10
Begin line assembly by measuring & cutting the rails to desired length, making sure to center the baluster hole pattern on the rails. Use the brackets as templates and mark the hole locations on the bottom rail and top sub rail. Make sure that a minimum of 2-3/4" space is left from the end of the rail to the first baluster hole. www.verandadeck.com VER-0057-LIT 7/13 Railing Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to load requirements and bottom space requirements for rails. All supporting structures must be in accordance with applicable building codes. Neighborhood associations and/or historic districts may regulate size, type, placement and ability of railing. Apply for permits if required by local authorities and codes. Ensure compliance prior to installation. Local building code requirements will always supersede any and all suggested procedures and measurements in the following installation. The following installation instructions are intended as a general guideline based on common building practices used in railing installation. Measure & cut all balusters to the desired length. Lay out the bottom rail & top sub rail with the balusters roughly aligned with the predrilled holes. Predrill the bracket holes using a 1/8" drill bit. Make sure to only predrill 3/4" or the hole may be visible from the top surface. Use a pencil to mark the hole locations, making sure to leave the bracket 1/32"- 1/16" short from the cut end. Position the top of the balusters inside the channel in the top sub rail, carefully aligning the holes & fastener, and secure each with 1-3/4" (minimum) screws (hardware sold separately). Locate the holes and predrill the holes in the top sub rail. Install post trim. Secure all brackets using 3/4" screws (hardware sold separately). (NOTE: Do not over tighten.) Align the bottom balusters with the predrilled holes. Make sure the rail channel is facing away from the balusters. 1 4 2 5 3 6

Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Embed Size (px)

Citation preview

Page 1: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Begin line assembly by measuring & cutting the rails to desired length, making sure to center the baluster hole pattern on the rails. Use the brackets as templates and mark the hole locations on the bottom rail and top sub rail. Make sure that a minimum of 2-3/4" space is left from the end of the rail to the first baluster hole.

www.verandadeck.com VER-0057-LIT 7/13

Railing Installation Instructions - Composite Balusters

Prior to installing railing:Please consult local zoning laws in regards to load requirements and bottom space requirements for rails. All supporting structures must be in accordance with applicable building codes. Neighborhood associations and/or historic districts may regulate size, type, placement and ability of railing. Apply for permits if required by local authorities and codes. Ensure compliance prior to installation. Local building code requirements will always supersede any and all suggested procedures and measurements in the following installation. The following installation instructions are intended as a general guideline based on common building practices used in railing installation.

Measure & cut all balusters to the desired length. Lay out the bottom rail & top sub rail with the balusters roughly aligned with the predrilled holes.

Predrill the bracket holes using a 1/8" drill bit. Make sure to only predrill 3/4" or the hole may be visible from the top surface. Use a pencil to mark the hole locations, making sure to leave the bracket 1/32"-1/16" short from the cut end.

Position the top of the balusters inside the channel in the top sub rail, carefully aligning the holes & fastener, and secure each with 1-3/4" (minimum) screws (hardware sold separately).

Locate the holes and predrill the holes in the top sub rail. Install post trim. Secure all brackets using 3/4" screws (hardware sold separately).(NOTE: Do not over tighten.)

Align the bottom balusters with the predrilled holes. Make sure the rail channel is facing away from the balusters.

1

4

2

5

3

6

Page 2: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

TIP: only insert 1-3/4" (minimum) screws into the bottom end of the balusters part way (hardeware sold separately). This allows for easier alignment of upcoming balusters. Tighten all screws after each baluster is secured to bottom rail.

Predrill all holes with a 1/8" drill bit.

Remove the top rail and drill out the sub rail holes with a 7/32” drill bit. Secure the rail to assembly using four 1-3/4" screws (hardware sold separately). (NOTE: Do not over tighten.)

Install post trim. Lower the assembly onto crush blocks cut to the required length. A minimum of 2 crush blocks are needed and the installer needs to cut crush blocks from an extra baluster.

Secure the brackets to the posts with 2" screws (hardware sold separately). Align the top rail with the assembly.

Finish the assembly by gluing the crush blocks between the 5th and 6th baluster from each end & post caps in place using a quality exterior grade adhesive.

Use a pencil to mark the locations of the screw holes for the bottom and sub rails on both ends.

Predrill the sub rail & top rail before the first baluster and between the 5th and 6th baluster from each end using a 1/8" drill bit no deeper than 1-7/8" deep, making sure to not penetrate the top of the top rail. (NOTE: this will allow the fastener to snug the top rail correctly).

www.verandadeck.com

7

10

13

8

11

14

9

12

VER-0057-LIT 7/13

Page 3: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Posts should be plumb in both directions. Measure the distance between the posts in various locations. The measurement should not vary by more than 1/16”. Length between posts should not exceed 70” diagonally.Begin by supporting the bottom rail uniformly between the completed post assemblies. Transfer the proper angle to the rail.

www.verandadeck.com VER-0057-LIT 7/13

Stair Installation InstructionsPrior to installing railing:Please consult local zoning laws in regards to load requirements and bottom space requirements for rails. All supporting structures must be in accordance with applicable building codes. Neighborhood associations and/or historic districts may regulate size, type, placement and ability of railing. Apply for permits if required by local authorities and codes. Ensure compliance prior to installation. Local building code requirements will always supersede any and all suggested procedures and measurements in the following installation. The following installation instructions are intended as a general guideline based on common building practices used in railing installation. Angle used in the installation instructions is based on a common 7” rise x 11” run.

Pre-drill the holes for the brackets using a 1/8” drill bit.

Center the hole pattern, and cut both ends to the proper angle.Drill out the holes with a 7/32” bit at the same angle as the end cuts. A minimum of 2-1/2” is needed from end of rail to first baluster hole.

Secure the brackets to the top sub-rail & bottom rail using 3/4” screws (hardware sold separately).(NOTE: Do not over tighten.)

Place the hinge angle brackets on the bottom & top sub-rail. Use a pencil to mark the hole locations, making sure to leave the bracket 1/32”-1/16” short from the cut end.

Transfer the rail angle to both ends of the balusters and cut to correct length. It may be necessary to predrill the 1/8” diameter holes at the ends of the balusters. Place rails on a smooth, clean surface with the balusters loosely aligned with the holes.

1 2 3

4 5 6

Page 4: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Starting with the top sub-rail, secure each baluster using 1-3/4” (minimum) screws (hardware sold separately). The balusters will fit between the walls on the underside of the top sub-rail.

Also mark the locations of the top bracket. Slide trim onto post before attaching rail.

Position the top rail over the assembly.

Secure the bottom rail to the balusters using 1-3/4” (minimum) screws (hardware sold separately).TIP: don’t fully drive the screws into the bottom rail until all balusters have been started. This will help in starting the screws into the predrilled holes in the balusters. Make sure to snug the screws once all balusters are started properly. Install post trim prior to step #9.

Predrill bottom holes, and secure using 2” screws (hardware sold separately).(NOTE: Care should be taken to predrill and insert the screws as perpendicular to the post as possible. For stairs, it will not be possible to drive all bracket fasteners perpendicular to the post. The use of a flexible shaft or extension may be necessary.)

Lower the top rail into place.

Position and support the assembled guardrail between the posts in final position. Mark the screw holes with a pencil for predrilling.

Secure the top bracket using 2” screws (hardware sold separately).

www.verandadeck.com

7

10

12 13 14

8

11

9

VER-0057-LIT 7/13

Page 5: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Predrill holes at 1/3 points and between the bracket and first baluster from each end using a 1/8” drill bit. Follow up with a 7/32” drill bit, drilling through the top sub rail only (this will allow screws to snug the top rail tightly).

Finish by gluing the post caps on using a quality exterior adhesive. Cut 1 crush block from baluster and glue centered between posts as shown in the above diagram.

Secure the top rail to the top sub rail using four 1-3/4” screws (hardware sold separately).(NOTE: It may be necessary to countersink using a 3/8” bit, not more than 1/4” deep.)

www.verandadeck.com

15 16 17

VER-0057-LIT 7/13

Page 6: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Comience el armado de la línea midiendo y cortando los travesaños a la longitud deseada, cerciórese de centrar el patrón de hoyos del balaustre en los travesaños. Use los soportes como plantillas y marque las posiciones de los hoyos en el travesaño inferior y el travesaño secundario superior. Asegúrese que haya un espacio mínimo de 2-3/4" (7 cm) desde el extremo del travesaño al primer hoyo de balaustre.

www.verandadeck.com VER-0057-LIT 7/13 (Spanish)

Instrucciones para la instalación de barandillas - Balaustres compuestos

Antes de instalar la barandilla:Sírvase consultar las leyes de zonificación locales con respecto a los requerimientos de carga y los requerimientos de espacio inferior para las barandillas. Todas las estructuras de soporte deben conformar con los códigos de construcción vigentes. Asociaciones del vecindario y/o distritos históricos pueden regular el tamaño, el tipo, la colocación y la habilitación para instalar la barandilla. Solicite permisos si así lo requieren las autoridades o códigos locales. Asegúrese de cumplir con las ordenanzas antes de la instalación. Los requerimientos del código de construcción local siempre prevalecen sobre cualquier y todos los procedimientos y medidas que sugerimos a continuación. Las siguientes instrucciones para instalación están diseñadas como una guía general basada en prácticas de construcción comunes empleadas en la instalación de barandillas.

Mida y corte todos los balaustres a la longitud deseada. Coloque el travesaño inferior y el travesaño secundario superior con los balaustres alineados con los hoyos previamente perforados.

Perfore los hoyos previamente usando una broca de 1/8" (3 mm). Cerciórese de perforar solamente 3/4" (19 mm) o el hoyo podrá ser visible desde la superficie superior. Use un lápiz para marcar las posiciones de los hoyos, cerciórese de dejar el soporte a 1/32"-1/16" (0.8 mm a 1.6 mm) desde el extremo de corte.

Coloque la parte superior de los balaustres dentro del canal del travesaño secundario superior, alineando con cuidado los hoyos y la sujeción, y fije cada uno con los tornillos de 1-3/4" (44 mm) como mínimo (los herrajes se venden por separado).

Ubique los hoyos y perfórelos previamente en el travesaño secundario superior. Instale la moldura del poste. Fije todos los soportes con tornillos de 3/4" (19 mm) (los herrajes se venden por separado).(NOTA: no apriete en exceso).

Alinee los balaustres inferiores con los hoyos previamente perforados. Cerciórese que el canal del travesaño apunte en dirección contraria a los balaustres.

1

4

2

5

3

6

BARANDILLAS COMPUESTAS

Page 7: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

SUGERENCIA: inserte los tornillos de 1-3/4" (44 mm) (como mínimo) en el extremo inferior de los balaustres solo parcialmente (los herrajes se venden por separado). Permitirá así una más fácil alineación de los balaustres siguientes. Apriete todos los tornillos después de fijar cada balaustre al travesaño inferior.

Perfore todos los hoyos previamente usando una broca de 1/8" (3 mm).

Retire el travesaño superior y perfore los hoyos del travesaño secundario con una broca de 7/32" (6 mm). Fije el travesaño al ensamble con cuatro tornillos de 1-3/4" (44 mm) (los herrajes se venden por separado). (NOTA: no apriete en exceso).

Instale la moldura del poste. Deposite el ensamble sobre bloques de soporte cortados a la longitud requerida. Se necesita un mínimo de 2 bloques de soporte y el instalador necesita cortar bloques de soporte de un balaustre adicional.

Fije los soportes a los postes con los tornillos de 2" (5 cm) (los herrajes se venden por separado). Alinee el travesaño superior con el ensamble.

Termine el ensamble pegando los bloques de soporte entre el 5º y el 6º balaustre desde cada extremo y las tapas de los postes en su sitio con un adhesivo de calidad apto para exteriores.

Use un lápiz para marcar la posición de los hoyos para los tornillos del travesaño inferior y el secundario en ambos extremos.

Perfore previamente el travesaño secundario y el travesaño superior y entre el 5º y el 6º balaustre desde cada extremo con una broca de 1/8" (3 mm) pero no más profundo de 1-7/8" (47 mm), cerciórese de no penetrar la parte superior del travesaño superior. (NOTA: permitirá así la correcta sujeción del travesaño superior).

www.verandadeck.com

7

10

13

8

11

14

9

12

VER-0057-LIT 7/13 (Spanish)

Page 8: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Los postes deben estar a plomo en ambas direcciones. Mida la distancia entre los postes en varias posiciones. La medida no debe variar por más de 1/16" (2 mm). La longitud entre los postes no debe exceder de 70" (178 cm) diagonalmente.Comience por apoyar uniformemente el travesaño inferior entre los ensambles completos de los postes. Transfiera el ángulo apropiado al travesaño.

www.verandadeck.com VER-0057-LIT 7/13 (Spanish)

Instrucciones para instalaciones en escalerasAntes de instalar la barandilla:Sírvase consultar las leyes de zonificación locales con respecto a los requerimientos de carga y los requerimientos de espacio inferior para las barandillas. Todas las estructuras de soporte deben conformar con los códigos de construcción vigentes. Asociaciones del vecindario y/o distritos históricos pueden regular el tamaño, el tipo, la colocación y la habilitación para instalar la barandilla. Solicite permisos si así lo requieren las autoridades o códigos locales. Asegúrese de cumplir con las ordenanzas antes de la instalación. Los requerimientos del código de construcción local siempre prevalecen sobre cualquier y todos los procedimientos y medidas que sugerimos a continuación. Las siguientes instrucciones para instalación están diseñadas como una guía general basada en prácticas de construcción comunes empleadas en la instalación de barandillas. El ángulo empleado en las instrucciones para la instalación se basa en una elevación de 7" (18 cm) x escalón de 11" (28 cm).

Perfore previamente los hoyos para los soportes con una broca de 1/8" (3 mm).

Centre el patrón de hoyos, y corte ambos extremos en el ángulo apropiado.Perfore los hoyos con una broca de 7/32" (6 mm) en el mismo ángulo que los cortes en los extremos. Se necesita un mínimo de 2.5" (6.35 cm) desde el extremo del travesaño al primer hoyo para balaustre.

Fije los soportes al travesaño secundario superior y al travesaño inferior con los tornillos de 3/4" (19 mm) (los herrajes se venden por separado).(NOTA: no apriete en exceso).

Coloque el soporte en ángulo variable en el travesaño inferior y el travesaño secundario superior. Use un lápiz para marcar las posiciones de los hoyos, cerciórese de dejar el soporte a 1/32"-1/16" (0.8 mm a 1.6 mm) desde el extremo de corte.

Transfiera el ángulo del travesaño a ambos extremos de los balaustres y corte la longitud correcta. Puede ser necesario perforar previamente los hoyos de 1/8" (3 mm) en los extremos de los balaustres. Coloque los travesaños sobre una superficie lisa y limpia con los balaustres holgadamente alineados con los hoyos.

1 2 3

4 5 6

BARANDILLAS COMPUESTAS

Page 9: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Comience con el travesaño secundario superior, fije cada balaustre con los tornillos de 1 3/4" (44 mm) como mínimo (los herrajes se venden por separado). Los balaustres se ajustarán entre las paredes en la cara inferior del travesaño secundario inferior.

También marque las posiciones del soporte superior. Deslice la moldura en el poste antes de fijar el travesaño.

Coloque el travesaño superior sobre el ensamble.

Fije el travesaño inferior a los balaustres con tornillos de 1 3/4" (44 mm) como mínimo (los herrajes se venden por separado).SUGERENCIA: no apriete los tornillos completamente en el travesaño inferior hasta que todos los balaustres estén colocados. Esto ayudará a introducir inicialmente los tornillos en los hoyos previamente perforados en los balaustres. Cerciórese de apretar los tornillos cuando todos los balaustres estén colocados correctamente. Instale la moldura del poste antes del paso #9.

Perfore previamente los hoyos inferiores, y fije con los tornillos de 2" (5 cm) (los herrajes se venden por separado).(NOTA: debe tener cuidado de perforar e insertar los tornillos tan perpendicular al poste como sea posible. En las escaleras, no será posible atornillar todos los soportes perpendiculares al poste. Es posible que necesite usar un eje o una extensión flexibles).

Baje el travesaño superior a su sitio.

Coloque y apoye el barandal armado entre los postes en la posición final. Marque los hoyos para los tornillos con un lápiz para perforarlos previamente.

Fije el soporte superior con los tornillos de 2" (5 cm) (los herrajes se venden por separado).

www.verandadeck.com

7

10

12 13 14

8

11

9

VER-0057-LIT 7/13 (Spanish)

Page 10: Railing Installation Instructions - Composite Balusters Installation Instructions - Composite Balusters Prior to installing railing: Please consult local zoning laws in regards to

Perfore previamente los hoyos en puntos a 1/3 y entre el soporte y el primer balaustre desde cada extremo, con una broca de 1/8" (3 mm). A continuación use una broca de 7/32" (6 mm), atravesando el travesaño secundario superior solamente (permitirá así que los tornillos sujeten el travesaño superior con seguridad).

Termine pegando las tapas de los postes con un adhesivo de calidad para exteriores. Corte y pegue 1 bloque de soporte del balaustre y céntrelo entre los postes como se ilustra en el diagrama anterior.

Fije el travesaño superior al travesaño secundario superior con cuatro tornillos de 1 3/4" (44 mm) (los herrajes se venden por separado).(NOTA: puede ser necesario avellanar con una broca de 3/8" [9 mm] a una profundidad no mayor de 1/4" [6 mm]).

www.verandadeck.com

15 16 17

VER-0057-LIT 7/13 (Spanish)