin 2B/C - Technical [email protected]

Marie Oppegaard 2B/C - Contract [email protected]

Contact information