Railway Development in Indonesia

Embed Size (px)

Citation preview

  • 7/30/2019 Railway Development in Indonesia

    1/26

    PRESENTED BY:

    TAUFIK HIDAYAT & HARRY ARJADI

    RESEARCHER, INDONESIAN INSTITUTE OF SCIENCES

    RAILWAY DEVELOPMENTIN INDONESIA

  • 7/30/2019 Railway Development in Indonesia

    2/26

    Outline

  • 7/30/2019 Railway Development in Indonesia

    3/26

    Background and the History of Indonesian Railways

    At the earlier, IndonesianRailways was built to supporthorticultural and agricultural

    commodities export and formilitery expansion ofcolonial, which wasdominated

    at Java

    Since 1999 and refer to Law

    23/2007, the single operatorof Indonesian railways wasPT. KA (Persero) that coveredpassanger, cargo, private

    company service, etc.

  • 7/30/2019 Railway Development in Indonesia

    4/26

    Present Condition of Indonesian Railways

    y As company PT Kereta Api (PT KA) who runningrailway transportation in Indonesia has vision andmission, they are:{ Vision: to be the best providers of railway service that focus

    on service to the customer and meet the expectations of

    stakeholders

    { Mission: Organizing the railway business and its support,through good practice and good organizational model for

    providing high added value for our stakeholders andensuring environmental sustainability through four mainpillars i.e. safety, right time, services and pleasantness

  • 7/30/2019 Railway Development in Indonesia

    5/26

    Present Condition of Indonesian Railways

    Present Indonesian Railway serve four region

    operation;1. Java,

    2. South Sumatera,

    3. West Sumatera, and4. North Sumatera,

    Consisting more then 4,500 km track Plus Local

    commuter about 400 km.

    Several performance analysis about IndonesianRailways is showed at the next pages.

  • 7/30/2019 Railway Development in Indonesia

    6/26

    Present Condition of Indonesian Railways

    The map indicates most of the major cities are alreadyinterconected in Java. The main requirements in Javawould related to : Upgrading existing lines, Buildingaccess lines to key facilities, expanding urban services

  • 7/30/2019 Railway Development in Indonesia

    7/26

    Present Condition of Indonesian Railways

    Sumatras railwaysystem is quitedifferent from the railnetwork on Java,divided into threewidely separated

    system that fail (i) tomeet the needs ofintercity passenger andfreight transport and

    (ii) do not adequatelyserve newly emergingdevelopment in thecoal and plantation

    sectors

  • 7/30/2019 Railway Development in Indonesia

    8/26

    Present Condition of Indonesian Railways

    y Trend of Passenger Transportation Volume (2004 2008)

    2004 2005 2006 2007 2008

    AnnualProgram 163.14 157.86 154.09 164.00 177.60LongTermPlanning 242.75 169.56 154.09 164.00 177.60Realization 149.79 151.49 159.30 175.50 197.77

    0.00

    50.00

    100.00

    150.00

    200.00

    250.00

    300.00

    PassengerMillion

    AnnualProgramLongTermPlanningRealization

  • 7/30/2019 Railway Development in Indonesia

    9/26

    Present Condition of Indonesian Railways

    y Trend of Transportation Services Selling Volume (2004 2008)

    2004 2005 2006 2007 2008

    AnnualProgram 16.09 14.91 14.84 15.95 16.50LongTermPlanning 23.75 14.91 14.84 15.95 16.50Realization 14.28 14.18 14.96 15.90 18.51

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    Passenger

    km

    AnnualProgramLongTermPlanningRealization

  • 7/30/2019 Railway Development in Indonesia

    10/26

    Present Condition of Indonesian Railways

    y Trend of Passenger Transportation Services Income (2004 2008)

    2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8

    A n n u a lP r o g r a m 1 .5 2 6 1 .5 3 0 1 .7 2 1 1 .7 7 3 1 .8 1 3L o n g T e r m P l a n n i n g 1 .7 8 6 1 .5 3 0 1 .7 2 1 1 .7 7 3 1 .8 1 3R e a l i z a t i o n 1 .4 4 6 1 .5 8 7 1 .6 8 5 1 .7 5 3 2 .2 0 1

    0 . 0 0 0

    0 . 5 0 0

    1 . 0 0 0

    1 . 5 0 0

    2 . 0 0 0

    2 . 5 0 0

    Income(BillionRp.)

    A n n u a lP r o g r a mL o n g T e r m P l a n n i n gR e a l i z a t i o n

  • 7/30/2019 Railway Development in Indonesia

    11/26

    Present Condition of Indonesian Railways

    y Trend of Goods Transportation Services Volume (2004 2008)

    2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8

    AnnualProgram 2 1 .5 1 2 0 .2 3 1 8 .6 1 1 8 .2 0 2 0 .3 0L o n gTerm Planning 2 7 .2 2 1 9 .7 7 1 8 .6 1 1 8 .2 0 2 0 .3 0Realization 1 7 .4 6 1 7 .3 3 1 7 .2 0 1 7 .2 0 1 9 .5 5

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    Ton(Millio

    n)

    AnnualProgramLongTerm PlanningRealization

  • 7/30/2019 Railway Development in Indonesia

    12/26

    Present Condition of Indonesian Railways

    y Trend of Goods Transportation Services Selling Volume (2004 2008)

    2004 2005 2006 2007 2008

    AnnualProgram 5.15 5.31 4.86 4.80 5.20LongTermPlanning 7.48 5.14 4.86 4.80 5.20Realization 4.60 4.39 4.42 4.40 5.45

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    7.00

    8.00

    Ton(Million

    )

    km

    AnnualProgramLongTermPlanningRealization

  • 7/30/2019 Railway Development in Indonesia

    13/26

    Present Condition of Indonesian Railways

    y Trend of goods transportation services income (2004 2008)

    2004 2005 2006 2007 2008

    AnnualProgram 601 676 1,067 1,173 1,398LongTermPlanning 662 607 1,067 1,173 1,398Realization 564 704 1,117 1,091 1,423

    0

    200

    400

    600

    800

    1,000

    1,200

    1,400

    1,600

    Income(Billion

    Rp.)

    AnnualProgramLongTermPlanningRealization

  • 7/30/2019 Railway Development in Indonesia

    14/26

    Present Condition of Indonesian Railways

    y In otherwise, the realization of income generallydoesnt reach the annual and long term program(except in 2006) because several reason:{ Waiting of passenger trains.

    { Rate of turn wagon is high (average over 3 days).

    { Canceling of freight trains.

    { Technical problems by rolling stock and infrastructure.

  • 7/30/2019 Railway Development in Indonesia

    15/26

    Present Condition of Indonesian Railways

    y Train Accident (2004 2008)

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    2004 2005 2006 2007 2008

    TechnicalFactor 127 110 52 44 36Staff'sNegligence 7 12 5 12 10Other 3 3 31 59 40

    NaturalFactor 5 3 7 10 3Outsider 32 22 22 22 16

    Prce

    ntage

    TechnicalFactorStaff'sNegligenceOther

    NaturalFactorOutsider

  • 7/30/2019 Railway Development in Indonesia

    16/26

    Present Condition of Indonesian Railways

    y Human resources, there are still some factors toconsider increasing the productivity of humanresources in the future. The factors are:

    { The quality of human resources remains low, as withmental aspect, as well as formal education

    { Inappropriate human resources are placed for theircompetence, not rewards and punishments executed,unclear job descriptions, and have not applied, the job

    description is unclear, but the application of merit system(in terms of management)

    ' l f

  • 7/30/2019 Railway Development in Indonesia

    17/26

    Company's Long-Term Plan of PT KAYear 2009 - 2013

    Strategic Challenge; Aspects of the operation

    Financial aspects

    Human resources and IT aspects

    Strategic Road Map; Consolidation

    Improve capabilities

    Innovation World Class

    C ' L T Pl f PT KA

  • 7/30/2019 Railway Development in Indonesia

    18/26

    Company's Long-Term Plan of PT KAYear 2009 - 2013

    y Strategic Challenges.

    PassengerOperation Planning

    (GAPEKA)

    Freight

    Operation Punctuality

    Safety

    Service

    Budgeting

    investment

    Asset Utilization

    Competency

    Finance

    HumanResource andInformation

    Technology

    Operation

    ProfitAnd

    Net Profit

    C ' L T Pl f PT KA

  • 7/30/2019 Railway Development in Indonesia

    19/26

    Company's Long-Term Plan of PT KAYear 2009 - 2013

    y In order to company revenue should be able to cover all costsof both, so strategic thinking is required as follows:{ Transportation revenue growth should continue to increase, to

    compensate for the stagnation of the growth in passenger transport. In2011 projected revenues exceed revenues from freight transport;

    { Non-transportation revenue should be increased from only 0.1% to atleast 5% of total operating revenues

    y Then the solution that can be done is:{ Identify passenger and goods transport mapping (occupancy rate, etc.),

    to increase the volume;{ cost efficiency is very relevant to review costing system;{

    developing the potential of freight in the region outside Java (SouthSumatera Regional Division);{ Development of non-transport activities through property management,

    advertising, and utilities (cable, pipeline, telecommunications, etc.).

    C ' L T Pl f PT KA

  • 7/30/2019 Railway Development in Indonesia

    20/26

    Company's Long-Term Plan of PT KAYear 2009 - 2013

    y Strategic Road Map

    R d M f th D l t f

  • 7/30/2019 Railway Development in Indonesia

    21/26

    Road Map for the Development ofCorporate Human Resources

    2009 2011 2013

    I.

    PerformanceIndicator

    DevelopmentInisiation

    Re

    structurisation

    Fase

    OperasionalFase Bussiness

    Value

    Improvement

    Fase

    a. Profitperstaff TBO TBO TBOb. Staffsatisficationindex TBO TBO TBOc. Staffcompetencyindex 40% 60% >80%d. Amountofsectionheadlevel

    andupperstaffpersentasione. Structuralperfunctionalstaff

    rasiopersentasion 90:10 70:30 60:40II. MilestoneofHumanResource

    Development

    a. FinalisasionandStandarisationofHumanResourcedevelopmentBussiness

    Process

    FinalImplementationofCompetencybasedStaffPerformance

    Assesment

    HumanResourceEffortinCorporateHoldingControl

  • 7/30/2019 Railway Development in Indonesia

    22/26

    Revitalization Of The Railways Sector

  • 7/30/2019 Railway Development in Indonesia

    23/26

    Revitalization Of The Railways Sector

    Rail network

    developement need inKalimantan for urban /suburban services, andto freight the coal fromthe mining areas. Thenetwork may beconstructed in the shortterm as special projectswith private sectorfunding

  • 7/30/2019 Railway Development in Indonesia

    24/26

    Revitalization Of The Railways Sector

    As well asKalimantan,Sulawesi need

    also to developerail network forurban / suburbanservices

  • 7/30/2019 Railway Development in Indonesia

    25/26

    Revitalization Of The Railways Sector

    MRT system planis signed to bebuild in Jakartacity area

  • 7/30/2019 Railway Development in Indonesia