RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

Embed Size (px)

Citation preview

Page 1: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

RADWG 4TH - 2012 4TH JULY 2012

G. Spiezia (EN/STI/ECE)

Page 2: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

AGENDAMatters arising and SEU

eventsCNRAD and PSEAST areaH4IRRADLHC Weekly reportPSI test- Voltage regulators,

Current source, Switch

Page 3: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

Technical stopLHC TS2 Reading of the radfets-analysis

on going (PS and SPS) LHC TS3Moved to September.

Consequences for CNRAD will be communicated (if any)

Page 4: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

PSI test plan -1Date Equipment

OwnerTest group DUT

1 February EN/STI EN/STI PXI power supply

18-19FebruaryEN/STI EN/STI

Voltage regulator

Cypress

Toshiba

Diff Amp

TE/EPC TE/EPC AC/DC

17-18 March BI BI BPM electronics

24-25 March EN/STI EN/STI

Analog switches

current regulator

RadFet

21-22 April

TE/EPC EN/STI Mosfet-1

EN/STI EN/STI RadMon prototype

BI BI Beam Loss Monitor

Page 5: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

PSI test plan-2

Date Equipment Owner

Test group DUT

May 20th EN/STI EN/STI OSL, TLD

BE/BI BE/BI Detector

June 1st TE/EPC EN/STI

Mosfet

 Voltage regulators

 Voltage reference

July 1st TE/EPC

EN/STI-TE/EPC

PWM, Transceiver

EN/STI EN/STI Profibus module

28-29July BI BI BPM components

August/September TE/EPC TE/EPC FGC lite components

The collaboration is to renew for the next years. 1 test per month?

Page 6: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

PSI – Irradiated boards and cables

Page 7: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

PSI – Irradiated boards and cables

The amount of boards and cables from previous irradiation start to become significant

Use a label on the DUT and on the cables to identify

Equipment Group/Responsible contact Date of the test

Specify if you want to recuperate or throw it away (once the activation levels are low). The material is under your responsibility

Page 8: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

PSI - Note on Profibus controller

Anybus IC. Tested at PSI to implement the data communication from an acquisition board to a PLC

ASIC does not stand radiation (overcurrent consumption as soon as beam is on)

Work-around IP core for FPGA could be bought Use of ModBus. Require a rad tol RS485

transceiver. Good candidate?

Page 9: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

CEA – 1 MeV facility Request of beam time for 2013 to be sent by

next week Test is advised for equipment in DS LHC areas

and SPS Passive test can be an option Send your request by specifying the

components and the location A brief communication is appreciated if you do

not consider such a test

Beam slots in October/ November

Page 10: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

TID test for the future Use of external facility under

consideration GIF++. Dedicated source at

CERN Foreseen for the experiments Negotiations to get test slots and

have a Co60 source

Page 11: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

News on NanoFip purchase Ordered 2 batches of 5000

A3P400-PQG208 each Batch 1 (non programmed)

expected on 03.09.2012 Batch 2 (programmed and marked

with logo) expected on 26.11.2012 ~10 components per batch will be

tested at PSI

@ E. Gousiou

Page 13: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

Conferences

Topical workshop on electronics for Particle Physics (TWEPP-12) The registration is open 17-21 September 2012, Oxford http://

www.physics.ox.ac.uk/twepp12/

Page 14: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

Back-up

Page 15: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

SEU events in LHCDate Title LHC

point Area Type SEU? Beam Dump Equipment

04/05/2012 Cryogenic compressor stop in P8 Point 8 US85 soft SEE TBC FALSE CRYO

03/05/2012 RF trip module M2B2, L8B2 Point4 UA47 soft SEE TBC TRUE RF

19/04/2012 QPS Wfip lost Point 5 DS soft SEE YES FALSE QPS

16/04/2012 Power converter- FGC Point 7 ARCs soft SEE TBC TRUE EPC

13/04/2012 Power Converter Fault Point 1 RR17 hard SEE YES TRUE EPC

10/04/2012 QPS-Protection 600 A Point 5 UJ56 soft SEE TBC TRUE QPS

09/04/2012 Power Converter Fault Point 1 UJ16 hard SEE YES TRUE EPC

04/04/2012 Trip of QPS 4R8 - loss of cryo maintain Point 8 LSS - TBC TRUE QPS

Page 16: RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)

Course conference workshop Course radiation effects R. Gaillard on

CERN training web site SEE symposium

April 2012 http://radhome.gsfc.nasa.gov/radhome/SEE/

NSREC July 2012 www.nsrec.net

RADECS September 2012 www.radecs.com