Upload
blaise-morton
View
214
Download
1
Tags:
Embed Size (px)
Citation preview
RADWG 4TH - 2012 4TH JULY 2012
G. Spiezia (EN/STI/ECE)
AGENDAMatters arising and SEU
eventsCNRAD and PSEAST areaH4IRRADLHC Weekly reportPSI test- Voltage regulators,
Current source, Switch
Technical stopLHC TS2 Reading of the radfets-analysis
on going (PS and SPS) LHC TS3Moved to September.
Consequences for CNRAD will be communicated (if any)
PSI test plan -1Date Equipment
OwnerTest group DUT
1 February EN/STI EN/STI PXI power supply
18-19FebruaryEN/STI EN/STI
Voltage regulator
Cypress
Toshiba
Diff Amp
TE/EPC TE/EPC AC/DC
17-18 March BI BI BPM electronics
24-25 March EN/STI EN/STI
Analog switches
current regulator
RadFet
21-22 April
TE/EPC EN/STI Mosfet-1
EN/STI EN/STI RadMon prototype
BI BI Beam Loss Monitor
PSI test plan-2
Date Equipment Owner
Test group DUT
May 20th EN/STI EN/STI OSL, TLD
BE/BI BE/BI Detector
June 1st TE/EPC EN/STI
Mosfet
Voltage regulators
Voltage reference
July 1st TE/EPC
EN/STI-TE/EPC
PWM, Transceiver
EN/STI EN/STI Profibus module
28-29July BI BI BPM components
August/September TE/EPC TE/EPC FGC lite components
The collaboration is to renew for the next years. 1 test per month?
PSI – Irradiated boards and cables
PSI – Irradiated boards and cables
The amount of boards and cables from previous irradiation start to become significant
Use a label on the DUT and on the cables to identify
Equipment Group/Responsible contact Date of the test
Specify if you want to recuperate or throw it away (once the activation levels are low). The material is under your responsibility
PSI - Note on Profibus controller
Anybus IC. Tested at PSI to implement the data communication from an acquisition board to a PLC
ASIC does not stand radiation (overcurrent consumption as soon as beam is on)
Work-around IP core for FPGA could be bought Use of ModBus. Require a rad tol RS485
transceiver. Good candidate?
CEA – 1 MeV facility Request of beam time for 2013 to be sent by
next week Test is advised for equipment in DS LHC areas
and SPS Passive test can be an option Send your request by specifying the
components and the location A brief communication is appreciated if you do
not consider such a test
Beam slots in October/ November
TID test for the future Use of external facility under
consideration GIF++. Dedicated source at
CERN Foreseen for the experiments Negotiations to get test slots and
have a Co60 source
News on NanoFip purchase Ordered 2 batches of 5000
A3P400-PQG208 each Batch 1 (non programmed)
expected on 03.09.2012 Batch 2 (programmed and marked
with logo) expected on 26.11.2012 ~10 components per batch will be
tested at PSI
@ E. Gousiou
SEU events in LHC
Summary at the LMC on 20 June by M. Brugger
https://espace.cern.ch/lhc-machine-committee/Presentations/1/lmc_138/lmc_138i.pdf
http://radwg.web.cern.ch/RadWG/
Conferences
Topical workshop on electronics for Particle Physics (TWEPP-12) The registration is open 17-21 September 2012, Oxford http://
www.physics.ox.ac.uk/twepp12/
Back-up
SEU events in LHCDate Title LHC
point Area Type SEU? Beam Dump Equipment
04/05/2012 Cryogenic compressor stop in P8 Point 8 US85 soft SEE TBC FALSE CRYO
03/05/2012 RF trip module M2B2, L8B2 Point4 UA47 soft SEE TBC TRUE RF
19/04/2012 QPS Wfip lost Point 5 DS soft SEE YES FALSE QPS
16/04/2012 Power converter- FGC Point 7 ARCs soft SEE TBC TRUE EPC
13/04/2012 Power Converter Fault Point 1 RR17 hard SEE YES TRUE EPC
10/04/2012 QPS-Protection 600 A Point 5 UJ56 soft SEE TBC TRUE QPS
09/04/2012 Power Converter Fault Point 1 UJ16 hard SEE YES TRUE EPC
04/04/2012 Trip of QPS 4R8 - loss of cryo maintain Point 8 LSS - TBC TRUE QPS
Course conference workshop Course radiation effects R. Gaillard on
CERN training web site SEE symposium
April 2012 http://radhome.gsfc.nasa.gov/radhome/SEE/
NSREC July 2012 www.nsrec.net
RADECS September 2012 www.radecs.com